Loading...
HomeMy WebLinkAboutDept Report 06-17-03 7 '1- '1'," , CARMEL/CLAY PLAN COMMISSION DEPARTMENT REPORT June 17, 2003 3i. Docket No. 29-03 Z; Clarian North Hospital Campus PUD The applicant seeks to rezone a 107.367 acre property from B-3, B-6, and S-2 subject to the US 31 Overlay Zone to a Planned Unit Development District. The site is located at . ili the northwest corner of US 31 and 116 Street. Filed by Joseph M. Scimia of Baker and Daniels for Clarian Health Partners, Inc. The Subdivision Committee completed its discussion of the Clarian PUD at their June lih meeting. The Subdivision Committee forwards this item back to the full plan commission with a 5-0 vote of no recommendation as amended (see infonnationalbooklet distributed by FedEx last week). Please note a motion to fonvard the application to the full commission with a favorable reconunendation failed by a vote of two in favor, two opposed, and one not voting. The Committee members not voting in favor of the PUD noted that they would generally be in support of the PUD if all non-residential uses were restricted to the area between the proposed minois Street and Meridian Street. The minutes from the Public Hearing and all committee meetings except the meeting held June 12th where the above noted recommendation was made are attached. Please take the time to read through these minutes, in particular discussion regarding the Comprehensive Plan. Discussion of the Camp Plan has taken place at past meetings including, but not limited to, the April special meeting and May Committee meetings. Over several meetings starting in March, the plan has been modified in response to comments from the public, direction of the Committee, and recommendations made by the Department resulting in the plan fonvarded by the Committee for consideration by the full Plan Commission. The greatest changes have come within the area between Spring Mill Road and the proposed Illinois Street (approximately 40 acres of the 106 acre PUD). Specifically, the plan originally presented called for all 40 acres to contain office development and 27 acres of which would allow freestanding retail uses. Residential uses were limited to being permitted uses in roughly 25 of the 40 acres. However, they were not exclusive to any area meaning that the fmal plan could conceivably contain no residential. In addition, access to Spring Mill Road was proposed to be from a maximum of three public or private streets and the potential for individual cuts to be determined on a case-by-casebasis. The plan being considered this evening is the product ofthe review process spanning the last several months. The current plan, as amended, provides for a minimllm of2o of the approximMp.ly 40 ~C',rp.s 'hetween T111T1ois ann ~prine Mill to 'he exclusivelYTp.sic1enti::ll11sP's This area deliberately rests within the wooded area to the north, along Spring Mill Road to the west, and 116th Street to the south (see PUD Concept Plan, page 3 of the PUD). The remaining 14 acres along and adj acent to the proposed Illinois Street would provide for primarily office use and restrict any retail to the basement and ground floor of a primary building. Access for the area .. l i 7 onto Spring Mill Road, as proposed, would be limited to one public street. The Camp Plan supports a single public street in this area. In addition, uses previously proposed for the area west of Illinois Street including Restaurants, Hotel, Conference Center, and higher intensity retail have been shifted to the other side of Illinois Street (between Meridian and Illinois). These uses are now permitted in areas I-A and I-B.. The transition from high intensity commercial to residential now.occurs entirely within this PUD. Excluding non-residential uses from the perimeter of the PUD along Spring Mill, II6th and the existing neighborhood to the north maintains the Spring Mill Road residential corridor and sets the stage for the other three comers of the 1I6th and Spring Mill intersection. The stage maintains the viability of 100 percent residential to be developed under the guidelines of the current S-llResidential zoning and Comprehensive Plan. The Department recommends that the Plan Commission forward 29-03 Z to the City Council with a Favorable Recommendation. If appropriate, the Commission may desire to send clarification of the recommendation to the Council in the form of a memorandum addressing any remaining concerns related to the 10-12 acres of non-residential uses along the west side of Illinois Street noted above. , . p 1 The petitioner also seeks approval of the following SubdivisionW aivers: 183-023 SW SeD 7.1 reduced open space 183-02b sw seo 7.5.7 clearing of woodland areas 183-02c sw sea 6.5.1 50' lot frontage at right-of-way 183~02d sw seo 6.3.15.3 150' centerline radius for residential streets Filed by Charles D. Frankenberger of Nelson & Frankenberger for The Anderson Corporation. TABLED to April 15, 2003 3h. " he app lean see s rezone a 7.367 acre property from B-3, B-6, and 8-2 subj ect to the US 31 Overlay Zone to a Planned Unit Development District. The site is located at the northwest comer of US 31 and 1 16th Street. Filed by Joseph M. Scimia of Baker and Daniels for Clarian Health Partners, Inc. 4h. ',J~1 eapp leant seeks Final Development Plan and Architectural Design, Lighting, Landscaping & Signage approval for a hospital and medical office building. The 68.164 acre site is located at the northwest corner of US 31 and 116th Street. There is a proposal filed to rezone the site to a Planned Unit Development District. Filed by Joseph M. Scimia of Baker and Daniels for Clarian Health Partners, Inc. Note: Items 3h and 4h were heard simultaneously. Joe Scimia, Baker and Daniels, 600 East 96th Street, appeared before the Commission representing the applicant. Also in attendance: Marvin Timber and Barry Evans of Clarian Hospital; Boyd Zoccola, Vice President of Hokanson & Companies, Proj ect Manager; Steve Felnibach of A&F Engineering; and Roger Kilmer, Land Consultant with Baker & Daniels. The current proposal is for a hospital facility and medical office building located at the northwest corner of 11 6th Street and US 31. The applicant is also seeking a rezone of the l07.367-acre site to a Planned Unit Development District. Approval is also requested for a final Development Plan for the site. Numerous meetings have been held with the neighbors and the Department of Community Services staff to try to minimize concerns of the adjacent property owners and work through issues presented. In 1997, the Comprehensive Plan was amended with a specific study that targeted this particular parcel of ground. The current proposal is consistent with the Comprehensive Plan for a mixed- use development on this site. The uses would include offices, hotels, specialty retail, full table service restaurants, and a planned, residential community. The development could create a special destination environment and would include a new arterial roadway running north/south across the site. The Thoroughfare Plan actually shows the extension of Illinois Street