Drainage Report
126TH STREET MEDICAL OFFICE PARK
Kite Development
Carmel, Indiana
August 2004
, .
..-
TABLE OF CONTENTS
DRAINAGE SUMMARY & SITE MAPS.. ............ ....... ...... ,..... ... .............. ..........,.., ..... ...... .SECTION 1
DEVELOPED SITE DRAINAGE PLAN ....................................................................... ,..SECTION 2
STORM SEWER CALCULATIONS...................................,....... ...... ........................,.....,..,. ,. SECTION 3
Woolpert
April 2004
126lh Street Medical Office Park
Kite Development
DRAINAGE REPORT
Existing Conditions
The existing 23.64-acre site is located in the n011hwest quadrant of the intersection of West
Carmel Drive and Pennsylvania Street in the City of Carmel, Hamilton County, Indiana. At
present, the site is an open grassy meadow with a line of trees and bushes along the west side of
the prope11y. There is one existing pond located on the south end of the site that has been
designated as existing wetlands. Soil types present onsite include Crosby silt loam and
Brookston silt loam. The site cUlTently drains south into the existing pond and then continues
south through twin 21" cOlTUgated metal pipes.
The allowable release rate from the twin 21" C"M:P's into the existing manhole south of West
Carmel Drive is 5.0cf8. This release rate was set forth in the drainage study "Addendum to
Stonnwater Management Design Calculations on Hamilton Crossing" dated June 1, 1989
prepared by Paul I. Cripe and Associates. Release rate restrictions were placed on this site, the
Duke property to the south, the Meijer propelty to the east, and Meridian Crossing to the west
across U. S. 31. This was due to histOlical accounts of Pennsylvania Street oveliopping during
intense rainfall events.
According to the FEMA Flood Boundary and Floodway Map, Community Panel 180081 0007 C,
the site does not lie in a floodplain.
Proposed Conditions
The proposed improvements include a multi-story office building, parking areas, expansion of
the existing detention pond, stOlID and sanitary sewers, and other associated utilities. This
construction will take place on the middle por60n of the overall site. Therefore, the proposed
detention will be for this pOltion of the development as well as the existing building on the nOlth
side of the propelty The release rate from the proposed pond will be held to 2.73cfs or less
which is 55%, 12.90 Acres, of the allowable S.Ocfs for the overall site. This con.esponds to the
percent of tbe property that is being disturbed with this ClllTent development and the existing
n01ih building.
The site will drain to the proposed detention pond, located on the west side of the propel1y,
through a storm sewer network Pond A will outlet into a temporary channel that flows south to
the existing twin 21-inch pipes under Carmel Drive. A 7-inch orifice plate will be placed on the
outlet pipe from the pond to control tbe flow into the temporary channel to 2.23cfs_ This is less
than the allowable 2.73cfs described above. In order to prevent flooding, due to the orifice being
clogged, an emergency overflow weir will be placed at the 1 aO-year pond elevation of 867.95 ft
A proposed watershed map for this site can be found in Section 2 of this report
The ponds were analyzed using the SCS Method and the Advanced Interconnected Channel and
Pond Routing (AdICPR) program version 3.02. The pond is designed to regulate the laO-year,
Woo I pert
August 2004
1261h Street Medical Office Park
Kite Development
Wi""
24-hour rainfall event to 2.34cfs into the temporary channel that flows to the existing twin 2]"
CMP culverts at the south end of the site. This is O.30efs less than the 2,73cfs restrictive release
rate described above.
Pond A
Normal Pool
864.00
Acreage
0.73
Release Rate (cfs)
2.34
Time of concentration calculations and runoff values for the overall basin can be found in
Section 2 of this report. The time of concentration was assumed to be 5 minutes for all storm
sewer calculations and the !Unoffvalue was taken as 0.85,
Conclusion
The development of this property includes a multi-story office building, parking areas, the
extension of all necessary utilities, and the reduction of the storm water outflow to help reduce
flooding of Pennsylvania Street. The proposed development of Carmel Medical Center has been
designed in accordance with the Drainage Report for the Hamilton Crossing East development
dated November 1998. The post-developed release rate of 2.34cfs, for the north portion of the
site is less than 2,73 cfs, the percent of the allowable release rate ofS.Ocfs set forth in the drainage
study "Addendum to Stormwater Management Design Calculations on Hamilton Crossing" dated June 1,
1989 prepared by Paull. Cripe and Associates, Therefore, no adverse impacts are anticipated from
this development.
Woolpert
Augusl2004
12611> Street Medical Office Park
Kite Development
\VOOLPERT
Drainage Report
OPUS LANDMARK AT
MERIDIAN
Opus North Corporation
Carmel, Indiana
July 2000
: Drainage Report
OPUS LANDMARK AT
MERIDIAN
Opus North Corporation
Cannel, Indiana
July 2000
DRAINAGE REPORT
Existing Conditions
The existing 23.67-acre site is located in the northwest quadrant of the intersection of \~/est
Carmel Drive and Pe1U1sylvania Street in the City of Carmel, Hamilton County, Indiana. At
present, the site is an open grassy meadow with a line of trees and bushes along the west side of
the property. 'Ibere is one existing pond located on the south end of the site that will be utilized
for storm water detention. Soil types present onsite include Crosby silt loam and Brookston silt
loam. The site currently drains south into the existing pond and then continues south through
twin 2] " corrugated metal pipes.
The allowable release rate from the twin 21" CMP's into the existing manhole south of West
Carmel Drive is 5.0cfs. This release rate was set forth in the drainage study "Addendum to
Stormwater Management Design Calculations on Hamilton Crossing" dated JlUle 1, 1989
prepared by PaulL Cripe and Associates. Release rate restrictions were placed on this site, the
Duke property to the south, the Meijer property to the east, and Meridian Crossing to the west
across U.S. 31. This was due to historical accounts of Pennsylvania Street overtopping during
intense rainfall events. This drainage analysis follows the drainage designs that were done for
the Meijer property to the east and the Hamilton Crossing East development to the south.
According to the FEMA Flood Boundary and Floodway Map, Community Panel 180081 0007 C,
the site does not lie in a floodplain.
Proposed Conditions
The proposed improvements include three multi-story office buildings, parking areas, two
detention ponds, storm and sanitary sewers, and other associated utilities.
