HomeMy WebLinkAboutDept Report 06-03-03
CARMEL/CLAY PLAN COMMISSION
SPECIAL STUDIES COMMITTEE
DEPARTMENT REPORT
June 3, 2003
3. Docket No. 05-03 DP/ADLS; Old Meridian Professional Building
The applicant seeks approval to construct an office building. The site is located at the southwest
comer of Old Meridian Street and Pennsylvania Street. The site is zoned B-6/Business within
the US 31 Overlay Zone.
Filed by James K. 'vVheeler of Coots, Henke & Wheeler for Jolm N. Kirk and Lowell Thomas
Kirk.
The applicant is requesting approval of a Development Plan and ADLS for the construction of an
office building. The site is generally located at the southwest corner of Old Meridian Street and
Pennsylvania Street.
The applicant has addressed all of the Depm1ment Concerns previously discussed. They should
be prepared to make the following commitments or accept approval subject to the following
conditions:
1. Dedication of additional right-of-way per the Thoroughfare Plan and at the area of the
roundabout per plans on file with the Carmel Engineering Department.
2. Final drainage approval by Camlel Engineering.
3. Signage: The existing pole sign shall be removed from the property.
A motion was made at the May 20th Plan Conunission meeting to suspend the rules and approve
this item that evening. That motion failed 8 votes to 2. Mr. Kestner and Mr. Chomanczuk
expressed concerns.
The Department recommends that this item be forwarded back to the full Plan
Commission witb a favorable recommendation once aU comments and concerns have been
addressed.
Post-it'" Fax Note 7671 Dale [r#Of I>
To ::r:: W\\ec: Ie ,-- pages
From '"I-i --v'L
Co./Dept Co.
Phone # Phone #
Fax# t..,~7 3 -;,-3 fS Fax #
Committee Report 2003-0603