HomeMy WebLinkAboutA205.1 - EXISTING BUILDING ELEVATIONS - BLDG 51ST FLOOR
EL: 0' -0"
2ND FLOOR
EL: 8' -0"
TRUSS BEARING
EL: 17' -5"
1
33
2
2
2
2
88
1ST FLOOR
EL: 0' -0"
2ND FLOOR
EL: 8' -0"
TRUSS BEARING
EL: 17' -5"
1
2
3
2 2
2222
22
1
1
5
33
1
2
3 3
2 2
2222
222
22
22
22
2 2
111
1 1
5 5
333334
66 6
6
6
6
6
6
6 66
66
6 6
6
7
7
7
7
7
7
7
7
7
7
7
7
8 8
1ST FLOOR
EL: 0' -0"
2ND FLOOR
EL: 8' -0"
TRUSS BEARING
EL: 17' -5"
3 3
2 2
2222
222
22
22
22
2 2
11
1 1
5 5
3333
11
6
6 66 6
6
6
6
6
6 6
6666
6
7
7
3
1
1
3
1
2 2 2
2222
22
5
2
22
22
22
2 2
3 3 3 3
5
1
1
1
88
1ST FLOOR
EL: 0' -0"
2ND FLOOR
EL: 8' -0"
TRUSS BEARING
EL: 17' -5"
1
33
2
2
2
2
88
GENERAL DEMOLITION NOTES
1. CONTRACTOR SHALL FIELD-VERIFY ALL EXISTING
CONDITIONS, DIMENSIONS, AND ARRANGEMENTS.
2. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL
EXISTING SURFACES, MATERIALS, AND COMPONENTS TO
REMAIN OR BE RELOCATED. DAMAGE TO THESE
RESULTING FROM PERFORMANCE OF WORK SHALL BE
REPAIRED BY CONTRACTOR TO SATISFACTION OF OWNER
AND ARCHITECT AT NO ADDITIONAL EXPENSE TO OWNER.
3. CONTRACTOR SHALL PROVIDE TEMPORARY DUST
PROTECTION AS REQUIRED TO PREVENT CONSTRUCTION
DEBRIS AND DUST FROM MIGRATING OUT OF PROJECT
AREA. OWNER/ARCHITECT SHALL CONFIRM ALL DUST
PREVENTION MEASURES/LOCATIONS AND SHALL
DETERMINE CHANGES TO THESE MEASURES.
4. ALL EXISTING EQUIPMENT AND FIXTURES SHALL REMAIN
PROPERTY OF OWNER. ALL REUSABLE ITEMS SALVAGED
DURING DEMOLITION OPERATIONS SHALL BE RETAINED
FOR OWNER'S INSPECTION. ONLY ITEMS SO INSPECTED
AND REJECTED BY OWNER SHALL BE DISPOSED. ALL
OTHER SUCH ITEMS SHALL BE TURNED OVER TO OWNER
FOR DISPOSITION.
5. ALL EXISTING SURFACES LOCATED ADJACENT TO, OR
EXPOSED BY DEMOLITION WORK AND SCHEDULED TO
RECEIVE NEW CONSTRUCTION SHALL BE PATCHED AND
REPAIRED AS REQUIRED TO CLEANLY RECEIVE NEW
WORK.
6. ALL EXISTING SURFACES LOCATED ADJACENT TO, OR
EXPOSED BY DEMOLITION WORK AND SCHEDULED TO
REMAIN EXPOSED AFTER COMPLETION OF NEW CONST.
SHALL BE REPAIRED AND PATCHED AS REQUIRED TO
RECEIVE NEW FINISHES.
7. OWNER WILL BE RESPONSIBLE FOR
REMOVAL/REARRANGEMENT OF ALL EXISTING LOOSE
FURNISHINGS DURING CONSTRUCTION, UNLESS NOTED
OTHERWISE.
8. REFER TO MECH./ELEC. DRAWINGS FOR ADDITIONAL
PATCHING AND PREPARATION WORK RELATED TO M.E.P.
DEMOLITION ITEMS.
9. EXISTING SLEEVES, HOLES, AND OTHER PENETRATIONS TO
BE SEALED PRIOR TO NEW CONSTRUCTION. NEW DAMAGE
OF EXISTING BUILDING STRUCTURE ABOVE
GRADE EXPOSED BY DEMOLITION AND REMOVAL OF
PIPING, APPURTENANCES, EQUIPMENT SHALL BE PATCHED
AND REPAIRED AS PART OF THE WORK. MAINTAIN FIRE
RATINGS OF ALL AND ADJACENT CONSTRUCTION
AFFECTED.