through S:\PlanC:ornrnission~inutes 2 T .. , ~ this property from 106th Street to 126th Street The proposed plan takes into consideration the Comprehensive Plan and the Thoroughfare Plan. The C1arian PUD provides for high intensity office along the US 31 frontage-higWy appropriate for the plan and consistent with the US 31 Overlay. The plan also provides transition from east to west in form of scale, density, and strict controls on architectural standards, building design and height limitation as development progresses from the high intensity 31 corridor to the west to Springmill Road. A PUD concept has been developed that consists of tvvo areas. Area one consists of 55 to 60 acres located between the future extension of Illinois Street and US 31. Area two consists of approximately 35 to 40 acres of real estate, located to the west of the future extension of Illinois Street and to the east of Springmill Road. Area one consists of basically two sub-areas made clear by the PUD Ordinance north of 116th Street and represents the focal point of the POD. It is intended to provide for the development of a major hospital facility, high intensity, hospital- related uses and the physical plant necessary to support a hospital development. Area 1- B consists of approximately 10-12 acres and located north of the project and is also intended for high-intensity development either in support ofthe major hospital facility or possibly an area of expansion ofmajor hospital facility. Other uses allowed would be medical office building and other hospital-related uses. Transitioning to the west, 5 sub-areas are developed within the property located to the west of lllinois Street and east of Springmill Road. Area 2a is a tentative area far to the north of the site, adjacent to a residential development under construction known as Springlake Estates and backs up to the Ritz Charles in the 31 corridor. The applicant is proposing a 100-foot tree conservation area created by the existing wooded area and maintaining 100 feet in its current, natural state. The applicant is prepared to enter into a Deed Restriction or Conservation Easement with the neighborhood to the north to ensure that the 1 OO-foot conservation area would remain nndisturhed except for the extension ofTIlinois Street. Area 2b is roughly 2-5 acres located to the south of the property and represents an area of separation to the north property line of the overall PUD and Illinois Street. This area is intended to be relatively low-intense uses providing transition for the residents of the area existing to the north and the hospital campus. Permitted uses may consist of a chi1dcare facility, a day nursery, professional offices or medical offices. The development is restricted in terms of height (35 feet, roughly 3 stories) and a maximum lot coverage of 75%. Area 2b represents approximately 5 to 17 acres of real estate currently located along the PUD frontage on Springmill Road for a minimum depth of 150 feet to exceed the Springmill Road right-of-way. This area is intended to provide a transition between the potential residences/uses on the West that are not yet developed and those high intensity uses recommended along US 31 corridor. The transition area of 2c is accomplished by a combination of permitted use restrictions, height regulations, architectural regulations, and site design restrictions. Permitted uses may consist of multi-family dwellings, assisted living facilities, medical offices, professional offices, or limited general service establislunents. There is talk in the Comprehensive Plan of buffering what may occur to the west and this is not lmown at present. The applicant has attempted to extremely the S; \PlanCommis SiOll \Minute 3 l' 3 height of the facility to 40 feet with a maximum lot coverage of75% and to incorporate a number of special design guidelines that would ensure a residential character development. Of special interest is the requirement that every development in any part of area 2 or 1 will be required to go through the Development Plan! ADLS process and any development in this area will be reviewed. Area 2d is located essentially within the PUD directly across from the hospital complex along the proposed extension of Illinois Street. This area is in closer proximity to the hospital facility and is higher intensity dwelling/office/retail and other uses. The height stair-steps from 40 feet, 50 feet, then to 90 feet as it progresses west to east. The hospital complex in the 31 corridor goes up to 150 feet; from west to east it goes 35 feet, 50 feet, 90 feet, to 150 feet-stair-stepping every 200 feet progressing from west to east, in the provided transition area. Area 2e is the comer of Springmill Road and 116th Street, consists of 8-9 acres and is intended to be developed as partofthecentral, integrated center, with a combination of multiple use building, individual use buildings provided a minimum ground floor area per building is maintained. Again, there are height limitations that increase from west to east. The Department did not want an "out-lot" type of development in this area and the requirement is a 3-acre minimum lot except for one, I-acre lot being possible, subject to specific design guidelines to maintain the residential character of Structures to be built in the area. There is also the requirement of development plan and ADLS approval as well as all other developments. Mr. Scimia said the applicant was unable to purchase a part ofthe real estate-the entire 100+ acres must be acquired. The applicant has no plans to develop the entire parcel at present, but they are trying to put into place some infrastructure so that people can expect what could be built there, knowing they would still have to go through the approval process. The plans at present are for the hospital and medical" office building. The landscape and site plans have been submitted to the Department. The hospital complex is limited to west of Illinois Street and east of US 31. The Clarian North Hospital will focus on pediatrics and women's services; a medical office building connected to the hospital via an atrium in the center; a utilities plant; a helipad; surface parking and retention pond; and the development extension of TIlinois Street. The initial hospital building will be five stories plus a mechanical penthouse, structurally designed to accommodate further expansion up to nine stories with a maximum height of 150 feet. The hospital court of the complex will have approximately 400,000 square feet, located along the portion of the property-that runs along US 31. Exterior building materials will consist of Indiana limestone base vertical accent. There are two shades of red brick to be used, and two types of windows. The medical office building will be located to the rear half ofthe project. llIinois Street would be the medical office building entrance. There is a below-grade truck dock that will not be visible from US 31 and will be landscaped to further screen from view. The office building will be a S: \PlanCommission \M:inutes 4 " if minimum of 157,000 square