HomeMy WebLinkAboutC0.5 GENERAL NOTESELECTRICAL RISER
GUY ANCHOR
ELECTRIC JUNCTION BOX
ORNAMENTAL LIGHT
GENERATOR
STREET LIGHT
ELECTRIC MANHOLE
ELECTRIC OUTLET
UTILITY POLE
UTILITY POLE W/ TRANSFORMER
TRANSFORMER
COMMUNICATIONS JUNCTION BOX
COMMUNICATIONS MANHOLE
COMMUNICATIONS PEDESTAL
E
JCT
E
C
RIGHT OF WAY LINE
FENCE
GUARD RAIL
BUILDING SETBACK LINE
BOUNDARY LINE
CISTERN
DRINKING FOUNTAIN
FIRE DEPT HOOKUP
FIRE HYDRANT
POST INDICATOR VALVE
CHILLED WATER MANHOLE
WATER MANHOLE
SPRINKLER CONTROL BOX
SPRINKLER CONTROL VALVE
SPRINKLER
SPIGOT
WELL HEAD
WATER METER
WATER VALVE
GAS METER
GAS VALVE
CISTERN
FDH
CW
W
SP
W
W
W V
G
VG
ELECTRIC METERE
LIQUID PROPANE GAS TANK
MONITORING WELL
TRAFFIC SIGNAL POLE
TRAFFIC SIGNAL
BOLLARD
FLAG POLE
PARKING METER
POST
SIGN
PARKING WHEEL STOP
DOWN SPOUT
ACCESSIBLE SPACE
GATE POST
COMMUNICATIONS RISER
STORM CLEANOUT
BEEHIVE INLET
CURB INLET
FLOOR DRAIN
ROUND INLET
SQUARE INLET
STORM MANHOLE
SANITARY SEWER CLEANOUT
LIFT STATION
SANITARY SEWER MANHOLE
SANITARY STUB MARKER
SEPTIC TANK
C
ST
ST
SS
LIFT
SS
SS STUB
MARKER
SEPTIC
LP GAS
MW
BOL
PRK
DS
GP
PARKING LOT LIGHT (1 HEAD)
PARKING LOT LIGHT (3 HEAD)
PARKING LOT LIGHT (4 HEAD)
PARKING LOT LIGHT (2 HEAD)
HEAVY DUTY ASPHALT
CONCRETE PAVEMENT
RIGHT OF WAY PAVEMENT
C
JCT
C
DISTRIBUTION BOX
DBOX
ROW RIGHT OF WAY
BSL BUILDING SETBACK LINE
ESMT EASEMENT
EX.EXISTING
D&UE DRAINAGE AND UTILITY EASEMENT
FFE FINISH FLOOR ELEVATION
GUT GUTTER
TC TOP OF CURB
INV INVERT
TOC TOP OF CASTING
CMP CORRUGATED METAL PIPE
RCP REINFORCED CONCRETE PIPE
PVC POLYVINYL CHLORIDE PIPE
VCP VITRIFIED CLAY PIPE
HDPE HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
SSD SUB SURFACE DRAIN PIPE
STM STORM
SAN SANITARY
STR STRUCTURE
CO CLEANOUT
STANDARD DUTY ASPHALT
STONE
PAVEMENT
PROPOSED PLAN LEGEND
UTILITIES
ABBREVIATIONS
OTHER
LINE TYPES
SECTION LINE
FLOW LINE
INDEX CONTOUR
INTERMEDIATE CONTOUR
500
501
SANITARY SEWER MAIN
STORM SEWER MAIN
UNDERGROUND GAS
UNDERGROUND WATER
AERIAL ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
AERIAL COMMUNICATIONS
OVERHEAD UTILITY
FORCE MAIN
G G G
W W
E(A)E(A)
E E E
C C C
C(A)C(A)
OHU OHU
FM FM
AERIAL FIBER OPTIC CABLEFO(A)FO(A)
UNDERGROUND FIBER OPTICFOFO
SANITARY SEWER LATERALSANSAN
ROOF DRAINSTMSTM
SUB SURFACE DRAIN
GRADE BREAK LINE
CHAIN LINK FENCE
BOARD FENCE
WROUGHT IRON FENCE
GUARD RAIL
HAND RAIL
FLOW LINE (EX.)
