From: Nicholas Jahn [nrjahn@vsengineering.com]
Sent: Tuesday, May 27, 2008 1 :56 PM
To: Conn, Angelina V
Subject: RE: St. Christopher's Episcopal Church
Ms. Conn,
Thank you for the quick reply. I have a couple of other questions regarding the TAC process that we will need to go
through. They are as follows:
G If there are any comments during TAC regarding our plans (I'm assuming there won't be since we aren't changing
much), will we be required to attend the next meeting once those issues are resolved?
ill It is my understanding that we can not apply for ourstormwater permit or approval from the engineering
department until we are through with the Plan Commission process. Since we may not be required to go through
the Plan Commission, is it possible to submit for these items before the TAC meeting, or do we need to wait until
TAC approval before submitting to the Engineering Department?
Once again, thank you for your time, I greatly appreciate your help.
Sincerely,
Nick Jahn
Nicholas R. Jahn, E.1.
Design Engineer
VS Engineering, Inc.
4275 N. High School Rd.
Indianapolis, IN 46254
www.vsengineering.com
(317) 293-3542 Ext. 137
The information contained in this message is private and may be privileged and confidential. If the reader of this message
is not the intended recipient or responsible for the delivery of the message to the intended recipient(s), any use of the
information is strictly prohibited. If you have received the message in error, immediately notify the sender and
delete/destroy the information and message.
-----Original Message_un
From: Conn, Angelina V [mailto:Aconn@carmel.in.gov]
Sent: Wednesday, May 21, 2008 10:47 AM
To: Nicholas Jahn
Cc: Foley, Amanda J; Duncan, Gary R
Subject: RE: St. Christopher's Episcopal Church
Hi, Nick:
I was rechecking some things in the ordinance today, and since it has been over 2 years since the adls was
approved, we will have you come back for TAC (technical advisory committee) review, or you can touch base with
each tac member individually, but I recommend the former. (I am not sure I relayed this message to Tim Fleck.)
The tac application is online (we can waive the fee), as well as a list of tac members:
http://www.ci.carmel.in.us/se rvices/DOCS/DOCS PCA2008P DF appl icationslT AC%20only%202008 .pdf
http://www.ci.carmel.in.us/services/DOCSIT AC2008IT AC%20members%20revised%2004 .24 .2008. Rdf
If the site plan and architecture has not changed drastically, then we would not make you go back in front of the
plan commission for re-approval., even though the adls approval has technically expired.
Angie Conn, Planning Administrator
Dept. of Community Services - Planning & Zoning
6/2312008
Page 2 of2
1 Civic Square, 3rd Floor
City of Carmel, IN 46032
p.317-571-2417 F.317-571-2.426
acano@carmel.in.gov
From: Nicholas Jahn [mailto:nrjahn@vsengineering.com]
Sent: Wednesday, May 2.1, 2.008 10:2.0 AM
To: Duncan, Gary R
Cc: Foley, Amanda J; Conn, Angelina V
Subject: St. Christopher's Episcopal Church
All,
We finally got approval from the St. Christopher's Episcopal Church (Located at 131 sl ancj Meridian, just east of
the proposed Browning Investment Development) to proceed with finishing phase III of this project. I wanted to
touch base and verify where the project currently stands with the City of Carmel. It is my understanding that this
project does not need to go through TAC or the Plan Commission, as all pha,ses were approvE;ld some time ago.
However, I believe we are required to submit for an Erosion Control and Stormwater Permit for Phase III of the
project only. I was hoping that you all could verify this for me. I would hate to waste time because I didn't follow
the City of Carmel's project development process. I really appreciate the help.
Sincerely,
Nick Jahn
Nicholas R. Jahn, E.I.
Design Engineer
VS Engineering, Inc.
4275 N. High School Rd.
Indianapolis, IN 46254
www.vsengineering.com
(317) 293-3542 Ext. 137
The information contained in this message is private and may be privileged and confidential. If the reader of this
message is not the intended recipient or responsible for the delivery of the message to the intended recipient(s),
any useof the information is strictly prohibited. If you have received the message in error, immediately notify the
sender and delete/destroy the information and message.
6/23/2008
Page 1 of 1
Conn, Angelina V
From: Conn, Angelina V
Sent: Wednesday, May 21, 2008 10:47 AM
To: 'Nicholas Jahn'
Cc: Foley, Amanda J; Duncan, Gary R
Subject: RE: S1. Christopher's Episcopal Church
Hi, Nick:
I was rechecking some things in the ordinance today, and since it has been over 2 years since the adls was approved, we
will have you come back for T AC (technical advisory committee) review, or you can touch base with each tac member
individually, but I recommend the former. (I am not sure I relayed this message to Tim Fleck.) The tac application is online
(we can waive the fee), as well as a list of tac members:
http://www.ci.carmel.in.us/services/DOCS/DOCS PCA2008P DF applications/T AC%20only%202008. pdf
http://www.ci.carmel.in.us/services/DOC SIT AC20081T AC%20members%20revised%2004.2~200Rpdf
If the site plan and architecture has not changed drastically, then we would not make you go back in front of the plan
commission for re-approval., even though the adls approval has technically expired.
Angie Conn, Planning Administrator
Dept. of Community Services - Planning & zoning
1 Civic Square. 3rd Floor
City of Carmel, IN 46032
p.317-571-2417 f.317-571-2426
aconn@carmel.in.gov
~+.v~- +(~j/ pU\f-
in fL~ /c(jrL,d
I ~w~-,~_
From: Nicholas Jahn [mailto:nrjahn@vsengineering.com]
Sent: Wednesday, May 2.1, 2.008 10:2.0 AM
To: Duncan, Gary R
Cc: Foley, Amanda J; Conn, Angelina V
Subject: St. Christopher's Episcopal Church
All,
We finally got approval from the St. Christopher's Episcopal Church (Located at 13151 and Meridian, just east of the
proposed Browning Investment Development) to proceed with finishing phase III of this project. I wanted to touch base
and verify whe~e the project currently stands with the City of Carmel. It is my understanding that this project does not
need to go through TAC or the Plan Commission, as all phases were approved some time ago. However, I believe we
are required to submit for an Erosion Control and Stormwater Permit for Phase III of the project only. I was hoping that
you all could verify this for me. I would hate to waste time because I didn't follow the City of Carmel's project development
process. I really appreciate the help.
Sincerely,
Nick Jahn
Nicholas R. Jahn, E.!.
Design Engineer
VS Engineering, Inc.
4275 N. High School Rd.
I ndianapolis, IN 46254
www.vsenglneenng.com
(317) 293-3542 Ex1. 137
The information contained in this message is private and may be privileged and confidential. If the reader of this message
is not the intended recipient or responsible for the delivery ofthe message to the intended recipient(s), any use of the
information is strictly prohibited. If you have received the message in error, immediately notify the sender and
delete/destroy the information and message.
5/21/2008