Loading...
HomeMy WebLinkAboutStorm Drainage Report D' o u u [J u [J D [J o o o u o [J u o D ,D ~ ~ @ C) (6) I ~@ C~ ..J 5@ fDegv Z~ ~~ Z CI I <(@ ~~ en · loj ~~ <(~ ~@ ~ W o o o '0 o o o o o o D o o o o o [J o D Storm Drainage Report For: A new office building for Mark Swanson Associates, Inc. Project No. 122..0046 January 19, 2003 Prepared By: Mid-States Engineering 970 Logan Street, Suite 202 Noblesville, IN 46060 o Table of Contents o Introduction D Pre-Developed Conditions Summary Post-Developed Conditions Criteria o o Outlet Structure Simulation u Summary of Results Storm Sewer Calculations Narrative 2 2 3 4 Soil Map Schematic of Nodes and Basins 5 6-9 o ICPR Output-Pre-Developcd Conditions Data ICPR Output-Post-Developed Conditions Data o Storm Sewer Calculations Drainage Maps for Storm Sewer Design - Areas Delineation o o Appendix eN and Tc Sheet for Pre- and Post - Developed Conditions D o D o o o o [J [J o o D o o D o o D D D U o U o o o D o Introduction This report details the proposed drainage for the new Mark Swanson Associates Office site located on northwest corner of intersection of l06lh Street and Park Avenue and is bounded by the l06lh Street to the south, by Park A venue to the east, by Ruckle Road to the west, and undeveloped site to the north in Carmel, IN. Pre-Developed Conditions The site presently is undeveloped. Under existing conditions, O.70-Acre site contains of the grass area. A soil map from United States Department of Agriculture Soil Conservation Service identifies Crosby (CrA) and Brookston (Br) soils on the property and is included in this report. Existing drainage characteristics are such that the site generally flows from a high point on south-east corner across the site and ultimately discharges into existing ditch along east side of Ruckle Road which directly flows to the drain, as shown on the existing drainage map included in this report. There is no offsite drainage affecting this site. Post-Developed Conditions Proposed drainage for the developed site consists constnlction of two separated system of new storm inlets and connecting pipes. Storm sewer system on the east side will flow into the existing storm sewer system along Park A venue. The developed portion of the . site on the west side along with overland flow from south portion will discharge into the existing ditch along east side of Ruckle Road. Criteria To establish the lO-year storm allowable peak discharge, hydrographs are generated and added accounting for the 2-year storm generated by the onsite drainage area at the pre- developed conditions. To establish the lOO-year storm peak discharge, hydro graphs are o o D D o D o o o o o o o D D D o o u generated and simulated accounting for the runoff generated by the onsite area during the 10-year storm at pre-developed conditions. Outlet Structure The outlet structure to the existing ditch consists of 2 "orifice detail and also 6" orifice controls the flow discharging from Basins 3B and 4 on the east portion of the side. Per verified as-built information, existing pipe along Park Avenue has the capacityof2.74 cfs. Based on calculations provided in this report, the discharge rate of the proposed stom1 pipe 12"RCP is 1.15 cfs and will not exceed the discharge rate at existing conditions. Simulation The simulation of the system was performed using rCPR, which is advanced storm water modeling software and the Tr-55 method with the SCS Type II rainfall data and 1, 2, 3, 6, 12, and 24 hours storm duration for the 2-year, 10-year and 1 DO-year storm event. The 1 OO-year peak discharge from the pond should not exceed the 1 O-year pre-developed allowable peak discharge. 2 o o Summary of Results D D. Ousite Basin t Basin 2 amI 3A Basin 3B and 4 Pre-Develooed Area (acres) 070 eN 86 Time of Concentration (min.) 30.43 2- Year Storm Peak Disrharge (rfsl 0.31 to-Year Storm Peak Discharge (efs) 0.74 AllllwahlclO-Year Storm Prak Discharge 0.76 (efs) for the entire site Post-Develooed Area (acres) 0.25 0.23 0.22 eN 84 94 95 Time of Concentration (min.) 3436 5(min.) 5(min.) Oriliee Diameter (in.) 2" 6" Sum of Ilydrograph = to-Year Storm 0.22 0.07 Peak Discharge (efs) Sum ofllydrograph = 100- Year Storm 0.52 007 115 Peak Discharge (rfs) IOU-Year Storm Water Surface Elevation 849.58 849.58 (feet) (849.58- (849.58- 849.15=0.33=4" 849.25=0.33=4" < < 9 "(a/lowab/e 9 "(allowable lIeigllt of lleight oftlJe ponding on the ponding on tire parking (or) porking (ot) o D o D D o D o D D u o Note: Above is a listing of data and results used to calculate parameters. Please refer to tlifferent .~ections of tile report for additioJlaL informatioJl. o D o .., -' o o o D o o o D U U o o o D D o o o o Storm Sewer Calculations Included in this report are the storm sewer calculation spreadsheets, listing all the generated data and results with its drainage areas delineation map and other maps for structures and pipes identification. 4 D o o o D D D D D o D o o o o o o o u Map1 S.l t e N SCALE 1 : 3,060 .~ ~..~ ~ 200 0 200 400 600 FEET D o o o o [J o u o D D D o o o o D o C NODE AND BASIN MAP (3 1 SIMULATED CONNECTION 1 UNSIMULA TED BASIN CONNECTION Pre-Developed Conditions ONSITE A = 0.70 ACRES Ie = 30.43 MIN CN = 86 122-0046 o o D D D U o D o [J D D o o u o o o [J 8 1 SIMULA TED CONNECTION 1 UNSIMULA TED BASIN CONNECTION NODE AND BASIN MAP Post-Developed Conditions BASIN I A = 0.25 ACRES Tc = 34.36 MrN CN = 84 122-0046 o D D o D o o D D D o D U o o o o U D (3 1 SIMULA TED CONNECTION 1 UNSIMULA TED BASIN CONNECTION NODE AND BASIN MAP Post-Developed Conditions BASIN 3A and 2 A = 0.23 ACRES T c = 5 M IN eN = 95 122-0046 o o D D D D D o D o D D D o o o D o U NODE AND BASIN MAP 8 1 SIMULATED CONNECTION 1 UNSIMULA TED BASIN CONNECTION Post-Developed Conditions BASIN 38 and 4 A = 0.23 ACRES Tc = 5 MIN eN = 94 122-0046 IJ - l - n .- I] - !] -- o oiOiit IJ -- n ..... ICPR Pre-developed conditions data o r] - IJ ,- i] - iJ iJ CJ o iJ o n .;;;;;; o o o 0' o o o o o o o Ie D D o u o I I I I '0 I D 122-0046 INPUT REPORT AT PRE-DEVELOPED CONDITIONS Name: ONSITE Group: BASE Status: Onsite Unit Hydrograph: Rainfall rile: Rainfall Amount (in) : 0.000 Area(ac): 0.700 Curve N~~er: 86.00 DCIA(%): 0.00 Node: DITCH Type: SCS Unit Hydrograph Peaking Factor: 484.0 Storm Duration(hrs): 0.00 Time of Cone (min) : 30.43 Time Shift(hrs): 0.00 Max Allowable Q(efs): 0.000 Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. Page I of I D o D D o D o o [J D o o D o D D D o o 122-0046 INPUT RE?ORT AT PRE-DEV~LOPED CONDITIONS Name: Group: DITCH BASE Init Stage(ftl: 845.000 Warn Stage(ft): 848.000 Time(hrs) 0.00 48.00 Stage(ft) 845.000 848.000 Base Flow(cfs): 0.000 Interconnected Channel and Pond Routing Model (lCPR) @2002 Streamline Technologies, Inc. Page I of I ![J I o D o o o o o D o o o D D o D D o o 122-0046 INPUT REPORT AT PRE-DEVELOPED CONDITIONS Name: 10Y-012HR Filename: F:\ICPR3\10Y-012HR.R32 Override Defaults: Yes Storm Duration(hrs): 12.00 Rainfall File: HUFF2 Rainfall .~ount(in): 3.60 Time{hrs) Print Inc(min) 15.000 5.00 --------------------------------~--------------------------------~-------------------------~- Name: 10Y-01HR Filename: F:\ICPR3\10Y-OIHR.R32 Override Defaults: Yes Storm Duration(hrs): 1.00 Rainfall File: HUFF2 Rainfall Amount (in) : 1.96 Time (hrs) Print Inc[min) 5.000 5.00 ------~----------------------------------------------------~-------------~------,------------- Name: 10Y-024HR Filename: F:\ICPR3\10Y-024HR.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: HUFF2 Rainfall Amount (in) : 4.08 Time(hrs) Print Inc(min) 30.000 5.00 -------------------------------------------.