NATURAL RESOURCES
PLAN REVIEW AND COMMENT
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville IN 46060
Ph- 317.;773-1432 or Email at john-south@iaswcd.or~
Project Name- BeI1,.B.orn Building
Loeation- Mayflower Park, See 6, T-17N R-3E
Acreage- 2.7 ac < lAc disturbed
OwnerlDeveloper- Bell-Horn
7952 Zionsville Road
Indianapolis, IN 46268
Engineer- Foresight Engineering
8404 Siear Terrace, Suite 100
Indianapolis, IN 46227
Plan Review Date: September 22, 2004
Soils Infonnation: Soils have been dishrrbed by previous construction.
Additional infonnation about soils is available in the "Soil Survey of Hamilton County". The engineer and/or
developer should consider the need for an onsite soils investigation.
I have reviewed the plans for this project and have the following commeuts:
This site disturbs less than one acre. A Rule 5 plan is not required.
The label for the silt fence is hard to fmd or understand. An arrow from the C to the symbol 011
the plan would help.
The catch basins are labeled as dry wells but they look too shallow to be dry wens. Could the
pipe outlets be covered with debris?
Should you have questions conceming these comments, please contact me.
Submitted By:
John B. South P.E.
Certified Professional in Erosion and Sediment Control
Cc: .T on Dobosiewicz, Carmel DOCS
Greg Hoyes, County Surveyor
Steve Broennann, County Highway
File
SEP 20 '04 06:30PM
P.1/2
.'
:Kimloll c. 'Ward, Surl!t')Jor
fI'{iarrr' U 17) 776cS4~5
. rat" (J 17) 7It~~J6~8
Sllir~ z88
D/le :HIJllliI{PII Calmly Sqrwn'
..;"'0 (dewl!fe. l/rdillllC/ 46(1 til~"V. J('
September 20, 2004
Foresight Engineering.
A TTN: Mark Settlemyre
8404 Siear Ten-ace, Suite 100
Indianapolis, IN 46227
VIA FACSIMILE: 881 ~0885
\1)
. c\ 00
1..+0
Re: Mayflower P8.rk - Bell Horn
Dear Mr. Settlemyre:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's
Office on September 8,2004 fot" this project and have the following comments:
1, This projectfaIls within the jurisdiction of Hamilton County.
2. The proposed project does not fall in a rc;gulated drain watershed but is bordered
by the Crooked Creek Shed directly on the north side of the project.
3. The Hamilton County Surveyor's Office recommends against the proposed site
drainage. The dry wells in the parking lot may have served well when the site
was used for semi trailer parking, but will probably not function to the ovmer's
expectatiol1 for a bU3iness parking lot. We would recommend catch basins and
piping to the storm sewer located north of this site.
4. The drainage in the southern portion of Mayflower Park is also in poor shape and
our office gets complains of standing water and no adequate drains available.
5. Please show in the construction plans where the water will stand in the parking lot
during a 100 year 24 hour storm event.
6. It appears the loadmg dock will have a bottom elevation (I assume) lower then the
surrounding site. Where will the water drain that accumulates in this loading
dock?
P.2/2
SEP 20 '04 06:31PM
'-
7. I would strongly suggest looking at the site during a rain event and consider
deSigning a more appropriate stonn sewer system. The site has wetlands to the
west and north and Will likely stand water during much of the year.
8. Please note that further Comments m.ay be necessary at a later date.
Should you have any questions, I can be reached at 317.776-8495.
Sincerely~
.~~
Greg Hoyes
Plan Reviewer
Cc: Jon Dobosiewicz~ Cannel DOeD
John South - HCSWCD
Steve Broermann - HCHD
SEP-13-2004 15:36 FROM:HAMILTON CO HWY DEP 3177769814
TO:317 571 2426
P.001/001
HAMILTON COUNTY
HIGHWA Y DEPARTMENT
September 13, 20 4
Mr. Mark Settlem!e
Foresight Engine ring
8404 Siear Terra I ' Suite 100
Indianapolis. IN 4tfi227
VIA FACSIMILE 1
RE: Bell-Horn ite Development
Site Plans
Mayflower Park
Clay Town,ship
Dear Mr. Settlemyre:
This letter serves'to aCknowledge receipt of a transmittal recei~d 917/04 containing the
plans for the above-mentIoned prOject. After reviewing the plans the Highway
Department has the following comments:
1. This project is located on a private street Therefore. the Highway Department has
no juri$dlct~on In this area.
