GENERAL DEMOLITION NOTES
A. REFER TO MECHANICAL, ELECTICAL, PLUMBING & SITE DEMOLITION
DRAWINGS FOR ADDITIONAL DEMOLITION ITEMS
B. CONTRACTOR RESPONSIBLE FOR FIELD VERIFYING EXISTING CONDITIONS
PRIOR TO REMOVAL WORK.
C. CONTRACTOR RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO EXISTING
SURFACE, EQUIPMENT, ETC. IN AREAS TO REMAIN. THIS INCLUDES TRAVEL
ROUTE FOR MATERIAL AND WORKMAN MOVEMENT, AND SURFACES DISTURBED
BY TEMPORARY PARTITIONS. ALL AREAS TO BE DEMOLISHED OR DISTURBED BY
ANY DEMOLITION ARE TO BE PATCHED TO MATCH EXISTING ADJACENT AND
PREPARED FOR NEW FINISH. IN ALL AREAS OUTSIDE LIMITS OF WORK NEW
FINISH IS TO BE COMPLETED TO MATCH EXISTING ADJACENT SURFACE.
D. ALL REMOVAL WORK TO BE COORDINATED WITH NEW WORK TO ENSURE
PROPER LIMITS AND SCOPE.
E. CONTRACTOR RESPONSIBLE FOR PATCHING/REPAIR TO FLOORS, WALLS, ETC.
UPON REMOVAL OF ANY FIXTURES, MECHANICAL EQUIPMENT, WALLS, ETC.
F. CONTRACTOR RESPONSIBLE FOR COORDINATING WITH OWNER ANY
CONFLICTS BETWEEN CONSTRUCTION HOURS AND CHURCH SERVICES AND
ACTIVITIES.
G. CONTRACTOR RESPONSIBLE FOR MINIMIZING CONSTRUCTION AREAS
EXPOSED TO AND CHURCH SERVICES AND ACTIVITIES. IF AN AREA IS EXPOSED
TO AN OCCUPIED AREA, THE CONTRACTOR SHALL PROVIDE A SECURE, DUST
TIGHT TEMPORARY PARTITION SEPARATING CONSTRUCTION AREAS FROM
OCCUPIED SPACE.
H. CONTRACTOR RESPONSIBLE FOR MAINTAINING EXISTING FIRE RATINGS AND
PATHS OF EGRESS FROM EXISTING BUILDING.
I. CONTRACTOR RESPONSIBLE FOR SECURING OPENINGS TO THE EXTERIOR
CAUSED BY DEMOLITION OF THE EXISTING BUILDING.
J. EXISTING SANCTUARY DEMOLITION WORK TO BE COORDINATED W/ PHASE II
OF PROJECT
K. SALVAGE ALL FIRE EXTINGUISHERS AND TURN OVER TO CONSTRUCTION
MANAGER.
A3 A5 A6 A7 A8 A9 A10 A11 A12
AD
AE
AF
AG
HH
AJ
AK
AL
S101F
4.2
A1 A2
5
10
10 2
10
1 11 1
10
10
10
10 11
10
11
4 10 2 2 4
8 8
9
5
2
2 3 2
3
6
2 3 2
3
6
5
2
2
4
10 4
8 10
2 2
10
10
6 7
12
LIMITS OF
FULL DEMOLITION
PHASE I
SEAL WITH WEATHER-TIGHT
PROTECTION DURING WORK
NO WORK
LIMITS OF NEW WORK
AND SELECTIVE
DEMOLITION PHASE II
SEE GEN. NOTE J.
5
15 15
8 8
LIMITS OF
FULL DEMOLITION
PHASE I
SEAL WITH WEATHER-TIGHT
PROTECTION DURING WORK
13
13
13
13
14
13
16 16
16
LIMITS OF NEW WORK
AND SELECTIVE
DEMOLITION PHASE II
SEE GEN. NOTE J.
FIRST FLOOR
817' - 7 5/8"
LEVEL-2 UPPER
LEVEL
830' - 7 5/8"
A12 A11 A10 A9 A8 A7 3 A6 A5 A4 A3
4.8 4.3 4.2 3.8 2.2 2.1 1.3
A2 A1
4
5
4
1
1
8 8 8 8
6 6
2 2
5
3
5
2
7
FIRST FLOOR
817' - 7 5/8"
LEVEL-2 UPPER
LEVEL
830' - 7 5/8"
AE AD AB AA A
2
2 5
9
5
1
FIRST FLOOR
817' - 7 5/8"
LEVEL-2 UPPER
LEVEL
830' - 7 5/8"
A AA AB AD AE
MAIN ROOF
873' - 1 5/8"
2
5 2
9
5
1
Date: Scale
Drawn By
Checked By
Project
Number
ARCHITECTURE
PLANNING
INTERIOR DESIGN
STRUCTURAL ENGINEERING
424 East Fourth Street
Cincinnati, Ohio 45202
w w w . c h a r c h i t e c t s . c o m
tel: 513/241/4474 fax: 513/241/0081
ISSUANCES
COMPUTER FILE
1400 West Dorothy Lane
Dayton, Ohio 45409-1310
Tel: (937) 224-0861
Fax: (937) 224-5777
3417 South Sherman Drive
Beech Grove, IN 46107
Tel: (317) 780-1555
Fax: (317) 780-6525
750 North Orleans, Suite 400
Chicago, IL 60610
Tel: (312) 944-8230
Fax: (312) 944-8297
117 East Washington
Street, Suite 200
Indianapolis, IN 46204
Tel: (317) 637-2222
Fax: (317) 637-2260
1137 West Taylor St.
Suite 316
Chicago, IL 60607
Tel: (312) 224-8460
Fax: (312) 224-8961
1025 N.Watery Ln.
Brigham City, UT 84302
TEL: (453) 723-5000
FAX: (453) 538-5506
6622 Kingspointe
Parkway
Orlando, FL 33819
Tel: (407) 816-9400
Fax: (407) 816-9300
900145
E
T
T
E
L
C
O
T
T
A
B
J
.