The entire site will drain to the two proposed detention ponds, located on the west side of the
property, through a storm sewer network. Pond A will flow south to Pond B through a 12"
reinforced concrete pipe. An 8" orifice plate on the end of the pipe controls flow through this
connecting pipe. In order to prevent flooding, due to the orifice being clogged, an emergency
overflow weir will be placed at the 1 OO-year pond elevation of 866.27 ft. Flow from Pond B will
be controlled through a 10" orifice plate placed on the end of the ] 8" reinforced concrete pipe.
There will also be an emergency overflow weir placed at the 1 DO-year pond elevation of 861.07
[1. The 18" pipe will connect to the twin 21" eMP culverts that will be enclosed within proposed
manholes. A proposed watershed map for this site can be found in Section 4 of this report
The ponds were analyzed using the SCS Method and the Advanced IntercoIll1ected Channel and
Pond Routing (AdICPR) program version 2.1]. The interconnected ponds are designed to
regulate the IOO-year, 24-hour rainfall event to the 5.0cfs release rate. This design releases
3.68cfs into the existing twin 21" eMP culverts allhe south end of the site. This is 1.32cfs less
Opus Landmark at Mencilan
Opus North Corporation
Wool pert
July 2000
than the restrictive release rate set forth by Paul L Cripe and Associates in their drainage study
"Addendum to Storm water Management Design Calculations on Hamilton Crossing" dated June 1, 1989.
Pond A
Pond B
Normal Pool
864.00
858.70
Acreage
1.67
1.05
Volume (Ae-ft)
Release Rate (ds)
1.63
3.68
The site was divided up into two sub-basins, N-BLDGS and S-BLDG. This was done to
determine what area was going to each pond. The time of concentration was found for each
individual basin by assuming travel time over gra<;s and pavement. The runoff value was
calculated to be 91 for both drainage basins. Time of concentration calculations and runoff
values for each of the sub-basins can be found in Section 2 of this report.
Conclusion
The development of this property includes three multi-story office buildings, parking areas, the
extension of all necessary utilities, and the reduction of the storm water outflow to help reduce
flooding of Pennsylvania Street. The proposed development of Opus Landmark at Meridian has
been designed in accordance with the Drainage Report for the Hamilton Crossing East
development dated November 1998. The post-developed release rate of 3.68cfs is less than the
release rate of 5.0cfs set forth in the drainage study by Paul]. Cripe and Associates, therefore, no
adverse impacts are anticipated from this development.
Opus Landmark at Meridian
Opus North Corporation
Woolpert
July 200J
HAMILTON COUNTY, INDIANA
SHEET NUMBER 50
r,
I
~
APPROXIMATE 5CALE
400 0
:-1 .! .,., j ,-.--- ~
400 FEET
I
III NATIONAL fLOOO INSURANCE PROGRAM
FLOODW A Y
FLOOD BOUNDARY AND
FLOODWAY MAP
CI TY 0 F
CARMEL,
INDIANA
HAMILTON COUNTY
PANEL 7 OF 14
~SEE MAl' INDEX FOR PANELS NOT PRINTED}
COMMUNITY.P ANEl NUMBER
180081 0007 C
EFFECTIVE DATE:
MAY 19, 1981
federal emergency management agency
federal insurance administration
(/) r.n
f- f-
~ ~
-l ::::i
UJ UJ
f- f-
<( 4:
0:: 0::
o 0
Q... 0-
0::: 0:::
o 0
v u
<!
z
<(
>
.J
~I
I~
a:
w
2
I
I
VJ-l
f-W ,-
-:;::
~c:
-l <(
U
I/J..
0
w f
f-
~ >-
01-
a. -
c: u
0
0 ~
Project: Carmet Professional Center
Location: Carmel, Indiana
Prepared By: Stacey Paul
Date: 07/20/2000
N,BLDGS S-BLDG
Surface description (table 3-1 ).....H.... Grass Grass
Manning's roughness coeff.. n (table 3-1 ).. 0.15 0.15
Flow length, L (total L <=300ft.)...... .ft. 20 20
Two-yr 24hr rainfall, P2..............in. 2.64 2.64
Land slope, s......................ftIft 0.01 001
0.007 (nL)^0.8
TI = ------------ Computed Tt. . .:11r. 0.065 0.065
P2^0.5 S^OA
Surface description (PAVED or UNPAVED)........... Paved Paved
Flow length, L.........H."...........ft 150 180
Watercourse slope, s.................ftlft 0.01 0.01
Average velocity, V (figure 3-1 }...... ft/s 203282 2.03282
Tt:::; U(36DO V)...........Computed TLhr. 0.020 0.025
Bottom Width...... ........ .....ft
Depth........ ..........ft
Left Side Slope ?:"1
Right Side Slope ?:1
Cross sectional flow area, 3..........ft^2 0 0
Wetted perimeter, Pw.... ..............ft 0 0
Hydraulic radius, r=a/Pw Compute r....ft 0 0
Channel slope.s.....................fVft
Manning's roughness eoert.,n.. (See next sheet)
V =(1.49 r^2/3 s^112)/n Computed V..ftJs 0 0
Flow length, L .......................ft.
Tt == U(3600 V)...........Computed Tt.hr. 0.000 0.000
Velocity ....... ..............._.. __.... ....ftJs 2.5 2.5
Length...... .... ..... ......... ....... "H_" ..ft 655 680
Tt=U(3600v)......................Computed TLhr 0.073 0.076
Watershed or sUQarea Tc or Tt.....hr
Watershed or subarea Tc or TL.min
Project: Carmel Professiona[ Center
Owner: Opus North Corporation
Location: Carmel, Indiana
Prepared by: Stacey Paul
Existing
Area or % Soil Type eN CNxA
Land Use 1 SOB 69 34.50
Land Use.2 50 C 79 3950
Land Use 3 0
Land Use 4 0
land Use 5 0
I
Use eN: II
74001
7411
Total: ~
100t
Dale;
06/13/2000
Project: Carmel Professional Center
Location: Carmel, Indiana
Prepared by: Stacey Paul
Proposed North - (N-SlOGS)
Area or '% Soil Type eN CNxA
Land Use 1 4.95 B 98 485.1
Land Use 2 4.95 C 98 485.1
Land Use 3 1.75 B 61 106.75
Land Use 4 1.63 C 74 120.62
Land Use 5 1.67 POND 100 167
I 1364.571
Use eN: 11 9111
Total: I
14,951
Date:
07/20/2000
Project: Carmet Professional Center
Location: Carmel, Indiana
Prepared by: Stacey Paul
Proposed South - {S-BLDG)
Area or % Soil Type eN CNxA
Land Use 1 3,83 B 98 375;34
Land Use 2 3C 98 294
Land Use 3 1,25 B 61 76.25
Land Use 4 1 C 74 74
Land Use 5 1.05 POND 100 105
l 924.591
Use eN: 11 9111
Total: l ~
10:'131
Date:
07/20/2000
.~
Client:
Sheet:
---L.:io.
