Loading...
HomeMy WebLinkAboutA7035. 4. 3. 2. 1. 6. 7. DOUBLE STUD GYPBOARD WALL 2 LAYERS OF 5/8" GYPBOARD, STAGGERED 3" GLASSFIBER OR MINERAL WOOL BATT SOUND BLANKET (x2) 358ST USG STEEL STUD (x2) COVE BASE CONSTRUCTION NOTES CONSTRUCTION DETAIL BY A MINIMUM OF ONE STUD. SEAL IN ACCORDANCE WITH DETAIL A-2. PIPE PENETRATIONS IN ACCORDANCE WITH DETAIL A-1. NON-HARDENING ACOUSTICAL SEALANT BY U.S.G., TREMCO OR SEAL ALL WALL INTERSECTIONS AND CONTROL JOINTS. OUTLETS ON OPPOSITE SIDES OF PARTITIONS SHOULD BE SEPARATED SEAL ALL CONDUIT & STRUCTURAL PENETRATIONS. SEAL DUCT & LARGE STAGGER & SEAL ALL JOINTS ON MULTIPLE LAYER PARTITIONS. SEAL AIR TIGHT AT FLOOR, SIDES & CEILING ON BOTH SIDES WITH a = b = c = d = APPROVED EQUIVALENT. SIDE VIEW FLOOR g c f d e = a AND BUTTED JOINTS, TAPE ALL LAYERS 2 LAYERS OF 5/8" GYPBOARD, STAGGERED AND BUTTED JOINTS, TAPE ALL LAYERS f = AIR GAP TOP VIEW c abbef ISOLATED GWB CEILING b e WALL SYSTEM SHOULD EXTEND FROM THE FLOOR TO BEYOND THE ISOLATED GWB CEILING. THERE SHOULD BE NO CONNECTIONS BETWEEN THE STUDS OTHER THAN FLOOR AND THE ISOLATED GWB CEILING. g = ACOUSTICAL SEALANT h h = 2" PERIMETER ISOLATION JOINT CONSTRUCTION DETAIL ISOLATED GWB CEILING A B E D C G F FLOOR TOP VIEW A = 2 LAYERS OF 5/8" GYPBOARD, STAGGERED AND BUTTED JOINTS, TAPE ALL LAYERS B=3" GLASSFIBER OR MINERAL WOOL BATT SOUND BLANKET C=358ST USG STEEL STUD D=COVE BASE E=2 LAYERS OF 5/8" GYPBOARD, STAGGERED AND BUTTED JOINTS, TAPE ALL LAYERS F=2" PERIMETER ISOLATION JOINT G=ACOUSTICAL SEALANT CONSTRUCTION NOTES 1. SEAL AIR TIGHT AT FLOOR, SIDES & CEILING ON BOTH SIDES WITH NON-HARDENING ACOUSTICAL SEALANT BY U.S.G., TREMCO OR APPROVED EQUIVALENT. 2. STAGGER & SEAL ALL JOINTS ON MULTIPLE LAYER PARTITIONS. 3. SEAL ALL CONDUIT & STRUCTURAL PENETRATIONS. SEAL DUCT & LARGE PIPE PENETRATIONS IN ACCORDANCE WITH DETAIL A-1. 4. OUTLETS ON OPPOSITE DIES OF PARTITIONS SHOULD BE SEPARATED BY A MINIMUM OF ONE STUD. SEAL IN ACCORDANCE WITH DETAIL A-2. 5. SEAL ALL WALL INTERSECTIONS AND CONTROL JOINTS. 6. WALL SYSTEM SHOULD EXTEND FROM THE FLOOR TO BEYOND THE ISOLATED GWB CEILING. 7. THERE SHOULD BE NO CONNECTIONS BETWEEN THE STUDS OTHER THAN FLOOR AND THE ISOLATED GWB CEILING. CABB E CONSTRUCTION DETAIL AA BC FE 13-7/8" STRUCTURE D B C A A E D CEILING FLOOR SIDE VIEW TOP VIEW A=5/8" GYPBOARD B=3-5/8" METAL STUD, 24" O.C. C=3-1/2" BATT INSULATION D=ACOUSTICAL SEALANT E=1" AIR SPACE F=FOUNDATION WALL CONSTRUCTION NOTES 1. SEAL AIR TIGHT AT FLOOR, SIDES & CEILING ON BOTH SIDES WITH NON-HARDENING ACOUSTICAL SEALANT BY U.S.C., TREMCO OR APPROVED EQUIVALENT. 