Conn, Angelina V
From: Conn, Angelina V
Sent: Thursday, March 13,20082:37 PM
To: 'Nicholas Jahn'
Subject: RE: Docket No. 07080036 PP: Rosado Hill Subdivision
Attachments: Docket No. Assignment: (SP) Rosado Hill (#07120005 SP); RE: Docket No. Assignment: (SP) Rosado
Hill (#07120005 SP)
Hello: the primary plat did receive approval already. Roger Kilmer with baker & Daniels should have already taken the
signed Mylar to the county commissioners for approval. If that was done, then the mylar should have been recorded at
the recorder's office in Noblesville. Two paper copies of the recorded plat and a Mylar of the recorded plat must be submitted to our
Department following recording. Also, please provide DOCS with a copy of the RECORDED covenants/restrictions.
In addition; you will have to work with the TAC members (see:b1tQ_:Hwww-,(;L(;j:lrmt31jn.u_sl$~IYj(;t3sL[)_Q_Q$ilf.\g_?.QQ]J.IAg%
20members%20revised%2009.07.07.(.2df) to pick up where the other engineering company left off (Nathan Althouse of
Miller Surveying) and resolve any outstanding issues. Also, this is not city engineering jurisdiction, but Hamilton county
surveyor's office jurisdiction, since this plat is located outside the city limits.
Not sure where you go from here....
Angie Conn, Planning Administrator
Dept. of Community Services - Planning & Zoning
1 Civic Square, 3rd Floor
City of Carmel, IN 46032
p.317-571-2417 f.317-571-2426
aconn@carmeLin.gov
From: Nicholas Jahn [mailto: nrjahn@vsengineering.com]
Sent: Thursday, March 13,20082.:17 PM
To: Conn, Angelina V
Subject: Docket No. 07080036 PP: Rosado Hill Subdivision
Ms. Conn,
VS Engineering has been asked to provide civil engineering services for the Rosado Hill subdivision located in the
southeast corner of 106th St. and Spring Mill Road. I was told that the Plan Commission has approved the subdivision,
and I wanted to check with you to verify this. I'm assuming that if the project has been approved by the Plan Commission,
our next step would be to garner all of the applicable permits from the Engineering Department (i.e. stormwater, sanitary,
water, etc.), or are there some things that need to be addressed through the Department of Community Services and the
Plan Commission? Thank you very much for your time.
Sincerely,
Nick Jahn
Nicholas R. Jahn, E.1.
Design Engineer
VS Engineering, Inc.
4275 N. High School Rd.
Indianapolis, IN 46254
W'tf"'l,Y$engiO!?Jlring.GQrr:!
(317) 293-3542 Ext. 137
The information contained in this message is private and may be privileged and confidential. If the reader of this message
is not the intended recipient or responsible for the delivery of the message to the intended recipient(s), any use of the
information is strictly prohibited. If you have received the message in error, immediately notify the sender and
delete/destroy the information and message.
3/13/2008
Page 1 of2
Conn, Angelina V
From:
Sent:
To:
Robert Thompson [rct@co.hamilton.in.us]
Wednesday, February 20, 2008 11 :18 AM
Nathan Althouse
Cc: Conn, Angelina V
Subject: RE: Rosado Hill
Attachments: Hamilton County Rule 5 Plan Review Forl!1-Rosado Hill-def.pdf
I will approve the plans with your assurance that the plans are clarified and comments address. I have spoken
with Greg to let him know that I am OK to release. I will send you a fonnal SWPPP approval once I have seen
the plans. Also who will be the designated "trained individual" for Sediment and Erosion Control for this
project?
'R.sJ6ert 'Tfiompsol1) Y{Ljl, CLJlcJ(13
Program Manager
Hamilton County Surveyor's Office
1 Hamilton Co. Square, Suite 188
Nob1esville, TN 46060
Q) 317-776-8495, fax: 317-776-9628
r:tJ rct@co.hamilton.in.us
W,VW. cO.hamiIton. in. us/cle.mwa teT
1:;4 n"ver is tlie report cardfor its watershed."