-------------------------------------------------- Name: 10Y-02HR Filename: F:\ICPRJ\10Y-02HR.R32 Override Defaults: Yes Storm Duration(hrs): 2.00 Rainfall File: HUFF2 Rainfall Amount (in) : 2.40 Time (hrs) Print Inc(min} 6.000 5.00 ---------------------------------------~----------------~~---------------~----------~-------- Name: 10Y-03HR Filename: F:\ICPR3\10Y-03HR.R32 Override Defaults: Yes Storm Duration(hrs): 3.00 Rainfall File: HUFF2 Rainfall ~~ount(in): 2.64 Time (hrsJ Print Inc(min) Interconnected Channel and Pond Routing Model (ICPR) iQ2002 Streamline Technologies, Inc. Page I of3 o D 10 o o o o D o o o D o o D o o o o 122-0046 INPUT REPORT AT PRE-DEVELOPED CONDITIONS 8.000 5.00 --------------------------------------------~---------~~-------------~---------~------------- Name: 10Y-06HR Filename: F:\ICPR3\10Y-06HR.R32 Override Defaults: Yes Storm Duration(hrs): 6.00 Rainfall File: HUFF2 Rainfall Amount (in) : 3.12 Time (hrs) Print Inc(min) 10.000 5.00 ---------------------~---------------------~~--------------------------~-----------~--------- Name: 2Y-012HR Filename: F:\ICPR3\2Y-012HR.R32 Override Defaults: Yes Storm Duration(hrs): 12.00 Rainfall File: HUFF2 Ralnfall Amount (in) : 2.40 Time{hrs) Print Inc[min) 15.000 5.00 -----~------------------------~--------------------~----------------------~------------------ Name: 2Y-OIHR Filename: F:\ICPRJ\2Y-OIHR.R32 Override Defaults: Yes Storm Duration (hrsl : 1.00 Rainfall File: HUFF2 Rainfall Amount (in) : 1.25 Time (hrs) Print Inc{min) 5.000 5.00 ------~-------------~---------------------~--------------~~-------------~------~------------- Name: 2Y-024HR Filename: F:\ICPRJ\2Y-024HR.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: HUFF2 Rainfall Amount (in) : 2.64 Time (hrs) Print Inc(min) 30.000 5.00 --------'-------------~------~---------------~~------~--------------------~------------------- Name: 2Y-02HR Filename: F:\ICPRJ\2Y-02HR.R32 Override Defaults: Yes Storm Duration(hrs): 2.00 lnterconnected Channel and Pond Routing Model (ICPR) (1;)2002 Streamline Technologies, Inc. Page 2 of3 o D D o D o o o D D o o o o o o o o o 122-0046 INPUT REPORT AT PRE-DEVELOPED CONDITIONS Rainfall File: HUFF2 Rainfall Amount (in) : 1.52 Time (hrs) Print Inc(min) 6.000 5.00 ~-----------------------------------~-------------------------------------------------------- Name: 2Y-03HR Filename: F:\ICPR3\2Y-03HR.R32 Override Defaults: Yes Storm Duration (hrsJ : 3.00 Rainfall File: HUFF2 Rainfall Amount (in) : 1.68 Time(hrsJ Print Inc(min} 8.000 5.00 -----------~-----------~---------------------------------~-----------------~----------~------ Name: 2Y-06HR Filename: F:\ICPR3\2Y-06HR.RJ2 Override Defaults: Yes Storm Duration(hrs): 6.00 Rainfall File: HUFF2 Rainfall Amount (inJ : 1.98 Time (hrs) Print Inc(min) 9.000 5.00 Interconnected Channel and Pond Routing Mode! (ICPR) ~2002 Streamline Technologies, Inc. Page 3 of3 u o D o o o o o o u o u o o o o o o o 122-0046 INPUT REPORT AT PRE-DEVELOPED CONDITIONS Name: 10Y-012HR Filename~ ************** Execute: Yes Alternative: No Max Delta Z (ft) : Time Step Optimizer: Start Time (hrs) : Min Calc Time(sec): Boundary Stages: Time(hrs) Hydrology Sim: 10Y-012HR Restart: No 1. 00 10.000 0.000 60.0000 15.000 5.000 Print Inc(min) Group Run BASE Yes Patch: No Delta Z Factor: 0.00100 End Time(hrs): 15.00 Max Calc Time(sec): 300.0000 Boundary Flows: --------------~------------------------------------------------------------------------------ Name: lOY-OIHR Filename: ~************* Execute: Yes Alternative: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time(sec]: Boundary Stages: Time (hrs) Hydrology Sill'.: 10Y-01HR Restart: No 1. 00 10.000 0.000 60.0000 5.000 5.000 Print Inc(min) Group Run BASE Yes Patch: No Delta Z Factor: 0.00100 End Time(hrs): 5.00 Max Calc Time(sec): 300.0000 Boundary Flows: -----------------------------------~-------------~------------------------------------------- Name: 10Y-024HR Filename: ************** Execute: Yes Alternative: No Max Delta 2(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time (sec) : Boundary Stages: Hydrology Sim: 1DY-024HR Restart: No 1. 00 10.000 0.000 60.0000 Patch: No Delta Z Factor: 0.Op100 End Time (hrs) : 30.00 Max Calc Time (sec) : 600.0000 Boundary Flows: Interconnected Channel and Pond Routing Model (lCPR) rQ2002 Streamline Technologies, Inc. Page I of 5 o D o u o D D D D [J D D o o D D o o o 122-0046 30.000 5.000 Time(hrs) Print Inc[min] Group Run BASE Yes Name: 10Y-02HR Filename: ************** Execute: Yes Alternative: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time(sec): Boundary Stages: INPUT REPORT AT PRS-DEVELOPED CONDITIONS Hydrology Sim: 10Y-02HR Restart: No 1. 00 10.000 0.000 60.0000 6.000 5.000 Time(hrs) Print Inc[min] Group Run BASE Yes Patch: No Delta Z Factor: 0.00100 End Time (hrs) : 6.00 Max Calc Time(sec): 300.0000 Boundary Flows: --------------~-------------------------~----~----------------------------------------------- Name: 10Y-03HR Filename: ************** Execute: Yes Alternative: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time (sec) : Boundary Stages: Time (hrs) Hydrology Sim: lOY-03HR Restart: No 1. 00 10.000 0.000 60.0000 8.000 5.000 Print Inc(min) Group Run BASE Yes Patch: No Delta Z Factor: 0.00100 End Time (hrs) : 8.00 Max Calc Time (sec) ; 300.0000 Boundary Flows: --------------------~--------------------------~~------------------------~~------------------ Interconnected Channel and Pond Routing Model (lCPR) <<;J2002 Streamline Technologies, Inc. Page 2 of 5 o o o D D D o u o o u o o o D D u o u 122-0046 INPUT REPORT AT PRE-DEVELOPED CONDITIONS Name: 10Y-06HR Filename: ****~~****~*** Execute: Yes Alternative: No Max Delta Z(ft): Time Step Optimizer: Start Time(hrs): Min Calc Time(sec): Boundary Stages: Time (hrs) Hydrology Sim: 10Y-06HR Restart: No 1. 00 10.000 0.000 60.0000 10.000 5.000 Print Inc(min) Group Run BASE Yes Patch: No Delta Z Factor: 0.00100 End Time (hrs) : 10.00 Max Calc Time(secJ; 300.0000 Boundary Flows; ----~-----------------------------------------~--------~----------------------------------,--- Name: 2Y-012HR Filename: *~************ Execute: Yes Alternative: No Max Delta Z(ft): Time Step Optimizer: Start Time(hrs): Min Calc Time(sec): Boundary Stages: Hydrology Sim: 2Y-012HR Restart: No 1. 00 10.000 0.000 60.0000 15.000 5.000 Time (hrs) Print Inc(min) Group Run BASE Yes Patch: No Delta Z Factor: 0.00100 End Time (hrs) : 15.00 Max Calc Time (sec) : 300.0000 Boundary Flows: ----------~-------~-------------------------~~-------------~--------------------------------- Name: 2Y-01HR Filename: ************** Execute: Yes Alternative: No Hydrology Sim: 2Y-OIHR Restart: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time (hrs) : 0.000 Min Calc Time (sec) : 60.0000 Boundary Stages: Patch: No Delta Z Factor: 0.00100 End Time (hrs) : 5.00 Max Calc Time (sec) : 300:0000 Boundary Flows: Interconnected Channel and Pond Routing Model (ICPR) (ld2002 Streamline Technologies, Inc. Page 3 of 5 o D o o D o D u D o o o o o D D o o u 122-0046 INPUT REPORT AT PRE-DEVELOPED CONDITIONS Time (hrs) Print Inc(min) 5.000 5.000 Group Run BASE Yes Name: 2Y-024HR Fil.ename: ************** ----~-------------------------------------------------~------------~------------------------- Hydrology Sim: 2Y-024ER Execute: Yes Alternative: No Restart: No Patch: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time (see) : 60.0000 Boundary Stages: Time (hrs) Print Inc(min) 30.000 5.000 Group Run BASE Yes Delta Z E"actor: 0.00100 End Time (hrs) : 30.00 Max Calc Time(sec): 600.0000 Boundary flows: Name: 2Y-02HR Filename: ***~********** ----------------------------------------------------------------------~---------------------- Hydrology Sim: 2Y-02HR Execute: Yes Alternative: No Restart: No Patch: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time (sec) : Boundary Stages: 1. 00 10.000 0.000 60.0000 Time (hrs) Print Inc(min) 6.000 5.000 Group Run BASE Yes Delta Z Factor: 0.00100 End Tirne(hrs): 6.00 Max Calc Time(sec): 300.0000 Boundary Flows: Name: 2Y-03HR Filename: ************** --------------------------------------------------------------------------------------------- Hydrology Sim: 2Y-03HR Interconnected Channel and Pond Routing Model (lCPR) <<)2002 Streamline Technologies, Inc. Page 4 of5 o D D D D D D D o o D o o D o o [J o [j 122-0046 INPUT REPORT AT PRE-DEVELOPED CONDITIONS Execute: Yes Alternative: No Restart: No Patch: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 60.0000 Boundary Stages: Delea Z ~actor: 0.00100 End Time(hrs): 8.00 Max Calc Time(sec): 300.0000 Boundary Flows: 8.000 5.000 Time (hrs) Print Inc(min) Group Run BASE Yes ----------------------------~---------------------------------------------------------------~ Name: 2Y-06HR Filename: *******~*~**~* Execute: Yes .ll,lternative: No Max Delta Z(ft): Time Step Optimizer: Start Time(hrs): Min Calc Time(sec): Boundary Stages: Time{hrs) Hydrology Sim: 2Y-06HR Restart: No Patch: No 1. 