FARM FENCE
INDEX CONTOUR (EX.)
INTERMEDIATE CONTOUR (EX.)
500
501
SANITARY SEWER
STORM SEWER
EXISTING LINE TYPES
INCLUDED IN TOTAL IS THE LEGEND OF THE PLAT, SURVEY AND ALTA SURVEY.
C0
.
5
-
G
E
N
E
R
A
L
N
O
T
E
S
C0.5
GE
N
E
R
A
L
N
O
T
E
S
W241058
JM
W2
4
1
0
5
8
01
.
0
3
.
2
0
2
4
BT
JM
JA
C
Q
U
I
E
'
S
G
O
U
R
M
E
T
C
A
T
E
R
I
N
G
43
0
6
W
e
s
t
9
6
t
h
S
t
r
e
e
t
,
Ca
r
m
e
l
,
I
N
4
6
0
3
2
GENERAL NOTES
1.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY WITH THE OWNER
DURING BIDDING AND DURING CONSTRUCTION ACTIVITIES ALL ITEMS TO BE
REMOVED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ANY
MATERIALS AND/OR STRUCTURES NOT LOCATED ON THIS SURVEY FOR THE
INSTALLATION OF THE NEW WORK.
2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL EXISTING
UTILITIES PERTAINING TO THEIR PHASE OF WORK, AND TO VERIFY WHICH UTILITIES
WILL BE REMOVED BY UTILITY COMPANY. ANY AND ALL UTILITIES NOT REMOVED BY
THE UTILITY COMPANY SHALL BE REMOVED BY THE CONTRACTOR.
3.UTILITIES ARE SHOWN TO BE APPROXIMATE AND SHALL BE RELOCATED AND/OR
CAPPED AND ABANDONED BEFORE CONSTRUCTION AT NO ADDITIONAL COST TO THE
OWNER.
4.ALL DEMOLITION MATERIAL AND SALVAGEABLE MATERIAL IS THE PROPERTY OF THE
DEMOLITION CONTRACTOR AND SHALL BE PROPERLY DISPOSED OF OFF THE SITE.
5.SLABS ON GRADE MUST BE REMOVED COMPLETELY AND TAKEN OFF THE SITE.
6.ALL UTILITIES MUST REMAIN ACTIVE FOR AREA TENANTS THAT ARE REMAINING. NO
UTILITY SERVICE SHALL BE INTERRUPTED DURING THE CONSTRUCTION PROCESS.
7.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE
RECORD SURVEYS AND PLATS FOR EXACT INFORMATION.
8.ANY EXISTING TREE(S) THAT MAY REQUIRE REMOVAL BUT ARE NOT SHOWN ON THE
PLAN AS BEING REMOVED MAY BE DONE SO, AS LONG AS THE TREE(S) ARE
RELOCATED TO AN APPROVED ALTERNATIVE LOCATION ON SITE.
9.IF THERE ARE ANY QUESTIONS CONCERNING THIS DEMOLITION PLAN, PLEASE
CONTACT THE ENGINEER BEFORE CONTINUING WORK.
EROSION CONTROL NOTES
10.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND
LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS.
11.INSTALL SILT DIKE ALONG ALL DOWNSTREAM SLOPES.
12.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET.
EROSION CONTROL SPECIFICATIONS
13.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM
LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT
FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE
PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE
EVENT THIS HAPPENS.
14.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL REMAIN
UNALTERED IN EXCESS OF 15 DAYS.
15.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE
ACHIEVED FINAL AND FINISHED GRADE.
16.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER
POSSIBLE TO PREVENT TOPSOIL EROSION.
17.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE
DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL
EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO
CONTINUE THEIR EFFECTIVENESS.
18.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY
DORMANT SEEDING PROCEDURES SHALL BE USED.