feet; the exterior building materials will be consistent with those used in the hospital. The helipad will be located at the'southeast comer of the hospital, near the emergency entrance off of 116th Street. This will not be a trauma center and will be used for transporting patients to Methodist Hospital downtown. The best estimates at this time are 4 to 5 flights per month from the helipad. The hospital building itself will provide a buffer to the west. The surface parking does exceed the Ordinance requirements; on-site retention ponds buffer the building and also provide on-site water retention. The signage plan primarily consists of wall signs on the north, east and south facade, individual letters, internally illuminated with additional fayade signage that includes the Clarian logo on the east and west fa9ade and resembles etched glass. The emergency entrance will be clearly identified and there will also be a ground monument sign that picks up the colors and materials of the main building that identifies parking areas, emergency entrance/exit, etc. Lighting will consist of fixtures that are flat lens, down lighting, slim line in appearance and architecturally significant. The landscape plan is in keeping with the US 31 Overlay requirements and has been approved by the City arborist. Approximately 20 trees per acre will be planted, in total more than 1,350 trees on the site. Regarding the development of Illinois Street, the Thoroughfare Plan does require an extension of Illinois Street north. There is a concern at the extension of Illinois Street at Spring Lake Estates to the north. The applicant is proposing to terminate illinois Street until it is extended at a future date. However, there is an issue with the current alignment to the north between the Ritz Charles and the Spring Lake Subdivision. The actual location of the extension is to be dictated by the City of Cannel and the Engineering Staff to ensure alignment farther north. The applicant will continue.to work with the City. illinois Street will be developed with a 120-foot right-of-way. A traffic study is being finalized and will be furnished to the sub-Committee. An additional round about is being proposed at Illinois Street and 1 16th Street. Initially, the development would include two left turn east bound lanes, two straight lanes and one right turn lane. Opposite, there would be three lanes west bound. Illinois Street would basically be two lanes of traffic. A secondary traffic developrnent is being proposed-the big change is that rather than a round about, there would be a signalized entrance. It is relatively easy to go from a round about to a signalized intersection. Remonstrance, Organized: .. Bruce Werth, business address 599 Industrial Drive, Suite 317, Carmel representing Spring Lake Estates Home Owners Association, stated opposition for the following reasons: The size and nature ofthe product, financial loss of homes in Spring Lake, and noise associated with the development. The homeowners are opposed to the commercial use that will be a 24-hour facility. Also, the buffer is felt to be extremely inadequate if the existing woods were cleared. Mr. Werth requested the Public Hearing remain open and that Spring Lake Subdivision be included and represented in any and all meetings pertaining to the proposed development. s: \P lanCommission\Minutes 5 "I' 5 Remonstrance, Individual: Tammy Reidy, 313 Mallard Court, Cannel, said there are unresolved issues between the Subdivision and tbe proposed development. Ms. Reidy is opposed to the helipad. The buffer is inadequate and Ms. Reidy's home is the closest in proximity and will be greatly affected by the proposed development. Mrs. Reidy also requested that the public hearing remain open. Mr. & Mrs. David W. Shell, 12225 Teal Lane, Cannel 46032 via letter submitted this evening by Mrs.. Tammy Reidy. Mr. & Mrs. Shell are opposed by reason of possible change in the Spring Lake Estates common ground, the berm on the east end of the lake, the streets, or any of the existing lots and against using eminent domain to obtain control of any part of the subdivision. Any changes to the subdivision would affect their view of the lake and the value of their home. Mr. and Mrs. Shell are also opposed to the destruction of the woods and the extension oflllinois Street that would be close to the homes. Don Bottamiller, business address of 9800 North Gray Road, Indianapolis 46280 developer of Spring Lake Estates, said he was aware of constant rumors about lllinois Street and what would happen to the property to the south, and he assured the purchasers in Spring Lake Estates that the ground was Residential. There was an "uproar" from the residents when Thomson Consumer Electronics was allowed a street cut off of Springmill Road. Mr. Bottamiller said he was assured by the previous administration that it would not happen again~that commercial would not be cut out of a residential area. Tbe proposed plans are for lots adjoining Springmill Road and Mr. Bottamiller suspects the developer will go for a variance for a street cut onto Springmill Road. As to Illinois Street, Mr. Bottamiller said that at the time he and his brother sold 2 12 acres to the Ritz Charles to allow them to expand their facility, he was assured by the previous administration that the parking lot would remain a parking lot and would never be anything other than a parking lot. The current proposal is fora 120-foot wide, 4-1ane road through what was to be a parking lot. Mr. Bottamiller said he had had a meeting with Mayor Brainard approximately two weeks ago, and that was the first time he had seen a proposal for the extension of lllinois Street along the back of the subdivision. Mr. Bottamiller said he was asked by the current Mayor to consider selling any of the lots to the City of Carmel. Mr. Bottamiller assumed it would be cheaper for the City to acquire resideptial property rather than commercial property. Mr. Bottamiller would also like to see the public hearing remain open. Bob Breckinridge and wife, Sue, recently purchased in Spring Lake Subdivision and moved in last December. Mr. Breckinridge said he bad never received any notice of any of the meetings relative to the current proposal. Mr. Breckinridge spoke to the extension of Illinois Street on the east side of the lake in the subdivision and all rumors relating to that extension. Mr.Breckinridge urged the COminission not to allow the proposal to change the Spring Lake Subdivision that was Recently approved by the Commission. Rumors indicate that the Plan Commission will be asked to allow lots on the east end of the cul-de-sacs on each side of the lakes to be abandoned and to allow lllinois Street to be extended and encroach on those existing lots. Mr. Breckinridge was opposed to altering the Spring Lake Subdivision in any way from the initial approval granted by the Commission. Joe Scimia commented that Clarian will continue to have dialogue with the surrounding neighbors and homeowners association groups. The 20-year Thoroughfare Plan adopted by the S:\PlanCommission\Minute 6 6 City