2. STAGGER AND SEAL ALL JOINTS ON MULTIPLE LAYER PARTITIONS. 3. SEAL ALL CONDUIT & STRUCTURAL PENETRATIONS. SEAL DUCT & LARGE PIPE PENETRATIONS IN ACCORDANCE WITH DETAIL A-1. 4. MAINTAIN CLEAR 1" AIRSPACE WITHOUT TIES, MORTAR OR OTHER MATERIALS. 5. SEAL ALL WALL INTERSECTIONS AND CONTROL JOINTS IN ACCORDANCE WITH DETAIL A-3. CONSTRUCTION DETAIL AA BC AA 6-1/8" D B C A A E D CEILING FLOOR TOP VIEW SIDE VIEW A=5/8" GYPBOARD B=3-5/8" METAL STUD, 24" O.C. C=3-5/8" BATT INSULATION D=ACOUSTICAL SEALANT E=COVE BASE CONSTRUCTION NOTES 1. SEAL AIR TIGHT AT FLOOR, SIDES, & CEILING ON BOTH SIDES WITH NON-HARDENING ACOUSTICAL SEALANT BY U.S.C., TREMCO OR APPROVED EQUIVALENT. 2. STAGGER & SEAL ALL JOINTS ON MULTIPLE LAYER PARTITIONS. 3. SEAL ALL CONDUIT & STRUCTURAL PENETRATIONS. SEAL DUCT & LARGE PIPE PENETRATIONS IN ACCORDANCE WITH DETAIL A-1. 4. OUTLETS ON OPPOSITE SIDES OF PARTITIONS SHOULD BE SEPARATED BY MINIMUM OF ONE STUD. SEAL IN ACCORDANCE WITH DETAIL A-2. 5. SEAL ALL WALL INTERSECTIONS AND CONTROL JOINTS IN ACCORDANCE WITH DETAIL A-3. TEST: US GYPSUM CO. STC TEST #2-4400 CONSTRUCTION DETAIL CABBE F 10 - 3/4" ISOLATED GWB CEILING TOP VIEW A B E F D C G FLOOR SIDE VIEW A=2 LAYERS OF 5/8" GYPBOARD, STAGGERED AND BUTTED JOINTS, TAPE ALL LAYERS B=3" GLASSFIBER OR MINERAL WOOL BATT SOUND BLANKET (x2) C=358ST USC STEEL STUD (x2) D=COVE BASE E=2 LAYERS OF 5/8" GYPBOARD, STAGGERED AND BUTTED JOINTS, TAPE ALL LAYERS. F=1" AIR GAP G=ACOUSTICAL SEALANT CONSTRUCTION NOTES 1. SEAL AIR TIGHT AT FLOOR, SIDES & CEILING ON BOTH SIDES WITH NON-HARDENING ACOUSTICAL SEALANT BY U.S.G., TREMCO OR APPROVED EQUIVALENT. 2. STAGGER & SEAL ALL JOINTS ON MULTIPLE LAYER PARTITIONS. 3. SEAL ALL CONDUIT & STRUCTURAL PENETRATIONS. SEAL DUCT & LARGE PIPE PENETRATIONS IN ACCORDANCE WITH DETAIL A-1. 4. OUTLETS ON OPPOSITE SIDES OF PARTITIONS SHOULD BE SEPARATED BY MINIMUM OF ONE STUD. SEAL IN ACCORDANCE WITH DETAIL A-2. 5. SEAL ALL WALL INTERSECTIONS AND CONTROL JOINTS. 6. WALL SYSTEM SHOULD EXTEND FROM THE FLOOR TO BEYOND THE ISOLATED GYPBOARD CEILING. 7. THERE SHOULD BE NO CONNECTIONS BETWEEN THE STUDS OTHER THAN THE FLOOR AND THE ISOLATED GWB CEILING. CONSTRUCTION DETAIL ISOLATED GWB CEILING CAB E A H B E I D C G F SIDE VIEW TOP VIEW A=2 LAYERS OF 5/8" GYPBOARD, STAGGERED AND BUTTED JOINTS, TAPE ALL LAYERS B=3" GLASSFIBER OR MINERAL WOOL BATT SOUND BLANKET C=358ST USG STEEL STUD D=COVE BASE E=2 LAYERS OF 5/8" GYPBOARD, STAGGERED AND BUTTED JOINTS, TAPE ALL LAYERS F=2" PERIMETER ISOLATION JOINT G=ACOUSTICAL SEALANT H=MASON DNSB SWAY BRACE I=WORSHIP CENTER FOUNDATION CONSTRUCTION NOTES 1. SEAL AIR TIGHT AT FLOOR, SIDES & CEILING ON BOTH SIDES WITH NON-HARDENING ACOUSTICAL SEALANT BY U.S.G., TREMCO OR APPROVED EQUIVALENT. 