Connie.
u
Dobosiewicz, Jon C
Sunday, March 09, 2003 3:09 PM
Tingley, Connie S
Docket number Assignment
I left the file on your chair.
Laurence issue"d the Docket number for Pedcor Friday.
Could you Mark up the folders and return it to me.
Thanks,
The Docket number is 41-03 DP/ADLS. Carmel City Center, parcel 28 (Pedcor)
Jon
u
". ~ -' ,..'
u
.~o]
~.~~
080
Mr. Bruce Cordingly
Pedcor Investments
8888 Keystone Crossing
Suite 900
Indianapolis, IN 46240
RE: Carmel City Center Parcel #2 Office Development
Dear Mr. Cordingly:
We are in receipt of documents prepared by Crews & Sturtz for the first phase of
your office development. The drawings submitted are dated 12/19/02 and include
the civil, structural, architectural, plumbing, mechanical and electrical engineering for
the project. The documents submitted reflect the schematic design approvals
granted by the Carmel Redevelopment Commission. This letter is to serve as your
approval for your construction documents for the project. We request that a color
palette be submitted for the exterior materials only so that we can review and
approve for the project. Should you have any questions regarding any of the above,
please do not hesitate to contact me personally.
Corporate Hea(:~qtj~H"ter~~
Very truly yours,
280 East 961h Street
Suite 200
Indianapolis, Indiana
Les S. Olds, AlA
Principal
46240
Icdj
T 317.848.7800
cc:
Rick Roesch
Luci Snyder
Ed Burke
Karl Haas
Steve Engleking
Mike Hollibaugh
Kate Weese
Steve Sturtz
Bob Olson
Greg Snelling
File
F 317.574.0957
www.cso-arch.com
'.
u
u
~
cso
EXHIBIT B
APPROVED PLAN LIST
Carmel City Center Phase I
12/19/02
SHEET INDEX
Civil
CO 00
C101
C201
C301
C302
C401
C501
C601
C602
C603
Structural
S101
S102
8201
S202
8203
S204
S205
8206
S401
S402
8403
Site Cover Sheet
Demolition Plan
Site Plan
Grading Plan
Erosion Control Plan
Landscape Plan
Utility Plan
Site Details
Site Details
Site Details
Building One - Foundation Plan
Building Two - Foundation Plan
Building One - 1st Floor Framing Plan
Building Two - 1st Floor Framing Plan
Building One - 2nd Floor Framing Plan
Building Two - 2nd Floor Framing Plan
Building One - Roof Framing Plan
Building Two - Roof Framing Plan
Notes, Schedules and Details
Sections and Details
Sections and Details
Architectural
A 0.1 Life Safety, Code Summary and General Architectural Info Sheet
A 1,1 Building 1: Floor Plan - Parking Level
A 1,2 Building 2: Floor Plan - Parking Level
A 2,1 Building 1: Floor Plan - First Level
A 2,2 Building 1: Floor Plan - Second Level
A 2,3 Building 2: Floor Plan - First Level
A 2.4 Building 2: Floor Plan - Second Level
A 3,1 Building 1: Reflected Ceiling Plan - Parking & First Levels
A 3,2 Building 1: Reflected Ceiling Plan - Second Level
A 3,3 Building 2: Reflected Ceiling Plan - Parking & First Levels
A 3.4 Building 2: Reflected Ceiling Plan - Second Level
A 4.1 Building 1: Roof Plan
A 4,2 Building 2: Roof Plan
A 5.1 Building 1: Exterior Elevations.