Council in October 2001 clearly shows the extension of Illinois Street. This is a sensitive issue with the Spring Lake Homeowners. As stated, Clarian is terminating Illinois Street just south of the woods until final design of the actual location; however, there is no doubt that traffic must continue to flow north/south and not just terminate into Springmill Road and US 31. CIarian's proposal of the 10-foot buffer/conservation area, funded by Clarian, is an appropriate transition between residential and the proposed development. Several of the homeowners did not want a Day Care at the facility; this would be a residential character facility and would back up to the woods. This is felt to be an appropriate land use for this site and Clarian is not prepared to dismiss this possibility. Department Report, Jon Dobosiewicz. The Plan Commission undertook a study of uses along the Meridian Corridor in 1997. This entire parcel, although outside the 600 foot designation for the Overlay was identified as a parcel to be included in the corridor. Reference material is available in the Department for public review and will also be available at the Committee meeting. Between 1997 and 2001, there was much discussion regarding the final alignment- evaluating and determining the appropriate alignment ofIllinois Street-and this was adopted by Resolution of the City Council in late October or early November 2001. During the discussion period, the Plan Commission spent considerable time and attention to addressing how lllinois Street would interact with adjacent, existing residential and commercial areas. The Plan Commission has dealt with tIns when Duke rezoned property adjacent to the corridor and Meridian Comers Boulevard, in essence, illinois Street, next to the Park West Subdivision along 131 st street and adjacent to that area. This may give the public an idea of the type of treatment that may be achieved in other locations along Illinois Street. The charge the City has today is to determine "how to thread the needle" because the road wants to go somewhere between Spring Lake Subdivision and the Ritz Charles parking lot. While that phase is only 20 feet in width and the roadway is a minimum of most likely 120 feet of right-of-way; within that 120 foot area are lawn areas, pathway improvements, and the roadway itself,c.onsiderably less than 120 feet. These are discussions that have been ongoing even before 1997 and ultimately formalized in 2001 by the adoption of the current Thoroughfare Plan. Individuals interested in the area and interested when they make a decision to invest in the area have all oftms information available to them in the Department. Under the current US 31 guidelines for the Overlay, building setbacks along the property line are required to be 45 feet; a landscape transition area is a required 25-foot dimension. The petitioner's proposal is for a 100-foot transition/buffer area-there is a much larger woods there, but there is an expectation under the current Comprehensive Plan that this area would be developed in accordance with the 31 requirements. The app1icantis requesting approval to provide an area that is four times the area required under the current Ordinance. Jon Dobosiewicz offered to bring the reference materials and have them available at the Committee me"eting. Comments from Plan Commission Members: S:\PlanCommission\Minutes, 7 7 Leo Dierckman said the primary question is whether or not the ground should be rezoned for a use that could go in another location. Mr. Dierckman was concerned with the number of full time employees (600) and the heIipad. Ron Houck had questionsrelated to traffic impact 'analysis and different scenarios. A copy of the traffic study should be furnished to each Plan Commission member. Mr. Houck stated that some concern should be given to whether or not this proposal is the best use for this property. Ron Houck cautioned the Committee that will be reviewing the PUD to look closely at the details. Steve Fehribach of A & F Engineering responded that one of the scenarios used in the traffic analysis is a hospital facility; the highest and most intense use was used in the study. Pat Rice was concerned with the "really red brick" and the green glass. The air conditioning units and related noise are a concern as well as the helipad and accompanying noise. Ms. Rice had the following comments for Mr. BottamiIIer-Administrations change, situations change, decisions change, and ultimately, plans need to come before the Commission and City Council. The Plan Commission is where the citizenry needs to be getting their information and it would help in making re-Iocation decisions and looking at potential plans for a certain area. Dan Dutcher encouraged the Committee to look carefully at conserving the woods. Mr. Dutcher pointed out a reference in the information materials to trails and asked the Committee to explore this in greater detail. Marilyn Anderson then closed the Public Hearing but explained that there would be an opportunity for additional public input at the Committee level. Docket Nos. 29-03 Z and 30-03 DP/ADLS, Clarian North Hospital PUD were referred to Subdivision Committee for further review on March 25, 2003 at 6:00 PM in the Caucus Rooms of City HalL 5h. Docket No. 32-03 Z;11300 Block of North Michigan Road (B-2 Rezone) The petitioner seeks to rezone a Parcel from 8-1 Residential to B-2/Business. The 14.826 acre site is located along the east side of Michigan Road Yz mile north of 106th Street. Filed by Steve Pittman of Pittman Partners. 6b. Docket No. 33-03 Z; 11300 Block of North Michigan Road (R-4 Rezone) The petitioner seeks to rezone a Parcel from S-l Residential to R-4/Residential. The 20 acre site is located along the east side of Michigan Road 12 mile north of 106th Street Filed by Steve Pittman of Pittman Partners. Note: Items 5h and 6h were heard together. Steve Pittman, 11530 N. Michigan Road, Carmel, and Neal SmithofPittman Partners appeared before the Commission representing the applicant. John Levinson of Levi Investment Real S: \PlanCommission\Minutes 8 8 City of Carmel CARMEL/CLAY PLAN COMl\1ISSION The Subdivision Committee met in a Special Meeting at 6:00 PM on Tuesday, March 25, 2003 in the Caucus Rooms of City Hall, Carmel, Indiana. Members present were Marilyn Anderson; Dave Cremeans, chairperson; Maureen Pearson; and Pat Rice. The Committee considered the following items: 1. e applicant seeks to rezone a om ~ " B-6, and 8-2 subject to the US 31 Overlay Zone to a Planned Unit Development District. The site is located at the northwest th ' comer of US 31 and 116 Street. Filed by Joseph M. Scimia of Baker and Daniels for Clarian Health Partners, Inc. 2. Docket No. 30-03 DP/ADLS; Clarian North Hospital The applicant seeks Final Development Plan and Architectural Design, Lighting, Landscaping & Signage approval for a hospital and medical office building. The 68.164 acre site is located at the northwest comer of US 31 and 116tb Street. There is a proposal filed to rezone the site to a Planned Unit Development District. Filed by Joseph M. Scimia