May 12, 2025
Jarrod Huff
Staff Engineer
City ofCarmel Engineering Department
One Civic Square
Carmel, IN 46032
thRe:136Street Trail Connections
Amendment #2 – Trail Design Modifications
Dear Mr. Huff:
thVSEngineering, Inc. (VS) appreciates the continued work with City ofCarmel onthe 136Street Trail
Connections project. Please find attached our requested amendment tothe contract forthe modifications of
trail design attheAbercorn, Pinto, and Ditch Segments (see Exhibit A, Figure 1).
DESIGN
Project Administration
The amendment covers the additional project review meeting due to City’sProject Manager change.
Trail Design
VS shall provide the designservices associated with the following trailmodifications directed bytheCity
subsequent tothe submission of90% Design plans (entire plan set emailed 10/31/2024, Pinto Segment
finalized prior to4/1/2025 review meeting):
Abercorn Segment
oShift the trail southward along the Misterka property toavoid grading impacts toexisting trees
that lieoutside theright-of-waythus eliminating the need for temporary right-of-way.
thoEliminatethe136Street eastbound right turn lane atAbercorn Street and widen the refuge
island atthe proposed mid-block pedestrian crossing.
Pinto Segment
oThe 90% Design oftrail was finalized with the bridge over Almond Ditch being parallel with
th136Streettoavoid relocation ofthe existing Carmel Utilities’ water main.
thoRevisethetrailalignmentwestofthebridgesuchthatthebufferoffsetfrom136Street is
increased and the trail passes north of the public warning siren pole.
Ditch Segment
oDesign astorm sewer and revise the trail grading along the Millholland property such that
extensive earthwork and driveway reconstruction beyond theexisting right-of-way isnot
required. Desirably, construction limits should be within theexisting right-of-way.
oRevise the trail atthe Ghoman property driveway toeliminate the serpentine alignment and
instead continue the parallel offset alignment that issouth ofthe driveway, through the
driveway.
PERMITTING
The amendment covers the additional work involved inobtaining Hamilton County Drainage Permits; two
crossings ofAlmond Ditch and one outlet toAlmond Ditch. The contact includes work for theobtaining of
IDEM 401and USACE 404 permits. Thecurrent design for both crossings keeps work outside the 100yr flood
plain and does not require these permits. VS shall use the contracted fee for the IDEM 401 and USACE 404
permits tocover the Hamilton County Drainage permits additional work.
The 401 / 404permits would berequired ifthe Hamilton County Drainage Board requires thatthe Almond
Ditch bedredged and armored aspart oftheproject. The procurement ofallthree permits is not included in
the scope ofwork as presented and would beanadditional service.
FEE SUMMARY
CurrentNew
LUMP SUM ITEMSContractAmendment Contract
Topographic Survey$28,000$28,000
Design$194,700$22,800$217,500
Permitting$36,200$36,200
Utility Coordination$16,900$16,900
Geotechnical Evaluation$10,900$10,900
Geotechnical On-Site Traffic Control$2,500$2,500
SUB-TOTAL$289,200$22,600$312,000
UNIT CurrentNew
UNIT ITEMSUNITSCOSTContractAmendmentContract
T&E Reports4$625$2,500$2,500
4R/WEngineering (Permanent)$2,950$11,800$11,800
4AdditionalDescription$725$2,900$2,900
4R/WStaking$750$3,000$3,000
SUB-TOTAL$20,200$20,200
CurrentNew
HOURLY FEES ITEMContractAmendmentContract
Construction Administration$5,000$5,000
SUB-TOTAL$5,000$5,000
TOTAL$314,400$22,600$337,200
We look forward toproviding our professional services. Please contact usif youshould have any questions or
require additional information.
Respectfully,
VS Engineering
Christopher L. Waidner, P.E.
Indiana Transportation Director
VSEngineering, Inc.
