Loading...
HomeMy WebLinkAboutA212.2 - NEW BUILDING ELEVATIONS - BLDG 121 33 2 2 2 2 1ST FLOOR EL: 0' -0" 2ND FLOOR EL: 8' -0" TRUSS BEARING EL: 17' -5" 6 6 6 6 6 6 6 6 11 3 2 2 2 2 2 2 2 2 22 8 1ST FLOOR EL: 0' -0" 2ND FLOOR EL: 8' -0" TRUSS BEARING EL: 17' -5" 6 6 6 6 6 6 6 6 11 1 1 7 7 2 2 2 7 7 7 7 2 2 2 55 33333 8 1 33 2 2 2 2 ELEVATION MATERIAL LEGEND ASPHALT SHINGLE ROOF FACE BRICK METAL DOWNSPOUT GUARDRAIL METAL GUTTER FIBER CEMENT FASCIA FIBER CEMENT HORIZONTAL SIDING FIBER CEMENT TRIM FIBER CEMENT WRAPPED COLUMN ELEVATION MATERIAL LEGEND# FB MR AS MD MG FCF FCH FCT NOTE: MATERIALS IDENTIFIED ARE ASSUMED FROM VISUAL INSPECTION. CONTRACTOR TO VIF EXISTING MATERIALS AS NEEDED TO ACCOMMODATE SCOPE OF WORK. FCW GENERAL DEMOLITION NOTES 1. CONTRACTOR SHALL FIELD-VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND ARRANGEMENTS. 2. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL EXISTING SURFACES, MATERIALS, AND COMPONENTS TO REMAIN OR BE RELOCATED. DAMAGE TO THESE RESULTING FROM PERFORMANCE OF WORK SHALL BE REPAIRED BY CONTRACTOR TO SATISFACTION OF OWNER AND ARCHITECT AT NO ADDITIONAL EXPENSE TO OWNER. 3. CONTRACTOR SHALL PROVIDE TEMPORARY DUST PROTECTION AS REQUIRED TO PREVENT CONSTRUCTION DEBRIS AND DUST FROM MIGRATING OUT OF PROJECT AREA. OWNER/ARCHITECT SHALL CONFIRM ALL DUST PREVENTION MEASURES/LOCATIONS AND SHALL DETERMINE CHANGES TO THESE MEASURES. 4. ALL EXISTING EQUIPMENT AND FIXTURES SHALL REMAIN PROPERTY OF OWNER. ALL REUSABLE ITEMS SALVAGED DURING DEMOLITION OPERATIONS SHALL BE RETAINED FOR OWNER'S INSPECTION. ONLY ITEMS SO INSPECTED AND REJECTED BY OWNER SHALL BE DISPOSED. ALL OTHER SUCH ITEMS SHALL BE TURNED OVER TO OWNER FOR DISPOSITION. 5. ALL EXISTING SURFACES LOCATED ADJACENT TO, OR EXPOSED BY DEMOLITION WORK AND SCHEDULED TO RECEIVE NEW CONSTRUCTION SHALL BE PATCHED AND REPAIRED AS REQUIRED TO CLEANLY RECEIVE NEW WORK. 6. ALL EXISTING SURFACES LOCATED ADJACENT TO, OR EXPOSED BY DEMOLITION WORK AND SCHEDULED TO REMAIN EXPOSED AFTER COMPLETION OF NEW CONST. SHALL BE REPAIRED AND PATCHED AS REQUIRED TO RECEIVE NEW FINISHES. 7. OWNER WILL BE RESPONSIBLE FOR REMOVAL/REARRANGEMENT OF ALL EXISTING LOOSE FURNISHINGS DURING CONSTRUCTION, UNLESS NOTED OTHERWISE. 8. REFER TO MECH./ELEC. DRAWINGS FOR ADDITIONAL PATCHING AND PREPARATION WORK RELATED TO M.E.P. DEMOLITION ITEMS. 