Loading...
HomeMy WebLinkAboutC304A-SWPPP - DetailsYbvA Br YmsB2 YshAH YbvA YmsB2 Ym s B 2 YclA YbvA Sx YbvA YbvA YmsB2 MmA YclA YmsB2 YclA YclA YclA MnB2 CrA YshAH YmsB2 YmsB2 DA T E MA R K RE V I S I O N S BY S & A JOB NO. SHEET NO. DRAWN BY:CHECKED BY: TH I S D R A W I N G I S N O T I N T E N D E D T O B E RE P R E S E N T E D A S A R E T R A C E M E N T O R OR I G I N A L B O U N D A R Y S U R V E Y , A R O U T E S U R V E Y O R A S U R V E Y O R LO C A T I O N R E P O R T . CE R T I F I E D : S T O E P P E L W E R T H A L W A Y S O N 79 6 5 E a s t 1 0 6 t h S t r e e t , F i s h e r s , I N 4 6 0 3 8 - 2 5 0 5 ph o n e : 3 1 7 . 8 4 9 . 5 9 3 5 f a x : 3 1 7 . 8 4 9 . 5 9 4 2 SW P P P - S P E C I F I C A T I O N S & D E T A I L S C304A 111895GBC PDR BKR CL A Y T O W N S H I P HA M I L T O N C O U N T Y , I N D I A N A Fi l e N a m e : S: \ 1 1 1 8 9 5 G B C \ D W G \ C 3 0 4 - S W P P P - D e t a i l s . d w g - C3 0 4 A Mo d i f i e d / B y : Ju n e 9 , 2 0 2 5 1 : 5 0 : 5 9 P M / pr i c h a r d s Pl o t t e d / B y : Ju n e 2 6 , 2 0 2 5 1 1 : 2 4 : 4 3 A M / Pa u l R i c h a r d s 06 / 2 6 / 2 5 SW I N L E Y F O R E S T 12 2 5 E A S T 1 1 6 t h S T R E E T THIS SHEET TO BE USED FOR EROSION CONTROL ONLY. PERSON RESPONSIBLE FOR EROSION CONTROL MARK GRADISON - SWINLEY FOREST, LLC 6330 EAST 75th STREET, SUITE 156 INDIANAPOLIS, INDIANA 46250 PHONE:(317) 506-1037 EMAIL:mgradison@gradison.net EROSION CONTROL MEASURE INSTALLATION SEQUENCE MAINTENANCE STONE ENTRANCE PRIOR TO CLEANING AND GRADING ·INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. ·RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. ·TOPDRESS WITH CLEAN STONE AS NEEDED. ·IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. ·REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. SILT FENCE PRIOR TO CLEANING AND GRADING ·INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. ·IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. ·REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. ·TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. ·AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. TOPSOIL STOCKPILE PRIOR TO CLEANING AND GRADING ·DETERMINE DEPTH AND SUITABILITY OF TOPSOIL AT THE SITE. (FOR HELP, CONTACT YOUR LOCAL SWCD OFFICE TO OBTAIN A COUNTY SOIL SURVEY REPORT OR CONSULT WITH A SOIL SCIENTIST.) ·PRIOR TO STRIPPING TOPSOIL, INSTALL ANY SITE-SPECIFIC DOWNSLOPE PRACTICES NEEDED TO CONTROL RUNOFF AND SEDIMENTATION. ·REMOVE THE SOIL MATERIAL NO DEEPER THAN WHAT THE COUNTY SOIL SURVEY DESCRIBES AS "SURFACE SOIL" (I.E., A OR AP HORIZON). ·STOCKPILE THE MATERIAL IN ACCESSIBLE LOCATIONS THAT NEITHER INTERFERE WITH OTHER CONSTRUCTION ACTIVITIES NOR BLOCK NATURAL DRAINAGE; AND INSTALL SILT FENCES OR OTHER BARRIERS TO TRAP SEDIMENT (SEE EXHIBIT 3.02-B). (SEVERAL SMALL PILES AROUND THE CONSTRUCTION SITE ARE USUALLY MORE EFFICIENT AND EASIER TO CONTAIN THAN ONE LARGE PILE.) ·IF SOIL IS STOCKPILED FOR MORE THAN 6 MONTHS, IT SHOULD BE TEMPORARILY SEEDED OR COVERED WITH A TARP OR SURROUNDED BY A SEDIMENT BARRIER. TEMPORARY DIVERSIONS AFTER ROUGH