>>> On 2/19/2008 at 10:55 AM, in message <20080219155919.567 ABB183E@barracuda.co.hamilton.in.us>,
"Nathan Althouse" <nalthouse@msinc.us> wrote:
GREG
YES I THINK SO
BOB IS THERE ANY THING ELSE I NEED TO DO
THANKS FOR BOTH OF YOUR HELP
NATHAN
-----Original Message-----
From: Greg Hayes [mailto:grh@co.hamilton.in.us]
Sent: Tuesday, February] 9,2008 10:57 AM
To: Nathan Althouse
Subject: Re: Rosado Hill
Have your resolved your issue with the SWPPP with Bob Thompson?
Greg Hayes
HCSO Plan Reviewer
>>> "Nathan Althouse" <nalthouse@msinc.us> 10:49 AM Tuesday, February 19,
2008 >>>
2/20/2008
Page 1 of2
"
Conn, Angelina V
From:
Sent:
Robert Thompson [rct@co.hamilton.in.us]
Tuesday, February 19, 2008 1 :28 PM
To: Nathan Althouse
Cc: Conn, Angelina V
Subject: RE: Rosado Hill
Attachments: Hamilton County Rule 5 Plan Review Form-Rosado Hill-def.pdf
Nathan, the SWPPP has not been approved yet, See attached. Also who will be the designated "trained
individuatt' for Sediment and Erosion Control for this project?
1(96ert rrTiompso1Z, 'l{.[:,}l, CL}l<R!B
Program Manager
Hamilton County Surveyor's Office
I Hamilton Co. Square, Suite 188
Noblesville, IN 46060
Q) 317-776-8495, fax: 317-776-9628
81) rct@co.hamilton.in.us
}Y\:\~\'/&Q.hgmjJtoJl.jl].us/{;le<!ll\Vilter
J'j1 river is the report cardfor its watershed-"
>>> On 2/19/2008 at 10:55 AM, in message <20080219155919.567ABB183E@barracuda.co.hamilton.in.us>,
"Nathan Althouse" <nalthouse@msinc.us> wrote:
GREG
YES I THINK SO
BOB IS THERE ANY THING ELSE I NEED TO DO
THANKS FOR BOTH OF YOUR HELP
NATHAN
-----Original Messagen---
From: Greg Hayes [mailto:grh@co.hamilton.in.us]
Sent: Tuesday, Febmary 19,2008 10:57 AM
To: Nathan Althouse
Subject: Re: Rosado Hill
Have your resolved your issue with the SWPPP with Bob Thompson?
Greg Hoyes
HCSO Plan Reviewer
>>> "Nathan Althouse" <nalthouse@msjnc.us> 10:49 AM Tuesday, February 19,
2008 >>>
WE ARE NEEDED THE PLAT REVIEW SIGN OFF SHEET FOR ROSADO HILL
2/19/2008
Page 2 of2
WE ARE TRYING TO MEET A NOON DEADLINE TOMORROW
IF YOU COULD HELP J WOULD REALLY APPRECIA IE IT
THANKS
K Nathan Althouse, PLS
Miller Surveying rne
948 Conner Street
Noblesville, in 46060
(317) 773-2644 (800) 886-2644
fax (317) 7732694
nalthouse@msinc.us
2/19/2008
"
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: IRosado Hill ICQunty: I Hamilton
Plan Submittal Date: I 2/1/2008 I I Hydrologic UnitCode: I 5120201 090060
Project Location Description: 1106th arid Springmill Rd
Latitude & Longitude of point of discharge: 139d56'26" 86d9'SO"
... Civil Township: I Clay IQuarter: I nw ISection: I 11 ITownship:1 17 I Range:1 3e
co
"Z Project Owner N amc: Issc 11, LLC
!';
E Contact: TDan Boeglin
,0 Address: 18]95 Heyward Dr
-
=
... City: IIndianapolis IState: IIN I Zip: 146250
...