Subject:
P~(lP05Ec:. R QvTlNL-,
Order No.:
Date:
Checked by:
OLPERT Computed by:
\
\
Lf6e:ND
:0 ~ NOD6
.. O. Ct J\Jk
Mfr
o
ISMIIv
N-5111O
un, .
or -j"O"fll
~e-.rn(i
-8
~\~
of
Date:
1)~\6
. "_'~'_' ".,_.... ,~.;""'..n
Advanced Interconnected Channel & Pond Routing {ICPR Ver 2.11} {lJ
Copyright 1995, Streamline Technologies, Inc.
CARMEL BUSINESS OFFICES - OPUS SITE
CONNECTING DPUS PONDS TO EXISTING SOUTH
G;\SD\SITE\58207\CALCS\DEV9\SIM 07/19/00
*******W*. Node Maximum Conditions - DEV9 ~~~~*~~~~*~***W*~******T**************~********~*****.****~**********************.
(Time units - hours)
Node Group Max Time
Name Harne Conditions
Max Stage ~afnin9 Max Detta Max Surface
eft) Stage (ft) Stage eft) Area (sf)
Max Time Max Inflo~
Inftow (cfs)
Max Time Max Outflow
Outflow (cfs)
__.___________~w___~_____*____----------~~---~-~-----~~~____.__~____________________________~____.M_________~-~.-.----------
45CULV BASE 12.45 860.98 861.00 -0.0100 34809.08 12.13 113.47 12.45 71.35
MEIJER BASE 13.00 854.41 855.31 -0.2200 315.71 13.09 68.27 0.00 0.00
MH BASE 13.08 856.09 861.00 0.0096 1187.75 13.07 68.27 13.08 68.27
Mill BASE 13.09 855.55 861.00 o .0083 1082.38 13.08 68.27 13.09 68.27
POND BASE 13.08 856.71 857.00 0.0078 84218.73 12.09 104.70 13.07 64.23
POND2 BASE 13.39 857.62 858.00 -0.0063 17640.64 12.05 17.90 15.73 2.50
MH3 NORTH 14.32 858.95 861.00 0.0021 602.81 14.31 3.68 14.32 3.68
PONO- A NORTH 17.85 866.27 868.00 0.0042 92830.82 12.03 63.64 11.73 1.63
POHD-B NORTH 14.31 861.07 863.00 0.0049 59892.22 12.03 47.43 14_31 3.68
Advanced Interconnected Channel & pond ~outing (ICPR Ver 2.11> [1}
Copyright '995, Streamline Technologies, Inc.
CARMEL BUSINESS OFFICES - OPUS SITE
CONNECTING OPUS PONDS TO EXISTING SOUTH
G:\SD\SITE\58207\CALCS\DEV9\SIM 07/19/00
*****....**. Basit"l S\..WlJTIary - DEV9 ...**.*..**......*..*........*****..****..........*....*......,.
***
_~_________________________________________________________________~..r_________
Basin Name:
Group Name:
Node Name:
Hydrograph Type:
Unit Hydrograph:
Peakins Factor:
Spec Time Inc em!n):
Camp Time Inc (m!n):
Rainfall f 11 e:
~ainfall Amount (in):
Storm Duration (hr):
Status:
Ti~ of Conc. (m)n):
Lag Time <hr):
Area (acres):
vol of Unit Hyd (in):
Curve N l1mbe r:
DCIA 1%):
Time Max (hrs):
Flow MaK <ds):
Runoff Volume (in):
Runoff Volume (cf):
***
Basin Name:
Group Name:
Node Name:
Hydrograph Type:
Unit Hydrograph:
Peaking factor:
Spec Time Inc (min):
Comp Time Inc <min):
Rainfall File:
Rainfall Amount (in):
Storm Duration (hr):
Status:
Time of Cone. (min):
Lag Time (hr):
Area (acres):
Vol of Unit Hyd (in):
Curve Number:
DeIA (%):
Time MaK (hrs):
Flow MaK (ds);
OS-SOUTH
BASE
POND
UIl
UH256
256.00
3.33
3.33
SCS11-24
6.00
24.00
OF FS ITE
25.00
D.DO
4.70
1.00
63.00
0.00
12.17
5.48
2.18
37120
HE -SITE
BASE
POND
Ufl
UII256
256.00
2.00
2.00
SCSI I -24
6.00
24_00
ONSlTE
15.00
0.00
1.44
1.00
85.00
0.00
12.07
4.84
1./- SHE
BASE
POND
UH
UH256
256.00
1.60
1.60
SCSI 1-24
6.00
24.00
ONSITE
12.00
0.00
9.57
1.00
91.00
0.00
1Z.05
40.50
4.96
172152
E - S ITE
BASE
MHZ
UH
UH256
256.00
0.93
0.93
SCSI 1-24
6.00
24.00
INACTIVE
1.00
0.00
0.40
1.00
82.00
0.00
12.02
1.81
MPP
BASE
48CULV
UH
UH256
256.00
2.67
2.67
SCSI! -24
6.00
24.00
OFFSITE
20.00
0.00
6.40
1-00
94.00
0.00
12.13
21.34
5.29
123010
SE-SITE
BASE
POMD2
UH
UH256
256.00
1-60
1.60
SCSll-24
6.00
24.00
ONSIlE
12.00
0.00
4.54
1.00
87.00
0.00
12.05
17.95
us31
BASe
48CULV
UK
UH256
256.00
2.67
2.67
SCSI I -24
6.00
24.00
OFFSITE
20.00
0.00
38.53
1.00
78.00
0.00
12.13
92.19
3.58
500391
N-BLDGS
NoRTH
POND'A
UH
UH256
256.00
1.33
1.33
SCSll-24
6.00
24.00
ONSITE
10.00
0.00
13.86
1.00
91.00
0.00
12.04
63.96
N-SITE
BASE
MH
UH
UH256
256.00
0.67
0.67
SCSII-24
6.00
24.00
ONSlTE
5.00
0.00
1.09
1.00
91. 00
0.00
12.01
6.40
4.96
19608
S-BLDG
NORTH
POND-B
UH
UH256
256.00
1.33
1.33
SCSn-24
0.00
24.00
ONSITE
10.00
0.00
10.00
1.00
91.00
0.00
12.04
46.14
Advanced Interconnected Chan~el & Pond RoutIng (ICPR Ver 2.11) [2)
Copyright 1995, Streamtinc Technologies, Inc.
