HomeMy WebLinkAboutP205 - SECOND BACLONY - NEW WORKDN
DN
DN
UP
DN
DN DN
DN
4" FR DN,
2.5" FR UP
4" FR
RD5 8,965 SQ.FT.
9,550 SQ.FT. RD5
8" STORM
8" DS
9,550 SQ.FT.
8" STORM
8" DS
8,965 SQ.FT
2" SD
FS
S
1
2
FCE1
FCE1
3
3
3
3
3
3
3 5
FDV FDV
2.5" FR 2.5" FR
Date: Scale
Drawn By
Checked By
Project
Number
ARCHITECTURE
PLANNING
INTERIOR DESIGN
STRUCTURAL ENGINEERING
424 East Fourth
Street
Cincinnati, w w w . c h a r c h Ohio i t e c t s . 45202 c o m
tel: 513/241/4474 fax: 513/241/0081
ISSUANCES
COMPUTER FILE
1400 West Dorothy Lane
Dayton, Ohio 45409-1310
Tel: (937) 224-0861
Fax: (937) 224-5777
3417 South Sherman Drive
Beech Grove, IN 46107
Tel: (317) 780-1555
Fax: (317) 780-6525
750 North Orleans, Suite 400
Chicago, IL 60610
Tel: (312) 944-8230
Fax: (312) 944-8297
117 East Washington
Street, Suite 200
Indianapolis, IN 46204
Tel: (317) 637-2222
Fax: (317) 637-2260
1137 West Taylor St.
Suite 316
Chicago, IL 60607
Tel: (312) 224-8460
Fax: (312) 224-8961
1025 N.Watery Ln.
Brigham City, UT 84302
TEL: (453) 723-5000
FAX: (453) 538-5506
6622 Kingspointe
Parkway
Orlando, FL 33819
Tel: (407) 816-9400
Fax: (407) 816-9300
1 SCHEMATIC DESIGN 10.18.07
2 DESIGN DEVELOPMENT 01.18.08
3 CD 50% 03.14.08
4 PERMIT SET 04.25.08
5 ADDENDUM #2 05.16.08
No. Description Date
6 ADDENDUM #3 05.22.08
7 ADDENDUM #5 06.04.08
8 PERMIT SET 06.10.08
1/8" = 1'-0"
6/10/2008 2:20:34 PM
C:\Drawings\revit\Northivew
Church\2007-06019-Central-LOCAL.rvt
P205
SECOND BACLONY -
NEW WORK
New Worship
Center
TWN
ATM
05-22-08
2007-06019
1/8" = 1'-0"
1
SECOND BALCONY - NEW WORK
GENERAL NOTES
A ALL PIPING SHOWN IS LOCATED ABOVE SUSPENDED CEILINGS
(AT THE UNDERSIDE OF STRUCTURE IN EXPOSED STRUCTURAL
AREAS) UNLESS INDICATED OTHERWISE.
B REFER TO DETAILS, DIAGRAMS AND SCHEDULES FOR PIPING AND PIPE
SIZES NOT SHOWN.
C PC SHALL COORDINATE INSTALLATION CAREFULLY WITH ALL OTHER
TRADES.
D ANNULAR SPACE OF PIPE, CONDUIT AND OTHER SIMILAR PENETRATIONS
OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION,
PENETRATIONS THRU 0-HOUR RATED FLOORS SHALL ALSO BE
FIRESTOPPED TO RETARD PASSAGE OF FIRE AND SMOKE. REFER TO
ARCHITECTURAL DRAWINGS FOR CONSTRUCTION, LAYOUT AND FIRE
RATINGS OF FLOORS, WALLS, PARTITIONS AND OTHER BUILDING
ELEMENTS.
E FINISHED FLOOR ELEVATION:
SECOND BALCONY - 851.39'
NOTES
1 SPRINKLER FLOOR CONTROL VALVE BY FSC. SEE DETAIL "A" ON SHEET
P100.
2 TO SPRINKLERS SERVING SECOND BALCONY AND SPRINKLERS ABOVE
AND BELOW CATWALK ABOVE. SEE ARCHITECTURAL DRAWINGS FOR
LOCATIONS OF CATWALKS. COORDINATE LOCATIONS OF ALL SPRINKLER
PIPING AND DEVICES CAREFULLY WITH ALL OTHER TRADES.
3 CATWALK ABOVE.
4 ROOM ON 2ND BALCONY LEVEL AND CATWALK LEVEL. PROVIDE
SPRINKLERS ON BOTH LEVELS AS REQUIRED.
5 PROVIDE "FCE2" FIRE DEPARTMENT VALVE IN CABINET ON CATWALK
LEVEL ABOVE.