A 5.2 Building 1: Exterior Elevations
A 5,3 Building 2: Exterior Elevations
u
~
cso
u
Exhibit B
Approved Plan List
Page Two
A 5.4 Building 2: Exterior Elevations
A 6.1 Wall Sections and Details
A 6.2 Wall Sections and Details
A 7.1 Enlarged Stair and Ramp Plans, Details and Sections
A 7.2 Enlarged Stair and Ramp Plans, Details and Sections
A 7.3 Stair and Ramp Details and Sections
A 7.4 Stair and Ramp Details and Sections
A 7.5 Stair and Ramp Details and Sections
A 7.6 Stair and Ramp Details and Sections
A 8,1 Door and Frame Elevations
A 8.2 Room Finish, Door and Frame Schedules
A 9.1 Miscellaneous Sections and Details
Plumbinq
P 1.1 Building 1 - Floor Plan - Basement Level Plumbing and HVAC
P 1.2 Building 1 - Floor Plan - Basement Level Plumbing and HVAC
P 2.1 Building 1 - Floor Plan - First Level Plumbing
P 2.2 BuildIng 1 - Floor Plan - Second Level Plumbing
P 2.3 Building 2 - Floor -Plan - First Level Plumbing
P 2.4 Building 2 - FIQor Plan - Second Level Plumbing
P 5.1 Plumbing Schedules and Details
P 5.2 Plumbing Details
Mechanical
M 2.1 Building 1 - West Floor Plan - First Level- HVAC
M 2.2 (Not Used)
M 2.3 Building 1 - West Floor Plan - Second Level - HVAC
M 2.4 Building 2 - West Floor Plan - First Level - HVAC
M 25 (Not Used)
M 2.6 Building 2 - West Floor Plan - Second Level - HVAC
M 3.1 Building 1 - Floor Plan - Roof Level - HVAC
M 3.2 Building 2 - Floor Plan ~. Roof Level - HVAC
M 5.1 Mechanical Schedules
M 5.2 Mechanical Schedules
M 5.3 Mechanical Schedules and Details
M 5.4 Mechanical Details
Electrical
E 1.1 Building 1 - Floor Plan - Basement Level - Lighting and Power
E 1.2 Building 2 - Floor Plan - Basement Level - Lighting and Power
E 2.1 Building 1 - Floor Plan - First Level - Lighting
E 2.2 Building 1 - Floor Plan - First Level - Power
,. ~
u
~
eso
u
Exhibit B
Approved Plan List
Page Three
E 2.3 Building 1 - Floor Plan - Second Level - Lighting
E 24 Building 1 - Floor Plan - Second Level- Power
E 2.5 Building 2 - Floor Plan- First Level- Lighting
E 2.6 Building 2 - Floor Plan - First Level- Power
E 2.7 Building 2 - Floor Plan - Second Level- Lighting
E 2.8 Building 2 - Floor Plan - Second Level - Power
E 3.1 Building 1 - Floor Plan - Roof Level - Power
E 3.2 Building 2 - Floor Plan - Roof Level - Power
E 5.1 Electrical Schedules and Details
E 5.2 Electrical Schedules
1=
~ITY OF CA~MEL
DEPARTMENT OF COMMUNITY SERVICES
~--._,
<~EMORA-NDlIM
====~~....._................................_......,~,.=~==4:;~>-:;'\L'_"i~~;i.~~~=~".,,,.=.,,""=,~==,==",,,.=.~,,~==,~==
RECFIVED
liAR 6 2003
DOCS
TO:
LES OLDS
KAIU~ I-L"./\S
/-
SUBJECT:
PARCEL #2 PROJECT
3/4/2003
I VL. <;
t\..o'] \7P ~
FROM:
DATE:
cc:
STEVE ENGELKING
LUCI SN'y1)ER
RON CARTER
ED BURKE
RICK ROESG-I
JOHN KOVEN
Following are the Department of Community Services comments regarding the draft project
agreements for Parcel #2. I hope these comments are helpful for you and the commission as you
final ize each of the project agreements. If you have any questions regarding the comments, do
not hesitate to contact me.
I. The Department recommends that all buildings on the north half of the north parcel front
on City Center Drive in order to maintain a continuous building fayade at the street. The
frontage place could be shifted south of the building to accomplish this objecti ve and still
allow for the same level of access to those buildings.
2. A Change Order, as defined in the project agreements, may only be executed by the CRe
or Developer. Section 12 ofthe agreement states that the only changes that can be made
to the approved plans are from Change Orders. Because changes may be requested in the
zoning approval process for technical and aesthetic reasons, the definition should be
expanded to allow for changes as required during the zoning approval process.
3. The definition Final Documents and Drawings refers to drawings finalized and approved
by the eRC but does not mention the C-l Development Plan (DP) or Architectural
Design, Landscaping, Lighting or Signage (ADLS) approval processes.
4. 111 Section 8, (h) Required Permits, it states that the Developer shall have obtaincd or bc
able to obtain all Required Permits by the Due Diligence Date. [fzoning approvals and
building permits are included in the definition of Required Permits then it is nearly
impossible to accomplish this with a Due Diligence date of September 10. These
approvals can only be granted after final construction drawings are pn:pared and
reviewed in conformance with the C-l zoning process and provisions in Section 12.