If you have any questions or comments concerning thIs letter, please feel free to contact
me at anytime.
Sincerely.
~/?-.-~
Steven J. Broermann
Staff Engineer
cc: Jon Dobosiewicz
Greg Hayes
G:'US5~S\Sa\04tac\og,.13..o4beltham .doc
1700 South loth Stret't
NqblellviHe, In. 46060
llww.co.llamil tOD.i 1I.11ji
orne!: (3)7) 713~7770
FAX (3)7) 776--9814
CI
EL
J~~EsBR~NjlliD,NL~YOR
September 14, 2004
Mr. Mark Settlemyre, PLS
Foresight Engineering
8404 Siear Terrace, Suite 100
Indianapolis, IN 46227
RE: Bell-Horn I Mayflower Park
Dear Mr. Settlemyre:
This project, scheduled for the September 22, 2004 Teclmical Advisory Committee meeting, is located
outside of the current corporate limits of the City of Carmel and therefore, outside of the jurisdiction of the
Department of Engineering.
iJ~
Dick Hill, Assistant Director
Department of Engineering
cc: Jon Dobosie"'1cz, Department of Community Services
Greg Hoyes, Hamilton County Surveyors Office (fax)
John South, Hamilton County Soil & Water Conservation District (fax)
Steve Broermann, Hamilton County Highway Department (fax)
Project File
Engineering Department
S :\PROJ REV04 \BELLHO RN
DEPARTMEi\'T OF E"G["EERlNG
Ol'iE CIVIC SQUAJ{E, C\R~IEL, IN 46032 OHICE 3 17.571.2441 FAX 317.571.2439
E~L\II. engineering@ci.carmeLin,lls
Butler, Angelina V
From:
Sent:
To:
Subject:
Bell Horn
99th and Mayflower Park
TAC-Q Construction Plans
contact;
Mark Settlemyer
859-5000
881-0885 fax
Babbitt, Pamela A
Wednesday, September 08,20041 :21 PM
Brewer, Scott I; Butler, Angelina V; Dobosiewicz, Jon C; Griffin, Matt L; Hollibaugh, Mike P;
Keeling", Adrienne M; Mindham, Daren; Pattyn, Dawn E
new
~j20Q oU
JIll.&rtm e ll1d
August 3, 2004
Mark Settlemyre, PLS
Foresight Engineering
8404 Siear Terrace, Suite 100
Indianapolis, IN 46227
RE: Bell-Horn Site Development
Dear Mr. Settlemyre:
The materials for the above-mentioned project have been received and
reviewed.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
~D..f~
Michael D. Fog~hy- -. f
Chief of Police
MDF:vb
cc: Dept. of Community Services
(317) 571-2500
A Nationally
rcement Agency
Fa" (317) 571.25l2
-l;a~~'
~..r,\ ..-~ '2' _ /4. - "
?:.\.'. .
. . Jl
...... Ij~
RFrl11i:-:n
\orf' Hi
! ..Ii
DOCS
January 3, 2004
Mr. Jon Dobosicwicz
City ofCarillel
Department of Community Services
One Civic Square .
Cannel, IN 46032
;0-?,
f~
.-3>
Re: Mayflower Park, Blk 1, Lot 7 - BeJ.I~Horn
TAC #04090013
D.ear Jon,
We are submitting one set ofi:evised construction plans for the above referenced projf;ct.
The following are comments from T AC meeting, for the above referenced project. Responses
and/or actions taken are indicated after each comment.
1. Place the docket riumber, 04090013 T AC, on the site plan. Docket number was adde(l.
2. ,Forward a copy of the approval letter/e-mail for the landscape plan, from the Urban
Forester. Revisedp/ans have been submitted ami letter will beforwarded upon receipt.
3. Show/Label the dumpster location/cncl'osure. Dumpster' closure is now /lIbeled.
4. Show the location of mechanical equipment and screening details. Equipment is noW
noted and screened 'by lands'caping~
5. Show/label yard and buffer yard setbacks. - Seibacks a,re noW'labeled and shown.
Please nl?tify me if you have any questions or need additional information on the above
responses. I appreciate your cooperati011 and consideration in working. with us on this project.
My client has submitted for the building permit release if any additional revisions our necessary
please advise.
Respectfully, .
FORESIGHT ENGIi'v'EERJN()
Mark Settlemyre, pts
Vice- President
1438 Sadlier Circle East-Drive. Indianapolis,. Indiana 46239 . Tel 317 -352-7052 . Fax 317-352-7056 ~ info@foresightengineering.com