10. CAP ALL PIPING TO REMAIN OR ABANDONED IN
ACCORDANCE WITH REQUIREMENTS OF AUTHORITY
HAVING JURISDICTION AND IN ACCORDANCE WITH ALL
LOCAL AND STATE PLUMBING AND HEALTH CODES. UTILIZE
ONLY PRE-MANUFACTURED AND APPROVED FITTINGS TO
CAP EXISTING PIPING.
11. COORDINATE ALL DEMOLITION WITH PROJECT
SEQUENCING AS DIRECTED BY GENERAL CONTRACTOR
OR CONSTRUCTION MANAGER.
12. CONTRACTOR TO COORDINATE WITH CONSTRUCTION
MANAGER TO PROVIDE ANY REQUIRED TEMPORARY
PATHS OF EGRESS AS REQUIRED PER CODE.
MATERIAL COLOR SCHEME
LAP SIDING
TRIM, FACIA, GUTTER AND DOWNSPOUTS
FACEBRICK
NOTE: ALL EXPOSED VENTS, CAPS, AND ELECTRICAL EQUIPMENT
HOUSING TO BE PREPPED AND PAINTED TO MATCH ADJACENT
FEILD COLOR.
ELEVATION DEMO NOTES
1
2
3
REMOVE EFFLORESCENCE AND STAINING OF FACEBRICK
AROUND THE ENTIRE BUILDING. CONTRACTOR TO PREP
EXISTING FACE BRICK AS REQUIRED TO RECEIVE NEW STAIN
COLOR.
CLEAN AND PREP ALL EXTERIOR WINDOWS TO RECEIVE NEW
SEALANT AS REQUIRED.
REMOVE LOWER ELBOW AT ALL DOWNSPOUTS AROUND THE
BUILDING. PREP ALL GUTTERS, DRIP EDGES, DOWNSPOUTS,
AND ELBOWS TO BE PAINTED. REMOVE AND REPLACE
SPLASH BLOCKS AT ALL DOWNSPOUTS.
REMOVE ALL EXTERIOR RAILINGS AT BUILDING ENTRIES,
TYPCIAL. PREP AREA TO RECIEVE NEW BUILDINGS.SEE CIVIL
DRAWINGS FOR MORE INFORMATION.
REMOVE ALL DOOR, FRAME ACCESSORIES, AND THRESHOLD
OF EXTERIOR BUILDING ENTRIES. REMOVE ANY AND ALL
ROTTEN OR STRUCTURALLY COMPROMISED FRAMING @
OPENINGS. PREP OPENING FOR TO RECEIVE NEW DOOR,
FRAME, AND THRESHOLD. REFER TO STRUCTURAL DRAWINGS
FOR STRUCTURAL REQUIREMENTS INCLUDING SHORING.
REMOVE ALL EXTERIOR LIGHT FIXTURES AROUND THE
BUILDING. PREP AREAS TO RECEIVE NEW LIGHT FIXTURE. SEE
ELECTRICAL DRAWINGS FOR MORE INFORMATION.
REMOVE ALL PATIO / BALCONY DOOR, FRAME, THRESHOLD
AND ACCESSORIES AS REQUIRED. REMOVE ADJACENT WOOD
FRAMING AND PREP OPENING TO REVEIVE NEW DOOR AND
FRAMING AS REQUIRED. REFER TO STRUCTURAL DRAWINGS
FOR STRUCTURAL REQUIREMENTS, INCLUDING SHORING.
OWNER TO CONFIRM EXTENTS OF LOCATIONS.
PRESERVE AND PROTECT, EXISTING ROOF TO REMAIN AS IS.
4
5
6
7
8
PR
O
J
E
C
T
DR
A
W
I
N
G
T
I
T
L
E
SE
A
L
SH
E
E
T
PR
O
J
E
C
T
I
N
F
O
RE
V
I
S
I
O
N
S
ARCHITECT
GC/CM
CLIENT
22028
MAY 2, 2025
50% CD SET
A205.1
EX
I
S
T
I
N
G
B
U
I
L
D
I
N
G
EL
E
V
A
T
I
O
N
S
-
B
L
D
G
5
BU
C
K
I
N
G
H
A
M
A
T
GR
A
M
E
R
C
Y
-
A
R
E
A
B
SCALE: 1/8" = 1'-0"3 SIDE ELEVATION
SCALE: 1/8" = 1'-0"1 FRONT ELEVATION
SCALE: 1/8" = 1'-0"2 BACK ELEVATION
SCALE: 1/8" = 1'-0"4 SIDE ELEVATION
#DESCRIPTION DATE