Loading...
HomeMy WebLinkAboutE300 - PIT LEVEL - POWER PLANF F F F F F F F V V J J J F F F F F F L F L L F F F F F S J J J J J J J J J J J J J F F V L F L F F L F F L V V V V V J J J J J J J J J J J L L J J J J V V V S H S F F F L L L H F V V V W L L L L F F L L F L L F V V V V V V V UP UP UP F.E.C. F.E.C. F.E.C. DN UP LP1 LP2 RP1 RP2 MDP3 WP/GF WP/GF TL2 TL2 TL2 TL2 TL2 AV AV AV AV AV C1 VBB C1 SBB GF TV1 AV C1 TL1 TV1 C1 RF RF HWP-4 HWP-3 CP-4 (IN CEILING) GF GF 2 1 GF GF C1 AV RF AVRF RF RF AV AV AV AV RF RF AV RF AV AV C1 AV CP AV RPAV1 RPAV2 S-02 RPAV1 - 1 RPAV1 - 2 RPAV1 - 3 RPAV1 - 4 RPAV1 - 5 RPAV1 - 6 RPAV1 - 7 RPAV1 - 8 A1 A A A1 A A A B1 A A A1 A A A1 A A A1 A A1 A A1 C B1 A B1 B B1 C B1 A A1 H O A B1 B A D1 A D1 A A A A A RPAV3 RPAV4 RPAV5 CP-3 (IN CEILING) RPAV4-1-6 RPAV4-7-12 RPAV4-13-18 RPAV4-19-24 TL2 SBX JB-102 F F G FB1 AV RPAV4 - 30 AV AV RPAV4 - 32 G RPAV4-33-36 RPAV4-37-40 AV AV AV RPAV1 - 36 EP FACP RPAV6 RP1 - 10 RP1 - 11 RPAV1 - 35 4 5 7 6 8 STAGE LIFT RP1 - 12 RP1 - 13 RP1 - 14 RP1 - 15 RP1 - 16 RP1 - 17 RP1 - 18 RP1 - 19 RP1 - 20 RP1 - 21 RP1 - 22 RP1 - 23 RP1 - 24 RP1 - 25 RP1 - 26 RP1 - 27 RP1 - 29 RP1 - 30 RP1 - 31 RP1 - 32 RP1 - 33 RP1 - 34 RP1 - 35 RP1 - 36 RP1 - 37 RP1 - 38 SUMP PUMP MDP3-13 MCP-1 MCP-2 RP3 RP4 3 MDP3-9 MDP3-8 HWP-1 HWP-2 10 10 MDP3-10 MDP3-11 VFD VFD 9 9 H-1 H-1 15 15 13 CUH-1 RP2 - 4 RP2 - 5 RP2 - 6 RP2 - 7 RP2 - 8 RP2 - 9 RP2 - 10 GF GF RP2 - 11 RP2 - 13 R R R RP5 RP5 - 2 RP5 - 1 RP5 - 3 RP5 - 4 CUH-2 13 RP2 - 12 RP5 - 5 RP5 - 6 CUH-3 13 CUH-4 13 GF 22 RP5 - 7 16 UH-2 RP5 - 8 17 RP4 - 1,3,5 CSD CP-3 11 RP4 - 2,4,6 CSD CP-4 11 AC-3 14 AC-4 14 RP4 - 9,11 RP4 - 8,10,12 RP4 - 13,15 CU-3 12 RP4 - 14,16 CU-4 12 RP4 - 17,19 DP3 A A GROUND BAR C1 AV 19 19 B B RPAV1 - 9 RPAV4 - 25 RPAV4 - 26 AV AV AV AV AV AV RPAV4 - 27 AV AV RPAV4 - 28 AV AV RPAV4 - 29 AV AV 18 23 20 21 RP5 - 15 DPL-1 033 S-01 001 019 020 021 022 024 C-005 027 025 029 S-03 C-007 003 002 C-001 004 005 006 007 008 009 010 011 015 016 018 014A 014 013 C-004 034 023 026 032 031 030 028 C-009 C-003 019A 017 018A 018 TELEPHONE BACKBOARD RP2 - 30 RP2 - 29 48" 48" 24 24 24 24 24 24 24 24 24 48" 48" 48" 48" 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 GF RP2 - 31 GF CP EP - 18 GF GF RP2 - 14 25 25 EP - 23,25,27 ATS #1 GENERATOR REMOTE ANNUNCIATOR EF-7 CU-1 12 CU-2 12 RP4 - 31,33 RP4 - 34,36 DWH-1 26 Date: Scale Drawn By Checked By Project Number ARCHITECTURE PLANNING INTERIOR DESIGN STRUCTURAL ENGINEERING 424 East Fourth Street Cincinnati, w w w . c h a r c h Ohio i t e c t s . 