HomeMy WebLinkAboutLandscape Plan_Stamped Approved(1) Gin-b
(1) Gin-b
(2) Pla-a
(2) Ulm-f (2) Pla-a
(2) Ulm-f
(2) Pla-a
(2) Ulm-f
(1) Gin-b
(1) Pla-a
(1) Gin-b
(2) Gin-b
(1) Gin-b
(6) Hyd-w
(14) Ses-a
(6) Hyd-w
(15) Ses-a
(5) Hyd-w
(1) Gin-b
(7) Cor-c
(9) Cor-c
(36) Lir-b
(34) Nep-c
(34) Lir-b
(30) Lir-b
(56) Nep-c
(16) Lir-b
(15) Lir-b
(9) Lir-b
(56) Nep-c
(26) Lir-b
(31) Lir-b
(5) Cor-c
(5) Cal-x
(11) Ses-a
(12) Rat-c
(18) Rat-c
(12) Ses-a
(5) Cal-x
(12) Ses-a
(19) Rat-c
(12) Rat-c
(11) Ses-a
(5) Cal-x
(32) Lir-b
(260 sf) Stone
(398 sf) Stone
(40) Lir-b
(69 sf) Stone
(54 sf) Stone
(36) Lir-b
(36) Nep-c
(29) Nep-c
(32) Nep-c
(37) Nep-c
(81 sf) Stone
(56 sf) Stone
(38) Lir-b
(42) Lir-b
(24) Nep-c
(22) Nep-c
(31) Nep-c
(73) Nep-c
(53) Lir-b
(6) Hak-m
(11) Bou-g
(6) Hyd-w
(9) Cal-x
(8) Pen-h
(5) Sch-b
(5) Sch-b(7) Pen-h
(5) Sch-b
(7) Pen-h
(6) Sch-b
(12) Pen-h
(6) Sch-b
(12) Pen-h
(5) Sch-b
(15) Hak-m
(6) Cal-x
(24) Pen-h
(14) Sch-b
(10) Cal-x
(24) Pen-h
(10) Cal-x
(3) Thu-p
(16) Sch-b (10) Cal-x
(14) Sch-b
(24) Pen-h
(24) Pen-h
(10) Cal-x
(16) Sch-b
(3) Thu-p
(14) Sch-b
(10) Cal-x
(24) Pen-h
(10) Cal-x
(16) Sch-b
(24) Pen-h
(3) Thu-p
(35) Lir-b
(26 sf) Stone
(42 sf) Stone
(17 sf) Stone
(36) Lir-b
(30 sf) Stone
(96) Lir-b
(17 sf) Stone
(42 sf) Stone
(26 sf) Stone
(31 sf) Stone
(36) Lir-b
(42 sf) Stone
(26 sf) Stone
(30 sf) Stone
(37) Lir-b
(17 sf) Stone
(26 sf) Stone
(106) Lir-b
(17 sf) Stone
(42 sf) Stone
(30 sf) Stone
(26 sf) Stone
(31) Lir-b
(42 sf) Stone
(17 sf) Stone
(32) Lir-b
( sf) Stone
(87) Lir-b
(26 sf) Stone
(17 sf) Stone
(42 sf) Stone
(30 sf) Stone
(6) Hyd-q
(1) Liq-w
(7) Ite-h
(9) Cal-x
(5) Thu-p
(2) Cor-s
(15) Pen-h
(1) Ace-t
(3) Hyd-q
(4) Ite-h
(3) Cal-x
(3) Thu-p
(2) Cor-s
(5) Ite-h
(4) Thu-p
(4) Cal-x
(13) Pen-h
(1) Ace-t
(3) Hyd-q
(1) Cor-s
(4) Aro-a
(3) Thu-p
(4) Cal-x
(3) Ite-h
(3) Cor-s
(1) Liq-w
(12) Pen-h
(4) Hyd-q
(3) Cor-s
(5) Ite-h
(3) Thu-p
(4) Cal-x
(1) Cor-s
(14) Pen-h
(1) Ace-t
(3) Hyd-q
(1) Cor-s
(5) Cal-x
(3) Thu-p
(5) Ite-h
(2) Cor-s
(2) Cor-s
(3) Thu-p
(15) Pen-h
(1) Cor-s
(1) Ace-t
(5) Ite-h
(5) Hyd-q
(2) Cor-s
(4) Thu-p
(5) Aro-a
(2) Cor-s
(4) Hyd-q
(2) Cor-s
(5) Ite-h
(4) Thu-p
(3) Aro-a
(2) Cor-s
(3) Hyd-q
(1) Ace-t
(2) Cor-s
(3) Thu-p
(4) Cal-x
(2) Cor-s
(3) Cor-s
(4) Thu-p
(9) Cal-x
(3) Ite-h
(5) Aro-a
(2) Cor-s
(3) Hyd-q
(14) Pen-h
(2) Cor-s
(7) Ite-h
(4) Thu-p
(6) Cal-x
(1) Cor-s
(3) Hyd-q
(1) Cor-s
(7) Cal-x
(11) Pen-h
(1) Liq-w
(4) Thu-p
(3) Cor-s
(5) Ite-h
(3) Cor-s
(4) Hyd-q
(4) Thu-p
(3) Ite-h
(4) Cal-x
(4) Cor-s
(7) Hyd-q
(4) Ite-h
(2) Ace-t
(1) Cor-s
(4) Ite-h
(3) Thu-p
(4) Ite-h
