Loading...
HomeMy WebLinkAboutCorrespondence NATURAL RESOURCES PLAN REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9th Street, Noblesville IN 46060 Ph- 317.;773-1432 or Email at john-south@iaswcd.or~ Project Name- BeI1,.B.orn Building Loeation- Mayflower Park, See 6, T-17N R-3E Acreage- 2.7 ac < lAc disturbed OwnerlDeveloper- Bell-Horn 7952 Zionsville Road Indianapolis, IN 46268 Engineer- Foresight Engineering 8404 Siear Terrace, Suite 100 Indianapolis, IN 46227 Plan Review Date: September 22, 2004 Soils Infonnation: Soils have been dishrrbed by previous construction. Additional infonnation about soils is available in the "Soil Survey of Hamilton County". The engineer and/or developer should consider the need for an onsite soils investigation. I have reviewed the plans for this project and have the following commeuts: This site disturbs less than one acre. A Rule 5 plan is not required. The label for the silt fence is hard to fmd or understand. An arrow from the C to the symbol 011 the plan would help. The catch basins are labeled as dry wells but they look too shallow to be dry wens. Could the pipe outlets be covered with debris? Should you have questions conceming these comments, please contact me. Submitted By: John B. South P.E. Certified Professional in Erosion and Sediment Control Cc: .T on Dobosiewicz, Carmel DOCS Greg Hoyes, County Surveyor Steve Broennann, County Highway File SEP 20 '04 06:30PM P.1/2 .' :Kimloll c. 'Ward, Surl!t')Jor fI'{iarrr' U 17) 776cS4~5 . rat" (J 17) 7It~~J6~8 Sllir~ z88 D/le :HIJllliI{PII Calmly Sqrwn' ..;"'0 (dewl!fe. l/rdillllC/ 46(1 til~"V. J(' September 20, 2004 Foresight Engineering. A TTN: Mark Settlemyre 8404 Siear Ten-ace, Suite 100 Indianapolis, IN 46227 VIA FACSIMILE: 881 ~0885 \1) . c\ 00 1..+0 Re: Mayflower P8.rk - Bell Horn Dear Mr. Settlemyre: We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office on September 8,2004 fot" this project and have the following comments: 1, This projectfaIls within the jurisdiction of Hamilton County. 2. The proposed project does not fall in a rc;gulated drain watershed but is bordered by the Crooked Creek Shed directly on the north side of the project. 3. The Hamilton County Surveyor's Office recommends against the proposed site drainage. The dry wells in the parking lot may have served well when the site was used for semi trailer parking, but will probably not function to the ovmer's expectatiol1 for a bU3iness parking lot. We would recommend catch basins and piping to the storm sewer located north of this site. 4. The drainage in the southern portion of Mayflower Park is also in poor shape and our office gets complains of standing water and no adequate drains available. 5. Please show in the construction plans where the water will stand in the parking lot during a 100 year 24 hour storm event. 6. It appears the loadmg dock will have a bottom elevation (I assume) lower then the surrounding site. Where will the water drain that accumulates in this loading dock? P.2/2 SEP 20 '04 06:31PM '- 7. I would strongly suggest looking at the site during a rain event and consider deSigning a more appropriate stonn sewer system. The site has wetlands to the west and north and Will likely stand water during much of the year. 8. Please note that further Comments m.ay be necessary at a later date. Should you have any questions, I can be reached at 317.776-8495. Sincerely~ .~~ Greg Hoyes Plan Reviewer Cc: Jon Dobosiewicz~ Cannel DOeD John South - HCSWCD Steve Broermann - HCHD SEP-13-2004 15:36 FROM:HAMILTON CO HWY DEP 3177769814 TO:317 571 2426 P.001/001 HAMILTON COUNTY HIGHWA Y DEPARTMENT September 13, 20 4 Mr. Mark Settlem!e Foresight Engine ring 8404 Siear Terra I ' Suite 100 Indianapolis. IN 4tfi227 VIA FACSIMILE 1 RE: Bell-Horn ite Development Site Plans Mayflower Park Clay Town,ship Dear Mr. Settlemyre: This letter serves'to aCknowledge receipt of a transmittal recei~d 917/04 containing the plans for the above-mentIoned prOject. After reviewing the plans the Highway Department has the following comments: 1. This project is located on a private street Therefore. the Highway Department has no juri$dlct~on In this area. If you have any questions or comments concerning thIs letter, please feel free to contact me at anytime. Sincerely. ~/?