GRADING ·INSPECT WEEKLY AND FOLLOWING EACH STORM EVENT. ·REMOVE SEDIMENT FROM THE CHANNEL AND REINFORCE THE RIDGE AS NEEDED. ·CHECK THE OUTLETS AND MAKE NECESSARY REPAIRS IMMEDIATELY. REMOVE SEDIMENT FROM TRAPS WHEN THEY ARE 50% FULL. ·WHEN THE WORK AREA HAS BEEN STABILIZED, REMOVE THE RIDGE, FILL THE CHANNEL TO BLEND WITH THE NATURAL GROUND, REMOVE TEMPORARY SLOPE DRAINS, AND STABILIZE ALL DISTURBED AREAS. ROCK DAM AFTER ROUGH GRADING ·INSPECT THE ROCK DAM AND BASIN FOLLOWING EACH STORM EVENT. ·REMOVE SEDIMENT WHEN IT ACCUMULATES TO HALF THE DESIGN VOLUME (MARKED BY STAKE). ·CHECK THE DAM AND ABUTMENTS FOR EROSION, PIPING, AND ROCK DISPLACEMENT, AND REPAIR IMMEDIATELY IF THE BASIN DOES NOT DRAIN BETWEEN STORMS, REPLACE THE STONE ON THE UPSTREAM FACE OF DAM IF THE BASIN DRAINS TO RAPIDLY FOLLOWING A STORM,(LESS THAN 6 HOURS), ADD INDOT CA No. 5 GRAVEL ON THE UPSTREAM FACE OF THE DAM. ·ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN PERMANENTLY STABILIZED, a.REMOVE WATER AND SEDIMENT FROM THE BASIN, b.REMOVE THE DAM, DISPOSING OF THE ROCK IN DESIGNATED DISPOSAL AREAS, c.SMOOTH THE SITE TO BLEND THE SURROUNDING AREA, d.STABILIZE TEMPORARY SEEDING AFTER ROUGH GRADING ·INSPECT PERIODICALLY AFTER PLANTING TO SEE THAT VEGETATIVE STANDS ARE ADEQUATELY ESTABLISHED; RESEED IF NECESSARY. ·CHECK FOR EROSION DAMAGE AFTER STORM EVENTS AND REPAIR; RESEED AND MULCH IF NECESSARY. ·TOPDRESS FALL SEEDED WHEAT OR RYE SEEDINGS WITH 50 LBS./ACRE OF NITROGEN IN FEBRUARY OR MARCH IF NITROGEN DEFICIENCY IS APPARENT. (EXHIBIT 3.11-B SHOWS ONLY WHEAT/RYE FALL SEEDED.) PERMANENT SEEDING ·INSPECT PERIODICALLY, ESPECIALLY STORM EVENTS, UNTIL THE STAND IS SUCCESSFULLY ESTABLISHED. (CHARACTERISTICS OF A SUCCESSFUL STAND INCLUDE: VIGOROUS DARK GREEN OR BLUISH-GREEN SEEDLINGS; UNIFORM DENSITY WITH NURSE PLANTS, LEGUMES, AND GRASSES WELL INTERMIXED; GREEN LEAVES; AND THE PERENNIALS REMAINING GREEN THROUGHOUT THE SUMMER, AT LEAST AT THE PLANT BASE.) ·PLAN TO ADD FERTILIZER THE FOLLOWING SEASON ACCORDING TO SOIL TEST RECOMMENDATIONS. ·REPAIR DAMAGED, BARE, OR SPARSE OR PATCHY, BY FILLING ANY GULLIES, RE-FERTILIZING, OVER- OR RE-SEEDING AND MULCHING AFTER RE-PREPARING THE SEEDBED. ·IF VEGETATION FAILS TO GROW, CONSIDER SOIL TESTING TO DETERMINE ACIDITY OR NUTRIENT DEFICIENCY PROBLEMS. (CONTACT YOUR SWCD OR COOPERATIVE EXTENSION OFFICE FOR ASSISTANCE.) ·IF ADDITIONAL FERTILIZATION IS NEEDED TO GET A SATISFACTORY STAND, DO SO ACCORDING TO SOIL TEST RECOMMENDATIONS. AFTER FINISH GRADING EROSION CONTROL MATTING AFTER FINISH GRADING ·DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. ·IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE-SEED THE AREA, AND RE-LAY AND STAPLE THE BLANKET. ·AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. INLET PROTECTION AFTER EACH INLET IS PLACED ·INSPECT FREQUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC, AND REPAIR IF NEEDED. ·INSPECT AFTER EACH STORM EVENT. ·REMOVE SEDIMENT (BUT NOT BY FLUSHING) WHEN IT REACHES HALF THE HEIGHT OF THE BARRIER. ·DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS. REMOVAL OF INLET PROTECTION AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED ·N/A REMOVAL OF SILT FENCE AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED ·N/A EROSION CONTROL NOTES HOSE CLAMP WOODEN STAKE PUMP DISCHARGE HOSE FILTER FABRIC GROUND SURFACE HOSE CLAMP WOODEN STAKES PUMP DISCHARGE HOSE SET ON FILTER FABRIC FILTER BAG FILTER BAG NOTE: LIMIT ONE DISCHARGE HOSE PER BAG. NOTES: 1.TO BE USED WHEN PUMPING DIRTY WATER. 