2. STAGGER & SEAL ALL JOINTS ON MULTIPLE LAYER PARTITIONS. 3. SEAL ALL CONDUIT & STRUCTURAL PENETRATIONS. SEAL DUCT & LARGE PIPE PENETRATIONS IN ACCORDANCE WITH DETAIL A-1. 4. OUTLETS ON OPPOSITE SIDES OF PARTITIONS SHOULD BE SEPARATED BY MINIMUM OF ONE STUD. SEAL IN ACCORDANCE WITH DETAIL A-2. 5. SEAL ALL WALL INTERSECTIONS AND CONTROL JOINTS. 6. WALL SYSTEM SHOULD EXTEND FROM THE FLOOR TO BEYOND THE ISOLATED GYPBOARD CEILING. 7. THERE SHOULD BE NO CONNECTIONS BETWEEN THE STUDS OTHER THAN THE FLOOR AND THE ISOLATED GWB CEILING. CONSTRUCTION DETAIL CA B ISOLATED GWB CEILING A B D C E FLOOR TOP VIEW A=1 LAYER OF 5/8" GYPBOARD B=3" GLASSFIBER OR MINERAL WOOL BATT SOUND BLANKET C=358ST USG STEEL STUD D=COVE BASE E=ACOUSTICAL SEALANT CONSTRUCTION NOTES 1. SEAL AIR TIGHT AT FLOOR, SIDES & CEILING ON BOTH SIDES WITH NON-HARDENING ACOUSTICAL SEALANT BY U.S.G., TREMCO OR APPROVED EQUIVALENT. 2. STAGGER & SEAL ALL JOINTS ON MULTIPLE LAYER PARTITIONS. 3. SEAL ALL CONDUIT & STRUCTURAL PENETRATIONS. SEAL DUCT & LARGE PIPE PENETRATIONS IN ACCORDANCE WITH DETAIL A-1. 4. OUTLETS ON OPPOSITE SIDES OF PARTITIONS SHOULD BE SEPARATED BY MINIMUM OF ONE STUD. SEAL IN ACCORDANCE WITH DETAIL A-2. 5. SEAL ALL WALL INTERSECTIONS AND CONTROL JOINTS. 6. WALL SYSTEM SHOULD EXTEND FROM THE FLOOR TO BEYOND THE ISOLATED GYPBOARD CEILING. 7. THERE SHOULD BE NO CONNECTIONS BETWEEN THE STUDS OTHER THAN THE FLOOR AND THE ISOLATED GWB CEILING. SIDE VIEW 7 3/4" CONSTRUCTION DETAILS PIPE CONSTRUCTION NOTES A. GYPBOARD B. BACKER ROD AND ACOUSTIC CAULK C. BATT INSULATION NOTE: HOLE IN GWB TO BE LARGER THAN PIPE BY 1" (1/2" GAP AROUND PIPE). USE BACKER ROD AND ACOUSTICAL CAULK AROUND PIPE (BOTH SIDES) TO CREATE AN AIRTIGHT SEAL. C A B CONSTRUCTION DETAIL E B A D C F DO NOT USE THIS DETAIL IN FIRE RATED PARTITIONS CONSTRUCTION NOTES A. 12" MINIMUM (SINGLE STUD WALLS). 36" MIN (DOUBLE STUD WALLS). CUT GYPBOARD TO ALLOW 1/4" MINIMUM OVERLAP BY FACE PLATE. B. AT LEAST ONE STUD BETWEEN BOXES C. FLEXIBLE CONDUIT PREFERRED D. SCHEDULED PARTITION E. SEAL VOIDS FROM OUTSIDE AND COVER BOX WITH 1/8" MINIMUM LOWRY'S BOX PAD F. CAULK ANY VOIDS BETWEEN GYPBOARD & BOX NOT COVERED BY BOX SEALANT CONSTRUCTION DETAILS PARTITION INTERSECTION PARTITION-WALL INTERSECTION CONTROL JOINT C BG AD D H A B C H D H E