(3) Cal-x
(4) Planters with Annuals
(4) Planters with Annuals
(21) Pen-h(17) Pen-h
(260 sf) Stone
(9) Cal-x
(7) Sch-b
(1) Cor-s
(2) Cor-s
(6) Cal-x
(12) Cal-x
(1) Ace-t
(1) Lir-t
(1) Lir-t
SOD
HP SOD
SOD
SOD
(6) Thu-p
(17) Cal-x
(1) Pla-a
(5) Hyd-q
(1) Pla-a
(2) Lir-t
(1) Pla-a
(3) Thu-p
(5) Cal-x
(2) Pen-h
(4) Aro-a
(7) Cal-x
(3) Hyd-q
(6) Cal-x
(33) Lir-b(7) Cal-x
PL
A
N
T
I
N
G
P
L
A
N
L401
These Drawings and Specifications, and all copies
thereof are and shall remain the property and
copyright of the Landscape Architect. They shall
be used only with respect to this Project and are
not to be used on any other Project or Work
without prior written permission from the
Landscape Architect.
Sheet No:
R
e
v
i
s
i
o
n
D
a
t
e
D
e
s
c
r
i
p
t
i
o
n
04
/
1
1
/
2
0
2
5
Do
c
k
e
t
N
o
.
P
Z
-
2
0
2
5
-
0
0
0
4
3
A
D
L
S
A
m
e
n
d
Sh
e
e
t
T
i
t
l
e
:
Date:
Project No:
Drawn by:
Checked by:
24-1829
KM/SS
FP
05/02/2025
58
2
5
L
a
w
t
o
n
L
o
o
p
E
.
D
r
.
|
I
n
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
1
6
31
7
-
4
8
5
-
6
9
0
0
|
w
w
w
.
c
o
n
t
e
x
t
-
d
e
s
i
g
n
.
c
o
m
CO
N
S
T
R
U
C
T
I
O
N
D
O
C
U
M
E
N
T
S
Ca
r
m
e
l
G
a
t
e
w
a
y
E
a
s
t
L
a
w
n
60
0
E
9
6
t
h
S
t
r
e
e
t
,
I
n
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
4
0
PE
R
M
I
T
SE
T
0
Scale 1" = 20'-0"
40'20'10'
North
5/21/2025 Daren Mindham
CODE QTY BOTANICAL NAME COMMON NAME CONT CAL REMARKS
DECIDUOUS TREES
Ace-t 8 Acer triflorum Three Flowered Maple B & B 3"Cal full, strong central leader, matched
Gin-b 8 Ginkgo biloba `Autumn Gold`Autumn Gold Maidenhair Tree B & B 2.5"Cal full, strong central leader, matched
Liq-w 3 Liquidambar styraciflua `Ward`Ward Sweetgum B & B 3"Cal full, strong central leader, matched
Lir-t 3 Liriodendron tulipifera Tulip Tree B & B 6"Cal full, strong central leader, matched
Pla-a 10 Platanus x acerifolia `Morton Circle'London Plane Tree B & B 5"Cal full, strong central leader, matched
Ulm-f 6 Ulmus x `Morton Circle'American Elm B & B 5"Cal full, strong central leader, matched
CODE QTY BOTANICAL NAME COMMON NAME SIZE HEIGHT REMARKS
SHRUBS
Aro-a 21 Aronia arbutifolia `Brilliantissima`Brilliant Red Chokeberry container 36" ht. min.space @ 3`-0" o.c.
Cor-s 53 Cornus sericea `Cardinal`Cardinal Red-twig Dogwood B & B 48" ht. mim.space @ 4`-0" o.c.
Cor-c 21 Cornus sericea `Kelseyi`Kelseyi Red Twig Dogwood container 36" ht. min.space @ 2`-6" o.c.
Hyd-q 56 Hydrangea quercifolia Oakleaf Hydrangea B & B 48" ht. mim.space @ 4`-0" o.c.
Hyd-w 23 Hydrangea quercifolia `Pee Wee`Pee Wee Oakleaf Hydrangea container 36" ht. min.space @ 3`-0" o.c.
