April 2, 2025
Jeremy Kashman
Chief Infrastructure Officer
City of Carmel
One Civic Square
Camel, Indiana 46032
Phone: 317.571.2441
E-mail: jkashman@carmel.in.gov
RE: Professional Services Proposal for:
Autumn & Veterans Greenways Preliminary Design
Weihe Proposal No. PW250128
Dear Jeremy:
Thank you for the opportunity to submit this proposal to perform landscape architecture services
for the proposed greenway improvements in the Autumn Greenway and Veterans Greenway
thcorridors. This proposal is based upon discussions with you on February 11, and afield walk
thwithEngineeringResources (ER) staff on February 20. The following project information
forms the basis of this proposal:
1. Weihe Engineers will partner with Engineering Resources, under separate contracts, to
develop Conceptual/Preliminary Engineering plans for the corridors.
th2. The east-west alignment of the Autumn Trail follows the 126 Street/Autumn Drive
rdalignmentandwillextendfromOldMeridianStreetto3Avenue SW.
3. The north-south alignment of the Veterans Trail will tee into the Autumn Trail west of
Guilford Avenue, and run north through several properties to aterminus at Main Street
and Old Meridian. It will also include aconnection to the VFW facility.
4. A route survey will be prepared (by Weihe Engineers) under a separate contract.
5. We understand the all-in budget for the two projects to be $12.4 million, funded through
a local bond.
6. Additional work outside of contract scope shall be approved by the City prior to
commencement of work.
Indianapolis, IN | St. Louis, MO | .www.weihe.net | (800) 452-6408
Allan H. Weihe, P.E., L.S. - Founder
Proposed Scope of Services
1. Preliminary Design:
We will attend a project kickoff meeting with the City and Carmel-Clay Parks staff
to confirm project scope, deliverables, and schedule, and review unique
characteristics or challenges associated with each trail segment.
We will work with Engineering Resources (ER) to prepare deliverables. ER will
focus on the alignment of the trail
design work will be complementary and will help sort out alignments through
complicated locations, and amenities along both alignments. Our deliverable will be
a booklet style packet depicting design solutions for detail areas.
Weihe scope of work as the project Landscape Architect will include:
o input on the mainline trail alignment
o developing alternatives in tight areas where a simple routing is not
possible.
o advising on connections to adjacent areas
o locating nodes/trailheads as part of the overall project
o recommendations regarding roadway crossings.
o landscape plantings/fencing/screening
o trail branding/wayfinding signage to develop individual identities for the
trails.
We will work to develop guidance on land acquisition, seeking to balance the trail
user experience with any perceived imposition on trail neighbors.
We will work with ER to develop a preliminary cost opinion for the projects.
We will meet with the City and ER staff to review the proposed preliminary design.
Schedule of Deliverables
We assume that the project schedule will be established at the project kickoff meeting with the
City and Carmel/Clay Parks staff. The following is a suggested schedule for the project.
Task Duration
Kickoff Meeting Within 30 days after Survey is Complete
Alignment Progress Discussion 45 Days
Alignment Presentation & Focus Area Discussion 45 Days
Trailhead, Signage, and Loose Ends Discussion 30 Days
Final Deliverable 30 Days
Autumn & Veterans Greenways Prelim Design 2 of 5 PW250128
Assumptions
The following assumptions are a basis for this proposal:
The City and/or Carmel/Clay Parks will handle any coordination of the public
engagement process and presentations including publications, legal notices, and
related matters.
During the project, we will keep the City informed as to the status of the progress of
the design and of decisions that need to be made to keep the project moving on
schedule.
Weihe Engineers reserves the right to increase fees remaining in contract after one
year from signed acceptance by 3% annually.
Additional Services:
There are many items that need to be included in a successful project. For the purpose of
identifying these items, and determining which member of the team will provide the service, we
have identified items that may be needed but have not been included with this proposal:
Topographic or boundary survey (services to be addressed in a separate contract)
Civil engineering services including grading, drainage, utilities, etc.
Drainage Permit documents including plans, calculations, stormwater report, and
O&M manual.
Offsite work including, but not limited to utility and/or drainage investigation or
design.
Geotechnical services.
Environmental services such as Phase I and/or Phase II site assessments.
Archeological services.
Wetlands determination/delineation and/or mitigation.
Floodway/floodplain analyses and/or HEC studies.
FEMA Letter of Map Revision applications.
Public notices or certified mailing, or legal research.