M
.
A
R
C
H
I
T
E
C
T
. .
NO
STATE OF
I
N
D
I
A
N
A
D
E
R
E
T
S
I
G
E
R
No. Description Date
As indicated
6/12/2008 4:32:16 PM
C:\!!!Bryan\Revit\NVCLC-bd.rvt
A111
MAIN LEVEL FLOOR
PLAN AND
ELEVATIONS
DEMOLITION
NEW WORSHIP
CENTER
Checker
Author
06-10-2008
535-3581
3 CD 50% 03.14.08
4 PERMIT SET 04.25.08
DEMOLITION PLAN KEYNOTES
REMOVE EXISTING BLDG INCLUDING EXTERIOR WALLS, ROOF, FOUNDATIONS,
WALKS, CEILINGS, INTERIOR WALLS, MECHANICAL, ELECTRICAL, PLUMBING, OR
ANY OTHER BUILDINGS ITEMS UNLESS OTHERWISE NOTED
REMOVE GYPSUM BOARD/ METAL STUD WALL IN AREA NOTED BY DASHED LINES.
VERIFY EQUIPMENT TO BE RELOCATED OR DEMOLISHED IN DASHED AREAS.
REMOVE GLAZING, WOOD FRAME
REMOVE BRICK AND CMU WALL IN AREA NOTED BY DASHED LINES. VERIFY
EQUIPMENT TO BE RELOCATED OR DEMOLISHED IN DASHED AREAS. PROVIDE NEW
STEEL LINTEL WITH 8" BEARING AT EACH END NEEDLING AND SHORING AS
REQUIRED TO STABILIZE ANY REMAINING MASONRY ABOVE.
REMOVE PLATFORM, STEPS AND FRAMEWORK
REMOVE PROJECTION SCREEN. SALVAGE FOR OWNER REUSE.
REMOVE HANGING CROSS. SALVAGE FOR OWNER REUSE.
REMOVE STAIRS.
REMOVE EXISTING BAPTISMAL FONT & DISCONNET ANY ELECTRICAL OR
PLUMBING CONNECTIONS. SALVAGE FOR OWNER REUSE IN NEW BUILDING.
REMOVE EXISTING DOOR, FRAME, AND SIDELIGHT.
EXISTING STRUCTURE TO REMAIN.
REMOVE EXISTING FLOOR FINISHES.
SAWCUT TO REMOVE PORTION OF SLAB ON GRADE AND PARTIALLY EXCAVATE AS
NECESSARY FOR REPLACEMENT OF NEW FOOTINGS FOR NEW INTERIOR COLUMNS.
SEE STRUCTURAL DWGS.
REMOVE CONC. AND MASONRY. ALSO REMOVE ANY FOUNDATION TO ALLOW FOR
NEW WORK.
EXISTING PROJECTORS TO BE RELOCATED BY OWNER AT START OF PHASE II.
REMOVE CONC. STAIR, FOUNDATION, AND WALKWAYS.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
ELEVATION KEY NOTES:
REMOVE THIS PORTION OF EXISTING IN ITS ENTIRETY INCLUDING ALL EXTERIOR
WALLS, ROOF, FOUNDATIONS, PARTITIONS, ALL MEP EQUIPMENT.
THIS PORTION OF THE EXISTING BUILDING TO REMAIN EXCEPT WHERE SELECTIVE
DEMOLITION IS INDICATED.
REMOVE NORTH WALL OF STAIRS.
REMOVE COPING. COORDINATE REMOVAL WITH NEW COPING FOLLOWING
INSTALLATION OF EIFS ON THIS WALL.
REMOVE FACE BRICK, MASONRY ACCENT BANDS, AND ALL MASONRY TIES AND
ANCHORS. COORDINATE REMOVAL WITH NEW EIFS INSTALLATION ON THIS
EXISTING NORTH WALL.
REMOVE DOWNSPOUT.
REMOVE PORTION OF RAILING TO ACCOMMODATE NEW WORK.
REMOVE PORTION OF BRICK AND CMU WALL IN THIS AREA. PROVIDE NEW STEEL
LINTEL WITH MIN. 8” BEARING ON EACH END AND NEEDLING AND SHORING
AS REQUIRED TO STABALIZE WALL ABOVE.
REMOVE STOREFRONT AND GLAZING SYSTEM.
1
2
3
4
5
6
7
8
9
A111 3/32" = 1'-0"
1 DEMO-LEVEL-1 MAIN LEVEL
A111 3/32" = 1'-0"
2 DEMO-NORTH BUILDING ELEVATION
A111 3/32" = 1'-0"
3 DEMO ELEVATION-EAST
A111 3/32" = 1'-0"
4 DEMO ELEVATION-WEST
5 ADDENDUM #2 05.16.08
10 PERMIT SET 06.10.08