CARMEL BUSINESS OFFICES - OPUS SITE
CONNECTING OPUS PONDS TO EXISTING SOUTH
G~\SO\SITE\58207\CAlCS\OEV9\SIM 07/19/00
.*~******* Basin Summary - DEV9 ***********.~**~*******~*~***w***.******.*******
___.~~.4______________~~_r______________~~a______._.__-.---------------~-~------
Runoff volume {in):
Runoff Volume (cf):
4.30
22483
3.99
5786
4.52
74420
4.96
249323
4.96
179887
Advanced Int~rconnected Channel & Pond Routing (ICPR Ver 2.11) [1]
Copyright 1995, Streamline Technologies, Inc.
CARMEL OFFICE BUILDINGS
.******.** Input Report **************~****~***~~*~~****.**********.*****~**~~.
--------Class: Node-----------------------------------------------------..------
Name: 48cULV Base Flow(cfs): 0 Init Stage(ft); 855.85
Group: BASE Len,gth(ft): 0 ~arn Stage(ft}: 861
Conrnent:
Stage(ft) Area(ac)
855.85 0
861 0.8
--------Class: Node---------------------------------------------------.---------
Name: MEIJER Base FLow(cfs): 0 Init Stage(ft}: 851
Group: BASE LengthCft); 0 ~arn Stage(ft): 855.31
COIlJl1l.?nt:
Time(hrs) Stage(ft)
o 850.78
10 851_41
1\ 851_74
12 853_35
13 854.41
14 852_79
15 852.14
16 851.77
19 851.4
22 851.28
24 851.26
25 851.05
29 850.78
30 850.78
60 850.78
--------class: Node---------------------------------------------------------.---
Name: MH Base f{ow{cfs): 0 Init Stege(ft): 852.65
Group: BASE Length(ft): 0 ~arn Stage(ft): 861
Cooment:
Stage(ft) Area[ac)
852.65 0.01
861 0.01
--------Class: Node-------------------------------------------------------------
Name: MHZ Base Flow(cfs): G Init Stage{ft}: 852.34
Group: BASE Length{ft): 0 ~arn Stagc<ft): 861
Com:nent:
Stage(ft)
852.34
861
Area(ac)
0.01
0.01
Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.1') {21
copyright 1995, Streamline Technologies, Inc.
CARMEL OFFICE BUILDINGS
*******~** l~put Report *****w*******~****************.****.*.*****~**w*********
n_ -----Class:
N3J11e': POND
Group: 8p.sE
coument:
Node - -- -- - - -- -- - - -- -- -- - -- - -- - -- - - -- -- - - - -- -- - -- -- - - - - -- -- - - - - - - -
Base Flow{cts}: 0 Init Stage(ft): 853
Length(ft): 0 ~arn Stage(ft): 8S7
Stage{ft) Area{ac)
852 0_97
853 1.1'
854 1 .34
855 1 .63
856 1.8
857 1.97
____roo_Class: Node--------------------------------------.----------------------
Narne: POND2 Base Flow(cfs): 0 Init Stage(ft): 855
Group: BASE Length{ft): 0 ~arn Stage{ft): 858
CO!1lllent:
StageCft) Area{ac)
854 0.25
855 0_29
856 0_33
857 0.38
858 0.42
859 0.49
--------Class: Node----------------------------------------------------------.--
Name: MH3 Base Flow(ds): 0 In;t Stage(ftJ: 858.3
Group: NORTH length{ft): 0 ~arn Stsge(ft): 861
COlllllent:
Stage{tt)
858.3
861
Area(sc}
0.01
0.01
--------C\ass: Node-----------------------------------.-------------------------
Name: POND-A Base Ftow(cfs): 0 Injt Stage{ftJ: 864
Group: NORTH Length{ft): 0 Warn Stage(ft): 868
Comment: NORTH POND ON OPUS SITE
StagcCft) Area{ac)
B64 1.67
867 2.28
868 2.48
--------Class: Node.----------------.--------------------------------.----------
Name: PO~D-B Base Ftow(cfs): 0 [nit Stage{ft): 858.7
Group: NORTH Length(ft): 0 ~arn Stagc(ft): 863
Comment: SOUTH POND ON OPUS SITE
Stage(ft)
858.7
863
Area(ac)
1.05
1.64
Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.11) [3]
Copyright 1995, Streamline Technologies, Inc.
CARMEL OFFICE BUILDINGS
****~~*.~* Input Report **.********.~~~~.~*******.****.****************.*.******
_un ~".Class: Pipen __ __ _" u u_ __ U _n_ n_ _______ ___ __ _ __ _ __ _ -- un n n -- n ----
~ame: II from Node; MHZ lengtn{ ft): 144
Group: BASE To Node; MEIJER Count; 1
UPSTREAM DO'.INSTREAH Equation: Average K
Geometry: Circular Circular Flow: Both
Span< in) : 54 54 Entrance Loss Coef: 0.5
Rise(;"): 54 54 Exi t Loss Coef: 0
Irwert(ft): 852.34 852.08 Bend Loss Coef: 0
Manni "g' s N; 0.013 0_013 Outlet Cntrl spec: Use de or tw
TOp CUp(in); 0 0 Inlet Cntrl Spec: Use dn
Bottom Clip(in): 0 0 Stabilizer Option: None
Upstream FH\.IA Inlet Edge Description:
Circular Concrete: Square edge wI headwall
Downstream FH~A Inlet Edge Description:
Circular Concrete: Square edge wI neadwall
Structure # to Structure #
-.-.----Class: pipe-.-.---------------------~~~~~~-----------------------------~
!lame: L1A From Node: MH Length( ft): 173
Group: BASE To Node: MH2 Count: 1
UPSTREAM DOI.INSTREAM Equation: Average I(
Geometry: Circular Circular Flow: Both
Span(in): S4 54 Entrance loss Coef: 0.5
Rise{in): 54 54 Exit Loss Coef: 0
Jnvert(ft): 852.65 852.34 Bend Loss Coef: 0
Manning's N: 0.013 0.013 OUtlet Cntrl Spec: Use dc or tw
Top Clip(in): 0 0 Inlet Cntrl Spec: Use dn
Bottom Clip(in): 0 0 Stabilizer Option: None
Upstream FHWA Inlet Edge Description:
Ci rcutarConcrete: Square edge wI headwal t
Downstream FHWA Inlet Edge Description:
Circular Concrete: Square edge wI headwall
Structure #
to Structure #
Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.11) [4]
copyright 1995, Streamline Technologies, Inc.