00 10.000 0.000 60.0000 Delta Z Factor: 0.00100 End Time(hrs): 9.00 Max Calc Time (see) : 300.0000 30undary Flows: 9.000 5.000 Print Inc{min) Group Run BASE Yes IntercolUlected Channel and Pond Routing Model (ICPR) <<)2002 Streamline Technologies, fnc. Page 5 of5 c=J c=J c=J c=J CJ CJ C:=J c:::J CJ c:::::J C=:J c=J c=:J CJ c=J c::::::J c-J c=J C=:J 122-0046 NODES MAXIMUM REPOkl AT PRE-DEVELOPED CONDITIONS Max Time Max Warning Max Delta Max Surf Max Time Max Max Time Name Group Simulation Stage Stage Stage Stage Area Inflow Inflow Outflow hrs ft ft ft ft2 hrs cfs hrs - ---~._-----_. -------- ---~------ -- -- --....-- DITCH BASE lOY-012HR 15.01 845.938 848.000 0.0052 0 4.93 0.257 0.00 DITCH BASE 10Y-OlHR 5.01 845.313 848.000 0.0052 0 0.86 0.737 0.00 DITCH BASE 10Y-024HR 30.01 846.876 848.000 0.0104 0 9.68 0.156 0.00 DITCH BASE 10Y-02HR 6.01 845.376 848.000 0.0052 0 1.17 0.674 0.00 DITCH BASE 10Y-03HR 8.01 845.501 848.000 0.0052 0 1. 63 0.583 0.00 DITCH BASE 10Y-06HR 10.01 845.626 848.000 0.0052 0 3.01 0.402 0.00 DITCH BASE 2Y-012HR 15.01 845.938 848.000 0.0052 0 6.01 0.140 0.00 DITCH BASE 2Y-01HR 5.01 845.313 848.000 0.0052 0 0.93 0.309 0.00 DITCH BASE 2Y-024HR 30.01 846.876 848.000 0.0104 0 12.01 0.082 0.00 DITCH BASE 2Y-02HR 6.01 845.376 848.000 0.0052 0 1. 24 0.286 0.00 DITCH BASE 2Y-03HR 8.01 845.501 848.000 0.0052 0 1.71 0.260 0.00 DITCH BASE 2Y-06HR 9.01 845.563 848.000 0.0052 0 3.10 0.197 0.00 Interconnected Channel and Pond Routing Model (ICPR) IQ2002 Streamline Technologies, Inc. Page I of I l22-00~6 BASIN HAXIMUM REPO"T .l\.T PRE-DEVELOPED CONDITIONS Simulation Basin Group Time Max Flow Max Volume Volume hrs cfs in ft3 ----~- --------~ - -- - -------------- - ___ _____n_ ____T~_.,____~__ 10Y-012HR ONSITE BASE 4.94 0.257 2.181 5541.332 10Y-01HR ONSITE BASE 0.81 0.742 0.786 1996.426 10Y-024HR ONSITE BASE 9.67 0.157 2.611 6635.690 10Y-02HR ONSITE BASE 1. 22 0.677 1.145 2910.151 10Y-03HR ONSITE BASE 1. 62 0.588 1. 350 3429.138 10Y-06HR ONSITE BASE 3.04 0.403 1.754 4457.691 2Y-012HR ONSITE BASE 6.02 0.140 1.159 2944.237 2Y-OIHR ONSITE BASE 0.95 0.311 0.318 808.705 2Y-024HR ONSITE BASE 11. 97 0.082 1. 355 3442.000 2Y-02HR ONSITE BASE 1. 28 0.287 0.497 1262.138 2Y-03HR ONSITE BASE 1. 69 0.263 0.610 1550.792 2Y-06HR ONSITE BASE 3.11 0.197 0.828 2103.291 Interconnected Channel and Pond Routing Model (ICPR) (02002 Streamline Technologies, Inc. Page I of I c=::J c::J c=J C:::J c:::::=J ~ CJ CJ CJ c::J CJ ~ c:=J c=J l=:J ~ ~ c=J c.=J J wi ] .. J ii ] .. l iii J ] .. l .. J .. ] - l "" ~ J ] .. ] .. J J ] ,. ] ... ICl'R Post-developed conditions data o 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 1 o o Name: ONSITE SOUTH Group: BASE Node: CULVERT Type: SCS Unit Hydrograph Sta1::u:;: On.si1::e tJ o Unit Hydrograph: HUFF2 Rainfall File: HUFF2 Rainfall Amount (in) : 0.000 Area (ae) : 0.250 Curve Number: 84.00 DCIA(%): 0.00 Peaking Factor: 484.0 Storm Duration (hr.s) : 0.00 Time of Cone (min): 34.36 Time Shift (hr.s) : 0.00 Max Allowable Q(cfs): 0.000 o o o o o o c( o o u o o o Interconnected Channel and Pond Routing Model (ICPR) <92002 Streamline Technologies, Inc. Page I of I [J u 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 1 o o Name: CULVERT Group: BASE Base Flow(cfs): 0.000 rnit Stage(ft): 846.770 War~ Stage(ft): 848.000 o Stage(ft) Area(ac) o 846.770 848.000 0.0007 0.0007 o Name: DITCH Group: BASE Base Flow(cfs): 0.000 Ioit Stage(ft): 846.000 Warn Stage(ft): 848.000 u Time(hrs) Stage (ft) u 0.00 48.00 846.000 848.000 u o o o o o u o o D Interconnected Channel and Pond Routing Model (ICPR) l{')2002 Streamline Technologies, Inc. Page 1 of 1 u u o o o [J o o o o o o o D o D o u o [J 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 1 Name: PIPE From Node: CULVERT Length (ft) : 29.00 Group: BASE To Node: DITCH Count: 1 Friction Equation: Average Conveyan UPSTREAL~ DOWNSTREAL~ Solution Algorithm: Automatic Geometry: Circular Circular Flow: Both Span(in) : 12.00 12.00 Entrance Loss Coef: 0.50 Rise(in) : 12.00 12.00 Exit Loss Coef: 0.00 Invert (ft) : 846.770 846.000 Bend Loss Coef: 0.00 Manning's N: 0.013000 0.013000 Outlet Ctrl Spec: Use de or tw Top Clip (in) : 0.000 0.000 Inlet Ctd Spec: Use dn Bot Clip(in): 0.000 0.000 Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge wi headwall Downstream FHWA Inlet Edge Descriptioh: Circular Concrete: Square edge wi headwall Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. Page 1 of 1 o 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 1 D o Name: 100Y-012HR Filename: F:\ICPR3\lOOY-012HR.R32 o Override Defaults: Yes Storm Duration(hrs): 12.00 Rainfall File: HUFF2 Rainfall Amount (in) : 5.16 o Time(hrsl Print Ine (min) 15.000 5.00 D Name: 100Y-01HR Filename: F:\ICPR3\100Y-OIHR.R32 o Override Defaults: Yes Storm Duration(hrsl: 1.00 Rainfall File: HUFF2 Rainfall Amount (in) : 2.88 o Time (hrs) Print Inc(min) o 5.000 5.00 o Name: 100Y-024HR Filename: F:\ICPR3\100Y-024HR.R32 o Override Defaults: Yes Storm Duration (hrs): 24.00 Rainfall File: HUFF2 Rainfall ~.ount(in): 6.00 Time (hrs) Print Inc(min) o 30.000 5.00 o Name: 100Y-02HR Filename: F:\ICPR3\lOOY-02HR.R32 o Override Defaults: Yes Storm Duration (hrs) : 2.00 Rainfall File: HUFF2 Rainfall Amount (in) : 3.50 Time (hrs) Print Inc(min) u 6.000 5.00 o Name: 100Y-03HR Filename: F:\ICPR3\lOOY-03HR.R32 u Override Defaults: Yes Storm Duration (hrs) : 3.00 Rainfall File: HUFF2 Rainfall Amount (in) : 3.87 o Interconnected Channel and Pond Routing Model (ICPR) <<)2002 Streamline Technologies, Inc. Page 1 of3 o [j 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 1 o o Time (hrs) Print Inc(min) o 8.000 5.00 o Name: lOOY-06HR Filename: F:\ICPR3\100Y-06HR.R32 o Override Defaults: Yes Storm Duration(hrs): 6.00 Rainfall File: HUFF2 Rainfall Amount (in) : 4.50 Time(hrs) Print Inc(min) o 9.000 5.00 o Name: lOY-012HR Filename; F:\ICPR3\10Y-012HR.R32 o Override Defaults: Yes Storm Duration(hrs): 12.00 Rainfall File: HUFF2 Rainfall Amount (in) : 3.60 Time(hrs) Print Inc(min) o 15.000 5.00 o Name: 10Y-OIHR Filename: F:\ICPR3\10Y-OIHR.R32 o Override Defaults: Yes Storm Duration(hrs): 1.00 Rainfall File: HUFF2 Rainfall Amount (in) : 1.96 Time (hrs) Print Inc(min) o 5.000 5.00 o Name: 10Y-024HR Filename: F:\ICPR3\lOY-024HR.R32 o Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: HUFF2 Rainfall Amount (in) : 4.08 o Time (hrs) Print Inc(min) 30.000 5.00 o Name: 10Y-02HR Filename: F:\ICPR3\10Y-02HR.R32 o Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. Page 2 of3 [J o 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS Bl\.SINS 1 o o o Override Defaults: Yes Storm Duration (hrs) : 2.00 Rainfall File: HUFF2 Rainfall Amount (in) : 2.40 Time (hrs) Print Inc(min) o 6.000 5.00 o Name: 10Y-03HR Filename: F:\ICPR3\lOY-03HR.R32 o Override Defaults: Yes Storm Duration(hrs): 3.00 Rainfall File: HUFF2 Rainfall Amount (in) : 2.64 Time(hrs) Print Inc(min) u 8.000 5.00 u Name: 10Y-06HR Filename: F:\ICPR3\10Y-06HR.R32 o Override Defaults: Yes Storm Duration(hrs): 6.00 Rainfall File: HUFF2 Rainfall F~ount(in): 3.12 o Time (hrs) Print Inc(min) 10.000 5.00 o o o o o o o Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. Page 3 of3 [J o o o o o o o o o o o o o D o o o [J o 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 1 Hydrology Sim: 100Y-D12HR Name: 100Y~Ol2HR Filename: ************** Execute: Yes Alternative: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time(sec}: Boundary Stages: Time (hrs) Restart: No Patch: No 1. 00 10.000 0.000 60.0000 Delta Z Factor: 0.00100 End Time(hrs): 15.00 Max Calc Time(sec): 300.0000 Boundary Flows: 15.000 5.000 Print Inc(m~n} Group Run BASE Yes ----------~---------------------------------------------~------------~-----~-------------~--- Name: 100Y-OlHR Filename: ***+**+***~**~ Execute: Yes Alternative: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time (sec) : Boundary Stages: Time [hrs) Hydrology 3im: 100Y-OIHR Restart: No Patch: No 1. 00 10.000 0.000 60.0000 Delta Z Factor: 0.00100 End Time(hrs): 5.00 Max Calc Time(sec): 300.0000 Boundary Flows: 5.000 5.000 Print Inc(min) Group Run BASE Yes -----------------------~----------------------------~~--------------~--------------------~--- Name: 100Y~024HR Filename: ************** Execute: Yes Alternative: No Hydrology 3im: 100Y~024HR Restart: No Patch: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time (hrs) : 0.000 Min Calc Time (see) : 60.0000 Boundary Stages: Delta Z factor: 0.00100 End Time(hrs): 3D.DO Max Calc Time(see): 600.0000 Boundary Flows: IntercOllilected Channel and Pond Routing Model (ICPR) CQ2002 Streamline Technologies, Inc. Page 1 of 5 o o o [J D o o o o o o o o o o u o o o 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 1 Time (hrs) Print Inc(min) 30.000 5.000 Group Run BASE Yes Name: lOOY-02HR Filename: ************** Hydrology Sim: lOOY-02HR Execute: Yes Alternative: No Restart: No Pat::::h: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time (see) : Boundary Stages: 1. 