Ite-h 69 Itea virginica 'Henry's Garnet'Henry's Garnet Virginia Sweetspire container 36" ht. min.space @ 4`-0" o.c.
Thu-p 72 Thuja plicata '4EVER'Forever Goldy™ Western Red Cedar B & B 48" ht. mim.Space @ 5'-0" o.c.
GRASSES
Bou-g 11 Bouteloua gracilis `Blonde Ambition`Blonde Ambition Blue Grama 3 gal space @ 2`-0" o.c.
Cal-x 221 Calamagrostis x acutiflora `Karl Foerster`Karl Foerster Feather Reed Grass 3 gal space @ 3`-0" o.c.
Hak-m 21 Hakonechloa macra Japenese Forest Grass 1 gal space @ 24" o.c.
Pen-h 324 Pennisetum alopecuroides 'Hameln'Hameln Fountain Grass 3 gal
Sch-b 129 Schizachyrium scoparium `Standing Ovation`Blue Heaven Little Bluestem 3 gal space @ 2`-0" o.c.
Ses-a 75 Sesleria autumnalis Autumn Moor Grass 3 gal space @ 2`-0" o.c.
PERENNIALS
Rat-c 61 Ratibida columnifera Prairie Coneflower 1 gal space @ 1'-0" o.c.
SYMBOL CODE QTY BOTANICAL NAME COMMON NAME CONT SPACING REMARKS
GROUNDCOVERS
Lir-b 967 Liriope muscari 'Big Blue'Big Blue Lilyturf 1 gal 18" o.c.
Nep-c 430 Nepeta x 'Cat's Pajamas'Cat's Pajamas Catmint 1 gal 15" o.c.
LAWN
HP Sod 7,286 sf High Performance Lawn Sod High Performance Lawn Sod sod
Sod 29,736 sf Lawn Sod Lawn Sod sod
ORNAMENTAL STONE
Stone 1,839 sf Ornamental Stone Ornamental Stone None
PLANT SCHEDULE EAST LAWN
These Drawings and Specifications, and all copies
thereof are and shall remain the property and
copyright of the Landscape Architect. They shall
be used only with respect to this Project and are
not to be used on any other Project or Work
without prior written permission from the
Landscape Architect.
Sheet No:
R
e
v
i
s
i
o
n
D
a
t
e
D
e
s
c
r
i
p
t
i
o
n
04
/
1
1
/
2
0
2
5
Do
c
k
e
t
N
o
.
P
Z
-
2
0
2
5
-
0
0
0
4
3
A
D
L
S
A
m
e
n
d
Sh
e
e
t
T
i
t
l
e
:
Date:
Project No:
Drawn by:
Checked by:
24-1829
KM/SS
FP
05/02/2025
58
2
5
L
a
w
t
o
n
L
o
o
p
E
.
D
r
.
|
I
n
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
1
6
31
7
-
4
8
5
-
6
9
0
0
|
w
w
w
.
c
o
n
t
e
x
t
-
d
e
s
i
g
n
.
c
o
m
CO
N
S
T
R
U
C
T
I
O
N
D
O
C
U
M
E
N
T
S
Ca
r
m
e
l
G
a
t
e
w
a
y
E
a
s
t
L
a
w
n
60
0
E
9
6
t
h
S
t
r
e
e
t
,
I
n
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
4
0
PE
R
M
I
T
SE
T
PL
A
N
T
I
N
G
S
C
H
E
D
U
L
E
&
D
E
T
A
I
L
S
L410
1.Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule
and Planting Details for additional information.
2.All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape
Architect to inspect all plant locations and plant bed conditions prior to installation. On-site adjustments
may be required.
3.Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'.
MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.
4.Remove from the site any plant material that turns brown or defoliates within five (5) days after planting.
Replace immediately with approved, specified material.
5.Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own
plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing),
unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install
appropriate quantities as governed by plant spacing per schedule. Plant material quantities shown on
plan are minimum quantities. Additional material may be needed to meet spacing requirements and
field conditions.
6.Sod all areas disturbed by construction activities that are not otherwise noted to receive pavement,
planting bed, or sod treatment.
7.The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications.
Contractor shall coordinate quantity and placement of topsoil. Landscaper shall verify depth of topsoil
prior to plant installation. (Refer to specifications for topsoil source and placement requirements)
8.All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the
Landscape Architect. Any plant material installed in an incorrect location, by the judgment of the
Landscape Architect, shall be reinstalled at the Contractor's expense.
9.All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted).
10.Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's
satisfaction at no additional cost.
11.The Contractor shall maintain all plant material and lawns until the project is fully accepted by the
Landscape Architect, unless otherwise noted.
12.All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year
after Final Acceptance.
