Loading...
HomeMy WebLinkAboutH400 - HOT WATER PIPING SCHEMATIC AND DATASCALE: NONE P T T T T T P P T T PUMPS DISCHARGE SUCTION & DESCRIPTION UNIT NO. PERFORMANCE GPM SERVICE MOTOR FT. HD. H.P. VOLT MIN. PHASE EFF.% REMARKS REMARKS: 1. PUMP SHALL HAVE A VFD BY HVAC CONTRACTOR. 2. STAND-BY PUMP DRAIN VALVE WITH HOSE FITTING. BALANCE VALVE SEE PUMP DETAIL, THIS DRAWING. LARGE CAPACITY AUTO AIR VENT. 12 WATER METER. 2 3 6 5 7 8 10 11 4 PRESSURE RELIEF VALVE SET AT - PSI. 4" HOUSEKEEPING CONCRETE PAD. SHUT-OFF VALVE. MANUAL REFILL VALVE. MANUAL AIR VENT. 1 BLOW DOWN VALVE SAME SIZE AS OUTLET, 1" MIN. TWO REQUIRED PER BOILER. 7" W.C NATURAL GAS SUPPLY (1800 CFH) - 2" H1 HOT WATER BOILER - TWO REQUIRED. BASED ON LOCHINVAR'S COPPER FIN II MODEL "CHN1800". 84% THERMAL EFFICIENCY SEALED COMBUSTION. 1800 MBH INPUT, 1512 MBH OUTPUT, 2.5" INLET AND OUTLET CONNECTIONS. H1A SAFETY RELIEF VALVE SET AT 75 PSI PIPE DISCHARGE TO NEAREST FLOOR DRAIN. ACCEPTANCE VOLUME, SIZE: 16" DIA. X 45" HIGH. CHARGE TO 20 PSI. AUTOMATIC AIR VENT (HOFFMAN 792) WITH VALVE. H2 3" AIR SEPARATOR (HOT WATER) WITH INTEGRAL STRAINER AND LARGE CAPACITY DRAIN PIPING; ALL 3/4" SIZE - SEE SPECIFICATIONS. H5 2 GALLON CHEMICAL POT FEEDER (HOT WATER) WITH VALVES ON INLET, OUTLET AND H3 HOT WATER EXPANSION TANK - VERTICAL BLADDER TYPE. 33.6 GALLONS, 11.3 GAL. HOT WATER RETURN MAIN FLOOR PIPE TO HW BOILER 1 H1 PIPE TO DRAIN 8 SCALE: NONE 4" 2 1 4" 3" 1" 6 3" EP 3" 8 4 3 1" H 4" 1" BACKFLOW PREVENTER PRESSURE REDUCING VALVE 12 BY H.C. BY P.C. H 10 HWP-4 FLOOR H4 WATER MAKE-UP ASSEMBLY - (HOT WATER). WATER REGULATING VALVE SET AT 20 PSI, VALVE EACH SIDE WITH VALVE AND BY-PASS. ALL 1" SIZE. H4 H3 H2 VENT AND COMBUSTION CONNECTION SIZE - 14" DIA. BASED ON B & G MODEL "R-3". PHYSICAL SIZE - 26" HIGH X 11" WIDE, 3" PIPE CONN., 1.5" DRAIN BASED ON B & G MODEL "B 60V". 11 0.75" H1A ELECTRICAL - 18.0 AMPS AT 120V/1 PHASE PIPE FROM DRAIN TAP ON BOILER TO FLOOR DRAIN. SIZE TO BE SAME AS BOILER DRAIN TAP. 9 9 HWP-1 HORIZONTAL IN-LINE CENTRIF. H.W. BOILER #1 - PRIMARY HWP-2 CP-1 CP-2 CP-3 CP-4 RTU-1 HEATING COIL RTU-2 HEATING COIL RTU-3 HEATING COIL RTU-4 HEATING COIL START/STOP HW-13 VFD RETURN TEMP. BLDG. HW HW-6 HW-9 START/STOP VFD BLDG. HW RETURN PRESS. HW-2 P HW-1 HW-16 SUPPLY TEMP. P BLDG. HW SUPPLY PRESS. HW-17 BLDG. HW BOILER #1 LEAVING TEMPERATURE BOILER #2 LEAVING TEMPERATURE BLDG. HW RETURN PRESSURE AI AI AI PUMP HWP-3 STATUS PUMP HWP-3 START/STOP DO AO DI ON FAILURE BLDG. HW HW-7 BOILER RETURN COMMENTS HW-13 HW-1 HW-2 NUMBER HW-5 HW-7 HW-6 HW-8 HW-9 HW-11 HW-12 HW-10 NAME TYPE CONTROL MONITOR ALARM BLDG. HW RETURN TEMPERATURE AI DI PUMP HWP-3 VFD FAULT PUMP HWP-3 VFD SPEED AI AI BLDG. HW BOILER PRESSURE AI H.W BOILER #1 H.W BOILER #2 HW-5 TEMP. HW-8 PUMP STATUS STATUS PUMP HW-12 TEMP. SUPPLY BLDG. HW SUPPLY TEMPERATURE BLDG. HW SUPPLY PRESSURE ON FAULT 4-20mA TO VFD, COORDINATE ABOVE 205F BELOW 140F HWP-3 HWP-4 HW-10 DRIVE SPEED HW-11 VFD FAULT HW-14 DRIVE SPEED HW-15 VFD FAULT HW-14 HW-15 HW-16 HW-17 PUMP HWP-4 PUMP STATUS PUMP HWP-4 START/STOP PUMP HWP-4 VFD SPEED PUMP HWP-4 VFD FAULT CONNECTION WITH VFD SUPPLIER COORDINATE CONNECTION WITH VFD SUPPLIER DO AO DI ON FAILURE DI ON FAULT 4-20mA TO VFD, COORDINATE CONNECTION WITH VFD SUPPLIER COORDINATE CONNECTION WITH VFD SUPPLIER VIA VFD VIA VFD CURRENT SENSOR OR VIA VFD CURRENT SENSOR OR VIA VFD AI BLDG. HW DIFFERENTIAL PRESSURE HW-18 P HW-18 BLDG. HW DIFFERENTIAL PRESSURE T T PRESS. T T P 3" 7 5 HORIZONTAL IN-LINE CENTRIF. HORIZONTAL IN-LINE CENTRIF. HORIZONTAL IN-LINE CENTRIF. HORIZONTAL IN-LINE CENTRIF. 