19.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER
APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT
INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR
CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING
UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED.
20.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER.
21.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE
PLANS.
22.PORTABLE TOILETS MUST BE ANCHORED.
GENERAL SITE NOTES
1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL
PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND
STATE AGENCIES PRIOR TO STARTING CONSTRUCTION.
2.ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF WORK
SECTION ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING
CONTRACTORS.
3.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR
EXCAVATIONS; FINAL RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL
EXCAVATIONS EXCEEDING FIVE (5) FEET IN DEPTH. IN ADDITION, EXCAVATION
EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY
SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER.
4.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO
MAINTAIN QUALITY CONTROL THROUGHOUT THIS PROJECT.
5.TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO
APPLICABLE LOCAL STANDARDS.
6.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE
RECORD SURVEYS AND PLATS FOR EXACT INFORMATION.
7.THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS
AND METHODS ASSOCIATED WITH THE PROJECT.
8.ALL DIMENSIONS ARE BASED ON FACE OF CURB OR BACK OF ROLL CURB OR FACE OF
BUILDING.
9.SEE ARCHITECTURAL PLANS FOR DETAILS OF BUILDING, BUILDING DIMENSIONS AND
SIGNAGE SPECIFICATIONS. DO NOT STAKE BUILDING FROM THESE PLANS.
10.COORDINATE CONSTRUCTION ACTIVITIES WITH ADJOINING WORK IF APPLICABLE.
VERIFY EXTENT OF ADJOINING WORK AND COORDINATE AS REQUIRED.
11.FIELD VERIFY EXISTING CURBS AND TAPER PROPOSED VERTICAL CURBS TO MATCH
WITHIN A MIN. OF THREE (3) FEET.
12.± DIMENSIONS INDICATE FIELD DIMENSION ADJUSTMENT AREA BASED ON ACTUAL
FIELD LAYOUT COORDINATES.
13.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO START OF
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD
DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM ACTUAL
FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY.
14.PROVIDE SMOOTH TRANSITION FROM NEWLY PAVED AREAS TO EXISTING AREAS AS
NECESSARY. ALL AREAS WHERE PROPOSED PAVEMENT MEETS EXISTING PAVEMENT,
THE EXISTING EDGE OF PAVEMENT SHALL BE FREE OF ALL LOOSE DEBRIS. THE EDGE
OF EXISTING ASPHALT PAVEMENT SHALL BE PROPERLY SEALED WITH A TACK COAT
MATERIAL IN ALL AREAS WHERE NEW ASPHALT PAVEMENT IS INDICATED TO JOIN
EXISTING.
15.RESURFACE OR RECONSTRUCT AT LEAST TO ORIGINAL CONDITIONS ALL AREAS
WHERE THE EXISTING PAVEMENT OR LAWNS ARE DAMAGED DURING CONSTRUCTION
FROM TRAFFIC BY CONTRACTORS, SUBCONTRACTORS, OR SUPPLIERS AFTER
CONSTRUCTION WORK IS COMPLETE.
16.THE CONTRACTOR SHALL PROTECT AND NOT DESTROY THE PROPERTY CORNER
MONUMENTS DURING CONSTRUCTION.
17.REFER TO ARCHITECTURAL PLANS FOR BUILDING ACCESSORY DETAILS.
18.REFER TO SITE PLAN DETAILS UNLESS OTHERWISE NOTED.
GENERAL GRADING NOTES
1.CONTRACTOR SHALL REFER TO THE STORMWATER POLLUTION PREVENTION PLAN
AND DETAILS FOR CONSTRUCTION SCHEDULING AND EROSION CONTROL MEASURES
TO BE INSTALLED PRIOR TO EARTHMOVING ACTIVITIES.
2.THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE
REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE
STATE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS MAY ALSO BE
APPLICABLE.
3.TOPSOIL SHALL BE STRIPPED FROM ALL AREAS TO RECEIVE PAVING AND FROM
WITHIN THE LIMITS OF PROPOSED BUILDINGS AND STRUCTURES. TOPSOIL SHALL BE
STRIPPED TO THE DEPTH AS NOTED IN THE GEOTECHNICAL REPORT.