<oJ
Q Phone: I 5694644 I FAX: I I E-Mail: I
'0'
!..
Q., Plan Preparer Name: INathan Althouse
Affiliation: I Miller Surveying
Address: 1948 Conner St
City: INoblesville IState: IIN I Zip: 146060
Phone: I 773-2644 I FAX: I 773-2694 I E-Mail: I nalthouse@msinc.us
Review Date:l02/0 lI08
~ Principal Plan Reviewer: I Robert Thompson, RLA
.~ Agency: ~IHamilton County Surveyor's Office
...
~ Address: II Hamilton County Sq. #188
c::::
- City: I N9blesville I State:1lN I Zip: 146060
-
oS
a... Phone: 1 770-8833 I FAX: I 776-9628 I E-Mail: \rct@co.hamilton.in.us
Assisted By: T
PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional informatitip.ii1clu~ded';;;the foll,i')wing,page(s);
~.- ._:.~ ~0 ~ ),\,1 r--r; ~~~
D Submit Notice of Intent (NO~}.;"'1~tach\ cbpy:!thL~ co~e-r:.pagelv,~e1~Sll?mitfing the NOl to the Indiana .
Deparlmem of Environmental Mandge/ne..f/t~~Ci:mstructioFracti\l.iJiel may begin 48 hours following the submittal oj
.1 .~ . __ "-. r;- I ,
the NO!. A copy of the ~OllJJ.l;!~t alJP be sent to the HCSO. '. - 'L'" ..1,'"'
i' .... ... "I'. "" .
D A preliminary plan re~ie~.J1.i~l'~e~n completed; a C?[~~~~:,!l~~~ive review \Vil.~ n~r;~e\:~mpleted within the 28-day
re"iew period. The r~Viewing,authority reserves th~~i~~,\to~rform a comp~ehen1iV~ re"iew at a later date
and revisions to the phlnorpaybe required at thatiiili,I"'3,\..!,'"~1'''~ss deficiencies. "', ...r'"~, "
I "Z!.':>j' ~;~,i:\ \
o Please refer to ~;dditional iI~~~..!iq, includedloi1~:"",;c '"",-~ wing page(s). \ \
o SubmitNotice?f Inteni (NOI):"~lIf~..,ita copy o./th,Lftt/o'3.1l;page when submittiA:s the Nql to the indiana
Department of Envirom~ental Manage ~ IJ;jJlfJ-1hQi'/;:as:tiY)!ie~",rJ.al!,JJegin 48 hours following the submittal of
the NO!. A copy'lof:J!t-g N91 must also be' ~->:'~''"tk;jlljjsf)jff:-~-'r'''--'' J ~ J !
D PLAN IS DIFiCIE~1(zil~g\ificant,.d [gsJ.1~~~r~]~Wlfil-:~1Jtj})g~the pla1r,evi,ew.,/
. 0 Please refer to adtl,itl2P,aJ &tQrma :;fdll. l}'lr;ffitf;ii5r~"lIp:(J~t~). /i:,3,.r-~-! ./
\ .r.~':: '-.. ~"'_.~ -1'---. _...... -' "----- .i-
o no NOT file a Notic~ &f'intelltJor thj~'p'rOjeif.'-....~..._-"-;;' =.~'- .-- _' .,.~". ..-
D DO NOT commence~~'n~~t!l;~ing.a~~~i~ie;::tiI-~ll~C~Ci~!).cid l~f :~q,~it:~IY addressed, the plan re-
submitted, and nOtification'J!Jis:bee9J:eCCjVed-thaUhe-minimur,~eq'ilir~.!nints have been satisfied.
D Plan Revisions 0 DefiCient lte[~ls-'sh.~tild%e &!iIM oIfdelive.!~d-hrthe Principal Plan Reviewer
identified-in thePlan"Review Section above.
