Loading...
HomeMy WebLinkAboutC201-Site Development PlansE.T . U. P . EAC U. P . U. P . U. P . U. P . U. P . U. P . 84 3 . 5 7 2I N P V C V R T 84 0 84 1 84 2 838 10 ' D . & U . E . 10 ' D . & U . E . 10 ' D . & U . E . 25' D.&U.E. 30 ' T . P . E . 50' T.P.E. 10 ' T . P . E . 851 84 6 850 849 848 847 84 5 84 4847 846 845 844 843 84 6 84 5 844 842 35 ' B . L . 35 ' B . L . 25' B.L. LOT 4 MFF:847.0 MAX. LOT COVERAGE: 15,000 sq. ft. 140 LF 12" 3.50% 53 LF 12" 3.49% 2' RIBBON CURB 2' RIBBON CURB 406 405 409 5+75 839.02 6+25 840.54 6+75 842.62 7+00 843.71 6+05.07 PVI 839.87 5+55.07 BVC 838.58 6+55.07 EVC 841.75 7+22.70 GB 844.70 60 ' I . E . E . & D . E . & U . E . 12 0 ' 15' Electrical & Telecomm. Easement Instr. No. 2019025955 & Instr. No. 2019031338 -2 . 0 0 % -2 . 0 0 % -3 . 4 2 % 10' T.P.E. VAR. WATER QUALITY PRESERVATION EASEMENT MLAG:826.0 MFPG:826.0 MLAG:844.8 MFPG:844.8 ML A G : 8 4 6 . 4 MF P G : 8 4 6 . 4 MLAG:826.0 MFPG:826.0 4.36% Lot 5Lot 4 Lot 6 Lot 7 DONNYBROOK ADDITION Plat Book 2, Pages 233-234 DONNYBROOK ADDITION Plat Book 2, Pages 233-234 Lo t 1 9 Lo t 2 0 Lo t 2 1 Lo t 2 2 DO N N Y B R O O K W O O D S Pl a t B o o k 2 , P a g e s 2 3 3 - 2 3 4 MONON FARMS CONDOMINIUMS Plat Cabinet 3, Slide 651 Inst. No. 200500039345 20' 10' T.P.E. LOT 3 MFF:845.3 MAX. LOT COVERAGE: 12,000 sq. ft. 25 LF SWALE 1.20%99 LF SWALE 4.04% 84 4 . 2 84 4 . 6 84 4 . 4 84 5 . 0 84 6 . 0 84 7 . 1 84 6 . 4 84 5 . 6 84 5 . 0 84 5 . 4 838.8 839.2 840.0 840.7 841.9 842.8 843.9 84 3 . 6 84 3 . 9 840.3 839.7 837.7 838.0 837.5 HP 838.8 838.6 837.2 837.7 838.4 845.3 843.2 840.1 840.4 839.9 845.3845.3 844.7844.5 843.5841.4 842.1841.7 841.2HP 844.1 845.3 84 4 . 7 84 3 . 0 84 2 . 7 84 2 . 6 845.3 841.9 838.9 839.2 838.4 842.8 84 3 . 3 84 2 . 6 84 2 . 3 84 3 . 5 84 3 . 4 84 2 . 5 84 3 . 4 843 843 844 845 839 840 841 842 843 844 845 838 839 837838839840841842843844 84 4 . 3 84 3 . 8 84 4 . 8 5. 5 8 % 4.97% 10 ' D . & U . E . 10 ' D . & U . E . 50' T.P.E. (Private) DRIVE ALL TREES / VEGETATION LOCATED WITHIN THE LIMITS OF THE VAR. WATER QUALITY PRESERVATION EASEMENT SHALL BE PRESERVED DA T E MA R K RE V I S I O N S BY S & A JOB NO. SHEET NO. DRAWN BY:CHECKED BY: TH I S D R A W I N G I S N O T I N T E N D E D T O B E RE P R E S E N T E D A S A R E T R A C E M E N T O R OR I G I N A L B O U N D A R Y S U R V E Y , A R O U T E S U R V E Y O R A S U R V E Y O R LO C A T I O N R E P O R T . CE R T I F I E D : S T O E P P E L W E R T H A L W A Y S O N 79 6 5 E a s t 1 0 6 t h S t r e e t , F i s h e r s , I N 4 6 0 3 8 - 2 5 0 5 ph o n e : 3 1 7 . 8 4 9 . 5 9 3 5 f a x : 3 1 7 . 8 4 9 . 