of Baker and Daniels for Clarian Health Partners, Inc. Items 1 and 2 were heard together. Dave Cremeans, chairperson, explained to the public in attendance that this particular meeting is not a public hearing but a working session and no inference will be made as to whether members or in favor or opposed to the petition. The Committee is charged with a thorough review of the proposal. Joe Scimia of Baker & Daniels, attorney for Clarian Health Partners, addressed the Committee representing the applicant. The general concept of the PUD is that there are two areas, east and west of Illinois Street-area one is the primary area for the hospital. Area two is the area west oflllinois Street and this is broken into basically four development parcels plus the tree conservation area. The first question posed at public hearing was land use overall and whether or not the ground should be rezoned. The site could be used for office use or potential corporate headquarters. Obviously, the site S:\PlanCommission\Minutes 1 is a valuable piece of real estate; it is important to think about what exactly a corporate headquarters brings to the area that a hospital would not bring. In reviewing a corporate headquarters, most people are talking about investment and job creation as the two key factors. The plan for the hospital is on 55 to 60 acres and still leaves not quite half ofthe project for development Looking at the 55 acres, in the 5th year on the basis of Full Time Employees (PTE) there would be 775 direct employees in a hospital operation and 200 employees in Medical Office Building (MOB) operations. This does not include suppliers and consumers relied upon in connection with the operation of a hospital or medical office building. There are an additional 386 Full Time Employees in that category for the hospital and an additional 100 in connection with the medical office building. Looking at the total impact between the direct employees as well as those suppliers and consumers, there is in excess of 1450 Full Time Employees. The personal income-salaries and wages for those 775 employees in the hospital operations-exceeds $210 million (at the end of year five.) The same number for the 200 medical office building employees is estimated to be at $42,500,000. This is an excess of $250 million in wages payable in connection with the direct and indirect employees at this location. The number of ETE and MOB employees does not take into account the number of construction jobs that will be created over a two-year period. Again, those are estimated to be in excess of 1,335 employment positions in the construction industry and 734 supplier/consumer industry related persons for a total benefit in excess of 2,000 jobs in the construction industry. The total number of employees at the end of three years is projected to be 890. This number is spread over a seven-day work week, three shifts. In response to questions from the public, .Mr. Scimia said commencement of construction would be scheduled for May 28, 2003 and construction concluded June 1,2005. .Mr. . Scimia went on to say that direct dollars investment, direct economic impact-the construction costs are in excess of $125 million. This figure does not include land acquisition costs, furniture, fixtures, equipment, infrastructure improvements, etc. The hospital will be a taxable entity. .Mr. Scimia said he understood the desire to have land available for future opportunities, it already exists in Parkwood West and Cannel Drive. Allowing for the proposed land use does not mean you are foregoing the ability to attract a good business. The benefit to the hospital is that the Community can use a facility of this type. Currently, there is a Special Care Facility in the heart hospital, 81. Vincent's community hospital to the north-the proposed facility will provide more services and the design is to have a specialty in women's care and children's care facilities that will also provide medical emergency services. There is the land available for expansion-this proposal is a long-term plan. In Mr. Scimia's opinion, the proposed use was appropriate for this particular site and meets the goals for the community. ' Barry Evans, Vice President of Planning and Business Development for Clarian said the staffmg of the proposed facility will go according to volumes. Approximately 20% of the volume for the proposed location would be a re-Iocation from downtown. Joe Scimia noted that this proposal is not a replacement facility but would function in addition to the S: \PlanCornrnission \Minutes 2 Jo existing facility. All of the downtown services would continue to operate. Regarding the concerns from the adjacent property owners, Mr. Scimia commented that the uses proposed in the area located just south of the neighborhood will be. buffered by a 100- foot tree conservation area that will remain in its natural state. The B-3, B-6 and B-7 type uses proposed require a 3D-foot landscape buffer-the petitioner has tripled the requirement. The petitioner is prepared to provide whatever assurances to the neighborhood that the area will remain in tree conservation, either by deed restriction or conservation easement. Joe Scirnia addressed further comments from the public and stated there are no plans to disturb any of the tree area either to the north or south except that small portion that will be disturbed when Illinois Street is actually constructed. That i~sue will be addressed at a future time when a Development Plan comes before the Plan Commission. It would be naive to think this area would remain a park-like setting forever. However, this area is in close proximity to US 31 and 465, it is a place where commercial development should occur, and a place to build a tax base. Again, at this time, there are no plans to disturb the tree area, but we want to provide assurances that no matter what happens, no matter what plan came in, the 100-foot tree buffer would be in place. Joe Scimia explained that the PUD Ordinance was prepared by looking at the US 31 Overlay District and incorporating those standards and requirements into the PUD. The applicant met with the Department Staff to make certain these standards were incorporated into the PUD. Next, the Development Plan approval process and the ADLS approval were applied. Pictures have been provided of proposed architectural standards for the area so that upon review, there is a "frame of reference" so that everyone is aware of the concept. In response to a question from the public regarding a market study, Joe Scimia stated that a market study had not been done for the proposed facility. It is common sense-the fastest growing community in the mid-west is right here in Hamilton County, where' the people live, where the people want to work. In order to meet the needs of the public and in looking at the population growth and patterns, we are comfortable that this is the area fot location. ;l At this point, the Committee began a page-by-page review of the proposed PUD Ordinance. Pat Rice mentioned the heliport that is planned. The Heart Hospital does not have one