00 10.000 0.000 60.0000 Delta Z Factor: 0.00100 End Time (hrs) : 6.00 Max Calc Time(sec): 300.0000 Boundary Flows: Time(hrs) Print Inc(min) 6.000 5.000 Group Run BASE Yes Name: 100Y-03HR Filename: ************** Hydrology Sim: 100Y-03HR Execute: Yes Alternative: No Restart: No Patch: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time(sec): Boundary Stages: 1. 00 10.000 0.000 60.0000 Delta Z Factor: 0.00100 End Time (hrs) : 8.00 Max Calc Time (see) : 300.0000 Boundary Flows: Time(hrs) Print Inc(min) 8.000 5.000 Group Run BASE Yes Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. Page 2 of5 o o o o o o o o o o o o D u o o o o o 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 1 Name: 100Y-06HR Filename: *~************ Hydrology Sim: 100Y-06ER Execute: Yes Alternative: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time(sec): Boundary Stages: Restart: No 1. 00 10.000 0.000 60.0000 9.000 5.000 Print Inc(min) Time(hrsl Group Run BASE Yes Name: 10Y-012HR Filename: ************** Execute: Yes Alternative: No Max Delta Z (ft) : Time Step Optimizer: Start Time (hrs) : Min Calc Time(sec): Boundary Stages: Time (hrs) Restart: No 1. 00 10.000 0.000 60.0000 15.000 5.000 Print Inc(min) Group Run BASE Yes Name: 10Y-01HR Filename: ************** Execute: Yes Alternative: No Restart: No Max Delta Z(ftJ: 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 60.0000 Boundary Stages: Patch: No Delta Z Factor: 0.00100 End Time(hrs): 9.00 Max Calc Time(sec): 300.0000 Boundary Flows: Hydrology Sim: lOY-012HR Patch: No Delta Z Factor: 0.00100 End Time(hrs): 15.00 Max Calc Time(sec): JOO.OOOo Boundary Flows: Hydrology Sirn: 10Y-01HR Patch: No Delta Z Factor: 0.00100 End Time(hrs): 5.00 Max Calc Time(sec): 300.0000 Boundary Flows: Interconnected Channel and Pond Routing Model ([CPR) [\)2002 Streamline Technologies, Inc. Page 3 of 5 o D D D o o [J D o o o o D o o o u o D 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 1 Time (hrs) Print Inc(min) 5.000 5.000 Group Run BASE Yes Name: 10Y-024HR Filename: ************** Hydrology Sim: 10Y-024HR Execute: Yes AlternatJ..ve: No Restart: No Patch: No Max Delta Z (ftl: 1. 00 Time Step Optimizer: 10.000 Start Time (hrs) : 0.000 Min Calc Time(sec): 60.0000 Boundary Stages: Delta Z factor: 0.00100 End Time(hrs): 30.00 Max Calc Time(sec): 300.0000 Boundary Flows: Time (hrsl Print Inc (min) 30.000 5.000 Group Run BASE Yes Name: 10Y-02HR Filename: *******-k****** Hydrology Sim: IOY-02HR Execute: Yes Alternative: No Restart: No Patch: No Max Delta Z(ft): Time Step Optimizer: Start Time(hrs): Min Calc Time(sec): Boundary Stages: 1. 00 10.000 0.000 60.0000 Delta Z Factor: 0.00100 End Time{hrs): 6.00 Max Calc Time(sec): 300.0000 Boundary Flows: Time(hrs) Print Inc(min} 6.000 5.000 Group Run BASE Yes Interconnected Channel and Pond Routing Model (lCPR) ~2002 Streamline Technologies, Inc. Page 4 of 5 o 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS I BASINS 1 I D o D Name: 10Y-03HR Filename: ************** Hydrology Sim: 10Y-03HR u Execute: YES Alternative: No Restart: No Patch: No D Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 60.0000 Boundary Stages: Delta Z Factor: 0.00100 End Time (hrs) : B.OO Max Calc Time(sec): 300.0000 Boundary rIm,s: u Time (hrs) Print Inc(min) 8.000 5.000 o Group Run BASE Yes D o Name: 10Y-06HR Filename: ************** Hydrology Siro: 10Y-06HR Execute: Yes Alternative: No Restart: No Patch: No o Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time (hrs) : 0.000 Min Calc Time(sec): 60.0000 Boundary Stages: Delta Z factor: 0.00100 D End Time(hrs): 10.00 Max Calc Time(sec): 300.0000 Boundary Flows: o Time(hrs) Print Inc(min) 10.000 5.000 o Group Run BASE Yes o o u D Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. Page 5 of 5 [j ~ CJ c=J C=:J CJ CJ CJ c=J c::::::J CJ c=:J CJ c=J L=:J C:=J c::::; c=J c=J CJ 122-0046 NODE MAXIMUM RE:PORl AT POST-DEVELOPED CONDITIONS BASINS 1 Max Time Max Warning [~ax Delta Max Surf Max Time Max Max Time Max Name Group Simulation Stage St<lge Stage Stage Area Inflow In flow Outflow Outflow hrs ft ft ft ft2 hrs cfs hrs cfs ----- - ---_.._------ _.~----- CULVERT BASE: 100Y-012HR 4.92 846.964 848.000 0.0022 124 4.92 0.142 4.92 0.142 CULVERT BASE 100Y-01HR 0.91 847 .130 848.000 0.0167 126 0.91 0.435 0.91 0.435 CULVERT BASE 100Y-024HR 30.00 847.325 848.000 0.0084 124 9.60 0.088 30.00 0.524 COLVERT BASE lOOY-02HR 1. 24 847.108 848.000 0.0119 126 1. 24 0.388 1.2.1 0.387 CULVERT BASE lo0y-03HR 1. 64 847.083 848.000 0.0088 126 1. 65 0.338 1.64 0.338 CULVERT BASE 100Y-06HR 2.75 847.021 848.000 0.0042 125 2.68 0.226 2.68 0.226 CULVERT BASE 10Y-012HR 5.01 846.916 848.000 0.0017 123 4.98 0.084 4.98 0.084 CULVERT BASE 10Y-OIHR 0.94 847.019 848.000 0.0118 125 0.93 0.223 0.94 0.223 CULVERT BASE loY-024HR 30.00 847.198 848.000 0.0050 124 9. -10 0.052 9.70 0.052 CULVERT BASE 10Y-02HR 1. 27 847.008 848.000 0.0089 125 1. 26 0.206 1. 27 0.205 CULVERT BASE 10Y-03HR 1. 69 846.993 848.000 0.0070 124 1. 67 0.183 1. 67 0.183 CULVERT BASE 10Y-06HR 3.07 846.957 848.000 0.0039 124 3.07 0.132 3.04 0.132 DITCH BASE 100Y-012HR 15.02 846.626 848.000 0.0033 11 4. 92 0.142 0.00 0.000 DITCH BASE 100Y-01HR 5.01 846.209 848.000 0.0026 9 0.91 0.435 0.00 0.000 DITCH BASE 100Y-024HR 30.00 847.250 848.000 0.0060 4 30.00 0.524 0.00 0.000 DITCH BASE 100Y-02HR 5.98 846.249 848.000 0.0026 10 1. 24 0.387 0.00 0.000 DITCH BASE 100Y-03HR 8.02 846.334 848.000 0.0033 11 1. 64 0.338 0.00 0.000 DITCH BASE 10OY-06ilR 9.00 846.375 848.000 0.0026 11 2.68 0.226 0.00 0.000 DITCH BASE 10Y-01211R 15.02 846.626 848.000 0.0033 11 4.98 0.084 0.00 0.000 DITCH BASE 10Y-OIHR 5.00 846.208 848.000 0.0026 9 0.94 0.223 0.00 0.000 DITCH BASE 10Y-024HR 30.00 847.250 848.000 0.0035 4 9.70 0.052 0.00 0.000 DITCH BASE 10Y-02HR 6.01 846.250 848.000 0.0026 10 1. 27 0.205 0.00 0.000 DITCH BASE 10Y-03HR 8.01 846.334 848.000 0.0035 11 1. 67 0.183 0.00 0.000 DITCH BASE 10Y-06HR 10.02 846.417 848.000 0.0026 11 3.04 0.132 0.00 0.000 Interconnected Channel and Pond Routing Model (ICPR) (('J2002 Streamline Technologies, Inc. Page 1 of 1 c::::! CJ c:::J C=:J CJ CJ CJ c:::::J CJ CJ CJ IL=:J c= CJ CJ c=::::J c:::J c=J CJ 122-0046 B.i\SIN MAXIMUM REPOR'r AT POST-DEVELOPED CONDITIONS BASIN 1 Simulation Basin Group Time Max Flow Max Volume Volume hrs cfs in ft3 - -- ---- - -- .-- 100Y-012HR ONSITE SOUTH BASE 4.96 0.142 3.411 3095.069 100Y-01HR ONSITE SOUTH B.I\.SE 0.84 0.437 1.409 1278.804 100Y-024HR ONSITE SOUTH BASE 9.70 0.088 4.189 3801.093 lOOY-02HR ONSITE SOUTH BASE 1. 22 0.391 1. 925 1746.751 lOOY-03HR ONSITE SOUTH BASE 1. 60 0.339 2.244 2036.106 lOOY-06HR ONSITE SOUTH BASE 2.67 0.226 2.801 2541. 487 10Y-012EIR ONSITE SOUTH BASE 4.96 0.085 2.018 1831.666 10Y-01HR ONSITE SOUTH BASE 0.92 0.224 0.711 644.856 10Y-024HR ONSITE SOUTH KLl.SE 9.70 0.052 2.437 2211.522 10Y-02HR ONSITE SOUTH BASE 1. 30 0.206 1. 032 936.519 10Y-03HR ONSITE SOUTH BASE 1. 68 0.184 1. 