45202 c o m tel: 513/241/4474 fax: 513/241/0081 ISSUANCES COMPUTER FILE 1400 West Dorothy Lane Dayton, Ohio 45409-1310 Tel: (937) 224-0861 Fax: (937) 224-5777 3417 South Sherman Drive Beech Grove, IN 46107 Tel: (317) 780-1555 Fax: (317) 780-6525 750 North Orleans, Suite 400 Chicago, IL 60610 Tel: (312) 944-8230 Fax: (312) 944-8297 117 East Washington Street, Suite 200 Indianapolis, IN 46204 Tel: (317) 637-2222 Fax: (317) 637-2260 1137 West Taylor St. Suite 316 Chicago, IL 60607 Tel: (312) 224-8460 Fax: (312) 224-8961 1025 N.Watery Ln. Brigham City, UT 84302 TEL: (453) 723-5000 FAX: (453) 538-5506 6622 Kingspointe Parkway Orlando, FL 33819 Tel: (407) 816-9400 Fax: (407) 816-9300 1 SCHEMATIC DESIGN 10.18.07 2 DESIGN DEVELOPMENT 01.18.08 3 CD 50% 03.14.08 4 PERMIT SET 04.25.08 5 ADDENDUM #2 05.16.08 No. Description Date 6 ADDENDUM #3 05.22.08 7 ADDENDUM #5 06.04.08 8 PERMIT SET 06.10.08 1/8" = 1'-0" 6/10/2008 1:01:35 PM C:\Drawings\2007-06019-Central-Local.rvt E300 PIT LEVEL - POWER PLAN New Worship Center Checker Author 05-22-08 2007-06019 1/8" = 1'-0" 1 POWER & SYSTEMS - PIT LEVEL GENERAL NOTES A E.C. TO COORDINATE WITH A/V DRAWINGS: AV201, AV211, AV202, AV212, AV203, AV213, AV204, AV205, AV215, AV251, AV252, AV253, AV301, AV302 FOR BOX TYPE, MOUNTING HEIGHT, EXACT LOCATION FOR A/V DEVICES AND A/V EQUIPMENT AND ANY ADDITIONAL ELECTRICAL REQUIREMENTS PRIOR TO ROUGH-IN. A/V CONSULTANT: CRAIG COMPTON PRO-SOUND PH: 407-816-9400 E-MAIL: CCOMPTON@PROSOUND.NET B PROVIDE 3/4"C. FROM EACH VOLUME CONTROL BOX ON PIT LEVEL TO ABOVE LAY-IN CEILING. PROVIDE NYLON BUSHING AT CEILING END OF CONDUIT. PLAN NOTES 1 DEDICATED RECEPTACLE FOR SUMP PUMP AT ELEVATOR PIT. COORDINATE LOCATION WITH PUMP PRIOR TO ROUGH-IN. 2 PROVIDE GFCI RECEPTACLE, VAPOR-PROOF LIGHT FIXTURE WITH WIRE GUARD AND LIGHT SWITCH PER CODE REQUIREMENTS NEARS STOP SWITCH. PROVIDE 26W 'PL' LAMP FOR THE LIGHT FIXTURE. 