Project Name: PZ-2025-00076 ADLS Amend - Harvest Church Exterior Improvements
Workflow Started: 4/10/2025 3:32:11 PM
Report Generated: 05/23/2025 12:42 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 Applicant
Marty Baker
4/14/25 2:45 PM
Inquiry
I did not see any specific correction comment and requirements identified in
this ProjectDox.site. I did upload site plan and architecture plans that were
included in the application. If I need to meet with Project Administrator in
person before our April 17 deadline, I can be available. Thank you, Marty
Baker
Question
2 1 Planning & Zoning
Christina Jesse
4/17/25 4:33 PM
Comment
Please upload site plan with locations of all peroglas and swings.
Responded by: Marty Baker - 5/14/25 1:39 PM
Files have been uploaded on 4/30/25 in Site Drawings,
files L1.1 Rev3 Site Plan Harvest and SL1.2 Rev 3 Site
Plan Harvest
Resolved
3 1 Planning & Zoning
Christina Jesse
4/17/25 4:33 PM
Comment
Please upload renderings of the building to show how the pergolas and
swings are architecturally compatible with the primary building.
Responded by: Marty Baker - 5/14/25 1:44 PM
Renderings were uploaded on 4/30/25 under Harvest
Architectural Rendering. The pergolas and swing are
also the color to our new parking lot lights, bicycle
racks, and bollard light posts.
Resolved
4 1 Building & Code
Services
Mike Sheeks
4/21/25 9:45 AM
Comment
Please see planning and zoning comments.
Thank you!
Responded by: Marty Baker - 5/14/25 1:41 PM
Responded in Planning and Zoning comments
UnResolved
5 1 Sign Permits
Aliza Shalit
4/21/25 11:37 AM
Changemark
Backer panels
Do the backer panels need to be there as wood? Could the signs be installed
directly on the building fascia?
Harvest Church - Building Signage
1.1.pdf
Responded by: Marty Baker - 5/14/25 1:24 PM
The backer panels will not be used and have been
revised. The signs will be directly installed on the
building fascia. Revised file under Architectural
Drawings, Harvest Church - Building Signage. 1.1
Question
REVIEW COMMENTS
Created in ProjectDox version 9.4.9.4
Plan Review - Review Comments Report
Project Name: PZ-2025-00076 ADLS Amend - Harvest Church Exterior Improvements
Workflow Started: 4/10/2025 3:32:11 PM
Report Generated: 05/23/2025 12:42 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
6 1 Sign Permits
Aliza Shalit
4/21/25 11:37 AM
Changemark
wood backer material
Please specify wood material. Why are they different in the three locations?
Wood paneling would become designated sign bands and should be
integrated into the architectural design.
Harvest Church - Building Signage
1.1.pdf
Reviewer Response: Aliza Shalit - 5/21/25 3:14 PM
Thank you. Please apply for sign permits if/when
variance is granted.
----------------------------------------------------------
Responded by: Marty Baker - 5/14/25 1:44 PM
Wood material will not longer be used or a component
of our building signage. The signs will be directly
installed on the building fascia. Revised file under
Architectural Drawings, Harvest Church - Building
Signage. 1.1
Resolved
7 1 Sign Permits
Aliza Shalit
4/21/25 11:37 AM
Changemark
wood panel size
Please provide the wood panel dimensions for all three signs. This would
become the spandrel panel. Maximum sign size is 70% of sign band height x
85% of sign band width.
Harvest Church - Building Signage
1.1.pdf
Reviewer Response: Aliza Shalit - 5/21/25 3:14 PM
Thank you. Please apply for sign permits if/when
variance is granted.
----------------------------------------------------------
Responded by: Marty Baker - 5/14/25 1:52 PM
Wood material will not longer be used or a component
of our building signage. The signs will be directly
installed on the building fascia. Revised file under
Architectural Drawings, Harvest Church - Building
Signage 1.1. The third sign, "You are Loved" has been
removed from this request.
Resolved
8 1 Sign Permits
Aliza Shalit
4/21/25 11:37 AM
Changemark
Diamond Background
This background was supposed to be removed or covered per previous ADLS
Amend. Please explain.
Harvest Church - Building Signage
1.1.pdf
Reviewer Response: Aliza Shalit - 5/21/25 3:14 PM
Thank you. Please apply for sign permits if/when
variance is granted.
