HomeMy WebLinkAboutP204 - FIRST BALCONY - NEW WORKDN
UP
DN
UP
DN
DN
UP
UP
4" FR
FCE1
FS
S
1
2
FCE1
4" FR
2" SD
S
3
2,140 SQ.FT.
8" STORM
8" DS
9,550 SQ.FT.
8" STORM
8" DS UP
8,965 SQ.FT
8" DS
11,105 SQ.FT
2,185 SQ.FT.
8" DS
11,735 SQ.FT
RD2 1,790 SQ.FT.
4" STORM
4" DS
1,790 SQ.FT.
RD2
4" STORM
4" STORM
RD2
2.5" FR 2.5" FR
Date: Scale
Drawn By
Checked By
Project
Number
ARCHITECTURE
PLANNING
INTERIOR DESIGN
STRUCTURAL ENGINEERING
424 East Fourth
Street
Cincinnati, w w w . c h a r c h Ohio i t e c t s . 45202 c o m
tel: 513/241/4474 fax: 513/241/0081
ISSUANCES
COMPUTER FILE
1400 West Dorothy Lane
Dayton, Ohio 45409-1310
Tel: (937) 224-0861
Fax: (937) 224-5777
3417 South Sherman Drive
Beech Grove, IN 46107
Tel: (317) 780-1555
Fax: (317) 780-6525
750 North Orleans, Suite 400
Chicago, IL 60610
Tel: (312) 944-8230
Fax: (312) 944-8297
117 East Washington
Street, Suite 200
Indianapolis, IN 46204
Tel: (317) 637-2222
Fax: (317) 637-2260
1137 West Taylor St.
Suite 316
Chicago, IL 60607
Tel: (312) 224-8460
Fax: (312) 224-8961
1025 N.Watery Ln.
Brigham City, UT 84302
TEL: (453) 723-5000
FAX: (453) 538-5506
6622 Kingspointe
Parkway
Orlando, FL 33819
Tel: (407) 816-9400
Fax: (407) 816-9300
1 SCHEMATIC DESIGN 10.18.07
2 DESIGN DEVELOPMENT 01.18.08
3 CD 50% 03.14.08
4 PERMIT SET 04.25.08
5 ADDENDUM #2 05.16.08
No. Description Date
6 ADDENDUM #3 05.22.08
7 ADDENDUM #5 06.04.08
8 PERMIT SET 06.10.08
1/8" = 1'-0"
6/10/2008 2:20:19 PM
C:\Drawings\revit\Northivew
Church\2007-06019-Central-LOCAL.rvt
P204
FIRST BALCONY - NEW
WORK
New Worship
Center
TWN
ATM
05-22-08
2007-06019
1/8" = 1'-0"
1
FIRST BALCONY - NEW WORK
GENERAL NOTES
A ALL PIPING SHOWN IS LOCATED ABOVE SUSPENDED CEILINGS
(AT THE UNDERSIDE OF STRUCTURE IN EXPOSED STRUCTURAL
AREAS) UNLESS INDICATED OTHERWISE.
B REFER TO DETAILS, DIAGRAMS AND SCHEDULES FOR PIPING AND PIPE
SIZES NOT SHOWN.
C PC SHALL COORDINATE INSTALLATION CAREFULLY WITH ALL OTHER
TRADES.
D ANNULAR SPACE OF PIPE, CONDUIT AND OTHER SIMILAR PENETRATIONS
OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN
ADDITION,PENETRATIONS THRU 0-HOUR RATED FLOORS SHALL ALSO
BE FIRESTOPPED TO RETARD PASSAGE OF FIRE AND SMOKE. REFER
TO ARCHITECTURAL DRAWINGS FOR CONSTRUCTION, LAYOUT AND FIRE
RATINGS OF FLOORS, WALLS, PARTITIONS AND OTHER BUILDING
ELEMENTS.
E FINISHED FLOOR ELEVATION:
FIRST BALCONY - 835.80'
NOTES
1 SPRINKLER FLOOR CONTROL VALVE BY FSC. SEE DETAIL A ON SHEET
P001.
2 TO SPRINKLERS SERVING FIRST BALCONY. COORDINATE LOCATIONS
OF ALL SPRINKLER PIPING AND DEVICES CAREFULLY WITH ALL OTHER
TRADES.
3 PROVIDE SUPERVISED ISOLATION VALVE FOR SPRINKLER HEAD IN
ELEVATOR MACHINE ROOM.