and St. Vincent's does not have one. Joe Scimia said he was "shocked" that the Heart Hospital does not have a heliport and certainly, if St. Vincent needed to use the heliport, they would not be denied. Members of the public also expressed concern regarding the heliport. Joe Scimia said that from a noise standpoint, Clarian is buffering by placing a building between Clarian and the west. FAA requires helicopters to fly main thoroughfares~when the "Life-line" flies north and south on US 3l-they are required to do so; putting the heliport close to the ambulatory service puts it in direct access. It is not on the roof so the noise disperses, we do not plan on having the s: \P lanCornmissioll \i.V!inutes 3 II helicopter parked there, and as a design concept, the heliport is on the side. Joe Scimia explained retail uses such as a coffee shop, card shop, barbershop--on the ground floor and within the building. These would provide services for persons within the hospital, and would be limited to 15%. There were concerns with the cafeteria and Joe Scimia said he would work with Jon Dobosiewicz and the Department to finalize this portion. There were concerns expressed regarding any day care facility. The Committee was not in favor of a separate building for a day care facility but rather in the primary building~ . John Myers, Traffic Consultant with Parsons, Brinckerhoff, 47 South Pennsylvania Street, Indianapolis, addressed the Committee and said he had not yet read the traffic report submitted by A&F Engineering. Mr. Myers was attending the Committee meeting strictly as information gathering only. Following a short recess, the Committee continued with its review of the PUD Ordinance. There were questions from the public regarding the traffic study and whether or not the study was available to the public. Dave Cremeans said the public could review the file, including the traffic study, at the Department of Community Services office, any time between 8:00 AM and 4:30 PM, Monday tlrrough Friday. Joe Scimia addressed comments from a member of the public regarding the current shortage of nurses. The Clarian facility will attract quality physicians and nurses through having a competitive project and a good facility by being in the right location. The City of Cannel is not hard to sell. The bottom line is, people want to live in Carmel, located in good facilities, in a good school system. This is not a land use concern. The facility is a women's and children's focus, but it will have other capability and flexibility. The vision is to allow expansion as needs dictate, whether that be other sorts of facilities, expansion of existing facilities, additional services, specialties, etc. In regard to traffic, Joe Sciri:1ia said the plan does address the office to the south-there are two openings currently, one is proposed to be closed in a right in/right out only and also moving traffic over to Illinois Street. The proposal actually improves the traffic pattern; there is also additional right-of- way required. Mr. Scimia also said the traffic study is not consistent with statements made by Mr. Bottamiller at public hearing with respect to gridlock. Regarding Judy Miller's comments relating to sensitivity to wildlife, conunents from Ms. Rice are being taken into consideration and this is being looked at. Regarding the high water table and tree removal, drainage plans must go tlrrough review and various approvals and signed off by government agencies. Any development cannot increase drainage flow or make drainage situation more difficult. The developer must handle the amount of flow and the engineer will deal with that. Notice requirements are for property owners within two properties or 660 feet in depth by certified mail. Mr. Scimia commented that Clarian has been sensitive to the neighbors, their concerns are understood s: \P lanComrnission \Minute 4 /2 as well as their reluctance to embrace illinois Street. The Illinois Street extension has been on the Thoroughfare Plan for a long time and the developer must comply. There are other commercial developments along the corridor-the Heart Hospital, Thompson Consumer Electronics-these are inter-twined with existing residential development along the corridor. Clarian is doing everything it can to be sensitive to the issues and also reach a compromise and work with the City of Carmel. A representative from Spring Lake Subdivision asked about the process-"Where do we go from here; what is the protocol for future discussions; who do we talk with about Illinois Street as far as what illinois Street will look like, where will it go; when will it happen; and do the residents have input?" Dave Cremeans explained the process through the Plan Commission and on to the City Council, with an opportunity for public input at both levels. Jon Dobosiewicz of Department of Community Services said Illinois Street would be placed between the Ritz Charles and the subdivision to the west. The Subdivision Committee will meet in reguhrrly scheduled meeting on April 3,2003 at 7:00 PM in the Caucus Rooms of City Hall. The meeting was adjourned approximately 9: 15 PM. Dave Cremeans, Chairperson Ramona Hancock, Secretary S:'lPlanCommission\Minutes 5 /3 Docket No. 164-02 Z, Riverview Medical Park (PUD) was referred to the Subdivision Committee for further review on May 13, 2003 at 7:00 PM in the Caucus Rooms of City Hall, Cannel, Indiana. Note: Items 2 and 3 were beard together. 2. Y'. , ,-, . _ _ _ _, _'l:....,:,,'J'':~,t'/tf,;'J',~;_ ".:{ ;~~.'. e applicant seeks to rezone a 107.367 acre property from H-3, .13:-6, and S-2 subject to the US 31 Overlay Zone to a Planned Unit Development District. The site is located at d th the northwest comer of US 31 an 116 Street. Filed by Joseph M. Scimia 'of Baker and Daniels for Clarian Health Partners, Inc. 3. Docket No. 30-03 DP/ADLS; Clarian North Hospital The applicant seeks Final Development Plan and Architectural Design, Lighting, Landscaping & Signage approval for a hospital and medical office building. The 68.164 acre site is located at the northwest comer of US 31 and 1 16th Street. There is a proposal filed to rezone the site to a Planned Unit Development District. Filed by Joseph M. Scimia of Baker and Daniels for Clarian Health Partners, Inc. Prior to presentation by the Petitioner, J oIm Myers of Parsons Brinckerhoff, 47 South Pennsylvania Street, Indianapolis addressed the Committee. Mr. Myers said he had reviewed the Traffic Operations Analysis provided by the petitioner and rendered the following report. There are also some remaining, operational issues that have to do with the larger system. Mr. Myers said he had reviewed the Traffic Analysis, starting out by looking at the land use and the trip generation rate and calculations based on those areas, making sure they are in accordance with ITE Guidelines (Institute of Transportation Engineers). Also, theintemal pass-by trips were checked. The trip distribution was reviewed and found to be reasonable. The level of service calculations were reviewed and questions were resolved by the traffic engineer. There