4.AFTER STRIPPING TOPSOIL, PROOFROLL AREAS TO BE FILLED WITH A MEDIUM
WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE
MATERIAL. RECOMMENDATIONS FOR DRYING, AMENDING AND/OR REMOVAL OF ANY
UNSUITABLE MATERIAL WITHIN THE PROPOSED PAVED AND/OR BUILDING AREAS WILL
BE DETERMINED AT THE TIME OF CONSTRUCTION BY THE OWNER'S GEOTECHNICAL
TESTING REPRESENTATIVE.
5.TOPSOIL SHALL BE PLACED IN MOUNDING AREAS, NONSTRUCTURAL FILL AND/OR
PLANTING AREAS TO A MINIMUM DEPTH OF 6". EXCESS TOPSOIL SHALL BE REMOVED
FROM THE SITE.
6.WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER,
PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT
TO CONTROL MOISTURE OF SOILS. REFER TO GEOTECHNICAL REPORT AND/OR
CONSULT WITH OWNER'S GEOTECHNICAL TESTING REPRESENTATIVE FOR
RECOMMENDATIONS.
7.FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS, BORROW PITS
OR OTHER APPROVED SOURCES. EARTH SHALL BE FREE FROM ORGANIC MATTER
AND OTHER DELETERIOUS SUBSTANCES AND LARGE ROCKS. THE FILL MATERIAL
SHALL BE PLACED IN LAYERS NOT TO EXCEED SIX INCHES FOLLOWING COMPACTION,
PROPER MOISTURE CONTENT OF FILL MATERIAL WILL BE SUCH TO ACHIEVE
SPECIFIED COMPACTION DENSITY. ALL FILL BENEATH PAVED AREAS, FLOOR SLABS
AND FUTURE BUILDINGS SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM
DRY DENSITY PER ASTM D-1557. FIELD COMPACTING TEST SHALL BE RUN ON EACH
LIFT, IN FILL SECTIONS, AND THE REQUIRED COMPACTION ON EACH LIFT SHALL BE IN
ACCORDANCE WITH STATE DEPARTMENT OF TRANSPORTATION REQUIREMENTS.
8.MAXIMUM LAWN SLOPE IS 3:1.
9.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE
LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS
UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY
OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY
OF THIS INFORMATION IS NOT GUARANTEED.
10.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS,
CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION
AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE
DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS
THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.
11.ALL SPOT ELEVATIONS ARE TO FINISHED GRADE.
12.COMPACTED "B" BORROW BACK FILL REQ'D. OVER ALL UTILITIES IN PAVED AREAS.
13.ALL GRADES AT BOUNDARY SHALL MEET EXISTING. CONTRACTOR SHALL ADJUST
AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND
CONTINUOUS GRADE. BUTT JOINTS SHALL BE PROVIDED AT TRANSITIONAL AREAS
BETWEEN PROPOSED AND EXISTING PAVEMENT.
14.ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5'
OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL.
15.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A.
STANDARDS FOR WORKER SAFETY.
16.THE CONTRACTOR SHALL CONFIRM ALL EARTHWORK QUANTITIES PRIOR TO THE
START OF CONSTRUCTION. IF AN EXCESS OR SHORTAGE OF EARTH IS
ENCOUNTERED, THE CONTRACTOR SHALL CONFIRM WITH THE OWNER AND
ENGINEER THE REQUIREMENTS FOR STOCKPILING, REMOVAL OR IMPORTING OF
EARTH.
17.PROVIDE POSITIVE DRAINAGE WITHOUT PONDING IN ALL AREAS AFTER INSTALLATION.
CONTRACTOR TO TEST FOR AND CORRECT ANY PONDING CONDITIONS. ANY AREAS
THAT HOLD WATER MORE THAN 1/8" DEEP SHALL BE CUT OUT AND CORRECTED TO
POSITIVE DRAINAGE AT NO COST TO THE OWNER/ DEVELOPER OR ENGINEER.