CARMEL OFFICE BUlI.DINGS
-********* Input Report ********************************************************
--------Class: Pipe-------------------------------------------------------------
Name: l2 From Node: POND length( ft): 198
Group: BASE To Node: MH Count: 1
UPSTREAM DOI.'NS1REAM Equation: Average 1(
Geometry: Circular Circular Flow: Both
Span( i n>: 48 48 Entrance Loss Coef: 0.5
Ri seCi n): 48 48 Exit Loss C01'1: 0
Invert( ft): 853 852.65 Bend loss coef: 0
Manning's H: 0.013 0.013 Outlet Cntrl Spec: Use dc or tw
Top Clip( in): 0 0 Inlet Cntrt spec: Use dn
Bottom Clip(in): 0 0 Stabilizer Option: NOrle
Upstream FH~A Inlet Edge Description:
Circular Concrete: Square edge wi headwalL
Downstream FH~A Inlet Edge Description:
Circular Concrete: Square edge ;J.I headwall
Structure #
to Structure #
----..--Class: Pipe---------.-------------------------------------..------------
Name; l3 From Node: 48cUlV length (f t): 194
Group: BASE To Node: POND Count: 1
UPSTREAM DOWNSTREAM Equat ion: Average K
Geometry: Circular Circular flow: Both
Span( i rI): 48 48 Entrance Loss Coef: 0.5
Ri see in): 48 48 Exi t Loss coef: 0
Invert(ft): 855.85 855_41 Bend loss Coef: 0
Manning'S N: 0.024 0.024 OUt Let Cntr I Spec: Use dc or tw
Top Cl ip( in): 0 0 Inlet CntrL Spec: Use dn
Bottom Cl ip( in): 0 0 StabiLizer Option: Wane
Upstream FHWA Inlet Edge Description:
Circular CMP: Projecting
2
3
Downstream FH~A Inlet Edge Description:
Circular CMP; Projecting
2
3
Structure #
to Structul'e #
Advenced Interconnected Channel 8. Pond.Routing (ICPR Ver 2.11) [5]
Copyright 1995, Streamline Technologies, lnc.
CARMEL OFFICE BUILDINGS
**k~****~ Input Report *~****~r***.*.*********~.*K***********ty~*****~*********
_...-'--Class: pjpe----.-----------.....----------------------------------------
Name: L7 From Node: PON02 Length{ft) : 411
Group: BASE To Node: POND Count: 1
UPSTREAM DOWNSTREAM Equation: Average K
Geometry: CircuLar Circular Flow: Both
Span( in): 12 12 Entrance Loss Coef: 0.5
Rise(in): 12 12 hit loss Coef: 0
lnvert(ft): 855 853 Bend'loss coef: 0
Hanning'S N: 0.013 0.013 OutLet cntrl Spec: Use de or tw
Top ctip(in): 0 a Inlet Cntrl Spec: Use dn
Bottom Clip(in): 0 0 Stabilizer Option: None
Upstream FHWA Intet Edge Description:
Circular Concrete: Groove end projecting
3
Downstream FHIIA Inlet Edge Description:
Circular Concrete: Groove end projecting
3
--------Class: pipe----------------------------------------.--------.-------.-.-
Name: l4 From Node: MH3 LengthCft): 100
Croup: NORTH To Node: MH Count: 2
UPSTREAM DO'rlNSTREP.M Equation: Average I(
Geometry: Circular Circular Flow: Both
span(in): 21 21 Entrance loss Coef: 0.5
Rise(in): 21 21 Ex it Loss Coef: 0
InverHft) : 858.3 857.48 Bend loSS eoef: 0
Manning's N: 0.024 0.024 OUtlet Cntrl Spec: Use dc or tw
Top Clip( in}: 0 0 Inlet Cntrl spec: Use dn
Bottom clip(in}: 0 0 Stabiliter Option: None
Upstream FHYA Inlet ~dge Description:
Circular CKP: Projecting
2
3
Downstream FHWA Inlet Edge Description:
Circular CMP: Head~all
2
structure #
to Strm;tlJre #-
Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.11) [6]
Copyright 1995. Streamline TechnoLogies, Inc.
CARMEL OFFICE BUIlOINGS
~********w Input Report ****.**************.**~*.******+*******.**.***********~*
--------Cla5s: Pipe-----------------------------------------------------------.-
Name: l8 From Node: POND-B length{ft) : 44
Group: NORTH To Node: MH3 Count: 1
UPSTREAM OO\.JNSTREAM Equatlol1: Average (
Geometry: Circular CirCUlar Flow: !loth
Span(in): 10 12 Entrance Loss Coef: 0.5
Rise{in): 10 .12 Exit Loss Coef: 0
Invert{ft): 858.7 858.3 8end Lass Cod: 0
Manning's H: 0.013 0.013 OutLet Cntrl Spec: Use dc or tw
Top cl ip(in): 0 0 Inlet Cntrl spec: Use dn
Bottom Cl ip( in): 0 0 StabiLizer Option: None
Upstream FHYA InLet Edge Description:
Circular Concrete: Square edge wi headwall
Downstream fH~A Inlet Edge Description:
Circular Concrete: Square edge ~I headwall
PIPE cONNECTfON BETWEEN POND-B AND 21" TWIN PIPES
--------Class: Pipe-----------------------------------------.--.----------------
!lame: L9 From Node: POND-A Length(ft) : 298
\iroup: NORTH To Node: POND-B Count: 1
UPSTREAM OO\./!lSTREAM Equation: Average K
Geometry: Circular Circular Flow: Both
span( in): 8 8 Entrance Loss Coef: 0.5
Rise{in): 8 8 Exit Loss Coef: 0
InverHft): 864 858.7 Bend Loss eoef: 0
Manning's N: 0.013 0.013 Outtet Cntrl Spec: Use de or tw
Top Clip{in): 0 0 Inlet Cntrl Spec: Use dn
Bottom Clip{in): 0 0 Stabil i zer Option: None
Upstream FH~A Inlet Edge Description:
Circular Concrete: Square edge 101/ headwall
Downstream FHYA Inlet Edge Description:
Circular Concrete: square edge 101/ headwall
coNNECTING PIPE BET~EEN POND-A AND POND-B
Hydraflow Plan View
r..-.--....n..
