Loading...
HomeMy WebLinkAboutUtility Report ,. (.;x u Westwood Estates Utility Report Water System: Water service will be provided by the City of Carmel. The onsite public water main system will connect to the existing main on the north side of 141s1 Street. The City will determine the exact route and size. Sanitary Sewer System: Clay Township Regional Waste District (CTRWD) will provide sanitary sewer service. The proposed system will connect to the existing sewer system serving Saddle Creek Section 10. Storm Drainaqe System: The pre-developed drainage follows a southerly pattern across this site to the Almond Drain. Post-developed conditions will follow that same path through a series of swales and pipes directing storm water to the retention ponds located along the existing legal drain Electric: Electric service will be provided by Cinergy. The development will be served by existing power service within the area of the subject site along 141 sl Street. Telephone: Ameritech will provide telephone service for the site The development will be serviced by existing telephone facilities along 141 sl Street. Natural Gas: Natural gas service will be provided by Vectren. u u Statement of Commitment Justus Home Builders, Inc. (subdivider) hereby agrees to provide financial performance and maintenance guarantees for public facility improvements and installations to be constructed in, and as necessary for proper connection and system coordination, adjoining the proposed Westwood Estates subdivision. The public facility improvements and installations shall include streets, curbs and gutters, sidewalks, storm water drain and storm sewer systems, sanitary sewer systems, water supply systems, street name signs, monuments and markers and the various appurtenances related thereto. Agreed to this day of January, 2003 Printed