5 9 4 2 SI T E D E V E L O P M E N T P L A N C201 111895GBC PDR BKR CL A Y T O W N S H I P HA M I L T O N C O U N T Y , I N D I A N A Fi l e N a m e : S: \ 1 1 1 8 9 5 G B C \ D W G \ C 2 0 0 - S i t e D e v e l o p m e n t P l a n s . d w g - C2 0 1 Mo d i f i e d / B y : Ju n e 2 6 , 2 0 2 5 9 : 5 1 : 5 4 A M / pr i c h a r d s Pl o t t e d / B y : Ju n e 2 6 , 2 0 2 5 1 1 : 2 2 : 4 1 A M / Pa u l R i c h a r d s 06 / 2 6 / 2 5 SW I N L E Y F O R E S T 12 2 5 E A S T 1 1 6 t h S T R E E T MA T C H L I N E " A " - S E E S H E E T C 2 0 0 MA T C H L I N E " A " - S E E S H E E T C 2 0 0 GRAPHIC SCALE 0' ( IN FEET ) 30'15'30' 1" = 30' LEGEND EXISTING FEATURES ELECTRIC LINE, UNDERGROUND FIBER OPTIC LINE GAS MAIN ELECTRIC LINE, OVERHEAD TELEPHONE LINE WATER MAIN SEWER, SANITARY SEWER, STORM CONTOUR FENCE LINE WATER FLOWLINE NORMAL WATER ELEVATION FLOODWAY FRINGE (PRE-PUBLISHED FLOOD LINE) TREE LINE MAILBOX UTILITY POLE GUY ANCHOR TELECOM, FIBER OPTIC HANDHOLE ELECTRICAL, ACCESS COVER WATER, HYDRANT WATER, VALVE RISER GATE POST SIGN RIGHT-OF-WAY MARKER TREE PROPOSED FEATURES WATER MAIN w/ HYDRANT SEWER, STORM CONTOUR NORMAL WATER ELEVATION WATER FLOWLINE 6" SUB-SURFACE DRAIN (UNDER SWALE) GRADE ELEVATION CURB & GUTTER (w/ 6" UNDERDRAIN) MLAG / MFPG - REAR LOT NUMBER MIN. FINISH FLOOR ELEVATION MLAG / MFPG - FRONT MFF:834.0 MIN. FINISH FLOOR ELEVATION IS BASED OFF OF THE FOLLOWING CRITERIA: 1. 12" (1.0') ABOVE THE NEAREST UPSTREAM OR DOWNSTREAM SANITARY MANHOLE (WHICHEVER IS LOWEST) 2. 6" (0.5') ABOVE THE MLAG 3. 15" (1.25') ABOVE THE HIGHEST ROAD ELEVATION ACROSS FRONT OF LOT DENOTES CONSTRUCTION LIMITS DENOTES TREE PROTECTION FENCE LOCATION(S) ABBREVIATIONS B.L.BUILDING SETBACK LINE B.M.P.E.BEST MANAGEMENT PRACTICE EASEMENT C.A.COMMON AREA D.E.DRAINAGE EASEMENT D.&U.E.DRAINAGE & UTILITY EASEMENT I.E.E.INGRESS / EGRESS EASEMENT L.M.A.E.LANDSCAPE & LAKE MAINTENANCE ACCESS EASEMENT T.P.E.TREE PRESERVATION EASEMENT U.E.UTILITY EASEMENT R/W RIGHT-OF-WAY VAR.VARIABLE ME MATCH EXISTING HP HIGH POINT LP LOW POINT GB GRADE BREAK LOT 1 833.5 833.2 MLAG: MFPG: MFF:834.0 826.0 826.0 MFPG: MLAG: DRAINAGE SUMMARY OVERALL Site Acreage:±3.19 ac. Offsite/Upstream Acreage:±0.59 ac. Volume Required:36,154 cu.ft. Volume Provided:38,804 cu.ft. Critical Elevations: 2-yr:825.87 10-yr:826.76 100-yr:828.03 Allowable Release Rate:Post Developed Release Rate: 10-yr:0.32 c.f.s.10-yr:0.31 c.f.s. 100-yr:0.96 c.f.s.100-yr:0.95 c.f.s. BENCHMARK DATA ORIGINATING BENCHMARK: BENCHMARK ELEVATIONS FOR THIS PROJECT WERE DERIVED USING THE NATIONAL GEODETIC SURVEY ONLINE POSITIONING USER SERVICE (O.P.U.S) AND ARE REFERENCED TO THE NAVD '88 DATUM. SITE TBMs: TBM #1: A CUT SQUARE ON TOP OF THE CONCRETE CURB ON THE SOUTH SIDE OF 116th STREET, IMMEDIATELY EAST OF THE ENTRANCE TO THE GRAVEL DRIVE ON THE WEST SIDE OF THE SITE. EL: 832.38 (NAVD 88) TBM #2: A CUT "X" ON TOP OF THE CONCRETE TOP OF THE BRICK HEADWALL OVER CARMEL CREEK, AT THE NORTHWEST CORNER OF THE WALL. EL: 830.09 (NAVD 88) NOTES 1.THIS SURVEY REFLECTS ABOVE GROUND INDICATIONS OF UTILITIES AND INFORMATION AVAILABLE FROM UTILITY COMPANIES. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL VERIFY DEPTHS OF ALL EXISTING ONSITE UTILITIES PRIOR TO CONSTRUCTION TO CONFIRM THERE ARE NOT ANY CONFLICTS WITH OTHER UTILITIES, STORM SEWERS OR STREETS. CONFLICTS AFTER CONSTRUCTION BEGINS ARE SOLELY THE CONTRACTOR'S RESPONSIBILITY. 3.STORM WATER CONTROLS SHOWN ON THE INITIAL SWPPP (C300) SHOULD BE INSTALLED AS SOON AS PRACTICAL. 4.IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL UTILITY POLES SHALL BE LOCATED WITHIN ONE FOOT OF THE PROPOSED RIGHT-OF-WAY. 5.ALL PADS SHOULD BE TESTED TO ASSURE A COMPACTION OF AT LEAST 95 PERCENT OF THE MAXIMUM DRY DENSITY USING THE STANDARD PROCTOR TEST METHOD. 6.ANY PRIVATE TILES LOCATED ON THIS SITE WILL NEED TO BE LOCATED; BREATHERS SET AT THE DOWNSTREAM PROPERTY LINE AND CRUSHED OR REMOVED ACROSS THIS SITE. IF ANY OF THESE TILES EXTEND BEYOND THE LIMITS OF THIS PROJECT, THEY WILL NEED TO BE PROVIDED A POSITIVE OUTLET AND ALLOWED TO CONTINUE TO FUNCTION, AS IT IS ILLEGAL TO BLOCK OFF A PRIVATE "MUTUAL" TILE. 7.CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF WORK TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED CITY R/W. 8.EXISTING PAVEMENT TO BE SAW CUT TO A CLEAN EDGE ADJACENT TO ANY WIDENING, AUXILIARY LANES, ETC. 9.NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 10.THERE IS TO BE NO DRIVEWAY ENCROACHMENTS INTO EASEMENTS BETWEEN LOTS. 11.IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL UTILITY POLES SHALL BE LOCATED WITHIN ONE-FOOT OF THE PROPOSED RIGHT-OF-WAY. 12.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 13. ALL PAVING WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. 14.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED SHALL BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 15.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY A THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WIT THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 16.ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND THE REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. 17.ANY DISTURBANCE TO EXISTING BMP GRADING AND/OR VEGETATION SHALL BE RESTORED PER DETAILS AND SPECIFICATIONS SHOWN ON V3 DESIGN DEVELOPMENT DOCUMENTS. 