Hamilton County Sur~ey()r
2/1/2008
COllstruction/Sto.rmwater POllutionPre'vention Plan - Tcchnkal Review aDd Comment (Form J)
Project Name: Rosado Hill
Date Reviewed: 02/01108,
The technical review and comments are intended toevalilate the completeness of the Construction/Stormwater
Pollution Prevention Planfor the project. The Plan submittedwas notrelliewedfor the adequacy of the engineering
design. All measures included in the plan, as well as those recommended in the comments should be evaluated as to
theirfeasibility by a q~/Qlified individual with stn/clural measures designed by a qualffied engineer, The Plan lias not
been reviewedfor other local, state, orfederal permits that maybe required to proceed with this project. Additional
infonnation, includii1g design calculations may be requested tofurther evaluate the Plan.
All proposed storm water pollution prevention measures and those referenced in this review must meet the design
criteria and standards set forth in the "Indiana Stormwater QualityManual"from the indiana Department o/Natural
Resources, Division of Soil Conservation as well as the Jigmilton County Storm water Design Manual.
Please direct questions and/or comments regarding this plan review to:
Robert Thompson, RLA
Please refer to the address and contact information identified in the Plan Review Section on. page 1.
Assessment of Construction Plan Elements (Section A)
The Construction Plan Elements are adequately represented to complete a plan review:
[2] Yes D No
The items checked below are deficient and require submittal to meet-the requirements ofthe rule.
A
A
D n by 17 inch plat showing bliilding lot
2
number;slboundaries and road layout/names
D 1 Index showing locations of required Plan Elements
D 3 Narrative describing the nature and purpose of the D
4 Vicinity map showing project location
project
D Legal Description of the Project Site D Luc~tion of all lots and proposed site
5 (Include Latitude and Longitude - NOI RequirerncnD ~_=< _ 6 improvements (roads, utilities, structures, etc.)
D 7 Hydrologic unit code (14 Digit) _.__.--,.;,;~ ;(, ~: D ffl' N~~~i.q,Il.....ofany State or Federal water quality
. ',1, _ '-" pyJn;1)ts, .'"
O Specific points where ston:nw_' ate'r,,_?isc.h.'argewilI leave D - Gocatictn and name of all wetlands, lakes and
9 - ~. 10 '. '.... ~ _ "
the site .,,~:'" . __ ~ water'co,urses;on -al).d adjacent to the site
O d'fi' f II . ,. " 0 Identification" ofpQttritial disc, harges, to ground
11 I entl lcatlOn 0 a recely,mg waters ,~ : 12 . , ,,_,~ ~.,
.. <",' ,ir!Ul]{ ''l.~ ':@. water (abandonea.wells,smkholes,etc.)
D f1 dJ / '''''=fl'"'' .di' d f1 d ,. .fi~. ~D~",:,:lf~ Pre-constructiohand~pos! construction estimate
13 100 year - 00 P ams,L.oo ways, an 00 way, ll_ ,,'~1;1~ ' \ ~
l -...,- f ~~. v~, fVl-~ ::;;'f of Peak D1scharg~ (10 Year,.storm event)
D A.d' ,I d l. 1 dl, ~<i'>~fR;" \~.' I d ~1~ D~?; , Locations a,.nd apPfoximat'e,. bound..aries ofaB
15. Jacent an use, me u mg upstream waters Ie ;j[!' 16 d' b d' ! .\.. .
;1 '\f"....'" ~ t.."'-- "'.7 - Istur. e areas (C9nstrnetlon Limns)
, , f..,. \ .'~~$~4~-~tzlrc~ ~ S5ils'frlap'includihg.soil descriptions and
D 17 IdenttficatlOn of\~x!stmg',~egetatlve coveI""";~7_'i~~IR ~ limitations l f-YJ /
o 19 Locations, size auf p~f!t.,.en~~ons of~~~!1~,,>:;:,,;eiF\ D~ i~ ~~~.fol. any, o.ft-~itc{o.~struction activit,ie~
stonnwatersystems (e.g, p'lpe~, swaleSiana.fhiInn~!~):J: ". :'!':' -i~~ al'.s,g,9f!tc.d^Wl!h thls,pro]Cet (sewer/water tlc-ms)
o Locations of prupos'ef~if stoc~piles i!!t<;!Lor:=;;__-r~': - D. ,-'. . ~xisti"lgsite 'topo~ral?,hy at an interval
21 borrow/disposal areas', l '~'-'.. ='L -:.....- ,'- -~. approp!iatcJ.fl~indic,aie drainage patterns
- .'