218 1105.030 10Y-06HR ONSITE SOUTH BASE 3.0.5 0.133 1.606 1457.026 Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. Page 1 of ] o D 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 2 AND 3A o Name: ONSITE 3A & 2 Group: BASE Node: INLET # 2 Type: SCS Unit Hydrograph Status: Onsite o Unit Hydrograph: Rainfall File: Rainfall Amount (in) : 0.000 Area (ac): 0.230 Curve Number: 95.00 DCIA(%): 0.00 Peaking Factor: 484.0 Storm Duration(hrs): 0.00 Time of Cone (min) : 5.00 Time Shift(hrs): 0.00 Max Allowable Q(cfs): 0.000 o D D n U' o D D o o o o 11 U D [J Interconnected Channel and Pond Routing Model (ICPR) <<:;)2002 Streamline Technologies, Inc. Page 1 of 1 o D 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 2 i".ND JA o D Name: EXIST. DITCH Group: BASE Base F1ow(cfs): 0.000 Init Stage (ft): 846.710 Warn Stage (ft): 849.750 o Time (hrs) Stage (ft) o 0.00 48.00 846.710 849.750 o Name: INLET # 2 Group: BASE Base Flow(cfs): 0.000 Init Stage(ft): 849.240 Warn Stage(ft): 849.780 o Time (hrs) Stage(ft) o 0.00 48.00 849.240 849.780 o D o o o o o o o o Interconnected Channel and Pond Routing Model (ICPR) \G:l2002 Streamline Technologies, Inc. Page 1 of 1 o o o o o o u D o o o o o o o o o o o [J 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 2 AND 3A Name: PIPE From Node: INLET # 2 Length (it) : 53.00 Group: BASE To Node: EXIST. DITCH Count: 1 Friction Equation: Average Conveyan UPSTREAN DOWNSTREAN Solution Algorithm: Automatic Geometry: Circular Circular Flow: Both Span(in) : 2.00 2.00 Entrance Loss Coef: 0.50 Rise (in) : 2.00 2.00 Exit Loss Coef: 0.00 Invert (ft) : 846.920 846.710 Bend Loss Coef: 0.00 Manning's N: 0.013000 0.013000 Outlet Ctrl Spec: Use de or tw Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use dn Bot Clip(in): 0.000 0.000 Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge wI headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge wI headwall Interconnected Channel and Pond Routing Model (ICPR) ll;>2002 Streamline Technologies, Inc. Page 1 of 1 o 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 2 AND 3A o o Name: 100Y-012HR Filename: F:\ICPR3\lOOY-012HR.R32 o o Override Defaults: Yes Storm Duration(hrs): 12.00 Rainfall File: HUFF2 Rainfall Amount (in) : 5.16 Time (hrs) Print Inc(min) 15.QOO 5.00 D Name: 100Y-OIHR Filename: F:\ICPR3\100Y-OIHR.R32 o o Override Defaults: Yes Storm Duration(hrs): 1.00 Rainfall File: HUFF2 Rainfall Amount (in) : 2.88 Time (hrs) Print Inc(min) o 5.000 5.00 o Name: 100Y-024HR Filename: F:\ICPR3\100Y-024HR.R32 o Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: HUFF2 Rainfall Arnount(in): 6.00 Time (hrs) Print Inc(min) o 30.000 5.00 o Name: lOOY-02HR Filename: F:\ICPR3\100Y~02HR.R32 o Override Defaults: Yes Storm Duration(hrs): 2.00 Rainfall File: HUFF2 Rainfall Arnount(in): 3.50 Time(hrs) Print Inc(min) o 6.000 5.00 u Name: 100Y-03HR Filename: F:\ICPR3\100Y-03HR.R32 o Override Defaults: Yes Storm Duration (hrs) : 3.00 Rainfall File: HUFF2 Rainfall Arnount(in): 3.87 o Interconnected Channel and Pond Routing Model (ICPR) cg2002 Streamline Technologies, Inc. Page 1 of3 o u 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 2 AND 3A o o Time (hrs) Print Inc(min) o 8.000 5.00 D Name: lOOY-06HR filename: F:\ICPR3\100Y-06HR.R32 o Override Defaults: Yes Storm Duration (hrs] : 6.00 Rainfall File: HUFF2 Rainfall ~~ount(in]: 4.50 Time{hrs) Print Inc(min) o 9.000 5.00 u Name: 10Y-012HR Filename: F:\ICPR3\10Y-012HR.R32 o Override Defaults: Yes Storm Duration (hrs) : 12.00 Rainfall File: HUFF2 Rainfall Amount (inl : 3.60 Time (hrs) Print Inc(min} o 15.000 5.00 o Name: 10Y-OlHR Filename: f:\ICPR3\lOY-OlHR.R32 o Override Defaults: Yes Storm Duration(hrs): 1.00 Rainfall file: HUFF2 Rainfall Amount (in) : 1.96 Time (hrs] Print Inc(min) o 5.000 5.00 o Name: 10Y-024HR Filename: F:\ICPR3\10Y-024HR.R32 u Override Defaults: Yes Storm Duration(hrs); 24.00 Rainfall File: HUFF2 Rainfall Amount (in) : 4.08 o Tirne(hrsl Print Inc(min) 30.000 5.00 o Name: 10Y-02HR Filename: F:\ICPR3\10Y-02HR.R32 o Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. Page 2 of3 o o 122-0046 INPUT REPORT AT POST~DEVELOPED CONDITIONS Rll.SINS 2 AND 3A o o o Override Defaults: Yes Storm Duration(hrs): 2.00 Rainfall File: HUFF2 Rainfall Amount (in) : 2.40 Time(hrs) Print Inc(min) o 6.000 5.00 o Name: 10Y-03HR Filename: F:\ICPR3\10Y-03HR.R32 o Override Defaults: Yes Storm Duration(hrs): 3.00 Rainfall File: HUFF2 Rainfall Amount (in) : 2.64 Time (hrs) Print Inc(min) D 8.000 5.00 o Name: 10Y-06HR Filename: F:\ICPR3\10Y-06HR.R32 o Override Defaults: Yes Storm Duration (hrs) : 6.00 Rainfall File: HUFF2 Rainfall Amount (in) : 3.12 u Time (hrs) Print Inc(min) 10.000 5.00 o o o o o o o Interconnected Channel and Pond Routing Model (ICPR) (92002 Streamline Technologies, Inc. Page 3 of 3 u o D o 122-0046 INPUT REPORT t>.T POST-DEVELOPED CONDITIONS BASINS 2 AND 3A Hydrology Sim: 100Y-012HR Name: 100Y-012HR Filename: ************** o Execute: Yes Alternative: No o Max De lta Z ( ft J : Time Step Optimizer: Start Time(hrs): Min Calc Time(sec): Boundary Stages: o Time(hrs) Restart: No Patch: No 1. 00 10.000 0.000 60.0000 Delta Z Factor: 0.00100 End Time (hrs) : 15.00 Max Calc Time(sec): 300.0000 Boundary Flows: o 15.000 5.000 Print Inc(min) Group Run o BASE Yes o Name: 100Y-OlHP. Filename: ************** Hydrology Sim: 100Y-OIHR o Execute: Yes Alternative: No o Max Delta Z (ft) : Time Step Optimizer: Start Time(hrs): Min Calc Time(sec]: Boundary Stages: u Time (hrs) Restart: No Patch: No 1. 00 10.000 0.000 60.0000 Delta Z Factor: 0.00100 End Time (hrs) : 5.00 ~lax Calc Time (see): 300.0000 Boundary Flows: o 5.000 5.000 Print Ine (min) Group Run o BASE Yes --------~-----------------------~~-~--~------------------------------------~-----------~----- o Name: 100Y-024HR Filename: ************** o Execute: Yes Alternative: No o Max Delta Z (ft) : Time Step Optimizer: Start Time (hrs) : Min Calc Time (see) : Boundary Stages: o Hydrology Sim: 100Y-024HR Restart: No Patch: No 1. 00 10.000 0.000 60.0000 Delta Z Factor: 0.00100 End Time (hrs) : 30.00 Max Calc Time(sec): 600.0000 Boundary Flows: Page 1 of5 Interconnected Channel and Pond Routing Model (ICPR) t6J2002 Streamline Technologies, fne. o [j o o o o o o o o o o o o o o o o o u 122-0046 INrUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 2 AND 3A Time(hrsl Print Inc(min} 30.000 5.000 Group Run BASE Yes Name: 100Y-02HR Filename: ***~********** Hydrology Sim: 100Y-02HR Execute: Yes Alternative: No Restart: No Patch: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time(sec): Boundary Stages: 1. 00 10.000 0.000 60.0000 Delta Z Factor: 0.00100 End Time (hrs) : 6.00 Max Calc Time(sec): 300.0000 Boundary Flows: Time(hrs) Print Inc(min) 6.000 5.000 Group Run BASE Yes -------------~-~----~--------------~---~------------------------------------~--~----~-----~-- Name: 100Y-03HR Filename: ************** Hydrology Siro: 100Y-03HR Execute: Yes Alternative: No Restart: No ratch: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time(sec): Boundary Stages: 1. 00 10.000 0.000 60.0000 Delta Z Factor: 0.00100 End Time (hrs) : 8.00 Max Calc Time (sec) : 300.0000 Boundary FIO\-Js: Time (hrs) Print Inc(min} 8.000 5.000 Group Run BASE Yes -------------------------------------~-~------------------------------------------~------,---- Interconnected Channel and Pond Routing Model (ICPR) lQ2002 Streamline Technologies, Inc. Page 2 of 5 o 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 2 .llliD 3.'" o o Hydrology Sirn: 100Y-06HR Name: 100Y-06HR Filename: ************** o Execute: Yes Alternative: No o Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time (see) : Boundary Stages: o Restart: No 1. 00 10.000 0.000 60.0000 o 9.000 5.000 Time (hrs) Print Inc(min) Group Run D BASE Yes u Name: 10Y-012HR Filename: ************** o Execute: Yes Alternative: No o Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time(sec): Boundary Stages: o Time (hrs) Restart: No 1. 00 10.000 0.000 60.0000 15.000 5.000 Print Inc(min) D Group Run o BASE Yes o Name: 10Y-01HR Filename: ************** o Execute: Yes Alternative: No o Max Delta Z(ftJ: Time Step Optimizer: Start Time (hrs) : Min Calc Tirne(sec): Boundary Stages: o Restart: No 1. 00 10.000 0.000 60.0000 Patch: No Delta Z Factor: 0.00100 End Time (hrs) : 9.00 Max Calc Time (sec) : 300.0000 Boundary F10'lIs: Hydrology 8im: 10Y-012HR Patch: No Delta Z Factor: 0.00100 End Time(hrs): 15.00 Max Calc Time(sec): 300.0000 Boundary Flows: Hydrology 8im: 10Y-01HR Patch: No Delta Z Factor: 0.00100 End Time(hrs): 5.00 Max Calc Time (sec) : 300.0000 Boundary Flows: Page 3 of5 Interconnected Channel and Pond Routing Model (ICPR) rD2002 Streamline Technologies, Inc. D [j D o o o D o D o o u o [J u o o o o [J 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 2 AND 3A Time (hrs) Print Inc(min) 5.000 5.000 Group Run BASE Yes Name: 10Y-024HR Filename: ************** Hydrology Sim: 10Y-024HR Execute: Yes Alternative: No Patch: No Restart: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time (hrs) : 0.000 Min Calc Time (see): 60.0000 Boundary Stages: Delta Z Factor: 0.00100 End Time (hrs) : 30.00 Max Calc Time(sec): 600.0000 Boundary Flows: Tirne(hrs) Print lnc(min} 30.000 5.000 Group Run BASE Yes Name: lOY-02HR Filename: ************** Hydrology Sim: 10Y-02HR Execute: Yes Alternative: No Restart: No Patch: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time(sec): Boundary Stages: Delta Z Factor: 0.00100 1. 