!
14
I
ri._- p;;;...--..----........-.---.-.
Project file: main.stm
~~-~-~~-~--~,._---------
12
/'6 J
~
__._J_~_~~_~~~_in d~~_~~.~o.lis.:I~~..._~______
4
t
t
--=L
No. Lines: 19
----.----.--." ._-~.-
'Tu.--....u....
i 07-18-2000
----1
0\
I
I
i:
I:
!
I
,
i
I.
I;
ji
I:
i'
I
;
I
I
I
Hy....ral.'V JV t..l!.~rn I ....;e\"",( I uuUlullo.~n
Page.1 .
- _. -~-
St::ltion Len Drng Area Rnaff Area x C Tc I Rain Total I Cap Vel Pipe Invert Elev HGL Elev Grnd I Rim Elev Line to
coeff (I) flow , full . .
Line To lncr Total Incr Tolal Inlet Sysl i ! Size Slope Up On Up On Up Dn
Line i
I (ft) (ac) lac) (e) (min) (min) (inlhr) (efs) (cfs) (fUs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft)
!
1 End 990 0.27 7.95 0.35 0.D9 6.24 I 8.0 8.7 5.8 36.17 41.86 6.65 36 0.39 864.39 864.00 866.54 866.16 870.00 868.00 #1-#2
2 1 1600 OA1 3.7B 0.80 033 302 . 5.0 7.0 6.3 18.96 20.48 3.24 33 015 864.63 86439 86724 867.06 868.00 870.00 #2-#3
,
3 2 9.0 0.48 2.56 0.80 0.38 2.05 5.0 7.0 6.3 12.87 17.87 3.24 27 033 864.66 864.63 867.38 867.36 869.15 868.00 #3-#4
I
4 3 234.0 0.63 2.08 10.80 0.50 1.66 5.0 5.6 6.8 11.23 11.99 2.83 27 0.15 865.01 864.66 867.71 867.40 869.05 869.15 #4-#5
I
5 4 9.0 0.64 0.64 i 0.80 0.51 0.51 5.0 5.0 7.0 358 3.94 4.55 112 122 855.12 865.01 867.92 867.83 869.00 869.05 #5-#6
6 4 1250 0.35 0.81 0.80 0.28 0.65 5.0 5.0 7.0 451 455 368 1 15 0.50 865.63 865.01 868.45 867.83 868.70 869.05 #5-#7
7 6 9.0 0.46 0.46 0.80 0.37 0.37 5.0 5.0 7.0 2.57 2.65 3.27 12 0.56 865.68 865.63 868.70 868.66 869.00 868.70 #748
8 2 125.0 042 0.81 0.80 0.34 065 5.0 5.1 7.0 4.51 5.57 3.68 15 0.74 865.57 864.64 867.97 867.36 869.05 868.00 #34t9
9 8 9.0 0.39 0.39 0.80 10.31 0.31 5.0 5.0 7.0 2.18 5.69 2.78 12 2.56 866.23 866.00 868.22 868.18 869.30 869.05 #94tl 0
10 1 i 161.0 . 0.41 3.78 0.80 i 0.33 3.02 5.0 7.0 6.3 19.01 20.84 3.25 33 0.16 864.64 864.39 867.24 867.06 869.00 I 870.00 #2-#13
11 10 9.0 0.48 2.56 0.80 0.38 2.05 5.0 6.9 6.3 112.90 14.5B 3.25 27 0.22 864.66 864.64 867.38 867.36 859.00 869.00 1#13-#14
12 11 225.0 0.63 2.08 0.80 0.50 1.66 5.0 5.6 68 11.23 11.99 I 2.83 27 015 865.00 86466 867.70 867.40 869.00 869.00 #14-#15
13 12 9.0 0.64 0.64 0.80 0.51 0.51 5.0 50 7.0 3.58 11.39 4.55 12 10.22 865.92 865.00 I 867.92 867.82 869.00 a69.00 #15-#1 6
14 12 125.0 0.35 0.81 0.80 0.28 0.65 50 5.0 7.0 4.51 5.00 ::'.68 15 0.60 865.75 865"00 868.44 867.82 869.00 869.00 #1 5-#1 7
I 15 14 90 0.46 0.46 0.80 037 0.37 5.0 50 7.0 2.57 557 3.27 12 2.44 865.97 865.75 868.69 868.65 869.00 86900 #17.1t18
16 10 125.0 0.42 0.81 0.80 0.34 0.65 5.0 5.1 7.0 4.51 5.00 3.68 15 0.60 865.39 864.64 867.97 867.36 B69.00 86900 #13-#19
I i 5.00
17 15 90 0.39 0.39 0.80 0.31 0.31 5.0 5.0 7.0 2.18 7.96 2.78 12 865.95 865.50 868.22 868.19 869.00 869.00 #19.#20
18 1 200.0 0.06 0.12 0.80 0.05 0.10 5.0 5.7 6.7 0.65 2.52 1.09 12 0.50 86657 86557 867.16 86706 870.00 87000 #2-#11
19 18 136.0 0.06 0.06 0.80 0.05 0.05 5.0 5.0 7.0 0.34 12.52 0.84 12 0.50 866.75 866.57 867.19 867.18 870.00 870.00 #11-#12 i
I !
I I i
! I
~ ! .---
Projec1 File main.stm I-D-F File: indianapolis.lDF Total number of lines: 19 Run Date: 07-18-2000
~,_----,>,-"-_____~.__L~~~'
/.JOTES Intensity" 56.97 I (Tc + 9.00) , 0.80: Return period" 1 0 Yrs: lnitial tailwater elevation = 866.16 (ft)
,"---
I-
I
I
I
,
,
!
I
r-
3:
(l)
......
>
~
~I
0..,
~I
01
- ,
if- ;
<'a
lI:.. '
"'0
>.
.:I: ,~.__."_..~.~__._.".......~.
I
o
o
o
<;I
a)
.,-
I
r-
o
N
(/)
<P
C
::J
o
z
I
i
ILL
I~
1:8
II
Ie
1'-
jili
l~
lLL
io
!-
'I>
E
Q)
L
-e
o
Cl
:~ !