o 23 Propose~ flnal ~op~~ral*! ~.~Jl~JIl~'er.x.'!~~~ ,.- .- ~ +~,~. "
appropnatc to lIl{hcate dral.\lage p:\i1e.rns. ~-_.- - ,R,/"
....""-.....
IT.V' ~ ..........
~ lQ' ~ ;r-~
.:LL ~'\.. ..- ~.r-~
~- -- -~-
."
.r-~--
.',
Hamilton County Surveyor
2/1/2008
2
COllstruction/StormwaterPollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: Rosado Hill
Date Reviewed: 02/0 1/08
~
:a
'l:
! -=- .:::
~ Q.
= ::J Q.
~ J;: <
"C :.0
~ 0
00
00
00
000
0005
000
000
000
000
00
00
00
00
D0
000
Assessment of Storrnwater Pollution Prevention Plan (Sections B & C)
Storm water Pollution Prevention Plan - Construction Component (Section B)
The construction component of the Storm water Pollution Prevention Plan includes storm water qualizy
measures to address erosion, sedimentation, and other pollutants associated with land disturbance and
construction activities. Proper implementation of the plan and inspections of the construction site are
necessary' to minimize the discharge ofpollutants. The Project Site Owner should be aware that
unforeseen construction activities and weather conditions may affect the performance of a practice or
.... the effectiveness of the plan. The plan musl be aflexible document, with provisions to modify or
i B substitute practices as necessary.
1 Description of potential pollutant sources associated with construction activities
Sequence describing stormwater quality measure implementation relative to land disturbing
2
activities
3 Stable construction entrance locations and specifications (at all points of ingress and egress)
4 Sediment control measures for sheet flow areas
Sediment control measures for concentrated flow areas
6 Storm sewer inlet protection lIleasure locations and specifications
7 Runoff control measures (e.g. diversions, rock check dams, slope drains. etc .)
8 Storm water outlet protection specifications
9 Grade stabilization structure locations aud specifications
10 Location, dimensions, specifications, and construction dctails of each stormwater quality measure
11 Temporary surface stabilization methods appropriate for each season (include sequencing)
12 Permanent surface stabilization specifications (include sequencing)
~"""---
13 Material handling and spill p!.even~iii~ plan . ,.--.~ ~__
J~ ~~"1."" l~ 7; : 't I~' ,-"_
14 Monitoring and main!eniu-'i<~e~g~id~~n..~JOI:"tl!~ ~~p~E9 st;~rrrJ.~ater quality measure
15 Erosion & sedim~n( co*t.rot~pecii1cations for individuall;mffding ,iots.
/'~X~ "'...> ~-- tt/_r~
Stormwater Pollution Prevention Plan - Post Construction Component (Section C)
: ".., ;' f,;lt. - \T-~;\'2t. -'\, ~ \..
~ The post ('(?n~ctl.9n component of the {{p, . 11RJlutlOn Preventw"n[:Ja;; lI!cludes the
~ ......::: implemen/atid"'ibf;,5torm}~f}!E.:" quality me~.;;~ f!fless pollutants tMf: wi!! be\lssociated with the
g ,., i mal lan1zise. P~'st co",~c:J~:n,.;tormwat'er.(q~CJ;.l.c'1!smeasures should be functiond{ upon completion of
2" i: < the proje,ct. Long terf'h./iiiil1XQnality vfthe me.Esf[f';gj,pre critical to their p~iformGl1ce and should be
~ :: ~ C monitor~d ~n: m~aintained. ~~f!i:t .~~~ t:2~;'~~J.Qlhl?1"W!:fj?eSign ta~U~ljrr guidance.