----------------------------------------------------------
Responded by: Marty Baker - 5/14/25 1:52 PM
Wood material will not longer be used or a component
of our building signage. The signs will be directly
installed on the building fascia. Revised file under
Architectural Drawings, Harvest Church - Building
Signage. 1.1
Resolved
Created in ProjectDox version 9.4.9.4
Plan Review - Review Comments Report
Project Name: PZ-2025-00076 ADLS Amend - Harvest Church Exterior Improvements
Workflow Started: 4/10/2025 3:32:11 PM
Report Generated: 05/23/2025 12:42 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
9 1 Sign Permits
Aliza Shalit
4/21/25 11:37 AM
Changemark
Elevation
Please provide full elevation including this sign location. Sign spandrel panel
must be designated according to building architecture. As presented, backer
and background do not create a harmonious visual design.
Harvest Church - Building Signage
1.1.pdf
Reviewer Response: Aliza Shalit - 5/21/25 3:14 PM
Thank you. Please apply for sign permits if/when
variance is granted.
----------------------------------------------------------
Responded by: Marty Baker - 5/14/25 1:53 PM
Wood material will not longer be used or a component
of our building signage. The signs will be directly
installed on the building fascia. The full elevation is
included on the revised file under Architectural
Drawings, Harvest Church - Building Signage. 1.1
Resolved
10 1 Sign Permits
Aliza Shalit
4/21/25 11:37 AM
Changemark
Sign Size
Sign size is measured to include all sign elements including spaces between
lines. Please provide correct sign size as outlined.
Harvest Church - Building Signage
1.1.pdf
Responded by: Marty Baker - 5/14/25 2:04 PM
Revised file under Architectural Drawings, Harvest
Church - Building Signage 1.1. The third sign, "You are
Loved" has been removed from this request.
Resolved
11 1 Sign Permits
Aliza Shalit
4/21/25 11:39 AM
Comment
Please provide site plan with all proposed and existing sign locations
properly marked.
Responded by: Marty Baker - 5/14/25 1:59 PM
Site plan uploaded in Site Drawings, Site Plan for
Existing and New Signs file
Resolved
12 1 Sign Permits
Aliza Shalit
4/21/25 11:43 AM
Changemark
Ground sign
Per present UDO sign standards the ground sign must have a base as deep
and wide as the sign itself. Ground sign will require a variance for base width.
Harvest Church - Duplicate Monument
1.1.pdf
Info Only
13 1 Sign Permits
Aliza Shalit
4/21/25 11:43 AM
Changemark
Ground sign Landscaping
Ground signs require a landscaped area at their base of equal or larger area
than the sign area. Plantings should include decorative grasses, bushes,
flowers, etc. Please provide landscape plan.
Harvest Church - Duplicate Monument
1.1.pdf
Responded by: Marty Baker - 5/14/25 2:03 PM
Landscaping plan uploaded in Architectural Drawings,
Monument Ground Sign.Landscaping Plan file.
Info Only
14 1 Sign Permits
Aliza Shalit
4/21/25 11:43 AM
Changemark
Sign Area
Sign area includes all graphic elements of the sign. Please provide
dimensions as marked by red rectangle.
Harvest Church - Duplicate Monument
1.1.pdf
Responded by: Marty Baker - 5/14/25 3:34 PM
The sign specification has been revised to meet the
UDO sign standards and should include the dimensions
and information requested. File is uploaded in
Architectural Drawings, Harvest Church - Duplicate
Monument 1.1
Info Only
Created in ProjectDox version 9.4.9.4
Plan Review - Review Comments Report
Project Name: PZ-2025-00076 ADLS Amend - Harvest Church Exterior Improvements
Workflow Started: 4/10/2025 3:32:11 PM
Report Generated: 05/23/2025 12:42 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
15 1 Sign Permits
Aliza Shalit
4/21/25 11:44 AM
Comment
A variance for number of signs will be required.
Info Only
16 1 Engineering
John Thomas
4/29/25 4:27 PM
Comment
Please provide a site map showing the location of the proposed pergolas
and swings for review.
Responded by: Marty Baker - 5/14/25 1:39 PM
Files have been uploaded on 4/30/25 in Site Drawings,
files L1.1 Rev3 Site Plan Harvest and SL1.2 Rev 3 Site
Plan Harvest
UnResolved
17 2 Sign Permits
Aliza Shalit
5/21/25 3:17 PM
Comment
A sign permit will be required for all signs. Please apply once Variance/s
is/are granted.
Info Only
Created in ProjectDox version 9.4.9.4