5. Section 12, Developer Construction, of the project agreements does not in any way
include the zoning approval process specified in the C-l district zoning ordinance. It
1 of 2
~
u
w
leaves out an essential part of the approval process and the ability for the DPI ADLS
process to be meaningful and effective. This process should be woven into the process
stated in Chapter 12 in order to ensure compatibility with the zoning regulations and
clearly layout the development approval process for all involved.
6. Section 12, (g) Permits, states that the Developer will obtain and pay for all Required
Permits, IS this the case? Exhibit B (CRC Scope ofImprovements) states that the CRC
will assist the developer in obtaining all permits. This should be clarified so
responsibilities of each party are clearly understood. Also ill Section 12 (g), it states that
the developer will submit all permits to the CRC for review. What is the purpose of this
review?
7. In Exhibit B (CRC Scope of Improvements), the ,section titled Description, it is stated
that Amli has first rights to excess topsoil stacked on the south edge of Parcel 2. The
PEDCOR agreement then states that they have access to left over material. The Kosene
agreement states the same thing. Who has precedence after Amli?
8. The Development Gu:idelines for the Property (Exhibit F) need to be updated.
A. The existing conditions are out of date for both agreements.
B. Section 4.B states that the developer wi]) meet a minimum of 3.5 spaces per 1000
exclusive of on-street parking. From our understanding ofthe proposals, the
ratio of 3: 1000 will be met This should be clarified.
C. Section 4.B states that the buildings should be close to the street. The site plan
for the North parcel does not COnfOffi1 to that principle.
D. In 4.D and 6.F, it.states that landscaping will be according to the regulations of
CarmeL Typically, the projects fall shortofthe bufteryard standards of the City
therefore this should be removed or refer to standards set by the eRe.
E. In 4.F, it is stated that the City will provide assistance in obtaining permits; this
conflicts with statements elsewhere in the agreement. Please see comment 7
above.
F. Tn 5.A, itstates a minimum building height of 2 stories and maximum height of 3
stories. This should state a minimum of 3 stories in order to be in conformance
with the definitions set forth in the text of the project agreement.
9. Signage, lighting and landscaping have not been specifically addressed in either the
project agreement text or exhibits. Will this be part of the project agreement?
2
~:a.~ Corporate Headquarters W
.~ 280 E. 96th Street, Sulte200
b.: ~--4 Indianapolis, Indiana 46240
C'S 0 T 317;848.7800 F 317.574.0957
www.cso-arch.com
u
Leder:" af "'fna'n'smiff'al c
- ~... -- - ~ ~ - ~
TO:
DATE: March 4, 2003
PROJECT NO: 22478
RE: Pedcor
WE ARE SENDING YOU:
1
Civil Construction Documents
THESE ARE TRANSMITTED:
o For approval
[8] For your use
[8] As requested
D For review and comment
D Reviewed as submitted
D As noted
D Revise and Resubmit
D Rejected
D Resubmit for approval
D Submit for distribution
o Return corrected prints
o Other:
REMARKS:
Jon: Here is the latest Set of construction documents for the Pedcor project including the latest revision
per Kate Weese. If you have any questions please feel free to call me at 706-2497. Thank you, Bob
CC: FILE
LES OLDS
By: Bob Olson
o 1-HR Courier D 3-HR Courier 0 Fed-Ex 8:30 A.M. Delivery
o Fed-Ex Saturday Delivery D Fed-Ex 3:00 P.M. Delivery
o Fed-Ex 10:30 A.M. Delivery
[S] Hand Delivey
D Fed-Ex Ground
IF ENCLOSURES ARE NOT AS INDICATED, PLEASE NOTIFY US AT ONCE.
Document3
~._.~
d;j:2~w~~~
~ r ~~cP J - ~......
~ de~~ r-cf r/o
?)~,
}f~
i MAR-O'S-03 WED 01: 37 PM CSO CCH ITECHS
FAX NO. 70P0.566
U
p, 02
w-.; .-"';;
~L Ii~'
...~
~~~
:)80
January 28, 2003
MI'. Bruce Cordingly
Pedcor Investments
8888 Keystone Crosslng
Suite 900
Indic'ln21polis, IN 46240
PE: C2Irn1'2t City Center Parcel #2 Office Development
Dear Mr. Cordingly:
We are ill receipt of documents prepared by Crews 8\ StUI-rZ for the first phase of
YOL.!! office development. The drawings slJbm~tted are dated 12/19/02 and include
the civil, structural, architectural, plumbing, mechanical and electrical engineering fOI-
the project. The documents submitted reflect the schematic design approvals
granted by tile Carmel r':;0developrnent Cormnissioll. This letter is to serve as your
approval fOi your construction documents for the project. We request that a color
palette be submitted for the exterior materials only so that we c~m review and
8pprova for the project. Should you have any questions regarding any of tile abov'2,
please do not hesit8tG to contact me personally.