3 STAGE LIFT - 208V, 3PH, 60HZ, 10HP DRIVE MOTOR. PROVIDE 240V, 3 POLE, 60A FUSED DISCONNECT WITH 40A FUSES. PROVIDE ALSO (2) 120V, 20A DEDICATED CIRCUITS FOR LIFT PLATFORM (MCP-2) AND STAGE LIFT (MCP-1). COORDINATE ALL ELECTRICAL REQUIREMENTS WITH STAGE LIFT SUPPLIER PRIOR TO ROUGH-IN. SEE SHEET TP1.0 FOR STAGE LIFT DETAILS AND ONE LINE DIAGRAM. 4 FIRE PUMP CONTROLLER. 5 FIRE PUMP AUTOMATIC TRANSFER SWITCH. 6 FIRE PUMP. PROVIDE ELECTRICAL ROUGH-IN AND FINAL CONNECTIONS. COORDINATE REQUIREMENTS WITH PLUMBING DRAWINGS PRIOR TO ROUGH-IN. SEE DETAILS IN SINGLE-LINE DIAGRAM ON SHEET E400. CONDUCTORS FOR THE FIRE PUMP INSIDE THE BUILDING TO BE ENCASED IN MINIMUM 2" CONCRETE AND BE PROTECTED BY FIRE RATED ASSEMBLY TO ACHIEVE MINIMUM FIRE RATING OF 2 HOURS DEDICATED TO FIRE PUMP CIRCUITS. FIRE PUMP NEEDS TO BE INSTALLED PER NEC 695 REQUIREMENTS. 7 JOCKEY PUMP CONTROLLER. 8 JOCKEY PUMP. PROVIDE ELECTRICAL ROUGH-IN AND FINAL CONNECTIONS. COORDINATE REQUIREMENTS WITH PLUMBING DRAWINGS. 9 HOT WATER PUMP. VFD BY OTHERS. PROVIDE ELECTRICAL ROUGH-IN AND FINAL CONNECTIONS. COORDINATE LOCATION WITH HVAC DRAWINGS. 10 HOT WATER PUMP IN BOILER. VFD BY OTHERS. PROVIDE ELECTRICAL ROUGH-IN AND FINAL CONNECTIONS. COORDINATE LOCATION WITH HVAC DRAWINGS. 11 COIL PUMP. PROVIDE COMBINATION STARTER. SIZE PER REQUIREMENTS. COORDINATE MOUNTING HEIGHT AND OTHER ELECTRICAL REQUIREMENTS WITH HVAC DRAWINGS. 12 CONDENSING UNIT. PROVIDE NEMA 3R FUSED DISCONNECT. PROVIDE ELECTRICAL ROUGH-IN AND FINAL CONNECTIONS. COORDINATE LOCATION AND OTHER ELECTRICAL REQUIREMENTS WITH HVAC DRAWINGS. 13 CABINET HEATER. PROVIDE ELECTRICAL ROUGH-IN AND FINAL CONNECTIONS. COORDINATE LOCATION, MOUNTING ARRANGEMENT, AND OTHER ELECTRICAL REQUIREMENTS WITH HVAC DRAWINGS PRIOR TO ROUGH-IN. 14 A/C UNIT. PROVIDE FUSED DISCONNECT ON UNIT. PROVIDE ELECTRICAL ROUGH-IN AND FINAL CONNECTIONS. COORDINATE LOCATION AND OTHER ELECTRICAL REQUIREMENTS WITH HVAC DRAWINGS. 15 CIRCUIT FOR COMBUSTION MOTOR IN BOILER. PROVIDE ELECTRICAL ROUGH-IN AND FINAL CONNECTIONS. COORDINATE LOCATION AND OTHER ELECTRICAL REQUIREMENTS WITH HVAC DRAWINGS. 16 UNIT HEATER. PROVIDE ELECTRICAL ROUGH-IN AND FINAL CONNECTIONS. COORDINATE LOCATION, CONTROLS, AND OTHER ELECTRICAL REQUIREMENTS WITH HVAC DRAWINGS. 17 EXHAUST FAN. PROVIDE ELECTRICAL ROUGH-IN AND FINAL CONNECTIONS. COORDINATE LOCATION, CONTROLS, AND OTHER ELECTRICAL REQUIREMENTS WITH HVAC DRAWINGS. 