Loading...
HomeMy WebLinkAboutCorrespondence Page 1 of 2 Conn, Angelina V From: Nicholas Jahn [nrjahn@vsengineering.com] Sent: Tuesday, May 27, 2008 1 :56 PM To: Conn, Angelina V Subject: RE: St. Christopher's Episcopal Church Ms. Conn, Thank you for the quick reply. I have a couple of other questions regarding the TAC process that we will need to go through. They are as follows: G If there are any comments during TAC regarding our plans (I'm assuming there won't be since we aren't changing much), will we be required to attend the next meeting once those issues are resolved? ill It is my understanding that we can not apply for ourstormwater permit or approval from the engineering department until we are through with the Plan Commission process. Since we may not be required to go through the Plan Commission, is it possible to submit for these items before the TAC meeting, or do we need to wait until TAC approval before submitting to the Engineering Department? Once again, thank you for your time, I greatly appreciate your help. Sincerely, Nick Jahn Nicholas R. Jahn, E.1. Design Engineer VS Engineering, Inc. 4275 N. High School Rd. Indianapolis, IN 46254 www.vsengineering.com (317) 293-3542 Ext. 137 The information contained in this message is private and may be privileged and confidential. If the reader of this message is not the intended recipient or responsible for the delivery of the message to the intended recipient(s), any use of the information is strictly prohibited. If you have received the message in error, immediately notify the sender and delete/destroy the information and message. -----Original Message_un From: Conn, Angelina V [mailto:Aconn@carmel.in.gov] Sent: Wednesday, May 21, 2008 10:47 AM To: Nicholas Jahn Cc: Foley, Amanda J; Duncan, Gary R Subject: RE: St. Christopher's Episcopal Church Hi, Nick: I was rechecking some things in the ordinance today, and since it has been over 2 years since the adls was approved, we will have you come back for TAC (technical advisory committee) review, or you can touch base with each tac member individually, but I recommend the former. (I am not sure I relayed this message to Tim Fleck.) The tac application is online (we can waive the fee), as well as a list of tac members: http://www.ci.carmel.in.us/se rvices/DOCS/DOCS PCA2008P DF appl icationslT AC%20only%202008 .pdf http://www.ci.carmel.in.us/services/DOCSIT AC2008IT AC%20members%20revised%2004 .24 .2008. Rdf If the site plan and architecture has not changed drastically, then we would not make you go back in front of the plan commission for re-approval., even though the adls approval has technically expired. Angie Conn, Planning Administrator Dept. of Community Services - Planning & Zoning 6/2312008 Page 2 of2 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p.317-571-2417 F.317-571-2.426 acano@carmel.in.gov From: Nicholas Jahn [mailto:nrjahn@vsengineering.com] Sent: Wednesday, May 2.1, 2.008 10:2.0 AM To: Duncan, Gary R Cc: Foley, Amanda J; Conn, Angelina V Subject: St. Christopher's Episcopal Church All, We finally got approval from the St. Christopher's Episcopal Church (Located at 131 sl ancj Meridian, just east of the proposed Browning Investment Development) to proceed with finishing phase III of this project. I wanted to touch base and verify where the project currently stands with the City of Carmel. It is my understanding that this project does not need to go through TAC or the Plan Commission, as all pha,ses were approvE;ld some time ago. However, I believe we are required to submit for an Erosion Control and Stormwater Permit for Phase III of the project only. I was hoping that you all could verify this for me. I would hate to waste time because I didn't follow the City of Carmel's project development process. I really appreciate the help. Sincerely, Nick Jahn Nicholas R. Jahn, E.I. Design Engineer VS Engineering, Inc. 4275 N. High School Rd. Indianapolis, IN 46254 www.vsengineering.com (317) 293-3542 Ext. 137 The information contained in this message is private and may be privileged and confidential. If the reader of this message is not the intended recipient or responsible for the delivery of the message to the intended recipient(s), any useof the information is strictly prohibited. If you have received the message in error, immediately notify the sender and delete/destroy the information and message. 6/23/2008 Page 1 of 1 Conn, Angelina V From: Conn, Angelina V Sent: Wednesday, May 21, 2008 10:47 AM To: 'Nicholas Jahn' Cc: Foley, Amanda J; Duncan, Gary R Subject: RE: S1. Christopher's Episcopal Church Hi, Nick: I was rechecking some things in the ordinance today, and since it has been over 2 years since the adls was approved, we will have you come back for T AC (technical advisory committee) review, or you can touch base with each tac member individually, but I recommend the former. (I am not sure I relayed this message to Tim Fleck.) The tac application is online (we can waive the fee), as well as a list of tac members: http://www.ci.carmel.in.us/services/DOCS/DOCS PCA2008P DF applications/T AC%20only%202008. pdf http://www.ci.carmel.in.us/services/DOC SIT AC20081T AC%20members%20revised%2004.2~200Rpdf If the site plan and architecture has not changed drastically, then we would not make you go back in front of the plan commission for re-approval., even though the adls approval has technically expired. Angie Conn, Planning Administrator Dept. of Community Services - Planning & zoning 1 Civic Square. 3rd Floor City of Carmel, IN 46032 p.317-571-2417 f.317-571-2426 aconn@carmel.in.gov ~+.v~- +(~j/ pU\f- in fL~ /c(jrL,d I ~w~-,~_ From: Nicholas Jahn [mailto:nrjahn@vsengineering.com] Sent: Wednesday, May 2.1, 2.008 10:2.0 AM To: Duncan, Gary R Cc: Foley, Amanda J; Conn, Angelina V Subject: St. Christopher's Episcopal Church All, We finally got approval from the St. Christopher's Episcopal Church (Located at 13151 and Meridian, just east of the proposed Browning Investment Development) to proceed with finishing phase III of this project. I wanted to touch base and verify whe~e the project currently stands with the City of Carmel. It is my understanding that this project does not need to go through TAC or the Plan Commission, as all phases were approved some time ago. However, I believe we are required to submit for an Erosion Control and Stormwater Permit for Phase III of the project only. I was hoping that you all could verify this for me. I would hate to waste time because I didn't follow the City of Carmel's project development process. I really appreciate the help. Sincerely, Nick Jahn Nicholas R. Jahn, E.!. Design Engineer VS Engineering, Inc. 4275 N. High School Rd. I ndianapolis, IN 46254 www.vsenglneenng.com (317) 293-3542 Ex1. 137 The information contained in this message is private and may be privileged and confidential. If the reader of this message is not the intended recipient or responsible for the delivery ofthe message to the intended recipient(s), any use of the information is strictly prohibited. If you have received the message in error, immediately notify the sender and delete/destroy the information and message. 5/21/2008