13.Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner
to obtain any required permits necessary to complete work.
14.Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall
be installed using tree pit drainage.
15.Tree Protection Fencing is the responsibility of the Contractor. Minimum protected area shall include
the full drip line of the canopy. NO construction activities, material storage, etc. may occur within that
area. The Contractor shall ensure that no soil compaction or tree damage occurs in any Protected
areas, at any time during the construction process.
17.Trees shall be matched in groups unless otherwise noted.
18.Remove all wire basket, twine, and other transportation material prior to planting.
GENERAL LANDSCAPE & PLANTING NOTES
1 SHADE TREE
Scale: Not to Scale
3" Shredded Hardwood Bark Mulch
Finish Grade
Slope & Scarify sides of Pit.
Width of Pit to be Two (2)
times Ball Diameter
Excavated planting soil. Refer to
Specification 32 93 00. Water
thoroughly when pit is half full.
Set root ball on undisturbed soil cone at bottom of pit.
Do NOT Cut Main Leader
1 2 Diameter of root ball
2"
Do NOT Place Mulch Directly Against Tree Trunk
NOTE:
Remove all wire basket, twine and other
transportation material prior to planting.
MULTI-STEM TREE
Scale: Not to Scale
3" Shredded
Hardwood Bark Mulch
Finish Grade
Slope & Scarify sides of Pit.
Width of Pit to be Two (2)
times Ball Diameter
Excavated planting soil. Refer to
Specification 32 93 00. Water
thoroughly when pit is half full.
Set root ball on undisturbed soil cone at bottom of pit
1 2 Diameter of root ball
2"
Do NOT Place Mulch Directly
Against Tree Trunk
NOTE:
Remove all wire basket, twine
and other transportation
material prior to planting.
SHRUB
Scale: 3/4" = 1'-0"
Hardwood mulch, do not bury stems
Finish Grade
Slope & Scarify sides of Pit.
Width of Pit to be Two (2)
times Ball Diameter
Planting soil. Refer to
Specification 32 93 00.
Set root ball on undisturbed soil cone at bottom of pit
1 2" Diameter of root ball
Note: Remove burlap from 1op 1 3 of root
ball or carefully remove container
Do NOT Place Mulch Directly
Against Shrub Root Flare and Stem
PERENNIAL PLANTING
Not to Scale
Note: All perennial beds shall be
planted using triangular planting
scheme. Refer to Planting Schedule
for On-Center planting dimension.
Hardwood mulch, do not
bury vegetation
Remove Container
12" Planting Soil
Compacted Subgrade
Existing Grade
12
"
Compacted subgrade
3"
Shredded Hardwood Organic Mulch
Place level with adjacent finish grades.
Refer to Specification 32 93 00.
mi
n
.
Topsoil, to include planting soil. Refer to Specification 32
93 00.
Remove all stones and other extraneous materials.
LANDSCAPE BED PREPARATION
Not to Scale
Adjacent sidewalk or curb, typ.
Compact soil adjacent to placement edges
and curbs to minimize settlement.
Do NOT Place Mulch Directly Against
Shrub Root Flare and Stem
SPADE EDGE
SCALE: NOT TO SCALE
Lawn condition @ finish grade;
See Civil Plans
Hardwood Bark mulch
Planting Soil
6"
3"
3"
3"
2
3
6
7
8
4
Area to receive River Rock
Finished grade
6
12"
6"
Weld corners.
Typical joint
Metal Landscaping Edging
METAL EDGE
Not to Scale
Topsoil, as specified in
Landscape Bed
Preparation detail.
CL
TREE PLANTING PIT IN STABILIZED DECOMPOSED GRANITE PAVING
Scale: 3/4" = 1'-0"
5"
8'-0"
3'-0"
3"
2'
-
1
0
"
±
1'-0"1'-0"3'-0"
Excavated planting soil. Refer to
Specification 32 93 00. Water thoroughly
when pit is half full.
1'-8"
3 1/4"
Finish Grade
12" TREE
INSERT
20" TRIM RING
Set root ball on undisturbed soil cone at
bottom of pit.
Dediduous Shede Tree, Refer to Detail 1,
This Sheet
2'-0" Sq., Welded Metal Edging to Form Sq.
Tree Opening. Do Not Embed Edging in Root
Ball
48" X 72" PAVER-GRATE® Paver
Suspension System by Ironsmith
Filter Fabric Between Tree Grate and
Decomposed Granite Paving
Stabilized Decomposed Granite
Paving, Refer to Materials Plan
and Detail 8/L600
Compacted #53 Aggregate
Compacted subgrade
3"
1'
-
6
"
1 2 Diameter of root ball, Min.
NOTE:
Remove all wire basket, twine and other
transportation material prior to planting.
5
5/21/2025 Daren Mindham