. L ~. . ( . l ~', ,I I .: ~ . I ,I, ." I :-~
Very truly yours,
t'~~~._:;:....?~~':1J'Jr ""."
';"- ,~~,~,.,.. 'r' .p-.... '''. 1'1-
<",l~f~.~J';;:_,.o'("").'I:'\-".~"...~.....~,.,.
...,'1'
2 2.0 [-:.1:-:1 t.r L;lh Sir0'-"'~,
~~~uitl~ ~'no
Indil7lIi!'iI."\fili:i, ill~..I;an"'l
Les S. Olds, AlA
Principal
4tJ~'1O
Icclj
T :~1~;.f,'^ 8.7BOO
cc;:;
Rick Roesch
Luci Snyder
Ed Burke
I<arl Haas
Steve Eng!eking
Milu;: Hollibaugh
Kate Weese
StEve Sturtz
Bob Olsol1
Greg Snelling
Fil8
F:3 i7.~)7.1Q057
"''''I'w,u.c,'"rcll Um,
':' '.'\':"I~;;:;~:">:::':>"':'::'>: :':.<:, .:,:-,;.~::-:;f:" : ':::~':< \:,: '; i i ~:'.,:::',L': .;.:>,'.;:,':<;:Y'~:'\';.'1{:: '.\ ,;::~.',\,T,;:-:--' ,;,::,,::..,:::,~ ,<. ",' ..'< ~:,:,;- ::.;:;'.
:1:< . ~'. .:..':..
'>, :..::~.~ ".: .,: ,"",;-.._~.-'
; MAR-D5-03 WED 01:37 PM CSOc:)CHITECHS
FAX NO, 70566
P. 03
~~
~
CSO
E){HlBIT 8
APPROVED PLAN UST
Carmel City Center Phase I
12/19/02
SHEET INDEX
Civil
CODO
C101
C2D1
C301
C3D2
CL\01
C501
C601
C6D2
eG03
Stcuctl!.uti
8101
5102
5201
5202
8203
5204
5205
8206
~i4CJ1
S'i02
5403
Site Cover Sheet
Demolition Plan
Site Plan
Grading Plan
Erosion Contl'ol Plan
Landscape Plan
Utifity Plan
Site DetE.1ils
Site Details
Site Det;::;!I;:;
BuHd:ng One - Foundation PI2n
Building Two ~ Foundation Plan
Building Ono ~ 'l:or Floor Framihg Plan
Building Two _1st Floor Fr<::ming Plan
Buildtng One ~ 2nd Floor Framing Plan
Building Two - 2'1d Floor Framing Plan
Building One -, Roof Framing Plan
8und~ng Two - Roof Framing Plsn
Notes, Sched~Jles and Details
Sections and D0tails
S9ctioilS and Details
f\rcllU5;~tLlral
A 0.1 Life Safet~', Cod':: Summary and General Architectural Info Sheet
/>, 1.1 Ejuikiing 1: Flool' Pfan - Parking Level
A 1.2 Buildii19 2: Floor" Plan ~ ParKing Level
0, 2.1 Building 1: Floor Plan - First L.ev:=!
A 2.2 Building 1: Floor Plan - Second Leve!
A 2.3 Building 2: Floor Plan ~ First Level
A 24 Building 2: Floor Plan - Second Level
p., 3.1 Building 1: Reflected Ceiting Plan - P2ric:ing & First Lev81s
/'\ 3.2 Building 1: Reflected Ceiling Plan - Second Level
A 3.3 Building 2: F~efleded Ceiling Plan - Parking & First Levels
P, 3.4 Building 2: r~8fI9ct(3d Ceiling Plan - S~cond Level
1-\ ..-1,.1 SuHding 1: Roof Pl21\"1
A 4.2 Bulldlng 2: Roof Plan
A 51 Building 1: Exterior Elevations
P, 5.2 BUilding 1: E:"jeriorElevations
;:,. 5,3 Building 2: Exte~'ior Elevations
i MAR-05-03 WED 01: 37 PM
CSO(jCHITECHS
FAX NO, 715566
p, 04
~~
~
080
E)~hibit B
Approved Plah List
P"lg'2 Two
1\ 5.4 Building 2: Exterior Elevations
A 6.1 Waif Sections and Det<::lils
A 6.2 Wall Sections and Details
P.7.1 Enlarged Stair and Ramp Plans, Details and Sectiotls
P,7,2 Enlarged Stair Blld Ramp Plans, Details and Sections
A 7.3 St8ir 8nd Ramp Details and Sections
A 7'A Stair and Ramp Details and Sections
f\ 7.5 Stair and Ramp Details 2lnd Sections
A 7.6 Stair and Ramp Det~lils and Sections
A 8.1 Door and Frame Elevations
r\ 8,2 Roon"l Finish, Door and Frame Schedules
/\ 9.1 Miscellaneous Sections and DGtails
PJ.LJrD !~Jf\g
P 1,1
P 1,2.