was one problem found with a round-about at 116th and Illinois Street. The unresolved issues are all on 116th Street. There is a single right-turn lane shown westbound from the new interchange at US 31 across 1 16th Street and turning right toward this site on Illinois Street. If there is a round- about there, a by-pass lane is proposed .so that those right turns would not actually occur within the round-about but at a special lane on the side, and only on Illinois Street approaching the hospital. Mr. Myers said he would be interested in seeing the actual detail as to how this is laid out and how the entrance extends to the hospital. The intent is to have a free-flowing right turn lane that would extend all of the way to the first entrance. This is a loose end, but a minor one. Mr. Myers said the other two issues are larger. A copy of the report was sent to Peter Doctors in Parsons' Boston office. The important questions are: Does a round-about work at this intersection; does it work for Spring Mill Road? Does it work with the interchange at US 31 ? This will take a little more time to study. A third issue has to do with the proximity of these intersections, even if they are signalized. The closeness of Spring Mill, Illinois, what will probably become two, ramp termini signalized S : \ {PlanCommission \Minutes\SubdivisionCommitteeMinutes 6 lLf intersections, and Pennsylvania on the other side is also an issue-how those will best be treated. A vital component is the US 31 study and that is not available at this time-we .still don't know where the signalized intersections are, we don't know if there are signals-they could be round- abouts. These questions need to be answered, but in terms of the traffic study itself, down to the point of the intersection, questions are invited at this time. Mike Hollibaugh commented that John Myers is wrestling with some big issues and the input from Peter Doctors regarding more detail-oriented questions on the round-about(s) and how the intersections will function needs to be reviewed. Regarding the extension of Illinois Street north to Carmel Drive, the concept was to show the southbound triple left turns at 116th Street. Ultimately when it is opened on the north side to Carmel Drive, all of the traffic will not head south, some of it will turn north, and it is likely the triple left will be converted to a double-left and have a second through lane. Sooner or later, there will be a need for the City to identify right-of-way requirements. This cannot be answered this evening. John Myers said he did not expect a lot of variations from the study; there are quite a few lanes- double turn lanes from the ramps-you just hate to "feel around in the dark" on something like this. When it comes time to make the ultimate decision, the best advice will be given based on the inforrilation available at that time-hopefully an INDOT study. The INDOT study should be available within the next 30 to 60 days. Pat Rice asked if the concern regarding the single right turn lane would be altered when the road goes through? It may create more traffic going straight through and less need for a double right turn. John Myers responded that is why he wants to take a look at the specific geometries in mind. If there were a continuous right turn lane going into a through lane from the south, then it would not work very well-a dedicated lane would work better. This will be looked at along with the other situations at this intersection. After a short recess, the Committee continued with the review ofthe C1arian North PUD. Joe Scimia addressed the Committee and thanked them for scheduling a special session to address this PUD. There are some peculiarities of this site. The property to the west is not developed; it is not flanked by residential development like some of the other developments. This does create some opportunity with respect to what happens in the future or planning that can occur. The property is zoned R-2 and allows 3.5 units per acre on the west as well as the small strip on the property line. There are developments to the immediate south that are much more dense than one-acre lots or ten-acre lots. Unlike some areas typically seen, this site is not fully developed and this is recognized by the Comprehensive Plan. 116th Street is the primary parkway for east/west traffic in this community; it is the largest parkway, it is four lanes, etc. This is where all of the traffic will be and when the overpass is done on US 31, it will make 116th Street even more attractive for traffic. Accordin~ to the Thoroughfare Plan, this is where the traffic is supposed to go, even more so than 146t Street. This proposal does not deviate from the s: \ {PlanCommission \Minutes\SubdivisionComrnitteeMinute ' 7 15 Comprehensive Plan-it would change the underlying zoning, but potential uses for this particular site are envisioned as offices, hotels, retail, full-table restaurants, and planned residential communities. All of these components are provided in the proposed PUD. We are consistent with the Comprehensive Plan, and we have gone to great lengths to incorporate those concepts into the proposed project. In regard to discussions regarding zoning without final plans-this proposal is not speculative. The time and cost of going through the process prohibits some from going through the process. To couple a request for rezoning on top of an ADLS and a PUD request only adds more cost and time. Mr. Scimia suggested the Committee look at the project in its entirety-where the property is located-its proximity to ll6th Street and what the Thoroughfare Plan calls for and the close proximity to the major north/south arterial in the entire State, US 31. Marilyn Anderson said she understood there was undeveloped land to the west, and this is one of the reasons why she was concerned about what is developed on 2C. What goes on 2C will directly impact what goes in west of Springmill Road. The concept was that illinois Street would divide the more commercial aspects from the residential. Ms. Anderson said she would like to see the transition from proposed uses happen within the Clarian parcel and not have offices in 2C. The parcel across the street would be directly affected. Joe Scimia responded there is a distinction between use and what is actually there. The transition is being created from Springmill Road back to Illinois Street. It is highly unlikely that this would be developed as single family residential. Conunercial development on ll6th Street within the US 31 corridor is ideal. There was open discussion and review of the proposal and possibilities of use. Dave Cremeans said the Committee had talked about 2C at the previous meeting and residential facing Springmill Road was preferred. The Committee did not want Springmill Road to have the appearance of a commercial corridor. A service road between 2C and 2D was previously discussed at Committee; commercial should not face Springmill Road. The Committee is concerned about the use because of the signage. Mike Hollibaugh commented that there are forces at work that will change the character of this portion of the City~primarily that will be the impact of the interchange at ll6th and US 31. It is a situation to wonder, -- what is the long-term viability of single-family along Springmill versus having a use with similar character as respective of the residential character that we want to see, but is nicely-designed, low-intensity office. The traffic generated in these areas today at rush hour makes it perhaps less than desirable for residences. Springmill will start to change, and traffic will start to flow. Docket Nos. 29-03 Z and 30-03 DP/ADLS, Clarian North Hospital, were continued to the April 22nd meeting ofthe Subdivision Committee at 7:00 PM in the Caucus Rooms of City Hall. S :\{PlanCommissioD\Minutes\SubdivisionCornrnitteeMinutes\~M~~~~;~i~~~~~~~&~~.