Preparation of easement descriptions exhibits and/or layout.
Private utility locating services.
Traffic counts, investigation, studies, or traffic engineering.
Permitting fees, or plan review fees.
Roadway lighting design.
Electrical design.
Structural Engineering including retaining wall design.
Public thoroughfare design improvements such as lane shifts or widenings, signal
improvements and/or restriping.
Autumn & Veterans Greenways Prelim Design 3 of 5 PW250128
Fee Proposal
Autumn & Veterans Greenways Preliminary DesignCarmel, Indiana
1.Preliminary Design$112,000.00
2.Reimbursable Expenses $1,000.00
TOTAL FOR ITEMS 1 THROUGH 2:$113,000.00
Should you have any questions or comments, please feel free to contact us at your convenience.
We appreciate the opportunity to be of service to you and look forward to working with you on
this project.
Sincerely,
Michael Krosschell, RLA
Senior Project Manager, Landscape Architecture
Cc: Diane Sharrer, PE Sr. Vice President Residential Development
Matt Manhart -SurveyProject Manager
Autumn & Veterans Greenways Prelim Design 4of5PW250128
FEESCHEDULE 2025
PRINCIPAL $300/Hour
DEPARTMENT MANAGER $265/Hour
Sr. PROJECT MANAGER $240/Hour
Sr. PROJECT ENGINEER $210/Hour
PROJECT MANAGER $190/Hour
PROJECT ENGINEER $185/Hour
CONSTRUCTION MANAGER $165/Hour
PROJECT SURVEYOR $140/Hour
Sr. DESIGNER $175/Hour
DESIGNER II $150/Hour
DESIGNER I $130/Hour
Sr. CAD TECHNICIAN $130/Hour
CAD TECHNICIAN II $120/Hour
CAD TECHNICIAN I $110/Hour
PROJECT ADMINISTRATOR $110/Hour
Sr. CREW CHIEF $170/Hour
CREW CHIEF $130/Hour
FIELD TECH II $100/Hour
FIELD TECH I $85/Hour
UTILITY LOCATE CREW $250/Hour
UTILITY LOCATE TECHNICIAN $200/Hour
DRONE UAV $175/Hour
Autumn & Veterans Greenways Prelim Design 5 of 5 PW250128
5/14/2025
WEIHE ENGINEERS INC
INDIANAPOLIS, IN 46280 -
116764
10505 N COLLEGE AVE
City of Carmel
ONE CIVIC SQUARE
CARMEL, INDIANA 46032-2584
FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL - 1997
INDIANA RETAIL TAX EXEMPT
CERTIFICATE NO. 003120155 002 0
FEDERAL EXCISE TAX EXEMPT
35-6000972
PURCHASE ORDER NUMBER
THIS NUMBER MUST APPEAR ON INVOICES, A/P
VOUCHER, DELIVERY MEMO, PACKING SLIPS,
SHIPPING LABELS AND ANY CORRESPONDENCE
PURCHASE ORDER DATE DATE REQUIRED REQUISITION NO. VENDOR NO. DESCRIPTION
VENDOR SHIP
TO
PURCHASE ID BLANKET CONTRACT PAYMENT TERMS FREIGHT
EXTENSION
Professional Services Agreement 3/19/25
City Engineering's Office
1 Civic Square
Carmel, IN 46032-
00351219
UNITPRICEDESCRIPTIONUNITOFMEASUREQUANTITY
Page 1 of 1
Laurie Slick
100504
2200Department:0Fund:2024 Bond
44-628.71Account:
ASA 1 - 24-PRK-01 & 24-PRK-02 - Autumn Greenway &
Veteran's Way - Preliminary Design Services
1 $113,000.00 $113,000.00Each
113,000.00SubTotal
113,000.00
Send Invoice To:
PLEASE INVOICE IN DUPLICATE
DEPARTMENT ACCOUNT PROJECT PROJECT ACCOUNT AMOUNT
SHIPPING INSTRUCTIONS
SHIP PREPAID.
C.O.D. SHIPMENT CANNOT BE ACCEPTED.
PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL
AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO.
THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945
PAYMENT
A/P VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A
PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN
AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBLIGATED BALANCE IN
THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER.
CONTROL NO. 116764
ORDERED BY
TITLE
City Engineering's Office
1 Civic Square
Laurie Slick
Carmel, IN 46032-
Bradley Pease Zac Jackson
Director CFO