P 2.1
P 2.2
F.l 2.3
P 2.4
P 5,1
':) r- ~)
I ..J,L
!yji!.gJ1~1tljf.91
M 2.1
IV1 2.2
[vi 2,3
I\~ 2..4
M 2.5
1'v12G
M 3.1
M 3.:~
M 5,1
M 5.2
I\A 5.3
1111 5,4
E !(1dri C(;il
Building 1 ~ Floor Plgn ~ Basement Level Ptumbing and HVAC
8uilding 1 - Ffoor Plall ~ Basem2nt Level Plumbing and HVAC
Building 1 - Floor Plan - First Levell::Jlurnbing
Buildlng 1 - Floor PI"Hl - Second L~Wel Plumblhg
Building 2 - Floor Plan ~ First Level Plumbing
Building 2 - Floor Plan - Second Level Plumbing
Plumbing Schedl,.lles and Detairs
F)lumbing DettClils
Building 1 -- \I'Jest Floor Plan - First Level - HVAC
(Not Used)
Building 1 - West Floor Plc:m - Second Lever - HVAC
nuilding 2 -. West Floor Plan - First Level ~ HVAC
(J\Iol Used)
Building 2 - West Floor Plan ~ Second L.evel - HVAC
E:uilding 1 -. Floor PI(jn - Roof LeV:31 - HVAC
BUilding 2 - Floor Plan - Roof Level - HVAC
Mcchclnic2d Schedules
Mechanic8.1 Schedules
Mecl'ianlcal Schedules and Details
Mech8:nicO',1 Details
E 1.1 Building 'I - floor Plail - Bas~rnt!lnt Level - Lighting and Power
E 1.2 . Building 2 -- Floor Plan - Basement Level - Lighting and Power
E 2.1 Building 1 ~ Floor PI8n -~ First Level ~ Ughtihg
E 2..2 BUilding '! .- Floor- Plan ~ First Level ~ Power
, M'AR-05-03 WED 01: 37 PM
CSO~AI)CHITECHS
U
Exhibit B
Approved Plan List
Pags Three
~~
\..:,,~--'.
CSO
FAX NO. 70P0\566
U
p, 05
E 2.3 Building 1 ~ Floor PI2n - Second Level - Lighting
E 2.4 Bui]drllg 1 - Fioor Plan - Second Level ~ power
E 2.5 Building 2 - Floor Plan ~ Fir5t Level - Lighting
E 2.6 Bu11dillg 2 -- Floor Plan - FirstLev~; - Power
E 2. -, Bui~ding 2 - Floor Plan - Second Leve! ~ Lighting
E 2.8 Bullding 2 - Floor Plail- Second Level - Pawer
E 3.1 Building 1 ~ Floor Pian - Roof Level- Power
E 3,2 Building 2 - Floor Plan .- Roof Level ~ Power
[::: 51 Electric81 Schedules ~md Details
E 5.2 Electrical SchedulGs
~...., Six Parkwood U
~ 600 E. 96th Street, Suite 550
l ~--4 Indianapolis, Indiana 46240
C S 0 T 317.848.7800 F 317.574.1869
www.cso-arch.com
u
, -: I.etter.,of'lnan:~'m'ift~f' ";
.,...... ~-,;,;:;~.r..... '-" "oJ: '"-' ,<-~-"-,,,,~" "';;:-4::-"'"'" .~~.....