00 10.000 0.000 60.0000 End Time(hrs}~ 6.00 Max Calc Tirne(sec}: 300.0000 Boundary Flows: Time (hrs) Print Inc(min) 6.000 5.000 Group Run BASE Yes Interconnected Channel and Pond Routing Model (lCPR) C02002 Streamline Technologies, Inc. Page 4 of 5 u o 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASINS 2 AND 3]1. o o Name: 10Y-03HR Filename: ************** Hydrology Sim: 10Y-03HR o Execute: Yes Alternative: No Restart: No Patch: No D Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time (sec) : Boundary Stages: 1. 00 10.000 0.000 50.0000 Delta Z Factor: 0.00100 End Time (hrsl : 8.00 Max Calc Tirne(sec): 300.0000 Boundary Flows: o Time (hrsl Print Inc(min) o 8.000 5.000 Group Run BASE Yes o [J Name: 10Y-05HR Filename: ************** Hydrology Siro: 10Y-06HR Execute: Yes Alternative: No Restart: No Patch: No u Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time (hrs) : 0.000 Min Calc Time(sec): 60.0000 Boundary Stages: Delta Z Factor: 0.00100 o End Time (hrs) : 10.00 Max Calc Time(sec): 300.0000 30undary Flows; o Time{hrs) Print Inc(min) 10.000 5.000 o Group Run BASE Yes u o u o Interconnected Channel and Pond Routing Model (ICPR) tD2002 Streamline Technologies, Inc. Page 5 of5 o ~ c:::::=J C=::J c=::: c:= CJ c=J c::::: CJ ~ c= c=l CJ c=J 122-0046 BASIN MAXIMUM REPOR'l' AT POST-DEVELOPED CONDITIONS BASINS 3A AND 2 Simulation Basin Group Time Max Flow Max Volume Volume hrs c[s in ft3 --- - ~ 100Y-012HR ONSITE 3A & 2 BASE 3.60 0.167 4.572 3817.096 100Y-01HR ONSITE 3A & 2 BASE 0.42 1. 024 2.329 1944.656 100Y-024HR ONSITE 3A & 2 BASE 7.20 0.098 5.404 4512.059 100Y-02HR ONSITE 3A & 2 BASE 0.81 0.648 2.935 2450.538 100Y-03HR ONSITE 3A & 2 BASE 1. 20 0.484 3.299 2753.958 100Y-06HR ONSITE 3A & 2 BASE 2.40 0.286 3.919 3272.350 10Y-012HR ONSITE 3A & 2 BASE 4.80 0.112 3.033 2532.451 10Y-01HR ONSITE 3A & 2 BASE 0.42 0.643 1.443 1204.611 10Y-024HR ONSITE 3A & 2 BASE 9.60 0.064 3.505 2926.541 10Y-02HR ONSITE 3A & 2 BASE 0.81 0.421 1. 864 1556.346 10Y-03HR ONSITE 3A & 2 BASE 1. 21 0.316 2.096 1750.034 10Y-06HR ONSITE 3A & 2 BASE 2.40 0.192 2.563 2140.022 Interconnected Channel and Pond Routing Model (ICPR) cg2002 Streamline Technologies, Inc. c= CJ c=J CJ c:= Page I of 1 ~ CJ CJ C:=J c=; c::::J c= c=J CJ C=:J c=J CJ c=J CJ c::J c::: c=J c=J c= 122-0046 NODES MAXIMUM COMPARISON K~PORT AT POST-DEVELOPED CONDITIONS BASINS 2 AND 3A Max Time Max War'ning Max Delta Max Surf Max Time Max Max Time Max Name Group Simulation Stage Stage Stage Stage Area Inflow Inflow Outflow Outflow hrs ft ft it ft2 hrs cfs hrs cfs ------------ --~-_._----_._- EXIST.DITCH BASE 100Y-012HR 15.01 847.661 849.750 0.0053 0 2.43 0.065 0.00 0.000 EXIST.DITCH BASE 100Y-01HR 5.01 847.028 849.750 0.0053 0 2.43 0.065 0.00 0.000 EXIST.DITCH BASE 100Y-024HR 30.01 848.611 849.750 0.0106 0 2.41 0.065 0.00 0.000 EXIST.DITCH BASE 100Y-02HR 6.01 847.091 849.750 0.0053 0 2.43 0.065 0.00 0.000 EXIST.DITCH BASE 100Y-03HR 8.01 847.218 849.750 0.0053 0 2.43 0.065 0.00 0.000 EXIST. DITCH BASE lOOY-06HR 9.01 847.281 849.750 0.0053 0 2.43 0.065 0.00 0.000 EXIST. DITCH BASE 10Y-012HR 15.01 847.661 849.750 0.0053 0 2.43 0.065 0.00 0.000 EXIST. DITCH BASE 10Y-OIHR 5.01 847.028 849.750 0.0053 0 2.43 0.065 0.00 0.000 EXIST. DITCH BASE 10Y-024HR 30.01 848.611 849.750 0.0106 0 2.41 0.065 0.00 0.000 EXIST.DITCH BASE 10Y-02HR 6.01 847.091 849.750 0.0053 0 2.43 0.065 0.00 0.000 EXIST.DITCH BASE 10Y-03HR 8.01 847.218 849.750 0.0053 0 2.43 0.065 0.00 0.000 EXIST.DITCH BASE 10Y-06HR 10.01 847.344 849.750 0.0053 0 2.43 0.065 0.00 0.000 INLET It 2 BASE 100Y-012HR 15.01 849.409 849.780 0.0009 0 3.60 0.166 2.43 0.065 INLET # 2 BASE 100Y-OIHR 5.01 849.296 849.780 0.0009 0 0.40 1.009 2.43 0.065 INLE:T # 2 BASE 100Y-024HR 30.01 849.578 849.780 0.0019 0 7.18 0.098 2.41 0.065 INLET # 2 BASE 100Y-02HR 6.01 849.308 849.780 0.0009 0 0.74 0.640 2.43 0.065 INLET # 2 BASE 100Y-03HR 8.01 849.330 849.780 0.0009 0 1.17 0.481 2.43 0.065 INLET # 2 BASE 100Y-06HR 9.01 849.341 849.780 0.0009 0 2.35 0.285 2.43 0.065 INLET # 2 BJI.SE 10Y-012HR 15.01 849.409 849.780 0.0009 0 4.68 0.112 2.43 0.065 INLE:T # 2 BASE 10Y-01HR 5.01 849.296 849.780 0.0009 0 0.45 0.629 2.43 0.065 INLET # 2 BJI.SE 10Y-024HR 30,01 849.578 849.780 0.0019 0 9.51 0.064 2.41 0.065 INLE:T # 2 BASE 10Y-02HR 6.01 849.308 849.780 0.0009 0 0.80 0.415 2.43 0.065 INLE:T # 2 BASE 10Y-03HR 8.01 849.330 849.780 0.0009 0 1.17 0.313 2.43 0.065 INLE:T # 2 BASE 10Y-06HR 10.01 849.353 849.780 0.0009 0 2.35 0.191 2.43 0.065 Interconnected Channel and Pond Routing Model (ICPR) @2002 Streamline Technologies, Inc. Page 1 of I u 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS B.l\SIN 3B AND 4 o u Name: 100Y-012HR Filename: F:\ICPR3\lOOY-012HR.R32 u Override Defaults: Yes Storm Duration (hrs) : 12.00 Rainfall File: HUFF2 Rainfall Amount (in) : 5.16 u Time (hrs) Print Inc(min) 15.000 5.00 u Name: 10DY-OIHR Filename: F:\ICPR3\100Y-OlHR.R32 D Override Defaults: Yes StODn Duration(hrs): 1.00 Rainfall File: HUFF2 Rainfall Amount (in) : 2.88 o Time (hrs) Print Inc(min) 5.000 5.00 o Name: 100Y-024HR Filename: F:\ICPR3\100Y-024HR.R32 u Override Defaults: Yes Storm Duration (hrs): 24.00 Rainfall File: HUFF2 Rainfall Amount (in) : 6.00 [J Time (hrs) Print Inc(min) o 30.000 5.00 Name: 100Y-02RR Filename: F:\ICPR3\100Y-02RR.R32 o o Override Defaults: Yes Storm Duration (hrs) : 2.00 Rainfall File: HUFF2 Rainfall Amount (in) : 3.50 Time (hrs) Print Inc(min) D 6.000 5.00 D Name: 100Y-03HR Filename: F:\ICPR3\lOOY-03HR.R32 o Override Defaults: Yes Storm Duration(hrs); 3.00 Rainfall File; HUFF2 Rainfall Amount (inl : 3.87 Time (hrs) Print Inc(minJ u Interconnected Channel and Pond Routing Model (ICPR) tCl2002 Streamline Technologies, Inc. Page 1 of3 o o 122-00q6 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASIN JB AND 4 [J D 8.000 5.00 D Name: lOOY-06HR rilename: F:\rCPR3\100Y-06HR.R32 o Override Defaults: Yes Storm Duration(hrs): 6.00 Rainfall File: HUFF2 Rainfall Amount (in) : 4.50 u Time (hrs) Print Inc(min) 9.000 5.00 u Name: IOY-012HR Filename: F:\ICPR3\lOY-012HR.R32 [J Override Defaults: Yes Storm Duration (hrs) : 12.00 Rainfall File: HUFF2 Rainfall A..'Tlount(in): 3.60 o Time(hrs) Print Inc(min) 15.000 5.00 o Name: 10Y-OlHR Filename: F:\ICPR3\10Y-OIHR.R32 u Override Defaults: Yes Storm Duration(hrs): 1.00 Rainfall rile: HUFF2 Rainfall Amount (in) : 1.96 o Time (hrs) Print Inc(min) 5.000 5.00 o Name: IDY-02QHR Filename: F:\ICPR3\lOY-024HR.R32 o Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: HUrr2 Rainfall Amount (in) : 4.08 o Time (hrs) Print Inc(min) D 30.000 5.00 o Name: 10Y-02HR Filename: F:\ICPR3\10Y-02HR.R32 Override Defaults: Yes Storm Duration (hrs) : 2.00 o Interconnected Channel and Pond Routing Model (ICPR) (92002 Streamline Technologies, Inc. Page 2 of3 o o 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASIN 3B AND 4 o u Rainfall File: HUFF2 Rainfall Amount (in) : 2.40 D Time (hrs) Print Inc(min) 6.000 5.00 o Name: 10Y-03HR Filename: F:\ICPR3\10Y-03HR.R32 u Override Defaults: Yes Storm Duration (hrs) : 3.00 Rainfall File: HUFF2 Rainfall Amount (in) ; 2.64 o Time (hrs) Print Inc(min) 8.000 5.00 o Name: 10Y-06HR Filename: F:\ICPR3\10Y-06HR.R32 u Override Defaults: Yes Storm Duration(hrs): 6.00 Rainfall File: HUFF2 Rainfall Amount (in) : 3.12 u Time (hrs) Print Inc(min) 10.000 5.00 o o o u u o o o Interconnected Channel and Pond Routing Model (lCPR) qJ2002 Streamline Technologies, Inc. Page 3 of3 u [J o D u o o o o o D u o o o u o u o u 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASIN 38 AND 4 Name: 100Y-012HR Filename: k****.******** Hydrology Sim: lOOY-OI2HR Execute: Yes Alternative: No Patch: No Restart: No Max Delta Z(ft): Time Step Optimizer: Start Time(hrs): Min Calc Time (see) : Boundary Stages: Delta Z Factor: 0.00100 1. 00 10.000 0.000 60.0000 End Time(hrs): 15.00 Max Calc Time(sec): 300.0000 Boundary Flows: Time(hrs) Print Inc(min) 15.000 5.000 Group Run BASE Yes Name: 100Y-OIHR Filename: ************** Hydrology Sim: 100Y-OIHR Execute: Yes Alternative: No Patch: No Restart: No Max Delta Z(ft): Time Step Optimizer: Start Time(hrs): Min Calc Time(sec): Boundary Stages: Delta Z Factor: 0.00100 1. 