18.ADA ACCESSIBLE PARKING SPACES, RAMPS, AND ROUTES SHALL BE IN ACCORDANCE
WITH THE LATEST ADA STANDARDS FOR ACCESSIBLE DESIGN.
19.VERTICAL CURVES, WITH A MINIMUM LENGTH OF 50', SHALL BE USED WHERE
POSSIBLE BETWEEN VERTICAL CHANGES IN DIRECTION (SLOPE) TO ALLOW FOR
POSITIVE DRAINAGE AND SMOOTH TRANSITIONS.
20.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION
(AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWER
FACILITIES, WATER MAIN, AND STORM SEWERS IS 18" OR LESS.
21.ALL DISTURBED AREA SHALL BE STABILIZED IN ACCORDANCE TO THE STORM WATER
POLLUTION PREVENTION PLAN AND LANDSCAPE PLAN.
22.ADJUST ANY STEEL MANHOLE LIDS IN THE PROPOSED SIDEWALK WITHIN THE RIGHT
OF WAY.
GENERAL UTILITY NOTES
1.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION
SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL CONTACT THE OWNER
AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN CONFLICT WITH THE
PROPOSED IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
2.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE
LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS
UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY
OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY
OF THIS INFORMATION IS NOT GUARANTEED.
3.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS,
CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION
AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE
DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS
THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.
4.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND
ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES.
5.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A.
STANDARDS FOR WORKER SAFETY.
6.ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5'
OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL.
7.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND
ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS
RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR
DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS.
8.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM /
SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY SEWER
LINE IN PROXIMITY OF WATER LINE SHALL BE WATER MAIN GRADE PVC.
9.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION
(AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWERS,
WATER MAINS AND STORM SEWERS IS 18" OR LESS.
10.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT
SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE
EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR
BETTER.
11.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE
ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO
CONTROL MOISTURE OF SOILS.
12.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS.
13.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND
SHALL HAVE TRAFFIC BEARING RING AND COVERS.
14.PROVIDE THRUST BLOCKS FOR ALL WATER LINE BENDS AND TEES, INCLUDING TAP
CONNECTION.
15.CONTRACTOR SHALL COORDINATE WITH WATER COMPANY FOR DOMESTIC AND FIRE
SERVICE. CONNECT TO BUILDING DOMESTIC AND FIRE LINE. COORDINATE WITH
PLUMBING DRAWINGS.
16.COORDINATE LOCATION OF ELECTRICAL AND COMMUNICATION LINES WITH LOCAL
UTILITIES.
17.COORDINATE LOCATION OF REQUIRED CONDUITS FOR ELECTRIC SERVICE, LIGHT
POLES, COMMUNICATION SERVICE AND IRRIGATION SYSTEM.
18.COORDINATE LOCATION AND SIZE OF GAS SERVICE CONNECTION AND INSTALLATION
OF SERVICE LINE AND METER WITH GAS COMPANY.
19.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH
PLUMBING DRAWINGS.
20.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO DOMESTIC/FIRE LINE
INSTALLATION AND STORM SEWER / SANITARY SEWER INSTALLATION.
21.SANITARY SEWER LATERAL, WATER SERVICE, & ELECTRICAL/COMMUNICATION
CONDUITS SHALL BE GRANULAR BACKFILL FOR ENTIRE RUN.
22.ALL EXISTING MANHOLE AND CATCH BASIN GRATES, WATER OR GAS VALVES SHALL
BE ADJUSTED TO NEW FINISH GRADE ELEVATIONS.
23.WATER LINES TO BE BURIED BELOW THE FROST LINE PER LOCAL WATER COMPANY
STANDARDS.
GENERAL LANDSCAPE NOTES
1.IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST, THE PLAN
SHALL DICTATE. IF IN QUESTION, CONTACT THE LANDSCAPE ARCHITECT.