TO:
Carmel Dept. of Community.S~r-vices- I ,
One Civic Square /.. '
Carmel, IN 46032 /,~:
/'
DATE: 01/07/03
PROJECT NO: 22478
- I
~Nt~
",t\..~~ t~~~
~~\\ ~~\,~
RE: Carmel City Center Parcel 2B
A TTN: Jon Dobosiewicz
WE ARE SENDING YOU:
\,; ~.
jlVL
ql_o5 171
.1
1-
CONTACT PHONE: 571-241'Q;;
~GqPIES' .D tXi];E" . ....'- , ,QESCe,fp]]ON ,:'C'':;,'"
" ~. .. '. ,. ,t~' " "f
" :'1'
1 12-19-02 Revised Site Construction Plans
THESE ARE TRANSMITTED:
D For approval
o For your use
D As requested
o For review and comment
o Reviewed as submitted
D As noted
o Revise and Resubmit
D Rejected
o Resubmit for approval
o Submit for distribution
o Return corrected prints
o Other:
REMARKS:
The enclosed information is submitted per comments received at the November 20,2002 Technical
Advisory Committee Meeting.
cc: FILE
By: Greg Snelling
D 1-HR Courier 0 3-HR Courier 0 Fed-Ex 8:30 A.M. Delivery
o Fed-Ex Saturday Delivery 0 Fed-Ex 3:00 P.M. Delivery
D Fed-Ex 10:30 A.M. Delivery
o
o Fed-Ex Ground
IF ENCLOSURES ARE NOT AS INDICATED, PLEASE NOTIFY US AT ONCE.
01-07-03 JDobosiewicz Rev. Canst. Plans.doc
~-., Six PaJkwood U'
'~ 600 E, 96th Street, Suite 550
1...:' ~~ Indianapolis, Indiana 46240
C S 0 T 317.848.7800 F 317.574.1869
www.cso-arch.com
u
'"~ "''[~tteT~rmt~nsmirtal' ::' .
-y-- "- R -.: . -~ ~ _~ - _~ ~ ~ 1 <(
TO: Dept. of Community Services
One Civic Square .
Carmel, IN 46032
DATE: 11/4/02
PROJECT NO: 22478
A TTN: Scott Brewer
~ t1\)
~t~J \\J 1~~~
~~\\ 1
\lJC~
RE: Carmel City Center Parcel 28
CONTACT PHONE: 571-2417'
WE ARE SENDING YOU:
:OOPIES DATE " iDESGRIPT.ION
;
1 Revised Construction Plans
THESE ARE TRANSMITTED:
o For approval
[gI For your use
o As requested
o For review and comment
D Reviewed as submitted
o As noted
D Revise and Resubmit
o Rejected
o Resubmit for approval
o Submit for distribution
o Return corrected prints
o Other:
REMARKS:
The enclosed information is submitted per comments received at the November 20, 2002 Technical
Advisory Committee Meeting. Note the existing landscaping now identified north of the reflecting pond.
Please call me or Kirt Moody at 848-7800 if you have any additional comments or questions. Thank
you.
CC: FILE
JON DOBOSIEWICZ
By: Greg Snelling
o 1-HR Courier ~ 3-HR Courier D Fed-Ex 8:30 A.M. Delivery
D Fed-Ex Saturday Delivery 0 Fed-Ex 3:00 P,M, Delivery
D Fed-Ex 10:30 A.M. Delivery
o
D Fed-Ex Ground
IF ENCLOSURES ARE NOT AS INDICATED, PLEASE NOTIFY US AT ONCE.
01-07 -03 SBrewer Rev, Const. Plans.doc
~ ..e",
eso
u
u
December 4, 2002
Mr. Bruce A. Cordingly
Pedcor Investments
8888 Keystone Crossing
Suite 900
Indianapolis, IN 46240
RE: Carmel City Center Parcel NO.2 Design Approval
Dear Mr. Cordingly:
This letter is to inform you that the Carmel Redevelopment Commission has
approved your Exhibit H dated September 16, 2002 covering the preliminary design
for site plan and building elevations. This approval is subject to the submittal of the
final construction documents and plans which will be reviewed by the Commission
for final approval for the project. If you have any questions regarding any of the
above, please do not hesitate to contact me personally.