00 10.000 0.000 60.0000 End Time(hrs): 5.00 Max Calc Time(sec): 300.0000 Bounda.ry Flolds: Time (hrs) Print Inc(min) 5.000 5.000 Group Run BASE Yes Name: 100Y-024HR Filename: ************** Hydrology Sim: lDOY-024HR Execute: Yes Alternative: No Patch: No Restart: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time (see) : 60.0000 Boundary Stages: Delta Z Factor: 0.00100 End Time (hrs) : 30.00 Max Calc Time (see) : 600.0000 Boundary Flows: Interconnected Channel and Pond Routing Model (ICPR) <02002 Streamline Technologies, [nc. Page I of5 o o D o o o [J o o [J o o D o o o u o u 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASIN 3B AND 4 Time(hrs) Print Inc(mln) 30.000 5.000 Group Run BASE Yes Name: lOOY-02HR Filename: ****~********* Hydrology Sim: 100Y-02HR Execute: Yes Alternative: No Patch: No Restart: No Max Delta Z (ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 60.0000 Boundary Stages: Delta Z Factor: 0.00100 End Time (hrs) : 6.00 Max Calc Time(sec): 300.0000 Boundary Flows: Time (hrs) Print Inc(min) 6.000 5.000 Group Run BASE Yes Name: 100Y-03HR Filename: ************** Hydrology Sim: 1DOY-03HR Execute: Yes Alternative: No Patch: No Restart: No Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time (sec) : Boundary Stages: 1. 00 10.000 0.000 60.0000 End Time (hrs) : 8.00 Max Calc Time(sec): 300.0000 Boundary Flows: Delta Z Factor: 0.00100 Time (hrs) Print Inc(min) 8.000 5.000 Group Run BASE Yes Name: 100Y-06HR Filename: ************** Hydrology Sim: 100Y-06HR Interconnected Channel and Pond Routing Model (lCPR) cD2002 Streamline Technologies, Inc. Page 2 of 5 o D u 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASIN 3B AND 4 Execute: Yes Alternative: No D Max Delta Z(ft): Time Step Optimizer: Start Time(hrs): Min Calc Time(sec): Boundary Stages: u [J Patch: No Restart: No 1. 00 10.000 0.000 60.0000 9.000 5.000 Time(hrs) Print Inc(min) u Group Run BASE Yes u Name: 10Y-012HR Filename: ************** u Execute: Yes Alternative: No u Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time (sec) : Boundary Stages: o Time (hrs) Delta Z Factor: 0.00100 End Time (hrs) : 9.00 Max Calc Time(sec): 300.0000 Boundary Flows: Hydrology Sim: 10Y-Ol2HR Restart: No Patch: No 1. 00 10.000 0.000 60.0000 o 15.000 5.000 Print Ine (min) Group Run o BASE Yes [J Name: 10Y-OIHR Filename: ************** D Execute: Yes Alternative: No o Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time (sec) : Boundary Stages: u o Delta Z Factor: 0.00100 End Time (hrs) : 15.00 Max Calc Time(sec): 300.0000 Boundary Flows: Hydrology Sim: 10Y-OIHR Restart: No 1. 00 10.000 0.000 60.0000 Patch: No Delta Z Factor: 0.00100 End Time [hrs) : 5.00 Max Calc Time(sec): 300.0000 Boundary Flows: Page 3 of 5 Interconnected Channel and Pond Routing Model (ICPR) @2002 Streamline Technologies, Inc. u [J 122-0046 [J INPUT RE PORT AT ?OST- DEVELOPED CONDIT IONS BASIN 3B AND 4 o Print Inc(min) Time (hrs) o 5.000 5.000 Group Run BASE Yes D u Name: 10Y-024HR Filename: *******~***+** Execute: Yes Alternative: No Hydrology Sim: 10Y-024HR Restart: No Patch: No [J Max Delta Z(ft): 1.00 Time Step Optimizer: 10..000 Start Time(hrs): 0.000 Min Calc Time (see) : 60.0000 Boundary Stages: o o Time (hrs) Print Inc(min) 30.000 5.000 o Group Run BASE Yes o Name: 10Y-02HR Filename: .************* [J Execute: Yes Alte:r:native: No Restart: No Patch: No u Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time (see) : Boundary Stages: 1. 00 10.000 0.000 60.0000 D o Time (hrs) Print Ine (min) 6.000 5.000 D Group Run BASE Yes o Name: 10Y-03HR Filename: *******.****** o Delta Z Factor: 0.00100 End Time(hrs): 30.00 Max Calc Time(sec): 600.0000 Boundary Flows: Hydrology Sim: 10Y-02HR Delta Z Factor: 0.00100 End Time (hrs) : 6.00 Max Calc Time(sec): 300.0000 Bounda.ry Flows: Hydrology Sim: lOY-03HR Page 4 of 5 Interconnected Channel and Pond Routing Model (ICPR) rtl2002 Streamline Technologies, Inc. u u u u 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASIN 38 JI.ND 4 Execute: Yes Alternative: No u Max Delta Z (ft) : Time Step Optimizer: Start Time (hrs) : Min Calc Time (see) : Boundary Stages: o o Time (hrs) Patch: No Restart: No 1.00 10.000 0.000 60.0000 5.000 Print Inc(min) 8.000 u Group Run BASE Yes o Name: lOY-06HR Filename: ************** o Execute: Yes Alternative: No u Max Delta Z(ft): Time Step Optimizer: Start Time(hrs): Min Calc Time(sec): Boundary Stages: u Time(hrs) Delta Z Facror: 0.00100 End Time [hrs) : 8.00 Max Calc Time [secl: 300.0000 Boundary Flows: Hydrology 3im: 10Y-06HR Restart: No Patch: No 1. 00 10.000 0.000 60.0000 [J 10.000 5.000 Print Inc(min) Group Run o BASE Yes u o D o o Delta Z factor: 0.00100 End Time (hrs) : 10.00 Max Calc Time(sec): 300.0000 Boundary Flows: Page 5 of5 Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. D u 122-0046 o o INPUT REPORT AT POST-DEVELOPED CONDITIONS BASIN 3B AND 4 Name: ONSITE 3B & 4 Group: BASE Status: Onsite u Unit Hydrograph: HUFF2 Rainfall File: HUFF2 Rainfall Arnount(in): 0.000 Area(ac): 0.230 Curve Number: 94.00 OCI]>.(%): 0.00 [J o o D D o o o u [j o o [J o Node: INLET # 1 Type: SCS Unit Hydrograph Peaking Factor: 484.0 Storm Duration (hrs) : 0.00 Time of Cone (min) : 5.00 Time Shift (hrs) : 0.00 Max Allowable Q(efs): 0.000 Page 1 of 1 Interconnected Channel and Pond Routing Model (ICPR) <<J2002 Streamline Technologies, Inc. u [j 122-0046 u D INPUT REPORT AT POST-DEVELOPED CONDITIONS BASIN 3B AND 4 Name: EXIST.INLET Group: BASE Base F1ow(cfs): 0.000 Init Stage(ft): 845.140 Warn Stage(ft): 849.190 o Time (hrs) Stage(ft) o 0.00 48.00 845.140 849.190 o Name: INLET # 1 Group: BASE o Time(hrs) Stage(ft) 0.00 849.250 48.00 849.7BO o D o o [J o o D o o o Base Flow(cfs): 0.000 Init Stage(ft): 849.250 Warn Stage(ft): 849.780 Page I of 1 Interconnected Channel and Pond Routing Model (ICPR) rQ2002 Streamline Technologies, Inc. o u o o o o D [J o u o D D o o o D' D u o 122-0046 INPUT REPORT AT POST-DEVELOPED CONDITIONS BASIN 3B .ll,ND 4 Name: PIPE From Node: INLET # 1 Length (ft) : 87.00 Group: BASE To Node: EXIST. INLET Count: 1 Friction EquatiDn: Average Con'leyan UPSTREAM DOWN STREAJVl Solution Algorithm: Automatic Geometry: Circular Circular Flow: Both Span (in) : 6.00 6.00 Entrance Loss Coef: 0.50 Rise(in): 6.00 6.00 Exit Loss Coef: 0.00 Invert (ft) : 846.010 845.140 Bend Loss Coer: 0.00 Manning's N: 0.013000 0.013000 Outlet Ctrl Spec: Use dc or tw Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use dn Bot Clip(in): 0.000 0.000 Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge wi headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge wi headwall Interconnected Channel and Pond Routing Model (ICPR) @2002 Streamline Technologies, Inc. Page 1 of 1 c=J CJ CJ c:::= c=J CJ CJ c:=J c=J CJ c=J ~ c::J c:::J 122-0046 BASIN MAXIMUM REPORT AT POST-DEVELOPED CONDITIONS BASINS 3B AND 4 c=J L:=J c=J C:=J ~ Simulation Basin Group Time Max Flow Max Volume Volume hrs cfs in ftJ -- -'-- --- -~._---'--'--_.~--------_.- 100Y-012HR ONSITE 3B & 4 BASE 4.80 0.163 4.460 3723.575 100Y~OlIlR ONSITE 3B & 4 BASE 0.42 0.989 2.231 1862.835 100Y-024HR ONSITE 3B & 4 BASE 7.20 0.097 5.290 4416.222 100Y-02HR ONSITE 38 & 4 BASE 0.81 0.633 2.832 2364.291 100Y-03HR ONSITE 3B & 4 BASE 1. 20 0.475 3.193 2665.637 100Y-06HR ONSITE 38 & 4 BASE 2.40 0.282 3.810 3181.169 10Y-012HR ONSITE 3B & 4 BASE 4.80 0.110 2.929 2445.609 10Y-01HR ONSITE 3B & 4 BASE 0.43 Q.607 1.357 1133.063 10Y-024HR ONSITE 38 & 4 BASE 9.60 0.063 3.398 2837.184 lOY-02HR ONSITE 3B & 4 BASE 0.81 0.404 1.772 1479.142 10Y-03HR ONSITE 3B & 4 BASE 1. 21 0.305 2.001 1670.359 10Y-06HR ONSITE 3B & 4 BASE 2.40 0.187 2.463 2056.320 Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. Page 1 of 1 CJ c::::J CJ c:::J c::::J Mid-S~ates Engineering, L.L.C. STUW '{AIN flOW TADIJLATION FORM CJ c:::J c=J c= c=; c=J c=:J c::= L~_; c:= c=J C1 CJ c= FKO,J, .MME MARK SWANSON ASSOCIATES NEW OFFICE t. ~CT Nu, 122-0046 COMPUTED BV, LIS STORM fREQUENCV DESIGN VEAR w CHECKED DY, DESCRIPTION lJEVELOPIW CONDITIONS 0.32 500 5.32 0.98 0.98 1,38 T,C.~ S40.01 849.25 845,14 J.N ~~~g~~~~~t~tj~~~~~~~j~~~~*f:: .......................... :~:~:~;~:~:;:1:?~?:~:~:~:!:~:~f:~~:~~:~:; ::::::::::::::.:::::::::::::.:.:~::::::::::::::::::: :;. .:::::::::::::::::::::::::::::::::=:::::::::::~::*::' .:.:-:.:-:.;.>:.:.:.;.:,;-:>:.:.;,:-:.:.:-:,:-:,:." .....,..................-- .:.;.:.:-:.:.;.:.;.:.:.;.;.:.;.;.:.;.:.:.:.:.;.:.;.; ................u........ ~1t~*~~l~t: m~Htt:::~ 0.22 ,;:-:.;.:.:-:-:.:-:.;-:.: :;~;;:::::~;;;:;:;~:: 0.90 020 :', -..:.:.; ..:.....:-:-:.:-:.:.:.:-:-:.:-:-:-:o:.~. EXIST. :::~:~~:=::;:;S:::~:i:::~::S::::::~~:::::::: 0.12 ~r~m1ili~r~@~~~~~I~it 0,20 5.00 5.00 ~:~~:~:~:~::;:<<;:: .