2.PROVIDE QUALITY, SIZE, GENUS, SPECIES, AND VARIETY FOR ALL PLANTS INDICATED,
COMPLYING WITH APPLICABLE REQUIREMENTS OF ANSI Z60.1 "AMERICAN STANDARD
FOR NURSERY STOCK", LATEST EDITION.
3.SUBMIT A LIST OF NURSERY SOURCES FOR ALL SPECIFIED PLANT MATERIAL
INDICATING THE SIZE, GENUS, SPECIES AND VARIETY. INCLUDE THE QUANTITY OF
PLANT MATERIAL TO BE PROCURED FROM EACH NURSERY.
4.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL EXISTING
UTILITIES PERTAINING TO THEIR PHASE OF WORK. UTILITIES ARE SHOWN TO BE
APPROXIMATE. CALL UTILITY LOCATE PRIOR TO ANY PLACEMENT OF PLANT MATERIAL
OR OTHER LANDSCAPE MATERIAL.
5.THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE
REQUIRED FOR HIS PORTION OF WORK.
6.ANY EXISTING TREE(S) AND/OR PLANTINGS THAT MAY REQUIRE REMOVAL BUT ARE
NOT SHOWN ON THE PLAN AS BEING REMOVED SHALL BE PROTECTED AND BROUGHT
TO THE ATTENTION OF THE LANDSCAPE ARCHITECT TO DETERMINE IF TREE(S)
AND/OR PLANTINGS SHOULD BE 1)REMOVED, 2)SAVED AND INTEGRATED INTO THE
LANDSCAPE DESIGN, OR 3) RELOCATED.
7.CONTRACTOR TO REVIEW THE SWPPP SERIES PLANS FOR STABILIZATION
(SEEDING/SOD/MULCH) REQUIREMENTS.
8.PLANTING BEDS AND PLANT MATERIAL SHALL BE LOCATED AS INDICATED ON
LANDSCAPE PLAN. IN THE EVENT FIELD CHANGES OR CONDITIONS REQUIRE
MODIFICATION TO THE LANDSCAPE DESIGN, THE CONTRACTOR SHALL CONSULT
LANDSCAPE ARCHITECT AS TO PROPOSED MODIFICATIONS PRIOR TO PLANTING. THE
LANDSCAPE ARCHITECT RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON
SITE IF NECESSARY.
9.ALL PLANTS ARE TO MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK,
LATEST EDITION, AS SET FORTH BY AMERICAN ASSOCIATION OF NURSERYMEN.
10.PLANTS SHALL BEAR A TAG SHOWING GENUS, SPECIES AND VARIETY. REMOVE AT
TIME OF FINAL ACCEPTANCE.
11.PLANTS SHALL BE CERTIFIED BY THE STATE OF INDIANA DEPARTMENT OF NATURAL
RESOURCES AND FREE FROM DISEASE OR HAZARDOUS INSECTS.
12.LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT IN WRITING PRIOR
TO BID DATE OF ANY PLANTS THAT HE FEELS MAY NOT SURVIVE IN LOCATIONS
NOTED.
13.NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED WITHOUT APPROVAL OF
THE JURISDICTION HAVING AUTHORITY AND THE LANDSCAPE ARCHITECT. IF PLANTS
ARE SHOWN TO BE UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE
ARCHITECT PRIOR TO BID DATE IN WRITING. THE CONTRACTOR SHALL COMPENSATE
THE LANDSCAPE ARCHITECT FOR THE TIME REQUIRED FOR REVIEW AND INSPECTION
OF PROPOSED PLANT SUBSTITUTIONS BID AWARD.
14.ALL PLANT MATERIAL SHALL BE SPECIMEN QUALITY. SUBMIT COLOR PHOTOGRAPHS
OF PROPOSED PLANT MATERIAL TAKEN IN THE NURSERY WHERE THEY ARE
GROWING. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO INSPECT PLANT
MATERIALS AT NURSERY OR CONTRACTOR YARD PRIOR TO DELIVERY TO THE SITE.
