HomeMy WebLinkAboutA211.1 - NEW BUILDING ELEVATIONS - BLDG 111ST FLOOR
EL: 0' -0"
2ND FLOOR
EL: 8' -0"
TRUSS BEARING
EL: 17' -5"
5
5
5
5
5
5
5
5
11
1 1
1
6
6
2
2 2
2
2
6
6
6
6
6
6
2
2
2
2
2
44
3333333
1ST FLOOR
EL: 0' -0"
2ND FLOOR
EL: 8' -0"
TRUSS BEARING
EL: 17' -5"
5
5
5
5
5
5
5
5
11
1 1
1
6
6
2
2 2 2
2
6
6
6
6
6
6
2
2
2 2
2
44
3333333
1
33
2
2
2
2
1
33
2
2
2
2
ELEVATION MATERIAL LEGEND
ASPHALT SHINGLE ROOF
FACE BRICK
METAL DOWNSPOUT
GUARDRAIL
METAL GUTTER
FIBER CEMENT FASCIA
FIBER CEMENT HORIZONTAL SIDING
FIBER CEMENT TRIM
FIBER CEMENT WRAPPED COLUMN
ELEVATION MATERIAL LEGEND#
FB
MR
AS
MD
MG
FCF
FCH
FCT
NOTE: MATERIALS IDENTIFIED ARE ASSUMED FROM VISUAL INSPECTION.
CONTRACTOR TO VIF EXISTING MATERIALS AS NEEDED TO
ACCOMMODATE SCOPE OF WORK.
FCW
GENERAL DEMOLITION NOTES
1. CONTRACTOR SHALL FIELD-VERIFY ALL EXISTING
CONDITIONS, DIMENSIONS, AND ARRANGEMENTS.
2. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL
EXISTING SURFACES, MATERIALS, AND COMPONENTS TO
REMAIN OR BE RELOCATED. DAMAGE TO THESE
RESULTING FROM PERFORMANCE OF WORK SHALL BE
REPAIRED BY CONTRACTOR TO SATISFACTION OF OWNER
AND ARCHITECT AT NO ADDITIONAL EXPENSE TO OWNER.
3. CONTRACTOR SHALL PROVIDE TEMPORARY DUST
PROTECTION AS REQUIRED TO PREVENT CONSTRUCTION
DEBRIS AND DUST FROM MIGRATING OUT OF PROJECT
AREA. OWNER/ARCHITECT SHALL CONFIRM ALL DUST
PREVENTION MEASURES/LOCATIONS AND SHALL
DETERMINE CHANGES TO THESE MEASURES.
4. ALL EXISTING EQUIPMENT AND FIXTURES SHALL REMAIN
PROPERTY OF OWNER. ALL REUSABLE ITEMS SALVAGED
DURING DEMOLITION OPERATIONS SHALL BE RETAINED
FOR OWNER'S INSPECTION. ONLY ITEMS SO INSPECTED
AND REJECTED BY OWNER SHALL BE DISPOSED. ALL
OTHER SUCH ITEMS SHALL BE TURNED OVER TO OWNER
FOR DISPOSITION.
5. ALL EXISTING SURFACES LOCATED ADJACENT TO, OR
EXPOSED BY DEMOLITION WORK AND SCHEDULED TO
RECEIVE NEW CONSTRUCTION SHALL BE PATCHED AND
REPAIRED AS REQUIRED TO CLEANLY RECEIVE NEW
WORK.
6. ALL EXISTING SURFACES LOCATED ADJACENT TO, OR
EXPOSED BY DEMOLITION WORK AND SCHEDULED TO
REMAIN EXPOSED AFTER COMPLETION OF NEW CONST.
SHALL BE REPAIRED AND PATCHED AS REQUIRED TO
RECEIVE NEW FINISHES.
7. OWNER WILL BE RESPONSIBLE FOR
REMOVAL/REARRANGEMENT OF ALL EXISTING LOOSE
FURNISHINGS DURING CONSTRUCTION, UNLESS NOTED
OTHERWISE.
8. REFER TO MECH./ELEC. DRAWINGS FOR ADDITIONAL
PATCHING AND PREPARATION WORK RELATED TO M.E.P.
DEMOLITION ITEMS.
9. EXISTING SLEEVES, HOLES, AND OTHER PENETRATIONS TO
BE SEALED PRIOR TO NEW CONSTRUCTION. NEW DAMAGE
OF EXISTING BUILDING STRUCTURE ABOVE
GRADE EXPOSED BY DEMOLITION AND REMOVAL OF
PIPING, APPURTENANCES, EQUIPMENT SHALL BE PATCHED
AND REPAIRED AS PART OF THE WORK. MAINTAIN FIRE
RATINGS OF ALL AND ADJACENT CONSTRUCTION
AFFECTED.