~::~~~::~:~:;:;:::: 1,38 .......................... :.:~:~;:t-:~::;~:::;::~;:~;::X;::~:;:::::; __..u"....,....,........ ............... ......~........,....:.-......... .... ,.... ..".'.'n... ........................... ~:?::~:~~~:}~:~@~}~~~:~~:t~:~B~:~~ .............._...........:........'....... .:::::::::::~::::::~:::. ~:~~::~:~:::~:::::.::: .. .. ...... .. ........ 0.23 ~~~~;~~~i~~~l~~~ 0.90 021 5.00 5.00 0.31 5.QO 5.3\ 6.98 698 \45 \AS T,e.= 849,24 2J2 ':':.;~:':';':'. .':-:-:' ...........,'....,....', ":::,:,:::;I:;.:,':;.::,......',,w,w. Dnell tt~l*~~~~~~gi:t~~~~~t~~~~~ ~~;~;~;f:~~~;~;:~~~t~~~it;~~;~~;~:~~ DITCH ~f:~r~H~~~~~~t~~~~~~!~t~~t {).2J1~~~~~~~~~:~rtMtl~~~~~~i!~~ 0, Z I 846n 840.71 .... ............. .... ~~~~ ~~:~: ~~ ~:~:~ :~~ :~: ~:~~:~: ~:~:~~:~:;{ ~ '.................'...',. ...'.....................', ';':-:';':':;:-;';':';'.- ;':':':'='~':'~':"....:.:. :;::~: ::=::: :::::::::::: ': ::~::::::: ~ ::~:~ ::~:!: .'.....,....',.........,'. .'...',..............',. .-'"'''''.''' ...."..,." ....~....L......~...'O .....,.....,'.........::. 1/~112003 9:44 PM Page 1 of 1 122-0046 storm sewer d9si-gn . :~~-': ~':-':~'~"'" ~ -~ "{. -> ., ~ ,,". - _.~ "". ".' ...~ ~:. .-..\--.:~:.~ ..,; ~ -).'.. ",.' .~'. ~--,~:~.::. .~""'!-~ ~...r--- ....--..,-..'" "iH 11'1"''1' ld ONY" . .StiO....~wnsCJHlLl"1.~:. ;.-:.,. fiHJ~.~.~~tr' LN10'S:ft'<J ,..'," .........11'" ,." '. - "'9-'''. (LUa . OIlill?91o VIll:YlONI"SqOdYHYIOHI 3?l'lf3~'" ~~]'10:'- HJ;,~ON '~"Ol '~NI SH~~NI9Il. ~HI~M. II ~ "'-<.H-g. ,-' i.t."IfO ~-:?:; . 6' J,.. r~.;:!'''~ ,. . .'~.A....u..~l"'f'Cl.I."........1.lSo'\oU""':ro' ,c"l::ilI""'D'QI'"b'Q .. .,~ ~ ~H:i("'J ~itr1.i.cu. I"IOU.JOCI"D" ~VMN9:H a,x,a N' '9a..!O' '.....~ns- NCu:vr1..US;;; -..o~...<, ...... ...., "".... .uI )LLWG SII(N'I14:R1 "~~J:ltaao " .. ~ w ~ C\i ,....... ...~"" '::Jrl'J 'oa:u..V'J~V' t'fOSl""VNtS ::olav...., :!> ., i I i . ,~. I Ii! 2 9 I ~ > e ; I ir !ll · I. i. ~~ I'n ii 1 i~ ~ II lIB ~~ ~.~ H i a~ !r ~d xi .! ~i n ~I-I Ii u Ll i ~h~ ~ . - . · t_.___u.. ",:; " '0 - ~(\I I i 1 ~~ u~M l.~r'r- i~im o h2~IJ 1 li!-i I bI ~: a. ~ l'l OJ J ". , \-- ~....lII"..........e-;;p~ -w,',;a~~r~~ aN" 3"'3".::0 1>->' r~ ~:hi . '..~ll .i~~ I~'~ :~hl-,I -) !.- '0 ~r r 1"11 'f ~ 11- a I U ~ II ~ D d 2 u 8 i . i ~:~ t ~ II II 3 .~ , i i ~- 11111 : ~!_J .'. ~HI"I-- !t,; ~;"~ ,U ~~'i "." ;; ., I o'~ !~"ii !4'1"-' ql!~~ ~l~ ! ,5- '. !!It ~n . D' " , ~::~ () JI 4 I~ I U ~v (:j 0- ~-~ .--- ot. r--- ~ ~ <t: 6 0 ,------- - ...-~"'ii_~-r- ~.=;,';;;~~-"?€~~=t I( - _.......~:l'-- tl ~I: ~:II ~ I N -~~s==~~=~~~~-=a~~~~__ -.~---~- -----= r>~-~~.~~~~=~=~---- l . ~ -- '3NIf >ltliJ d.... . ",. . :'IN".. 321O.....<!IVI3! II ;.: ~1111 ell ~3ii3~1~ 1 r ~~:!1~lr ). ~ ....~~"i r- 1~t!!"U__Q ......::-:::-==-..::.~~_-.- :1)'\---------;;;;;;.. -r- J I ~ ':"~ --:,::=...~.-.r !Ii , ~ . X~ if. ~t fII ~ ;tII).. .... uP a . ~ ~~ ,. ... .Z 1& ~" {I =il .. .>'1 .~ .' _ f-\. . -~ f',...:;,..~,;., ~.~ ~D-_ -;: .''-''';. :i.:i~;'2(~(.: '. .... ~ '. =r- . " {..........1 ~......~ ~.a.. '1L~. ~ ~ ~9V1J ..... ~ IT i -i~1 ii~:. . ~i11 II " Cll ~~ Q II!.. -_~ ----- --------''''-- -=::;;=-=- =~=~=-::jl..... --~-~ - 1 r-OLOCI"~ -- ---.,-.-:-. '" ~ ~ "~~ ~" ~~ - ..... "" i -.is 31>DnCl . --- ~~o -;,'_r- ~~.. u i .. .' H t "S i! fd I . . I I:H I" , ~~ o;J~ ~! Q< ~< -~I ~I I ----,- , I I I I I I ...... ''''.11 :, II ." II I'," II '" II :,,11 1/ " /I '.~ II '" II . II II II II /I /I II /I II II II i i'l : &" :R11 ;./1 :'11 ::11 ;,,11 :11 ; H'I ;"11 :111 ~ :'1 lj,l ill 'I .. ;i- F:: 7TH:- """ ~.:- .:-.:-;- --- - - -- - - - - - - - -- - - - - -- -- ;: _.:- - "~~,,,;:;;:c ::: ~ 1 jL_~~__ · 0.--- ---... / -.. rl- I J ~ &~z-z~ / '" / \~ .-----+- 0- I: r--\--- /~=---~ T'''''''''''-::::C''''1:'j-~C:::C~~:C;;=~~-:c''}'~ -f=~, "--- -,! 111"---7'--- / I I "-- 1 I ~" fIl rr----- 'J I I 10 // _____...l 1 (\ - "'-.JI I a I" i11.-===~.L I I , L _J ",1 I h... I ,I u -----~ : \ __ / ~~O~@5[EDJ J - / ---{ - -i: rF-=~--- 1 ------,C=_ : 0 : _ _ _ _ _: : (Q)~A{:~ ~QjDoo[~@ (I '\ I: I ~ - -1- - I I' , , , : I 1.I'di' 1 I .j" ,for I "- L J).,..i' II L' L ~ -I----'>.~~ OJI -f! ~ A I -f' / -f!' 1 -f!' \ I 1::----c.:::::J~ - J-.1: I 1 7--\-J I/,I II I I ...... i I ../ J I 1./1,000 SQ, fl FOOlffil1lT I \ r I L -.-J " - - - - - -K I .-J ) I r ------ " .i' - -~../-- /L 'J : .JlI -G D:lST1~ INLET &II,1t Ie I. ,~.,.,[.ItI. ~~."...' ~,. I.IIN, 11t~ I I I ' I I I I " i~'" t ,~ L- f' 30' o. of -.t' . .. II' ~ .~ <S>.- -- - " o' ~ .t ~ '" ''''0' '''.t''^- ," un n If" . uun-f . ,- n "., n--f?"', " ,,' :.1-' .";: ./' = = = == = = = = = = =....J== i == = === = = == = ==""'-.= ~= -=- = = = ~ = === = == =;;... ;;;''';'''';''''= ='=;.~=..=.. ;;;,',;.n,;.'~_,;. == =;;...;;... ;;...-j;~ -:_:_:::;.:.:'t-" '~ .. ,.,~' 't""C_~--,;, "'."."..~ --,--,,~, .. :., ~ 't'-- :.:..,-~ ~ . ,--, ';?" .t';o; ____ II to liT e>;. II -:.:. -- -'-~~ -=- -- _-l i =-..:... - --A. h':"""': -, '" , , ----------~~- ---~----=------- I ...... -- --~..--- '_ ___ rntlWiT N . _.. -:-:::-, ~u_~ H'- '" .:L ..- O. G ..-. c- '" W '" ~ "- 'Ii 1. 0 ~ 'i '" '" 3 'T ~ o I =1 I I' dt lh~a i n.dfjQ pRQPo~ed mop CORd;t; Ort.$ I ~1RI~I}{W"jj~(ClfllJJlR:~!L ~m~ r~!NI 1/15"=1' O. ~L-J 0' 5' is: 25' MI' ___J II MA~~ S'IfW~StOltlJ ASOOC~An:S INC. MlC:i[KI~~I!;J~ 1001i!] ~A1D-ll L9lMIt( ~%?~~ll>>E I ~ [>>1&.JN.N'lQl[lJ~, 1~())IMIl. 46B-100l(j)) (317) 844-1315 1:. 1Nl~ OJFIFDC~ ~IUlDliOlllINlG FOIFt ~~~ ~\YMMOOIM &~C(](t;~ffiI~~i ~i'lKG. 1001@ IMg~T~ P~RlOC Awan~~ DINCl~~ILDS, DINCl~ 46B ...~\\\~I\Ulllt,J,,,,,F, "",\- ~, SJt-4 '-_ .?:t' .{~:& '"- l:#I"- No, 0 \~~ ~1J4291~ ~ \S1AItCf I ff ~.. "1 ....VANtA ....-;'-, ~ .....~..J'~cHift ~...\.."...~ "'J1lln~'\~\ R[VlSIONS' OATE: &. k. .&. .& A &. '^ tft,. DAlE, 16 ocroea. 2002 DRAWN BY: (l.L L.O<:.Il'l'oocI CHECKED 8Y: .... A. Syonsan APPROVEO EN: :1.1. A. S.Oh&On PROJECT HUIlBER: 1<500 001<0 SHEET HUIlOCR: l~FJ ~ or: ONE '?.E?~.c:.,:!T, ~~J_,___ 0- "~ [J u u [j u u o o o o D D D U D D U o Date: Project No.: Project Description: County: 1/22/2003 122-0046 Hamilton A) Pre-Developed Conditions Basin Area: 0.70 Acres Runoff curve number Soil Names Soil Group Cover eN Area eN x Area Description Crosby CrA C Poor condition 86 0.66 56.76 Brookston Br D Poor condition 89 0.04 3.56 Total 0.70 60.32 eN 86 B) Post-Developed Conditions Basin Area : 0.23 Basins # 3B and # 4 Acres Runoff cunre number Soil Names Soil Group Cover eN Area CN x Area Description Impervious area 98 0.19 18.62 Landscape 74 0.04 2.96 Total O.~3 21.58 CN L ___:94 I c u U D o D U U [J o [J D o U D D D [J D C) Post-Developed Conditions Basin Area : 0.22 Basins # 3A and #2 Acres Runoff curve number Soil Names Soil Group Cover CN Area CN x Area Description Impervious area 98 0.19 18.62 Landscape 74 0.03 2.22 Total 0.22 20.84 CN ( I 9S D) Post-Developed Conditions Basin Area : 0.25 Basins # 1 Acres Runoff curve number Soil Names Soil Group Cover CN Area CN x Area Description Impervious area( sidewalk) 98 0.06 5.88 Landscape 79 0.19 15.01 Total 0.25 20.89 CN I 84 I [J D 1/22/2003 122-0046 Date: Project No.: Project Description: County: Hamilton [J D A) Pre-Developed Conditions Basin Area: "e" Coefficient Rainfall Intensity Time of Concentration 0.70 0.35 3.09 Acres in/hr o o D Segment lD Tc AS Sheet Flow Flow Length (<300 ft) ( ft) 300.00 Two year 24-hr rainfall 2.93 Land Slope (ftlft) 0.012 0.50 Surface coefi. 0.150 30.25 Shallow concentrated flow Flow Length ( ft ) 28.00 Slope (ftlft) 0.026 (Paved / Unpaved) U 0.00 Ave. Velocity 2.60 0.18 Totul 0.51 Totul 30.43 llischarge, Q 0.76 [J u [J o D D D D D u o u Time (hrs) Time (min) Time (hrs) Time (min) cfs u D Date: Project No.: Project Description: County: 1/22/2003 122-0046 u Hamilton [J A) Post-Developed Conditions Basin Area: Acres Basin 2 and 3A 0.23 o Time of Concentration u u Segment In Tc AB Sheet Flow Flow Length (<300 ft) ( ft ) 43.20 Two year 24-hr rainfall 2;93 Land Slope (ft/ft) 0.028 0.01 Surface coeff. 0.011 0.57 ..- Total 0.01 Total 0.57 o o u u Minimum Tc=5 min. D D o u o D D U Time (hrs) Time (min) Time (hrs) Time (min) u D, [J D o [J o D o u u o o D o D u u o Date: Project No.: Project Description: County: 1/22/2003 122-0046 Hamilton A) Post-Developed Conditions Basin Area: Basin 3B and 4 0.22 Acres Time of Concentration Segment ID Tc AB Sheet Flow Flow Length (<300 ft) ( ft ) 43.20 Two year 24-hr rainfall 2.93 Land Slope (ftIft) 0.028 0.01 Surface coeff. 0.011 0.57 Total 0.01 Total 0.57 Minimum Tc=5 min. Time (hrs) Time (min) Time (hrs) Time (min)