THE LANDSCAPE ARCHITECT MAY ALSO INSPECT AND APPROVED OR REJECTED
PLANT MATERIAL ON THE JOB SITE. IN THE EVENT PLANT MATERIAL IS NOT THE
SPECIFIED SIZE OR QUALITY, PLANTS WILL BE REMOVED AND REPLACED AT THE
CONTRACTORS EXPENSE.
15.PLANTS AND OTHER LANDSCAPE MATERIALS TO BE STORED ON SITE WILL BE PLACED
WHERE THEY WILL BE PROTECTED AND NOT CONFLICT WITH CONSTRUCTION
OPERATIONS.
16.COMPOST SHALL BE A WELL DECOMPOSED, STABLE, WEED FREE ORGANIC MATTER
SOURCE. IT SHALL BE DERIVED FROM: AGRICULTURAL, FOOD, OR INDUSTRIAL
RESIDUALS; BIOSOLIDS (TREATED SEWAGE SLUDGE); YARD TRIMMINGS;
SOURCE-SEPARATED OR MIXED SOLID WASTE. THE PRODUCT SHALL CONTAIN NO
SUBSTANCES TOXIC TO PLANTS AND SHALL BE REASONABLY FREE (< 1% BY DRY
WEIGHT) OF MAN-MADE FOREIGN MATTER. THE COMPOST WILL POSSESS NO
OBJECTIONABLE ODORS AND SHALL NOT RESEMBLE THE RAW MATERIAL FROM
WHICH IT WAS DERIVED.
17.SHRUB AND PERENNIAL BEDS SHALL BE PREPARED BY PLACING 3” OF APPROVED
COMPOST OVER PULVERIZED TOPSOIL AND ROTOTILLING TO A DEPTH OF 6”.
18.PRE-EMERGENT HERBICIDE SHALL BE APPLIED IN ALL PLANTING AND GROUND COVER
BEDS PRIOR TO MULCHING AT RATES SPECIFIED BY MANUFACTURER FOR EACH
VARIETY OF PLANT. PRE-EMERGENT HERBICIDE SHALL BE APPROVED BY THE
LANDSCAPE ARCHITECT PRIOR TO APPLICATION.
19.ALL TREE AND SHRUB PLANTING AREAS TO BE COVERED WITH 3" THICK LAYER OF
SHREDDED HARDWOOD BARK MULCH. ALL GROUND COVER BEDS SHALL BE
COVERED WITH 1" SHREDDED HARDWOOD BARK MULCH. BARK MULCH SHALL BE
APPROVED BY THE LANDSCAPE ARCHITECT AND SHALL BE UNIFORM IN TEXTURE AND
COLOR AND SHALL BE FREE OF STICKS, LEAVES, SOIL AND FOREIGN MATERIAL. NO
UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED.
20.CONTRACTOR SHALL MAINTAIN ALL LAWN AREAS AND PLANT MATERIAL UNTIL ALL
PUNCH LIST WORK HAS BEEN COMPLETED AND WRITTEN FINAL ACCEPTANCE BY THE
LANDSCAPE ARCHITECT OR OWNER. MAINTENANCE SHALL BEGIN IMMEDIATELY
AFTER EACH PLANT IS INSTALLED AND SHALL INCLUDE BUT NOT LIMITED TO,
WATERING, WEEDING, PRUNING, DISEASE AND INSECT CONTROL, MOWING,
RESETTING OF PLANTS TO PROPER GRADES OR UPRIGHT POSITION, AND ANY OTHER
PROCEDURE CONSISTENT WITH GOOD HORTICULTURAL PRACTICES.
21.ALL NEW LANDSCAPE PLANTINGS SHALL BE GUARANTEED FOR A PERIOD OF ONE
YEAR FOLLOWING FINAL ACCEPTANCE AS DETERMINED BY LANDSCAPE ARCHITECT
OR OWNER. AT THE END OF THIS PERIOD, PLANT MATERIAL DETERMINED TO BE DEAD
OR UNSATISFACTORY BY LANDSCAPE ARCHITECT OR OWNER SHALL BE REPLACED
AT NO ADDITIONAL CHARGE BY THE CONTRACTOR.