Reproductions/
Copies/
Materials/
PostageTravel
MileageDIRECT
COSTS
TOTALDIRECT
COSTTotal
Salary
CostAverage
Weighted
Hourly
RateTotal
HoursClientConduct
Coordination
Meetings
With
With
StakeholdersConduct
In-Person
Coordination
Meetings
Conduct
Submittal
Review
Meeting (
1)Prepare
Monthly
Progress
ReportsInternal
Project
Kick-
Off
MeetingPROJECT
ADMINISTRATION
PROJECT
ADMINSTRATION
WEIGHTED
HOURLY
RATE
Work
Tasks
RATE
FISCAL
YEAR
PROJECT: HOURS
AND
FEEJUSTIFICATION
CLIENT:
WEIGHTED
HOURLY
RATE
COMPUTATIONS
Subtotal 202720262025
Carmel136th
St.
TrailConnections
UNIT
COST
266.
00
266.
00$
266.
00
PM
II
532
0.
69
LS
2
20022
FISCAL
YEAR
TOTAL
QUANTITY
0.
00
0.
00
0.
00
PM
I
HOURS
PER
FISCAL
YEAR
0
000000
ESTIMATED
TIME
205.
00
205.
00
ENG
III
205.
00
2025
820
Cost
44
4004
ENG
II
0.
00
0.
00
0.
00
0
00000
ENG
I
0.
00
0.
00
0.
00
0
00000
HoursTotal
600600
Sub
Firm
0.
00
Fee SubtotalFee
1,
352
1,
352
May
12,
2025
0$
0$
0$
0
Total
Fee
1,
400$
1,
352$
1,
352
0
Storm
Sewer
layout (
2D)
Revise
cross
sections
and
construction
limitsRevise
trail
grade
at
Millholland
PropertyRevise
trail
geometry
at
Millholland
PropertyRevise
Plan
Profile
sheetRevise
cross
sections
and
construction
limitsRevise
trail
gradeRevise
trail
geometryPlan
ProfileRevise
construction
and
marking
details
on
Revise
pedestrian
refuge
spot
elevationspedestrian
refugeRevise
136th
Street
median
geometry
for
Revise
Plan
Profile
sheetUpdate
cross
sections
and
construction
limitsRevise
trail
geometryFinal
Plan
Preparation
ActivitiesPlan,
Coordinate,
Monitor
and
Document
Pre-
REVISIONS
TO
STAGE
3 -
90%
Work
TasksROADWAY
DESIGN
Abercorn
Segment
Ditch
SegmentPinto
Segment
PROJECT: CLIENT: HOURS
AND
FEEJUSTIFICATION
Carmel136th
St.
TrailConnections
266.
00PM
II
2
FISCAL
YEAR
0.
00PM
I
205.
00ENG
III
2025
24421112212111
ESTIMATED
TIME
136.
00ENG
II
4884421222
ENG
I
0.
00 CAD
TECH
150.
00
III
2212
Total
Hours
1212660353304243332
Sub
Firm
Fee SubtotalFee
1,
908$
1,
908
954$
954$
505$
749$
477$
546$
710$
355$
682$
505$
477$
477$
532
0$
0
May
12,
2025
Total
Fee
21,
379
Perform
Internal
QA/
QC
of
Revised
PlansRevise
QuantitiesRevise
Plan
Profile
sheetRevise
cross
sections
and
construction
limitsRevise
trail
grade
at
Ghoman
PropertyRevise
trail
geometry
at
Ghoman
PropertyRevise
Structure
Data
TableRevise
Plan
Profile
sheetStorm
Sewer
sizing (
3D)
Street
Inlet
Spread
ComputationHydrology
of
the
watersheds
Work
TasksROADWAY
DESIGN
Subtotal
Hours
Subtotal
Labor
PROJECT: CLIENT: HOURS
AND
FEEJUSTIFICATION
Carmel136th
St.
TrailConnections
266.
00
2,
394
PM
II
93112
0.
00PM
I
0
0
205.
00ENG
III
9,
63547
211124218
ESTIMATED
TIME
136.
00ENG
II
6,
80050
44212
ENG
I
0.