18.ALL STORM SEWERS ARE PUBLIC. 19.ROOF DRAINS SHALL BE CONNECTED TO THE PROPOSED CATCH BASINS. EARTHWORK NOTES 1.EXCAVATION A.EXCAVATED MATERIAL THAT IS SUITABLE MAY BE USED FOR FILLS. ALL UNSUITABLE MATERIAL AND ALL SURPLUS EXCAVATED MATERIAL NOT REQUIRED SHALL BE REMOVED FROM THE SITE. B.PROVIDE AND PLACE ANY ADDITIONAL FILL MATERIAL FROM OFFSITE AS MAY BE NECESSARY TO PRODUCE THE GRADES REQUIRED ON PLANS. FILL OBTAINED FROM OFFSITE SHALL BE OF QUALITY AS SPECIFIED FOR FILLS HEREIN AND THE SOURCE APPROVED BY THE DEVELOPER. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR ANY COSTS FOR FILL NEEDED. 2.REMOVAL OF TREES A.ALL TREES AND STUMPS SHALL BE REMOVED FROM AREAS TO BE OCCUPIED BY A ROAD SURFACE OR STRUCTURE AREA. TREES AND STUMPS SHALL NOT BE BURIED ON SITE. 3.PROTECTION OF TREES A.THE CONTRACTOR SHALL, AT THE DIRECTION OF THE DEVELOPER, ENDEAVOR TO SAVE AND PROTECT TREES OF VALUE AND WORTH WHICH DO NOT IMPAIR CONSTRUCTION OF IMPROVEMENTS AS DESIGNED. B.IN THE EVENT CUT OR FILL EXCEEDS 0.5 FEET OVER THE ROOT AREA, THE DEVELOPER SHALL BE CONSULTED WITH RESPECT TO PROTECTIVE MEASURE TO BE TAKEN, IF ANY, TO PRESERVE SUCH TREES. 4.REMOVAL OF TOPSOIL A.ALL TOPSOIL SHALL BE REMOVED FROM ALL AREAS BENEATH FUTURE PAVEMENTS OR BUILDING. TOPSOIL REMOVAL SHALL BE TO A MINIMUM DEPTH OF 6 INCHES OR TO THE DEPTH INDICATED IN THE GEO-TECHNICAL REPORT PROVIDED BY THE DEVELOPER TO BE EXCAVATED OR FILLED. TOPSOIL SHOULD BE STORED AT A LOCATION WHERE IT WILL NOT INTERFERE WITH CONSTRUCTION OPERATIONS. THE TOPSOIL SHALL BE FREE OF DEBRIS AND STONES. 5.UTILITIES A.RULES AND REGULATION GOVERNING THE RESPECTIVE UTILITY SHALL BE OBSERVED IN EXECUTING ALL WORK UNDER THIS SECTION. B.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE LOCATION OF EXISTING UNDERGROUND UTILITIES 2 WORKING DAYS PRIOR TO COMMENCING WORK. FOR UTILITY LOCATIONS TO BE MARKED CALL TOLL FREE 811. 6.SITE GRADING A.THE CONTRACTOR SHALL DO ALL CUTTING, FILLING, COMPACTING OF FILLS AND ROUGH GRADING REQUIRED TO BRING ENTIRE PROJECT AREA TO SUB-GRADE AS SHOWN ON THE DRAWING. B.THE TOLERANCE FOR PAVED AREAS SHALL NOT EXCEED 0.05 FEET ABOVE ESTABLISHED SUB-GRADE. ALL OTHER AREAS SHALL NOT EXCEED 0.05 FEET PLUS OR MINUS THE ESTABLISHED GRADE. PROVIDE ROUNDINGS AT TOP AND BOTTOM OF BANKS AND OTHER BREAKS IN GRADE. C.THE ENGINEER SHALL BE NOTIFIED WHEN THE CONTRACTOR HAS REACHED THE TOLERANCE AS STATED ABOVE, SO THAT FIELD MEASUREMENTS AND SPOT ELEVATIONS CAN BE VERIFIED BY THE ENGINEER. THE CONTRACTOR SHALL NOT REMOVE EQUIPMENT FROM THE SITE UNTIL THE ENGINEER HAS VERIFIED THAT THE JOB MEETS THE ABOVE TOLERANCE.