22.IRRIGATION DESIGN BY OTHERS.
10 9
a
b
c
d
8 7 6
e
f
g
h
10 9 8 7 6
5 4 3 2
Pa
r
t
o
f
t
h
e
X
X
/
4
o
f
S
e
c
t
i
o
n
X
X
,
T
o
w
n
s
h
i
p
X
X
N
o
r
t
h
,
R
a
n
g
e
X
E
a
s
t
,
X
X
X
X
T
o
w
n
s
h
i
p
,
X
X
X
X
C
o
u
n
t
y
,
I
n
d
i
a
n
a
1
PR
E
P
A
R
E
D
F
O
R
:
PROJECT NO.
SHEET NO.
a
b
c
d
5 4 3 2
e
1
f
h
PE
R
M
I
T
S
E
T
03
.
0
1
.
2
0
2
5
JM
1
g
AL
L
A
N
H
.
W
E
I
H
E
,
P
.
E
.
,
L
.
S
.
-
F
O
U
N
D
E
R
10
5
0
5
N
.
C
o
l
l
e
g
e
A
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
I
n
d
i
a
n
a
4
6
2
8
0
we
i
h
e
.
n
e
t
Bu
i
l
d
w
i
t
h
c
o
n
f
i
d
e
n
c
e
.
SM
EN
G
I
N
E
E
R
S
31
7
|
8
4
6
-
6
6
1
1
80
0
|
4
5
2
-
6
4
0
8
31
7
|
8
4
3
-
0
5
4
6
fa
x
W
E
I
H
E
La
n
d
S
u
r
v
e
y
i
n
g
|
C
i
v
i
l
E
n
g
i
n
e
e
r
i
n
g
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
PR
O
J
E
C
T
N
O
.
:
RE
V
I
S
I
O
N
S
A
N
D
I
S
S
U
E
S
DA
T
E
BY
DW
G
N
A
M
E
:
DE
S
I
G
N
E
D
B
Y
:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
DA
T
E
:
Know what's below.
before you dig.Call
R
DARRELL A. EDWARDS P.E. #890047
CI
T
Y
C
O
M
M
E
N
T
S
03
.
2
1
.
2
0
2
5
JM
2
CI
T
Y
C
O
M
M
E
N
T
S
3
/
1
7
/
2
5
03
.
2
6
.
2
0
2
5
JM
3
CI
T
Y
C
O
M
M
E
N
T
S
4
/
2
/
2
5
04
.
0
2
.
2
0
2
5
JM
4
AD
D
E
D
S
W
P
P
P
S
P
E
C
S
S
H
E
E
T
04
.
0
4
.
2
0
2
5
JM
5
CI
T
Y
C
O
M
M
E
N
T
S
4
/
1
6
/
2
5
04
.
1
7
.
2
0
2
5
JM
6
CI
T
Y
C
O
M
M
E
N
T
S
04
.
3
0
.
2
0
2
5
JM
7
CITY NOTES
1.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE
RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS
REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH
PROPOSED DEVELOPMENT SHALL BE THE RESPONSIBILITY OF THE
DEVELOPER TO RESOLVE WITH THEE UTILITY. EXISTING POLE
LINES, REQUIRED TO BE RELOCATED SHALL BE RELOCATED TO
WITHIN 1' OF PROPOSED ROW LINE.
2.ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURE AND
BRIDGES ACROSS THE FRONTAGE OF THE DEVELOPMENT ARE
INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO
IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES
AS NECESSARY OR AS REQUESTED BY THE CITY TO
ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES,
MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TO
THE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE OR
REPLACE ANY DRAINAGE STRUCTURE AND BRIDGES WILL BE
BORNE BY THE DEVELOPER.
3.DAMAGE TO THE EXISTING ROW SHALL BE RESTORED / REPAIRED
TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE
PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE
ROW WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO
DOCUMENT THE EXISTING CONDITION OF THE ROW.