9. EXISTING SLEEVES, HOLES, AND OTHER PENETRATIONS TO BE SEALED PRIOR TO NEW CONSTRUCTION. NEW DAMAGE OF EXISTING BUILDING STRUCTURE ABOVE GRADE EXPOSED BY DEMOLITION AND REMOVAL OF PIPING, APPURTENANCES, EQUIPMENT SHALL BE PATCHED AND REPAIRED AS PART OF THE WORK. MAINTAIN FIRE RATINGS OF ALL AND ADJACENT CONSTRUCTION AFFECTED. 10. CAP ALL PIPING TO REMAIN OR ABANDONED IN ACCORDANCE WITH REQUIREMENTS OF AUTHORITY HAVING JURISDICTION AND IN ACCORDANCE WITH ALL LOCAL AND STATE PLUMBING AND HEALTH CODES. UTILIZE ONLY PRE-MANUFACTURED AND APPROVED FITTINGS TO CAP EXISTING PIPING. 11. COORDINATE ALL DEMOLITION WITH PROJECT SEQUENCING AS DIRECTED BY GENERAL CONTRACTOR OR CONSTRUCTION MANAGER. 12. CONTRACTOR TO COORDINATE WITH CONSTRUCTION MANAGER TO PROVIDE ANY REQUIRED TEMPORARY PATHS OF EGRESS AS REQUIRED PER CODE. MATERIAL COLOR SCHEME LAP SIDING (PAINTED) SW7674 PEPPERCORN TRIM, FACIA, GUTTERS, AND DOWNSPOUTS (PAINTED) SW7004 SNOWBOUND FACE BRICK (STAIN) XXX STAIN, COLOR WHITE ELEVATION NOTES 1 2 3 STAIN ALL FACEBRICK IN IT'S ENTIRETY AROUND THE BUILDING. CONCTRACTOR TO PROTECT ALL ADJACENT SURFACES AND CONSTRUCTION.. SEE MATERIAL COLOR SCHEME FOR FINISH INFO. PROVIDE SEALANT AROUND EXTERIOR WINDOWS WHERE REQUIRED. COLOR MATCH TRIM / WINDOW FRAME. PROVIDE NEW LOWER ELBOW AT ALL DOWNSPOUTS AROUND THE BUILDING. PAINT ALL GUTTERS, DRIP EDGES, DOWNSPOUTS, AND ELBOWS -SEE MATERIAL COLOR SCHEME FOR COLOR. PROVIDE NEW SPLASH BLOCKS AT ALL DOWNSPOUTS. PROVIDE NEW RAILINGS AT EXTERIOR BUILDING ENTRIES, COLOR MATCH TO BUILDING TRIM. SEE CIVIL DRAWINGS FOR ATTACHMENT REQUIREMENTS AND DETAILS. PROVIDE NEW DOOR, FRAME, THRESHOLD AND ACCESSORIES AT ALL EXTERIOR BUILDING ENTRIES. REPLACE ANY ADJACENT WOOD FRAMING REMOVED DURING DEMOLITION. DOOR/ FRAME TO BE WHITE COLOR TO MATCH BUILDING TRIM. PROVIDE NEW EXTERIOR LIGHT FIXTURES AROUND THE BUILDING, TYPICAL. REFER TO ELECTRICAL DRAWINGS FOR MORE INFORMATION. PROVIDE NEW PATIO/BALCONY DOOR, FRAME, AND ACCESSORIES AS REQUIRED. REPLACE ANY ADJACENT WOOD FRAMING REMOVED DURING CONSTRUCTION DEMOLITION. PROVIDE NEW PATIO/BALCONY DOOR, FRAME, AND ACCESSORIES. REPLACE ANY ADJACENT WOOD FRAMING REMOVED DURING CONSTRUCTION DEMOLITION. OWNER TO CONFIRM EXENT OF LOCATIONS 4 5 6 7 8 PR O J E C T DR A W I N G T I T L E SE A L SH E E T PR O J E C T I N F O RE V I S I O N S ARCHITECT GC/CM CLIENT 22028 MAY 2, 2025 50% CD SET A212.2 NE W B U I L D I N G EL E V A T I O N S - B L D G 1 2 BU C K I N G H A M A T GR A M E R C Y - A R E A B SCALE: 1/8" = 1'-0"4 SIDE ELEVATION SCALE: 1/8" = 1'-0"1 FRONT ELEVATION SCALE: 1/8" = 1'-0"2 BACK ELEVATION SCALE: 1/8" = 1'-0"3 SIDE ELEVATION #DESCRIPTION DATE