DescriP~,ofi<"'OfP~~lutants and tli,el <.~{!~ ""~ed \vith the propo,~d~larid hse
2 Sequence\d~~ljbi~g stor~~~~e~II~ly_~liJr~!;tJ '~7,,~l'J~~tf6}ation/ t, i
3 Descriptio~ of (II9PQ.sed pos'Fcoi1str=lI[tiJ:ilii~torJ!1~.tc.1-tqlfa~tr~fue!l~ures2". ,I
\, "(jlcl~lde p writf.gn~e~.9jftjo~'!!L1Jo>>:''t~'{se.measu~escwill~'4dl~ce discharge of expected
4 Location, dimensiQns, specJ!icatid'ns, and-constrIlction det~.iJsJof.e~h s~p;mwater quality measure
5 Description of rnaj.~teQ~.cc -~uidelines for post con~Jructi~n s~rrri~~ai~r quality measures
00
00
00
00
00
c~'}---- -
C.)
"'-~. -.:::
J( i"
.:~~";d.
~s
~~ ;,
1<',,"
.,-
Hamilton COlm!y Surveyor
211/2008
3
Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment
Project Name: Rosado Hill
Date Reviewed: 02/01108
1. Concrete Washout Detail and Sandbag ditch details are unacceptable: Stakes driven through bags will result in sand
or stone being released, Use other BMP's that do not useusanu'bags, Use rock check dams or other appropriate
sediment and velocity barrier in ditch.
2. On North and west lots Silt fence will not. be adequate by itself on steep slopes. You will need erosion control not
sediment control. Use appropriately sized erosion control matting on slopes with seed in addition to silt fence.
3. Need to show individual building lot detail.
4. Shpw direction of flow on Silt Fence Detail
5. Plans must show proposed Contours.
6. Need to provide plansshowing existing sites conditions
7. Sheet C5.2.Section C Is incorrect. See Post-Construction Stormwater Plan Page 3 this form for guidelines.
8. Straw Bale dam maintenance needs deleting-straw bales du nut meet HC or EPA requirements for sediment control.
9. Sheet C5.2B14 Monitoring and Maintenance--Incllldes installation and removal of rip-rap horseshoe, Where is thIS
sediment controL device being used? If 110t being used delete. Delete all references to stmW bales and other BMP's .not
used.
] O. Include self inspection form on detail sheet
11. On page C5.2 under Erosion Control Maintenance requirements delete measures that arc not being used. Plans must
be project specific revise with BMP's to be used.
12. Sheet C5.2 General Notes: add 14. Submit NOT
_-"'='-='=--t--_
/ ~ j~') ~ ::-:"-~ '-
,r- ~- 7\\. :'\.f7..dL..... ~ ~ /;~'-",,~. -""-_
r'~ ~~.~ ----_ -- (D ~ -'.
.' ". .~~ "",-- -....._ ~ ,J7,
~&.. _~.---';- '--""Ol.", ~r~,. /.50
... ~.,~ -_.,5:"'c., ~.~ .. -i~
; .~;'"':~. 4" ~ ,lo.
; ~-1~ .~.- ?~
l (I /
_ v ;'
/:r~ f
I -':1).1
J - f
( ,
~~.
- - -).-
~~~t'""~~
~
,
"'\ ~""'''~_~.A '-~.\
, "" "'l;!
!
,
~,f:'u ~.
i \
'\ "~ \
t_.....t~ '\
\<. ,,~p; \\
. fi'
jL-,-L.