Corporate Headquarters
~ S. Olds, AlA
Principal
280 East 96th Street
Suite 200
Indianapolis, Indiana
Icdj
46240
cc:
Steve Sturtz
Rick Roesch
Luci Snyder
Ed Burke
Steve Engleking
Kate Weese
Kelli Lawrence
Bob Olson
File
T 317.848.7800
F 317.574.0957
www.cso-arch.com
..
i
u
u
Fahey, Joyce 0
From:
Sent:
To:
Andy Kern [Andy.Kern@ctrwd.org]
Tuesday, November 19, 2002 11 :33 AM
rfarrand@ccs.k12.in.us; AKeeling@cLcarmel.in.us; CTingley@ci.carmel.in.us;
DHill@ci.carmel.in.us; DPattyn@cLcarmel.in.us; Ghoyt@ci.carmel.in.us;
GStahl@cLcarmel.in.us; JDobosiewicz@ci.carmel.in.us; JFahey@ci.carmel.in.us;
JKendall@cLcarmel.in.us; JPFoster@ci.carmel.in.us; KHahn@ci.carmel.in.us;
LLillig@ci.carmel.in .us; MFogarty@ci.carmel.in.us; MHol1 ibaugh@cLcarmel.in.us;
MMcBride@ci.carmel.in.us; MSnyder@ci.carmel.in.us; PMorrissey@ci.carmel.in.us;
PPace@ci.carmel.in.us; RHancock@cLcarmel.in.us; SBrewer@ci.carmel.in.us;
slillard@ci.carmel.in.us; W Akers@cLcarmel.in.us; Dean. Groves@Cinergy.COM;
sprater@cmsenergy.com; sjb@co.hamilton.in.us; stc@co.hamilton.in.us; Jay Alley; john-
south@iaswcd.org; jeffry. farmer@timewarnercable.com; tskolak@usps.gov;
CSh upperd@vectren.com
Re: Change in Agenda for November 20th
SUbject:
Hello everyone:
Following are CTRWD comments on the agenda items effecting our sanitary sewers or service
area for the November 20, 2.002 TAC meeting. Please feel free to copy and distribute this
email or attach it to your meeting minutes. We have also created a new page on our
website linked to the "Construction" page where we have posted all CTRWD TAC comments from
2001 and 2002 meetings held to date. We will continue to add to this page every month so
please let everyone know they can view our comments online now too.
Proposed Wireless communication Towers-Crooked Stick Golf Course Special Exception
Application
The District has not received any plans for this proposal. Building permits should NOT be
issued unless the District has issued connection permits.
Hamilton Crossing Building #6 (Development plan)
The plans that the District received are in accordance with the District specifications.
Building permits should NOT be issued unless the District has issued connection permits.
Pennsylvania and 122nd Street-Northeast Corner (Rezone)
The District has no comments on the rezone unless it affects the sanitary sewers in this
development.
Lakeside Park, Section Two (Secondary Plat and Construction Plan~)
The plans received by the District do not contain the most recent version of the
District's Sanitary Sewer Specifications. Revised plans need to be submitted. A
preconstruction meeting will need to be held before the construction of the proposed
sanitary sewers. Building permits should NOT be issued unless the District has issued
connection permits.
.Please remind all TAC applicants to provide plans directly to the District at our main
office address in care of Andy Kern at:
10701 N. College Ave., Suite A, Indianapolis, IN 46280-1098.
If there are questions about the District I s requirements, then plea.se refer to our website
for current information on the District's construction specification and permit standards.
We are a member of the IUPPS underground locate network so call 1-800-382-5544 before you
dig! Please feel free to contact Jay or me if you have questions or need additional
information. Thanks!
1
,
~
Andy Kern, Project speCiali~
Clay Township Regional Waste District
Hamilton County, IN, USA
http://wwW.ctrwd.org/
317-844-9200 (phone)
3 17 - 8 4 4 - 92 03 ( fax )
u
~<<
>>> "Dobosiewicz, Jon C" <:JDobosiewicz@ci.carmel.in.us> 11/12/02 12:07PM >>>
To all,
The item scheduled for llam is called off. The llam spot will be filled
with the following item which was inadvertently left off the agenda.
11:00 a.m.
Carmel City Center Parcel 2B (Development Plan)
The applicant is proposing office and retail
The site is located at the southwest corner of 3rd Avenue
Drive.
Filed by Greg Snelling of CSO.
SW and
buildings.
City Center
Thanks,
Jon
See revised agenda attached.
<:<:TAC2002-1120.rtf>>
2
u
u
Mr. Greg Snelling
Six Parkwood
600 E. 96th Street, Suite 550
Indianapolis, IN 46240
~
. RrCF/I/FD
J,il~!' ,
'I! 1:'.-
,. ',; .'1/11)
DOCS . "
November 12, 2002
RE: Project NO: 22478
Carmel City Center Parcel 28
Dear Mr. Snelling:
I have received and reviewed the plans submitted for the above-mentioned
project.. I see nothing in the plans that would hamper law enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
~:])./T4
Michael D. Fogarty
Chief of Police
MDF:vb
cc: Dept. of Community Services
A Nationally Accredit '''g_ ....... orcement Agency
,~ffii.~t", .