! \..: I
I ~ I
_ ~ __~_~__-' I]
nj. ""fa1-.... N .....Jrn. -Ie\.....,r 1.........,.Uh........Jn
P"'!:I\;. "
1~ ----
Station Len OrnS! Area Rnotf Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Ehw Grnd I Rim Elev Line ID
coeff (I) flow full
Line To Incr Total Incr Total Inlet 5yst Si~e Slope Up On Up On Up On
Line
I (II) (ac) (ac) (e) (min) (min) (infhr) (cfs) (efs) {ftIs} (in) (%) (ft) (ft) (ft) (ft) (ft) (ft)
.~ ~-_.~.
1 End 25.0 0.21 0.56 0.80 0.17 0.45 5.0 5.5 68 304 3.56 4.95 12 1.00 864.25 864.00 864.99 ' 864.72 868. DO I 866.00 #21-#22
2 1 101.0 0.35 0.35 0.80 0.28 0.28 5.0 5.0 7.0 11.96 4.45 3.26 12 1.56 865.83 664.25 866.42 865.27 859.00 1868.00 #22-#23
I ! i
I
I
i
I
I
,
,
I i
I ,
! I 1
1
,
!
I i
\ I
! I
i
I
I I I I
i I-_~. I i i
Project File: north.stm I-D.F File: indianapolis.IDF Total rfumber of lines: 2 Run Date: 07.20.2000
- --.--,. .. -.----- ...._.u_
NOTES: Intensity = 56.97 f (To + 9.00) h 0.80; Return period = 10 Yrs.; Initialtailwater elevation" 864.72 (ft)
:s:
(I)
.-
>
s:
<<S
-
Q"
~
o
l4-
res
:r....
"C
~
J:
.. . ... ...------~-w=~r1
101
,0 I
01
~I
......1
1 I
r-- I
01
I
..-
N
it)
oJ)
C
-I
o
Z
N
I
i
il..L
10
1-
IW
i'3
i ~I
r ~ i
I .21 I
i -g i
1,- ,
I ill j
! ~ I
ilL!
i 0 i
i-I
, l
H
I .
1 I
I .
E
U;
.J::
"5
o
!(f)
i ..
I ~,~ Ii
:0
I,~
".~___~___,_"_~___._,_".,__.~_~_l~,j
n;, _.' al. _ -JV "- ..-,uu. -,t:~.....; . _....u 1e.......JU
p"V". ,-
Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Ele" Grnd I Rim Etev Line 10
coeff (I' flow full
Line To Iocr Total Incr Total Inlet Syst Size Slope Up Dn Up Dn Up Dn
Line
1ft) (ac) (ac) (e) (min) Imin) (in/hrl (cfs) (cf$) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft)
- ------ ,-.-
1 End 21.0 0.23 0.59 0.80 0.18 0.47 l 5.0 5.5 6.8 3.20 3.30 4.76 12 086 864.18 864.00 864.97 864. BO 868,00 B66,OO #24-#25
2 1 1210 0.36 0.3-6 0,80 0.29 029 5.0 5,0 7,0 201 4.39 3.86 12 1.52 865.42 864.56 867.02 ; 865.24 869.00 868,00 #25-#26
I I I
i
1
I
1
1 I
I
i i
1
I I
I
I 1 i
_J
Project File: Soulh.stm I I-D-F File: indianapolislOF Total number of lines: 2 Run Date: 07-18-2000
I NOTES: IntenSity" 56,97 I (Tc + 9,00) ^ 0,80; Return period = 10 Yrs.; Initial tailwater elevation'" 664.60 (ft)
I
.
Hydraflow Plan View
I
I
I
i
I
I
I
I
l~---.-_..__..-
~?j==~file_:_ Main-south, stm
1
3
10
1
=L...!.~~!~~~_i~dia n~~?"=_'9 F
4
l
5
No. Lines: 11
,"
I .07-18-2000
L_
n:> _.01._.IV ~.-'Dll. -,tt\l._. 1__Uh.........JIl
P..~"
I !
Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Jnvert Elev HGL Elev Grnd I Rim Elev Line lD
eoeH (Il flow full
Line To Incr Total Incr Total Inlet Syst Size Slope Up Dn Up On Up On
Line
(ft) (ac) (ac) (C) (min) (min) (in/h r) (ds) (cfs) (Ws) (in) (%) (fl) (ft) {ft) (ft) (ft) (ft)
~'I--' I ._--"---~-'
I
I
1 i End 182.0 0.48 5,23 0.80 0.38 4.18 5.0 10.6 5.4 \22.39 25.69 405 36 0,15 858.97 858,70 861,16 860.89 86600 86200 #35-#36
I
2 1 9.0 0,53 i3.29 0,80 0.42 2.63 [5.0 10.5 5.4 114.11 15.91 2.90 30 0.15 858.99 858.98 861.42 861 .41 866.00 866.00 #36..:#37
3 2 174.0 0,12 2.76 0.80 0.10 2.21 5.0 9,6 5,6 12.31 112.42 3.10 27 I 0.16 859.27 858.99 861.72 861 .44 866.00 866.00 #37-#38
4 3 38.0 0.12 2.32 0.80 0.10 1.86 5.0 9.4 5.6 10.43 1035 3.32 24 0.21 859.35 859.27 861.95 861.87 866.00 866.00 \ #38-#39
5 4 146.0 0,45 2.20 0.60 0.36 1.76 5.0 8,6 5.8 10.23 10.42 3.26 24 0.21 859,66 859.35 1852.27 861.97 866.00 186600 i #39-#40
6 5 9.0 0.52 0.52 0.80 0.42 0.42 5.0 5,0 7.0 2.91 2.90 3.70 12 0.67 859,72 859.66 862.50 852.44 866.00 866.00 #40-#41
7 5 1290 1.23 123 0.80 0.98 0.98 8.0 8.0 6.0 5.89 15'85 3.33 18 0.31 860 06 859.66 862.84 862.44 866.00 866.00 #40-#42
8 3 125.0 0.14 0.32 0.80 01 i 0.25 50 5.5 6.8 1.74 2.46 2.21 12 0.49 859.88 859.27 862.16 861.87 864.00 866.00 #38-#45
9 8 41.0 0.18 0.18 0.80 0.14 0.14 50 5.0 7.0 1.01 373 128 12 1.10 850.33 859.88 862.27 862.24 86400 864 00 #45-#46
10 1 128.0 0.50 1.46 0.80 0040 1,17 5.0 5.0 7.0 8.14 9.16 2.59 24 0.16 859.19 85898 861.58 861.41 865.00 866.00 #36-#43
11 10 9.0 0.96 0.96 0.80 077 077 5.0 5.0 7.0 536 5.35 3.44 18 026 862.30 862.28 863.54 863.51 865.00 86500 #43..:#44
,
I i
I
I
!
