Loading...
HomeMy WebLinkAboutP205 - SECOND BACLONY - NEW WORKDN DN DN UP DN DN DN DN 4" FR DN, 2.5" FR UP 4" FR RD5 8,965 SQ.FT. 9,550 SQ.FT. RD5 8" STORM 8" DS 9,550 SQ.FT. 8" STORM 8" DS 8,965 SQ.FT 2" SD FS S 1 2 FCE1 FCE1 3 3 3 3 3 3 3 5 FDV FDV 2.5" FR 2.5" FR Date: Scale Drawn By Checked By Project Number ARCHITECTURE PLANNING INTERIOR DESIGN STRUCTURAL ENGINEERING 424 East Fourth Street Cincinnati, w w w . c h a r c h Ohio i t e c t s . 45202 c o m tel: 513/241/4474 fax: 513/241/0081 ISSUANCES COMPUTER FILE 1400 West Dorothy Lane Dayton, Ohio 45409-1310 Tel: (937) 224-0861 Fax: (937) 224-5777 3417 South Sherman Drive Beech Grove, IN 46107 Tel: (317) 780-1555 Fax: (317) 780-6525 750 North Orleans, Suite 400 Chicago, IL 60610 Tel: (312) 944-8230 Fax: (312) 944-8297 117 East Washington Street, Suite 200 Indianapolis, IN 46204 Tel: (317) 637-2222 Fax: (317) 637-2260 1137 West Taylor St. Suite 316 Chicago, IL 60607 Tel: (312) 224-8460 Fax: (312) 224-8961 1025 N.Watery Ln. Brigham City, UT 84302 TEL: (453) 723-5000 FAX: (453) 538-5506 6622 Kingspointe Parkway Orlando, FL 33819 Tel: (407) 816-9400 Fax: (407) 816-9300 1 SCHEMATIC DESIGN 10.18.07 2 DESIGN DEVELOPMENT 01.18.08 3 CD 50% 03.14.08 4 PERMIT SET 04.25.08 5 ADDENDUM #2 05.16.08 No. Description Date 6 ADDENDUM #3 05.22.08 7 ADDENDUM #5 06.04.08 8 PERMIT SET 06.10.08 1/8" = 1'-0" 6/10/2008 2:20:34 PM C:\Drawings\revit\Northivew Church\2007-06019-Central-LOCAL.rvt P205 SECOND BACLONY - NEW WORK New Worship Center TWN ATM 05-22-08 2007-06019 1/8" = 1'-0" 1 SECOND BALCONY - NEW WORK GENERAL NOTES A ALL PIPING SHOWN IS LOCATED ABOVE SUSPENDED CEILINGS (AT THE UNDERSIDE OF STRUCTURE IN EXPOSED STRUCTURAL AREAS) UNLESS INDICATED OTHERWISE. B REFER TO DETAILS, DIAGRAMS AND SCHEDULES FOR PIPING AND PIPE SIZES NOT SHOWN. C PC SHALL COORDINATE INSTALLATION CAREFULLY WITH ALL OTHER TRADES. D ANNULAR SPACE OF PIPE, CONDUIT AND OTHER SIMILAR PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THRU 0-HOUR RATED FLOORS SHALL ALSO BE FIRESTOPPED TO RETARD PASSAGE OF FIRE AND SMOKE. REFER TO ARCHITECTURAL DRAWINGS FOR CONSTRUCTION, LAYOUT AND FIRE RATINGS OF FLOORS, WALLS, PARTITIONS AND OTHER BUILDING ELEMENTS. E FINISHED FLOOR ELEVATION: SECOND BALCONY - 851.39' NOTES 1 SPRINKLER FLOOR CONTROL VALVE BY FSC. SEE DETAIL "A" ON SHEET P100. 2 TO SPRINKLERS SERVING SECOND BALCONY AND SPRINKLERS ABOVE AND BELOW CATWALK ABOVE. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF CATWALKS. COORDINATE LOCATIONS OF ALL SPRINKLER PIPING AND DEVICES CAREFULLY WITH ALL OTHER TRADES. 3 CATWALK ABOVE. 4 ROOM ON 2ND BALCONY LEVEL AND CATWALK LEVEL. PROVIDE SPRINKLERS ON BOTH LEVELS AS REQUIRED. 5 PROVIDE "FCE2" FIRE DEPARTMENT VALVE IN CABINET ON CATWALK LEVEL ABOVE.