(317) 571-2&00
F 4X (317) 571-2512
\ (
EROS N AND SEDIMENT CONTRO PLAN
TECHNICAL REVIEW AND COMMENT
Hamilton County Soil and Water Conservation District
11 08 South 9th Street, NobIesvillc IN 46060
Ph- 317-773-1432 or Email at john-south@iaswcd.org
PROJECT NAME:
Carmel City Center ParceL2B
SUB"MITTED BY: Pedeol' Investments LLC
8888 Keystone Crossing, Suite 900
Indianapol i.s, IN 46240
Ph: 317-587-0320
Mr. Greg Snelling
CSO
280 East 96th Street, Suite 200
Indianapolis, IN 46240
REVIEWED BY:
John B. South P.E.
Certified Professional in Erosion and Sediment Control
PLAN REVIEW PROCEDURE: Plan Review Date: 11/11/02
Acreage: 4
LOCA nON: S.W. corner of 1261h and 3RD Avenue SW
LEGAL DESCRIPTION: Sec. 36
TOWNSHIP: 18N
RANGE: 3E
CIVIL TOWNSHIP: Clay
SOIL SURVEY MAP SHEET:
On Plans
The technical review and comments are intended to evaluate the completeness of the erosion and sediment cuntrol plan for the
project. The erosion and sediment control plan submilled was no/reviewedfor the adequacy of the engineering design ALl
practices included in the plan, as well as those recommended in the comments should be evaluated as /0 their.f~!Qsibility by a
qualified individual with structuralpractices designed by a quaLified engineer. Theplan has not been reviewed/or Local, state,
orfederal permits that may be required to proceed with this project. Additional information, including design calculations may
be requested /0 further evaluate the erosion and sediment control plan.
The erosion and sediment control plan has been reviewed and it has been determined that the plan:
X Satisfies the minimum requirements and intent of 327JAC 15-5 (Rule 5). Notification will be forwarded to the
Indiana Department of Environmental Management.
(This site is less than 5 acres but is part o1'a larger common project and must submit an NOI to IDEM.)
Proper impLementation of the erosion and sediment controL plan and inspections GIthe constructiun site by the developer or a
representative are necessGlY to minimize o!J:site sedimentation. The developer shouldbe aware that unforeseen construction
activities and weather conditions might affect the pelformance of a practice or the erosion and sediment control plan. The plan
must be aflexible document, with provisions 10 modifY or substitute practices as necessary.
Revised 4/97
Cc: Carmel DOCS
Ha. Co. Surveyor
IDEM
File
NOV 07 '02 01:56PM
\
(1
P.l/1
f')' ~.y I
>,~.._-) . ').- 'j,.l":
...~ -. '"
-"" ---..,').. ---'"'''". ,2, ....-;"
cJ" '-.n...._ ,,- C
Xcnlcm C. 'l.\:lardJ SW'I1I.'}/or
'1'Iioll\'..".-r;')}7",Ij:-S'Ill,1 ~-
? \'""~II"".;p'
NQ,"mb" 7, 2002 ,V''" 'r'-"~,:
l. RECENEO
eso <.=: !.IO\I 1 2002 ~
Attn: Greg Snelling;=1 l~ ,1 ~
Six Parkwood ~ . DOCS
600 E. 96u1 Street, Su:~~~SO /~
fndianapolis, LN 46240~O.t:!IL___-,..,{$/
VIA FACSIMll.$: ~ 17.574~
Re: Carmel City Conter Parcel 28
StilI!! lS8
Olle :l{t/mllloll Cmorty Sqmm
.Nobbllilll!, '//llllll1ll 4 t>ob/I.;l.1j<'
yUJ
d~f #-
Dear Mr. Snelling:
We have reviewed the constructiQn plans submitted to the Hamilton County Surveyor's office on November
4,2002. We have the following comments:
I. This :sjt~ doet. nQt appear to directly affect any Ha.milton County Regulated Dl'Blrts therefore, no
requests will need to be filed wIth this office
2. This project will fall under the regulations of the city ofCa.rmel Engineer's Office for drainage
requirements.
Should YOI.l have any ques.tiQns please contact me at 776-8495. Thank YQ\!.
,...sincerely,
bt~i~
Plan ReYiewer
Cr;;: Cann~J-Enginecr
Ca.rmel-Community Development
Hamilton County Department of Soil Conservation Services
Ha.mllton County Highway D\'lparttncnt