A B ACB D CONSTRUCTION NOTES A. GYPBOARD B. METAL STUD C. BATT INSULATION D. ACOUSTICAL CAULK E. JOINT REINFORCEMENT G. FIBERGLASS PACKING (3#-6# DENSITY) H. 24" MAXIMUM CONSTRUCTION NOTES GYPBOARD PARTITION MASONRY PARTITION A C D B D C DO NOT USE THIS DETAIL IN FIRE RATED PARTITIONS CONSTRUCITON NOTES A. GYPBOARD WALL CONSTRUCTION B. MASONRY WALL CONSTRUCTION C. ACOUSTICAL SEALANT (ENTIRE PERIMETER, BOTH SIDES) D. PACK WITH FIBERGLASS INSULATION (3# TO 6# DENSITY) 4" 2" FABRIC WRAPPED PANEL 1/2" REVEAL, PAINT BLACK EXPOSED PORTION OF SCHEDULED PARTITION AT REVEALS 1 1/2" H X 2 1/2" SOLID WOOD CONTINUOUS WAINSCOT STAINED PLYWOOD VENEER RUBBER BASE SCHEDULED PARTITION Date: Scale Drawn By Checked By Project Number ARCHITECTURE PLANNING INTERIOR DESIGN STRUCTURAL ENGINEERING 424 East Fourth Street Cincinnati, Ohio 45202 w w w . c h a r c h i t e c t s . c o m tel: 513/241/4474 fax: 513/241/0081 ISSUANCES COMPUTER FILE 1400 West Dorothy Lane Dayton, Ohio 45409-1310 Tel: (937) 224-0861 Fax: (937) 224-5777 3417 South Sherman Drive Beech Grove, IN 46107 Tel: (317) 780-1555 Fax: (317) 780-6525 750 North Orleans, Suite 400 Chicago, IL 60610 Tel: (312) 944-8230 Fax: (312) 944-8297 117 East Washington Street, Suite 200 Indianapolis, IN 46204 Tel: (317) 637-2222 Fax: (317) 637-2260 1137 West Taylor St. Suite 316 Chicago, IL 60607 Tel: (312) 224-8460 Fax: (312) 224-8961 1025 N.Watery Ln. Brigham City, UT 84302 TEL: (453) 723-5000 FAX: (453) 538-5506 6622 Kingspointe Parkway Orlando, FL 33819 Tel: (407) 816-9400 Fax: (407) 816-9300 900145 E T T E L C O T T A B J . M . A R C H I T E C T . . NO STATE OF I N D I A N A D E R E T S I G E R No. Description Date As indicated 6/13/2008 11:11:42 AM C:\!!!Bryan\Revit\NVCLC-bd.rvt A703 PARTITION DETAILS AND ACOUSTIC DETAILS NEW WORSHIP CENTER Checker Author 06-10-2008 535-3581 A703 1" = 1'-0" 1 DTL- SINGLE STUD GYP. WALL ISOLATION PERIMETER A703 1" = 1'-0" 2 DTL-COMPOSITE CONC./GYP WALL A703 1" = 1'-0" 3 DTL-DOUBLE LAYER GYP. WALL, METAL STUD A703 1" = 1'-0" 4 DTL-DOUBLE STUD GYP. WALL A703 1" = 1'-0" 6 DTL-SINGLE STUD GYP. W/SWAY BRACES A703 1" = 1'-0" 7 DTL-SINGLE STUD GYP. WALL A703 3" = 1'-0" 8 DTL-CONDUIT OR PIPE THROUGH GYP. A703 1" = 1'-0" 9 DTL-ELECTRICAL BACKBOX DETAIL A703 3" = 1'-0" 10 DTL-GYPBOARD CONSTRUCTION DETAIL A703 1" = 1'-0" 11 DTL-DUCT PENETRATION 5 ADDENDUM #2 05.16.08 A703 1 1/2" = 1'-0" 12 DTL- DETAIL AT BACK WALL OF WORSHIP CNTR. 7 ADDENDUM #4 05.30.08 A703 1" = 1'-0" 13 DTL-DOUBLE STUD GYP. WALL WITH ISOLATION JOINT 10 PERMIT SET 06.10.08