2.ANY DISCHARGE OF CONTAMINATED WATER DUE TO DEWATERING SHALL OUTLET THROUGH EXISTING VEGETATION OR FILTER BAGS THAT WILL NOT ADVERSELY IMPACT STORM WATER QUALITY. PLAN VIEW CROSS SECTION DEWATERING FILTER BAG DETAIL NOT TO SCALE 15'-0" 12 ' - 0 " HAY BALES STACKED AROUND ENTIRE PERIMETER LINE ENTIRE WASHOUT WITH IMPERMEABLE POLY-LINER. ANCHOR PLASTIC LINING OVER TOP OF BALES WITH STAKES HAY BALES STACKED 2 HIGH LINE ENTIRE WASHOUT WITH IMPERMEABLE POLY-LINER EXCAVATE 1.0' INTO GROUND SIGN TO DESIGNATE AREA AS A WASHOUT FACILITY CONCRETE WASHOUT DETAIL NOT-TO-SCALE NOTES: 1.FACILITY TO BE LOCATED AWAY FROM STREAMS, PONDS, OR OTHER DRAINAGE WAYS. 2.CONCRETE WASHOUT SHALL NOT BE REQUIRED IF CONCRETE TRUCK IS EQUIPPED WITH SELF-CONTAINED CHUTE SYSTEM, SIMILAR TO SYSTEM PROVIDED BY ENVIROGUARD, OR APPROVED EQUAL. HOUSE GARAGE PAD ELEV. TOPSOIL STOCKPILE CONSTRUCTION ENTRANCE/EXIT STREET (TO BE CLEARED AT END OF EVERY WORK DAY) SIDEWALK CURB & GUTTER REAR YARD DRAINAGE SWALE SIDE YARD DRAINAGE SWALE CURB INLET PROTECTION DROP INLET PROTECTION BASKET SUBSOIL STOCKPILE EROSION CONTROL PLAN LEGEND PROPERTY LINE/DRAINAGE SWALE DRAINAGE FLOW TREE CONSERVATION SILT FENCE CONCRETE WASHOUT PERMANENT SEEDING AREA TO BE TOP-SOILED, SEEDED, AND MULCHED BY OWNER AT COMPLETION OF CONSTRUCTION. PALIMAR IS TO BE USED OF GRASS GROWTH IS NOT POSSIBLE. NOTES: 1.EROSION/ SEDIMENT CONTROL MEASURES MUST BE FUNCTIONAL AND BE MAINTAINED THROUGHOUT CONSTRUCTION. 2.MAINTAIN POSITIVE DRAINAGE AWAY FROM THE STRUCTURE. 3.CONTRACTOR TO CLEAN STREETS WHEN DIRT AND CONSTRUCTION DEBRIS IS EVIDENT. 4.PERIMETER PROTECTION SHOULD BE INSTALLED BEFORE EXCAVATION OF BASEMENT/FOUNDATION HAS BEGUN. PERIMETER PROTECTION ON LOTS SHALL REMAIN IN PLACE UNTIL THE LOT IS STABILIZED WITH AT LEAST 70% COVER. ALL TRASH AND CONSTRUCTION DEBRIS SHALL BE DISPOSED PROPERLY INTO AN ENCLOSED WASTE RECEPTACLE. STORM WATER POLLUTION & PREVENTION NOTES: A.ALL STORM WATER QUALITY MEASURES, INCLUDING EROSION AND SEDIMENT CONTROL, NECESSARY TO COMPLY WITH THIS RULE MUST BE IMPLEMENTED IN ACCORDANCE WITH THE PLAN AND SUFFICIENT TO SATISFY SUBSECTION (B). B.PROVISIONS FOR EROSION AND SEDIMENT CONTROL ON INDIVIDUAL BUILDING LOTS REGULATED UNDER THE ORIGINAL PERMIT OF A PROJECT SITE OWNER MUST INCLUDE THE FOLLOWING REQUIREMENTS: B.1.THE INDIVIDUAL LOT OPERATOR, WHETHER OWNING THE PROPERTY OR ACTING AS THE AGENT OF THE PROPERTY OWNER, SHALL BE RESPONSIBLE FOR EROSION AND SEDIMENT CONTROL REQUIREMENTS ASSOCIATED WITH ACTIVITIES ON INDIVIDUAL LOTS. B.2.INSTALLATION AND MAINTENANCE OF A STABLE CONSTRUCTION SITE ACCESS. B.3.INSTALLATION AND MAINTENANCE OF APPROPRIATE PERIMETER EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO LAND DISTURBANCE. B.4.SEDIMENT DISCHARGE AND TRACKING FROM EACH LOT MUST BE MINIMIZED THROUGHOUT THE LAND DISTURBING ACTIVITIES ON THE LOT UNTIL PERMANENT STABILIZATION HAS BEEN ACHIEVED. B.5.CLEAN-UP OF SEDIMENT MUST BE REDISTRIBUTED OR DISPOSED OF IN A MANNER THAT IS IN COMPLIANCE WITH ALL APPLICABLE STATUTES AND RULES. B.6.ADJACENT LOTS DISTURBED BY AND INDIVIDUAL LOT OPERATOR MUST BE REPAIRED AND STABILIZED WITH TEMPORARY OR PERMANENT SURFACE STABILIZATION. B.7.FOR INDIVIDUAL RESIDENTIAL LOTS, FINAL STABILIZATION MEETING THE CRITERIA IN SECTION 7(B)(20) OR THIS RULE WILL BE ACHIEVED WHEN THE INDIVIDUAL LOT OPERATOR: B.7.A.COMPLETES FINAL STABILIZATION; OR B.7.B.HAS INSTALLED APPROPRIATE EROSION AND SEDIMENT CONTROL MEASURES FOR AN INDIVIDUAL LOT PRIOR TO OCCUPATION OF THE HOME BY THE HOMEOWNER AND HAS INFORMED THE HOMEOWNER OF THE REQUIREMENT FOR, AND BENEFITS OF, FINAL STABILIZATION. 7(B)(20) FINAL STABILIZATION OF A PROJECT SITE IS ACHIEVED WHEN: B.7.1.A.ALL LAND DISTURBING ACTIVITIES HAVE BEEN COMPLETED AND A UNIFORM (FOR EXAMPLE, EVENLY DISTRIBUTED, WITHOUT LARGE BARE AREAS) PERENNIAL VEGETATIVE COVER WITH A DENSITY OF SEVENTY PERCENT (70%) HAS BEEN ESTABLISHED ON ALL UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES, OR EQUIVALENT PERMANENT STABILIZATION MEASURES HAVE BEEN EMPLOYED; AND B.7.1.B.CONSTRUCTION PROJECTS ON LAND USED FOR AGRICULTURAL PURPOSES ARE RETURNED TO ITS PRECONSTRUCTION AGRICULTURAL USE OR DISTURBED AREAS, NOT PREVIOUSLY USED FOR AGRICULTURAL PRODUCTION, SUCH AS FILTER STRIPS AND AREAS THAT ARE NOT BEING RETURNED TO THEIR PRECONSTRUCTION AGRICULTURAL USE, MEET THE FINAL STABILIZATION REQUIREMENTS IN CLAUSE (A). B.8.THE PERMIT HOLDER/OWNER NEEDS TO CONDUCT AN ONSITE E.C. EVALUATION AFTER EVERY MEASURABLE RAIN FALL EVENT OF 5" OR GREATER. THESE MUST BE FILED FOR A MINIMUM OF THREE YEARS. CONSTRUCTION SEQUENCE FOR BUILDING SITE EROSION CONTROL PRACTICES INDIVIDUAL LOT STORM WATER POLLUTION & PREVENTION DETAIL NOT TO SCALE SEASONAL SOIL PROTECTION CHART STABILIZATION PRACTICE JAN.FEB.MAR.APR.MAY JUNE JULY AUG.SEPT.OCT.NOV.DEC. PERMANENT SEEDING DORMANT SEEDING SEEDING SODDING MULCHING A Kentucky Blue Grass 40 lbs. / ac., Creeping Red Fescue 40 lbs. / ac., plus 2 tons Straw Mulch / ac. or add Annual Ryegrass 20 lbs. / ac. B Kentucky Blue Grass 60 lbs. / ac., Creeping Red Fescue 60 lbs. / ac., plus 2 tons Straw Mulch / ac. or add Annual Ryegrass 30 lbs. / ac. C Spring Oats 3 bushel / ac. D Wheat or Rye 2 bushel / ac. E Annual Ryegrass 40 lbs. / ac. (1 lb. / 1000 sq. ft.) F Sod G Straw Mulch 2 tons / ac. - Anchor all mulch by crimping or tackifying Irrigation needed during June, July, and / or September Irrigation needed for 2 to 3 weeks after applying sod Seedbed Preparation for Permanent Seeding 1.Test soil to determine pH and nutrient levels. (Contact you county SWCD or Cooperative Extension office for assistance and soils information, including available testing services.) 2.If soil pH is unsuitable for the species to be seeded, apply lime according to test recommendations. 