100 25 1.5 208 3 60% 2.5" & 2.5" 100 25 1.5 208 3 60% 2.5" & 2.5" 32 30 3/4 208 3 44% 1.5" & 1.5" 12 30 3/4 208 3 26% 1.5" & 1.5" 42 30 1 208 3 50% 1.5" & 1.5" 11 30 3/4 208 3 25% 1.5" & 1.5" BOILER #2 PUMP HWP-2 STATUS DI ON FAILURE HW-4 BOILER #1 PUMP HWP-1 STATUS DI ON FAILURE HW-3 HWP-1 HWP-2 HW-3 PUMP STATUS HW-4 PUMP STATUS EXTEND 14" DIA. VENT AND COMBUSTION DUCT/FLUE TO ROOF. SEE FLOOR PLAN. 13 HOT WATER SYSTEM-SECONDARY 180 75 7.5 208 3 66% 2.5" & 2.5" 180 75 7.5 208 3 66% 2.5" & 2.5" HWP-3 VERTICAL IN-LINE HWP-4 VERTICAL IN-LINE H.W. BOILER #2 - PRIMARY HOT WATER SYSTEM-SECONDARY 13 DRAIN HWP-1 FLOOR PIPE TO HW BOILER 2 H1 8 H1A 9 13 DRAIN HWP-2 HOT WATER SUPPLY MAIN 4" 10 HWP-3 3" BYPASS LINE 4" 6 5 4 5 2 7 3 2 1 5 5 1 SHUT OFF VALVE. 2 PRESSURE PLUG. 3 PUMP WITH FLANGED CONNECTIONS. 4 CHECK VALVE - OMIT ON SINGLE PUMP INSTALLATIONS. 5 SPRING HANGER. 6 PARALLEL PUMP WHEN SPECIFIED. 7 COMBINATION BALANCING - SHUTOFF VALVE. SCALE: NONE A H400 HORIZONTAL IN-LINE CENTRIF. 1 1,2 5 7 1" 1" H5 TERMINATE PER MFG. GUIDELINES. 14 LOCATE PER PLAN. HW-19 HW-20 HW-21 HW-22 START/STOP INTERLOCKED TO BOILER ENABLE/DISABLE START/STOP INTERLOCKED TO BOILER ENABLE/DISABLE SETPOINT AT 25 PSID (ADJ.) BOILER #1 STATUS HW-19 HW-20 HW-21 BOILER #1 ENABLE/DISABLE HW-22 DO BOILER #2 ENABLE/DISABLE BOILER #2 STATUS DO DI DI ON FAILURE ON FAILURE DP SENSOR 14 P P EQUIPMENT DATA HOT WATER BOILER SYSTEM PIPING SCHEMATIC HOT WATER CONTROL DIAGRAM HOT WATER POINTS LIST PIPE MOUNTED PUMP BOILER SCHEMATIC NOTES Date: Scale Drawn By Checked By Project Number ARCHITECTURE PLANNING INTERIOR DESIGN STRUCTURAL ENGINEERING 424 East Fourth Street Cincinnati, w w w . c h a r c h Ohio i t e c t s . 45202 c o m tel: 513/241/4474 fax: 513/241/0081 ISSUANCES COMPUTER FILE 1400 West Dorothy Lane Dayton, Ohio 45409-1310 Tel: (937) 224-0861 Fax: (937) 224-5777 3417 South Sherman Drive Beech Grove, IN 46107 Tel: (317) 780-1555 Fax: (317) 780-6525 750 North Orleans, Suite 400 Chicago, IL 60610 Tel: (312) 944-8230 Fax: (312) 944-8297 117 East Washington Street, Suite 200 Indianapolis, IN 46204 Tel: (317) 637-2222 Fax: (317) 637-2260 1137 West Taylor St. Suite 316 Chicago, IL 60607 Tel: (312) 224-8460 Fax: (312) 224-8961 1025 N.Watery Ln. Brigham City, UT 84302 TEL: (453) 723-5000 FAX: (453) 538-5506 6622 Kingspointe Parkway Orlando, FL 33819 Tel: (407) 816-9400 Fax: (407) 816-9300 1 SCHEMATIC DESIGN 10.18.07 2 DESIGN DEVELOPMENT 01.18.08 3 CD 50% 03.14.08 4 PERMIT SET 04.25.08 5 ADDENDUM #2 05.16.08 No. Description Date 6 ADDENDUM #3 05.22.08 7 ADDENDUM #5 06.04.08 8 PERMIT SET 06.10.08 6/10/2008 1:58:21 PM C:\Drawings\REVIT\Northview\2007-06019-Central-local.rvt H400 HOT WATER PIPING SCHEMATIC AND DATA New Worship Center ARC CSR/GSS 05-22-08 2007-06019