Loading...
HomeMy WebLinkAboutDept Report PC HO 05-29-25CARMEL PLAN COMMISSION HEARING OFFICER Department Report for May 29, 2025 1. Docket No. PZ-2025-00087 DP/ADLS: Republic Airways Hotel - Addition. The applicant seeks design approval to construct a six-story, 60,930 square foot hotel (84 keys) with first floor retail as an addition to the 8 story/850 space parking garage. The site is located in the Meridian Corridor at 20 Brickyard Lane, Carmel, IN 46032. The property is zoned C2/Mixed Use. Filed by Alex Stephens of Kimley- Horn on behalf of the owner, Republic Airways, Inc. Site Context: The overall site is bordered by US 31 on the west, Carmel Drive and Capital Group to the north (zoned MC/Meridian Corridor), Pennsylvania St. and Penn Circle Apartments (zoned UR/Urban Residential) and Encore Sotheby’s (zoned UC/Urban Core) to the east, and Sunrise Senior Living (zoned MC/Meridian Corridor) to the south. The three other buildings on campus were approved under Docket No. 20020017 DP/ADLS – Training Center and Hotel; and Docket No. 2023-00251ADLS – Headquarters building. Please see the Petitioner’s Info Packet for additional information. Project Details: • Hotel addition: o 60,930 square-foot hotel over five floors (76.5’ tall), concealing the west and north facades of garage o This is a separate building from the existing hotel on site, providing 84 additional rooms o The first floor of the hotel building will have 2 commercial spaces opening to the internal street. • Parking garage: o The existing structure is 8 stories, providing 850 parking spaces o 3 new on-street parking spaces will be installed on the north side of the garage building o 25% (212.5 spaces) of the total garage spaces are reserved for tenant usage, the rest are open to the public • Building design and materials: o Proposed hotel design and new garage screening will complement existing buildings’ modern style o Brick base (dark iron spot), metal panels – gray and silver, accent metal panels – shades of blue, curtain wall glazing • Site design: o Constructed north of existing hotel, to east of HQ currently under construction. o 31.0% open space provided, 20% required o 10’ sidewalk is shown along Pennsylvania St. – this will need to be changed to an asphalt path. o Additional sidewalks and space for outdoor seating are also provided around the building. • Bicycle parking: o 8 Short-term spaces are provided – 4 at the SW corner, near the hotel entrance, and 4 on the north side of the building, adjacent to the retail space o Please provide more details on long-term bicycle parking spaces within the garage. • Lighting: o Streetlights will be installed along Brickyard Lane to the north of the building and adjacent to the sidewalk along Pennsylvania Street. • Landscaping: o The north and east sides of the garage will be landscaped. o Several planting beds will be located on the west side of the garage along the internal street. o The Urban Forester has approved the Landscape Plan. • Signage: o Standard “P” Parking signs will be installed at the entrances to the garage. o Signs for the two commercial tenants will be installed on the awnings above their respective entrances. DOCS Comments: 1. See bolded items above 2. Project Dox/Department sign offs are still needed (CRC will meet on June 18, 2025) Recommendation: The Department of Community Services (DOCS) recommends the Plan Commission Hearing Officer Approves this item.