3. Fertilize as recommended by the soil test. If testing was not done, consider applying 400-600 lbs./acre of 12-0-12 analysis, or equivalent, fertilizer. Do not use phosphorous containing fertilizer (12-12-12) unless soil tests show a phosphorous deficency. 4.Till the soil to obtain a uniform seedbed, working the fertilizer and lime into the soil 2-4 in. deep with a disk or rake operated across the slope. Rule 5 requires all disturbed areas likely to be idle for 15 day shall have surface stabilization applied. When weather conditions prevent rapid germination of grass, then 2t/ac mulch will be used to ensure ground stabilization requirements are met. A BB C D E F G LINE WITH GEOTEXTILE WOVEN FABRIC #2 STONE 3 1 6" MI N . FUELING & VEHICLE MAINTENANCE AREA PORT-O-LET FUEL OIL TANK (DOUBLE WALL) CONCRETE WASH OUT AREA CONSTRUCTION DUMPSTER POSTING SIGN LOCATION CONSTRUCTION ENTRANCE DETAIL NOT TO SCALE SECTION "Z-Z" CONSTRUCTION STAGING AREA NEEDS COVERED STORAGE, SUCH AS A BOX OR LEAN-TO SHED, FOR HAZARDOUS MATERIALS BLANKET THE BLANKET BLANKET. BLANKET STAPLES/STAKES BLANKET SOILS MAP SCALE: 1" = 500' Map Unit: YmsB2 - Miami silt loam, 2 to 6 percent slopes YmsB2--Miami silt loam-Urban land complex, 2 to 6 percent slopes, eroded This component is on till plains, till plains. The parent material consists of loess over loamy till. Depth to a root restrictive layer, densic material, is 24 to 40 inches. The natural drainage class is moderately well drained. Water movement in the most restrictive layer is low. Available water to a depth of 60 inches(or restricted depth) is low. Shrink-well potential is low. The soil is not flooded. It is not ponded. A seasonal zone of water saturation is at 30 inches during January, February, March, April, December. Organic matter content in the surface horizon is about 2%. This component is in the F111XA09IN Till Ridge ecological site. Nonirrigated land capability is 2e. This soil does not meet hydric criteria. The calcium carbonate equivalent within 40 inches, typically, does not exceed 33%. Map Unit: YshAH - Shoals silt loam, 0 to 2 percent slopes YshAH--Shoals silt loam, 0 to 2 percent slopes, frequently flooded, brief duration The Shoals, frequent, brief component makes up 60 percent of the map unit. Slopes are 0 to 2 percent. This component is on flood plains on alluvial plains. The parent material consists of loamy alluvium. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is somewhat poorly drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is high. Shrink-swell potential is low. This soil is frequently flooded. It is not ponded. A seasonal zone of water saturation is at 6 inches during January, February, March, April, May, November, December. Organic matter content in the surface horizon is about 3 percent. This component is in the F111XA004IN Wet Alluvium ecological site. Nonirrigated land capability classification is 2w. This soil does not meet hydric criteria. The calcium carbonate equivalent within 40 inches, typically, does not exceed 13 percent. SITE