10. CAP ALL PIPING TO REMAIN OR ABANDONED IN
ACCORDANCE WITH REQUIREMENTS OF AUTHORITY
HAVING JURISDICTION AND IN ACCORDANCE WITH ALL
LOCAL AND STATE PLUMBING AND HEALTH CODES. UTILIZE
ONLY PRE-MANUFACTURED AND APPROVED FITTINGS TO
CAP EXISTING PIPING.
11. COORDINATE ALL DEMOLITION WITH PROJECT
SEQUENCING AS DIRECTED BY GENERAL CONTRACTOR
OR CONSTRUCTION MANAGER.
12. CONTRACTOR TO COORDINATE WITH CONSTRUCTION
MANAGER TO PROVIDE ANY REQUIRED TEMPORARY
PATHS OF EGRESS AS REQUIRED PER CODE.
MATERIAL COLOR SCHEME
LAP SIDING (PAINTED)
SW7674 PEPPERCORN
TRIM, FACIA, GUTTERS, AND DOWNSPOUTS
(PAINTED)
SW7004 SNOWBOUND
FACE BRICK (STAIN)
XXX STAIN, COLOR WHITE
ELEVATION NOTES
1
2
3
STAIN ALL FACEBRICK IN IT'S ENTIRETY AROUND THE
BUILDING. CONCTRACTOR TO PROTECT ALL ADJACENT
SURFACES AND CONSTRUCTION.. SEE MATERIAL COLOR
SCHEME FOR FINISH INFO.
PROVIDE SEALANT AROUND EXTERIOR WINDOWS WHERE
REQUIRED. COLOR MATCH TRIM / WINDOW FRAME.
PROVIDE NEW LOWER ELBOW AT ALL DOWNSPOUTS AROUND
THE BUILDING. PAINT ALL GUTTERS, DRIP EDGES,
DOWNSPOUTS, AND ELBOWS -SEE MATERIAL COLOR SCHEME
FOR COLOR. PROVIDE NEW SPLASH BLOCKS AT ALL
DOWNSPOUTS.
PROVIDE NEW RAILINGS AT EXTERIOR BUILDING ENTRIES,
COLOR MATCH TO BUILDING TRIM. SEE CIVIL DRAWINGS FOR
ATTACHMENT REQUIREMENTS AND DETAILS.
PROVIDE NEW DOOR, FRAME, THRESHOLD AND
ACCESSORIES AT ALL EXTERIOR BUILDING ENTRIES. REPLACE
ANY ADJACENT WOOD FRAMING REMOVED DURING
DEMOLITION. DOOR/ FRAME TO BE WHITE COLOR TO MATCH
BUILDING TRIM.
PROVIDE NEW EXTERIOR LIGHT FIXTURES AROUND THE
BUILDING, TYPICAL. REFER TO ELECTRICAL DRAWINGS FOR
MORE INFORMATION.
PROVIDE NEW PATIO/BALCONY DOOR, FRAME, AND
ACCESSORIES AS REQUIRED. REPLACE ANY ADJACENT WOOD
FRAMING REMOVED DURING CONSTRUCTION DEMOLITION.
PROVIDE NEW PATIO/BALCONY DOOR, FRAME, AND
ACCESSORIES. REPLACE ANY ADJACENT WOOD FRAMING
REMOVED DURING CONSTRUCTION DEMOLITION. OWNER TO
CONFIRM EXENT OF LOCATIONS
4
5
6
7
8
PR
O
J
E
C
T
DR
A
W
I
N
G
T
I
T
L
E
SE
A
L
SH
E
E
T
PR
O
J
E
C
T
I
N
F
O
RE
V
I
S
I
O
N
S
ARCHITECT
GC/CM
CLIENT
22028
MAY 2, 2025
50% CD SET
A211.2
NE
W
B
U
I
L
D
I
N
G
EL
E
V
A
T
I
O
N
S
-
B
L
D
G
1
1
BU
C
K
I
N
G
H
A
M
A
T
GR
A
M
E
R
C
Y
-
A
R
E
A
B
SCALE: 1/8" = 1'-0"1 FRONT ELEVATION
SCALE: 1/8" = 1'-0"2 BACK ELEVATION
SCALE: 1/8" = 1'-0"3 SIDE ELEVATION
SCALE: 1/8" = 1'-0"4 SIDE ELEVATION
#DESCRIPTION DATE