18 SUMP PUMP FOR STAGE LIFT. PROVIDE OUTLET AND DEDICATED 120V, 20A CIRCUIT. COORDINATE LOCATION AND MOUNTING REQUIREMENTS WITH PLUMBING DRAWINGS. 19 PROVIDE WIREMOLD "RFB4" STEEL RECESSED FLOOR BOX WITH (2) RFB-DR INTERNAL DUPLEX OUTLET BRACKETS AND (2) DTB-2-4TKO COMMUNICATION BRACKETS WITH S38PPTCAL FLANGED PARTITION FEED COVER ASSEMBLIES. PROVIDE ALL NECESSARY ACCESSORIES AND FITTINGS TO MAKE A COMPLETE UNIT. 20 ELECTRICAL WATER HEATER. PROVIDE FUSED DISCONNECT. PROVIDE ELECTRICAL ROUGH-IN AND FINAL CONNECTIONS PER REQUIREMENTS. COORDINATE LOCATION WITH PLUMBING DRAWINGS. 21 DEDICATED OUTLET WITH 120V, 20A CIRCUIT FOR RECIRCULATING PUMP FOR WATER HEATER. COORDINATE LOCATION WITH PLUMBING DRAWINGS. 22 RECEPTACLE FOR WATER COOLER. COORDINATE OUTLET LOCATION WITH UNIT. 23 ISOLATION TRANSFORMER - 225KVA - 230V/3PH PRIMARY - 230V/3PH/4WIRE SECONDARY. 24 PROVIDE SINGLE GANG BOX WITH 3/4" CONDUIT TO THE SERVER ROOM. PROVIDE A BLANK COVER PLATE. RJ45 OUTLET AND CAT5 CABLING BY OTHERS. OVERALL LENGTH SHOULD NOT EXCEED 285'. 25 LIGHTING CONTROL PANELS - "LP1", "LP2", AND "EP" - LIGHTOLIER CONTROLS - LOW VOLTAGE LIGHTING CONTROL PANEL - 48 CIRCUITS. 26 DISCONNECT SWITCH FOR FIRE PUMP. SEE SINGLE-LINE DIAGRAM ON SHEET E400 FOR MORE INFORMATION. A/V CONDUIT NOTES A (1) 3/4"C. B (3) 1"C. C (1) 1"C. D (1) 2"C. E (1) 1-1/2"C. F (3) 1-1/2"C. G (2) 1"C. H (2) 2"C. J (2) 4"C. K (3) 4"C. L (3) 2"C. M (1) 1/2"C. N (2) 1-1/4"C. O (2) 1-1/2"C. A1 TO VBB. B1 TO A/V RACKS 023. C1 TO A/V RACKS AT STAGE LOCATION. D1 TO SBB. E1 TO A/V RACKS 023 COMPUTER FLOOR. F1 TO VDB-501. G1 TO ADB-501. H1 TO CPB. 001 STORAGE ROOM 002 SERVER ROOM 003 CONFERENCE ROOM 004 OFFICE 005 BLUE SKY ROOM 006 OFFICE 007 OFFICE 008 OFFICE 009 OFFICE 010 OFFICE 011 OFFICE 013 RECEPTIONIST 014 WAIT/LOBBY 014A SUITE ENTRY 015 WORK STATIONS 016 WORK ROOM 017 CHANGING ROOM WAITING AREA 018 MEN'S CHANGING ROOM 018A MEN'S TOILET 019 WOMEN'S CHANGING ROOM 019A WOMEN'S TOILET 020 MECHANICAL ROOM 021 GREEN ROOM 022 VIDEO CONTROL 023 PRODUCTION RACKS 024 TAPE STORAGE 025 VESTIBULE 026 AUDIO CONTROL 027 VIDEO EDIT 028 STORAGE 029 RECORDING STUDIO 030 VOICE 031 DRUM 032 VESTIBULE 033 TRAP ROOM 034 FIRE PUMP ROOM C-001 CORRIDOR C-003 CORRIDOR C-004 CORRIDOR C-005 CORRIDOR C-007 CORRIDOR C-009 CORRIDOR S-01 STAIR-1 S-02 STAIR-2 S-03 STAIR-3 ROOM INDEX