00
0
0
CAD
TECH
150.
00
2,
55017
III
28
Total
Hours
123
1210
3603533232
Sub
Firm
Fee Subtotal
21,
379
Fee
2,
020$
2,
172
798$
954$
505$
749$
477$
546$
272$
676$
471
0
May
12,
2025
Total
Fee
Reproductions/
Copies/
Materials/
PostageTravel
MileageDIRECT
COSTS
TOTALDIRECT
COSTTotal
Labor
CostAverage
Weighted
Hourly
RateTotal
Hours
Work
TasksROADWAY
DESIGN
WEIGHTED
HOURLY
RATE
RATE
FISCAL
YEAR
PROJECT: CLIENT: HOURS
AND
FEEJUSTIFICATION
Subtotal 202720262025
WEIGHTED
HOURLY
RATE
COMPUTATIONS
Carmel136th
St.
TrailConnections
UNIT
COST
266.
00
266.
00$
266.
00
PM
II
0.
69
LS90099
2,
394
TOTAL
QUANTITY
0.
00
0.
00$
0.
00
PM
I
000000
0
HOURS
PER
FISCAL
YEAR
205.
00
205.
00$
205.
00
ENG
III
Cost47474700
9,
635
ESTIMATED
TIME
136.
00
136.
00$
136.
00
ENG
II
50505000
6,
800
ENG
I
0.
00
0.
00$
0.
00
00000
0
CAD
TECH
150.
00
150.
00$
150.
00
171717
III
00
2,
550
Total
Hours
123
Sub
Firm
Fee Subtotal
21,
379
Fee
May
12,
2025
Total
Fee
21,
400
21,
379
0
5/30/2023
V S ENGINEERING, INC
INDIANAPOLIS, IN 46254 -
109780
4275 NORTH HIGH SCHOOL ROAD
City of Carmel
ONE CIVIC SQUARE
CARMEL, INDIANA 46032-2584
FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL - 1997
INDIANA RETAIL TAX EXEMPT
CERTIFICATE NO. 003120155 002 0
FEDERAL EXCISE TAX EXEMPT
35-6000972
PURCHASE ORDER NUMBER
THIS NUMBER MUST APPEAR ON INVOICES, A/P
VOUCHER, DELIVERY MEMO, PACKING SLIPS,
SHIPPING LABELS AND ANY CORRESPONDENCE
PURCHASE ORDER DATE DATE REQUIRED REQUISITION NO. VENDOR NO. DESCRIPTION
VENDOR SHIP
TO
PURCHASE ID BLANKET CONTRACT PAYMENT TERMS FREIGHT
EXTENSION
New Professional Services Agreement 6/7/23
City Engineering's Office
1 Civic Square
Carmel, IN 46032-
364215
UNITPRICEDESCRIPTIONUNITOFMEASUREQUANTITY
Page 1 of 1
Laurie Slick
77994
2200Department:0Fund:2022 Bond
44-628.71Account:
22-ENG-08 - 136th Street TrailConnections1 $299,400.00 $299,400.00Each
ASA 1 - 22-ENG-08 - 136th Street TrailConnections1 $15,000.00 $15,000.00Each
ASA 1a - 22-ENG-08 - 136th Street TrailConnections1 $22,600.00 $22,600.00Each
337,000.00SubTotal
337,000.00
Send Invoice To:
PLEASE INVOICE IN DUPLICATE
DEPARTMENT ACCOUNT PROJECT PROJECT ACCOUNT AMOUNT
SHIPPING INSTRUCTIONS
SHIP PREPAID.
C.O.D. SHIPMENT CANNOT BE ACCEPTED.
PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL
AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO.
THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945
PAYMENT
A/P VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A
PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN
AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBLIGATED BALANCE IN
THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER.
CONTROL NO. 109780
ORDERED BY
TITLE
City Engineering's Office
1 Civic Square
Laurie Slick
Carmel, IN 46032-
Bradley Pease Zac Jackson
Director CFO