-.-~ Steven J. Broermann Staff Engineer cc: Jon Dobosiewicz Greg Hayes G:'US5~S\Sa\04tac\og,.13..o4beltham .doc 1700 South loth Stret't NqblellviHe, In. 46060 llww.co.llamil tOD.i 1I.11ji orne!: (3)7) 713~7770 FAX (3)7) 776--9814 CI EL J~~EsBR~NjlliD,NL~YOR September 14, 2004 Mr. Mark Settlemyre, PLS Foresight Engineering 8404 Siear Terrace, Suite 100 Indianapolis, IN 46227 RE: Bell-Horn I Mayflower Park Dear Mr. Settlemyre: This project, scheduled for the September 22, 2004 Teclmical Advisory Committee meeting, is located outside of the current corporate limits of the City of Carmel and therefore, outside of the jurisdiction of the Department of Engineering. iJ~ Dick Hill, Assistant Director Department of Engineering cc: Jon Dobosie"'1cz, Department of Community Services Greg Hoyes, Hamilton County Surveyors Office (fax) John South, Hamilton County Soil & Water Conservation District (fax) Steve Broermann, Hamilton County Highway Department (fax) Project File Engineering Department S :\PROJ REV04 \BELLHO RN DEPARTMEi\'T OF E"G["EERlNG Ol'iE CIVIC SQUAJ{E, C\R~IEL, IN 46032 OHICE 3 17.571.2441 FAX 317.571.2439 E~L\II. engineering@ci.carmeLin,lls Butler, Angelina V From: Sent: To: Subject: Bell Horn 99th and Mayflower Park TAC-Q Construction Plans contact; Mark Settlemyer 859-5000 881-0885 fax Babbitt, Pamela A Wednesday, September 08,20041 :21 PM Brewer, Scott I; Butler, Angelina V; Dobosiewicz, Jon C; Griffin, Matt L; Hollibaugh, Mike P; Keeling", Adrienne M; Mindham, Daren; Pattyn, Dawn E new ~j20Q oU JIll.&rtm e ll1d August 3, 2004 Mark Settlemyre, PLS Foresight Engineering 8404 Siear Terrace, Suite 100 Indianapolis, IN 46227 RE: Bell-Horn Site Development Dear Mr. Settlemyre: The materials for the above-mentioned project have been received and reviewed. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, ~D..f~ Michael D. Fog~hy- -. f Chief of Police MDF:vb cc: Dept. of Community Services (317) 571-2500 A Nationally rcement Agency Fa" (317) 571.25l2 -l;a~~' ~..r,\ ..-~ '2' _ /4. - " ?:.\.'. . . . Jl ...... Ij~ RFrl11i:-:n \orf' Hi ! ..Ii DOCS January 3, 2004 Mr. Jon Dobosicwicz City ofCarillel Department of Community Services One Civic Square . Cannel, IN 46032 ;0-?, f~ .-3> Re: Mayflower Park, Blk 1, Lot 7 - BeJ.I~Horn TAC #04090013 D.ear Jon, We are submitting one set ofi:evised construction plans for the above referenced projf;ct. The following are comments from T AC meeting, for the above referenced project. Responses and/or actions taken are indicated after each comment. 1. Place the docket riumber, 04090013 T AC, on the site plan. Docket number was adde(l. 2. ,Forward a copy of the approval letter/e-mail for the landscape plan, from the Urban Forester. Revisedp/ans have been submitted ami letter will beforwarded upon receipt. 3. Show/Label the dumpster location/cncl'osure. Dumpster' closure is now /lIbeled. 4. Show the location of mechanical equipment and screening details. Equipment is noW noted and screened 'by lands'caping~ 5. Show/label yard and buffer yard setbacks. - Seibacks a,re noW'labeled and shown. Please nl?tify me if you have any questions or need additional information on the above responses. I appreciate your cooperati011 and consideration in working. with us on this project. My client has submitted for the building permit release if any additional revisions our necessary please advise. Respectfully, . FORESIGHT ENGIi'v'EERJN() Mark Settlemyre, pts Vice- President 1438 Sadlier Circle East-Drive. Indianapolis,. Indiana 46239 . Tel 317 -352-7052 . Fax 317-352-7056 ~ info@foresightengineering.com