";:,- ~i,~-:o ~'---:;d-L"""~;
-'j~~
"\
\
,
,
f
ff3J
I
.r
---i'=~~~~ ~~=__"'~ ,,~_ ~..3,_ _--I....-
_,i~ ~..~ -----J~- ~~L-
- ---- -"~
I
/ .:>-
il ~. ~/
/ . ,
",-<,. /
. ~'O'lf !
.-'
~.
...;'"'t-f
-J!.,.
'.
=~~,~~ '--"'--
. ft.L. -- ~----
:;r
-10_ _~_.(_ (t}._~ ~ ;( 1-
'. ~ ~:?) ~f
-_-..~ .ii '--\,
-.,~-
.....
4>
''lI.
0'
?
.,.,/
-~~
Hamilton County Surveyor
2/112008
4
Page 1 0[2
Conn, Angelina V
From: Nathan Althouse [nalthouse@msinc.us]
Sent: Tuesday, January 15, 2008 8: 13 AM
To: Conn, Angelina V
Cc: Krueskamp, Theresa A
Subject: RE: Docket No. Assignment: (SP) Rosado Hill (#07-120005 SP)
Attachments: 631724 2ND PG1 (1).pdf; 631724 2ND PG2 (1).pdf; 631724.dwg
SEE ATTACHED FILES
ANGIE HERE IS A COPY OF THE PLAT FOR ROSADO HILL
I HAVE A QUESTION ON THE dedication of road rights of way statement.
DO YOU HAVE A COPY OF THE STATEMENT THAT YOU PREFER
THANKS
NATHAN
From: Conn, Angelina V [mailto:Aconn'@carmel.in.gov]
Sent: Monday, January 07,20081:18 PM
To: Kilmer, Roger A.; Scimia, Joseph M.; Nathan Althouse
Cc: Stewart, Lisa M
Subjec~: RE: Docket No. Assignment: (SP) Rosado Hill (#07120005 SP)
2 extra review comments:
11. Please submit a revised Secondary Plat after making above-mentioned changes. Once these changes have been made and
comments addressed, please produce a Mylar copy for signature by this Department. Two paper copies of the plat must be
filed with the Mylar prior to recording, and two paper copies and a Mylar of the recorded plat must be submitted following
recording. Our approval of the secondary plat (signature) will be forthcoming upon revision of the plans according to the items
listed above.
12. Also, the staff has been advised that we cannot present a Secondary Plat to the Director for signature from this point forward
until Ms. Terry Krueskamp (tkrueskamp@carrriel.in.gov) in Information Systems has received an e-mail with an electronic file
attached (MicroStation ,dgn is preferred, or AuloCad .dwg of the subdivision) and it (the e-mail) has been copied to myself
(aconn@carmel.in.gov). Also, the Dept would also like a .pdf file of the plat, as we move toward a paperless office. If you
have any questions or if I may be of assistance, please feel free to call.
An'gieConn, Planning Administrator
Dept. of Community Services ~ Planning & Zoning
1 Civic Sq'uare, 3rd Floor
City of Carmel, IN 46032
p. 317-571-2417 f. 317-571-2426
aconn@carmel.in.gov
From: Conn, Angelina V
Sent: Wednesday, Decerriber 26, 2007 12:15 PM
To: Stewart, Lisa M; 'Kilmer, Rogt::r A.'; 'Scimia, Joseph M.'; 'Nathan Althouse'
Cc: Coy, Sue E; Hollibaugh, Mike P; Keeling, Adrienne M; Brewer, Scott I; Hancock, Ramona B; Brennan, Kevin 5;
Littlejohn, David W; DeVore, Laura B; Lillard, Sarah N; Holmes, Christine B; 'jmolitor@prodigy,net'; Boone, Rachel M.;
Tingley, Connie 5; Duncan, Gary R; Chastain, Jenny A
Subject: Docket No. Assignment: (SP) Rosado Hill (#07120005 SP)
I have issued the necessary Docket Numbers for (SP) Rosado Hill. They will be the following:
$ 834.00
$333.00
- $834.00
$333.00
Docket No. 07120005 SP: Rosado Hill
1/15/2008