I
.
I )
I
1 I
I
I
Project File: Main-south.stm I-D-F File: indianapolislDF Total number of lines: 11 Run Date: 07.18.2000
- ---------" --
NOTES: Jntensity =- 56.97 / (Tc + 9.00) ^ 0.80; Return period'" 1 0 Yrs.: lnitial tailwater elevation =- 860.89 (ft)
---- .--_.
.,-
o
o
o
N
I
cO
..-
I
1'--
01
N
(/)
Q)
c
:.:::i
o
z
LL
N 0
<J)
0
0..
<U
c:
al
TI
c
~
t::
LL
0
~
Q,)
.-
>
t:
ctS
-
a..
-~
o
-
\po
<<S
I..
"'C
~
.:I:
j
i
I
l_____~..______..____._.____.~---------------'-----------
E
(i)
U
I
.s!!
"0
:Q
E
~
-0
(j)
'0'
L-
0..
Ii'a} ___aL_ .'V ~ __'OIL _~V___ l_u_UI(.-__JII
Pi...:J-
Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd I Rim EJev Line ID
coeff (I} flow full . .
Line To Incr Total lner Total Inlet '5yst Si;ze Slope Up On Up Dn Up Dn
Line
(ft) (<!le) (ac) (e) (min} (min) (inlhr) (cfs) i (cfs} {ftls l (in) (%J (ft) (ft} (ft) (ft) (ft) (ft)
--"---- __~4 , ..
1 End 47.0 0.22 0.45 0.80 0.18 0.36 5.0 5.9 6.7 2.40 2.60 3.55 12 0.53 186355 86330 864.33 864.13 866.50 868.00 #2B-#30
2 1 113.0 0.23 0.23 0.80 018 0.18 5.0 5.0 7.0 129 239 2.17 12 0.45 864.06 863.55 864.65 864.48 866.50 866.50 #30--#31
i i
I !
I
I
\
I 1
]
!
I I i
I
i
1
I , I I
,
I
, i
_. ____ ____lJ
Project File: middle-c.stm I-D-F File: indianapolis.IDF Total number of lines: 2 Run Date: 07-18-2000
NOTES: Intensity'" 55.97 I (Te + 9.00) · 0.80; Return period = 10 Yrs.: Initial tailwa!er elevation = 864.13 (ft)
f1ydraTlow ~Ian view
i
I
I
I
I
I
I
L
l. Project file: SouthC.stm
i
-'---'-~~~~~~~~=-'=='--~DFfi~~i~~;P~i~}~~T.-'-'.~::~._~=:~-==~'_~:~:~..:_~.~.lNO. ~~~~~~_~.~~~. ....__J...07~18~ooa--_.._-- J
n:) ~.cU.~ JV i.....-1IH. -,t:=V~_" 1__UI<.......JrI
PAtJo;;'.' ...
- i Grnd I Rim Elev
i Station \ Dmg Area Rnoff Area x C Te Rain 1 Total Cap Vel Pipe Invert Elev HGL Elev Une tD
Len
~.,~_.-,,-~~.-..---.--! ~"~--- coeff f--------- - (I) I flow full I " .
Line: To Incr Total Incr Total Inlet Syst Size Slope Up Dn Up On Up Dn
i Line
I (ft) (ac) (ac) (e) (minI (min) (in/hr) (cfs) (cfs) (ftls) (In) (%1 (ft) (ft) (ft) 1ft) (ft) (ft)
1 End 750 0_20 0.39 a.BO 0.16 i 0.31 5.0 5.2 6.9 2.15 6_21 5.54 12 3.04 860.98 858.70 861.60 859,12 864,00 860.00 #32-#33
2 1 32.0 0.19 0.19 0.80 0,15 0.15 5.0 50 7_0 106 8.56 2.57 , 12 5,78 862.83 860.98 863.27 86164 86600 864.00 #33-#34
i
i I
I
i
]
i
I
I
I
I i
I
I
\
I I I I
i I
I
I
I I __l_.__J__._.
]
I
~.,~, -- I Run Date: 07~1~~2000
Project File: SouthC.slm I-D-F File: indianapolis.IOF Total number of lines: 2
NOTES lntensity = 56_97 I (Tc + 9.00) ^ O_BO; Return period = 10 Yrs.: Initial tailwater elevation = 859.12 (ft)
"I~
"... -
'_.'--'--'-~-~.---~
i
..,...
-------------------------------
, '
, !
ILL !
io i
j- !
i~ i
, 0'
i a.. I
! ~!
; '6 i
: c !
i '~ ~
H!~!
0'
!
I 1
I
I
!
I
~
(J)
.-
>
.s::
m
5:
~i
:>1
01
-
It-
~I
~I
J: L....
E
1'5
(I)
CIl
Cl)
..c
:5
o
,(fJ
I ..
l.ill
1<;:::
~it51
-~.._.._----- I'~
~____._ 0..
t1~ _fa1._ N ~~Jrn~ .je\._r 1_.....UI;.......:>n
P~~~.. ~..
S tCltjon Len Drng Area ! Roof! Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd I Rim Elev Line to I
coeff (I) flow full
Line To Iocr Total Incr Total Inlet Syst Sfze Slope Up Dn Up Dn Up On
Une
(ft) (ac) (ac) (C) (min) (min) (inlhr) (ds) (efs) 1ft/5) (in) ('Yo) (ft) (ft) [ft) {ft) I (ft) 1ft)
,
I
11 El1d 90.0 0.50 050 080 0.40 0.40 5.0 5.0 I 7.0 2.79 3.56 3.56 12 1.00 . 858.70 85780 860.09 859.54 863.00 860.00 #47-#48
I
I
,
,
\
I ,
I
i
I
I
I
I
I
j
,
I i
I f
i
I I
------~ i
Project File: Southeast-stm I.Q.F File'. indianapolls.IDF Total number of lines: 1 RUrl Date: 07-18-2000
NOTES: Intensity" 56.97 I (Te + 9.00) ^ 1).80; Relurn period =10 Yrs.: Initial tailwater elevation = 859.54 (ft)