~~'#('!t 8 /t City of Carmel CARMEL/CLAY PLAN COMMISSION The Subdivision Committee of the CarmeJJClay Plan Commission met in a Special Meeting on Tuesday, April 22, 2003 in the Caucus Rooms of City Hall. Members present: Marilyn Anderson; Stephanie BlackInan; Dave Cremeans, Chairperson; Wayne Haney; Pat Rice; and Pam Williams; thereby establishing a quorum. Jon Dobosiewicz attended the meeting on behalf of the Department of Community Services. The following items were considered: eapplicant seeks to'rezohea 6 acre'prop -" ,B-6, and S-2 subject to the US 31 Overlay Zone to a Planned Unit Development District. The site is located at the northwest corner of US 31 and 116th Street. Filed by Joseph M. Scimia of Baker and Daniels for Clarian Health Partners, Inc. 2. Docket No. 30-03 DP/ADLS; Clarian North Hospital The applicant seeks Final Development Plan and ArchitecturaL Design, Lighting, Landscaping & Signage approval for a hospital and medical office building. The 68.164 acre site is located at the northwest comer of US 31 and 116th Street. There is a proposal filed to rezone the site to a Planned Unit Development District. Filed by Joseph M. Scimia of Baker and Daniels for Clarian Health Partners, Inc. Note: Items 1 and 2 were heard together. Jo"e Scimia of Baker & Daniels was present representing Clarian Health Partners. The Committee began its review of the PUD on page 14. Public input was invited at the conclusion of the Committee's review this evening. Kathy Page, 2510 Coventry Way, Indianapolis-currently building a borne in Spring Lake Estates. Ms. Page said her family had looked at the guidelines for the 31 Overlay, and the City 20120 Vision Comprehensive Plan prior to deciding to build in Spring Lake Estates. The current proposal for a full S: \PlanCommission\Minutes\ . , 17 service hospital with 24-hour service will have a definite negative impact on their new home. The standards for development include I) A landscape buffer along Springmill Road and adjacent to residential development. 2) A well-conceived planned, single family residential community probably situated along the west side of the site (Springmill Road). 3) Access from a new parallel road rather than Springmill Road. Ms. Page asked that these three standards remain intact. The citizens of Carmel clearly understand the need to expand the commerciaVindustrial tax base to business growth. It is also clear that citizens support this ,growth, only if negative impacts of that growth can be mitigated and contained and not impede the quality of the neighborhood. If the current proposal for development proceeds, the entire character of Springrnill Road will change. Theron Nesbit, 363 Mallard Court, Spring Lake Estates. The residents in this area have a real problem-they are residents of Clay Township but unable to vote for any members of Carmel City Councilor the mayor. If this current proposal is approved, it could negatively affect the property values and quality of life. In some respects, the residents feel that they have been enticed by the City to build their homes in this Subdivision. If the intent is to change the zoning, 100 feet of woods is not a sufficient buffer between Spring Lake Estates and the noise and lights of a full service hospital. This subdivision will not stand by quietly and watch as trees are removed and a heliport built. At this point, Dave Cremeans gave a history lesson in government and the Joinder Agreement between Clay Township and the City of Carmel and representation from the Township and City elected offiCials. Mr. Cremeans also explained the process for rezoning and that any official change in zoning must be approved by the legislative body, the City Council; the Plan Commission is an Advisory Body only. Jon Dobosiewicz reported for the Department. If there is completion as to the discussion of the PUD, it would be appropriate for the petitioner to make the revisions as noted and re-submit a red-line copy for review by the Department and the Committee members. After final review, a recommendation should be fonvarded to the full Plan Commission for ultimate forwarding to the City Council with a recommendation. Jon further stated that the DP/ADLS for the hospital site should be reviewed/discussed further so that public comments can be addressed. If there is something specific the Committee would like to see changed and the petitioner has the ability to address those concerns, it can be done at Committee on May 13,2003. The DP/ADLS and the PUD do not necessarily have to be dealt with at the same time. There is still the public hearing process at City Council level once the PUD is forwarded to the Plan Commission with a recommendation. The POO could be heard by Council either June 2nd or the 19th, if the Plan Commission forwards this on to COlU1Cil at its May 20th meeting. Pat Rice asked that actual material samples be brought to the Committee meeting on May 13th. There being no further business to come before the Committee, the meeting was adjourned at 9:20 PM. Dave Cremeans, Chairperson Ramona Hancock, Secretary s: \P lanComrrrission \Minutes 2 /8 Jon Dobosiewicz said the medical office itself is considered a special use under the residential zoning. The petitioner could be appearing before the BZA today requesting approval for this project as a permitted Special Use. The only thing not considered consistent with a permitted Special Use is the bank branch. After the Church went in, the area was then pre-disposed; what is left is an approximate IO-acre site along the l46th Street frontage. The logic is that uses that would be considered permissible special uses under the ordinance that would otherwise go before the Board of Zoning Appeals may be found acceptable along this frontage where, based on previous actions and how development has occurred in the area, it is not a logical place for single family residential. It is apparent that the developer has garnered support from the Church and adjacent homeowners in Ashmore Trace. Jon went on to say that the development approved by Noblesville is retail with commercial out- lots: restaurants, bank, perhaps a gas station, although the gas station may have been excluded. Pat Rice commented the petitioner has done a good job in designing the proposed development. Dave Cremeans invited comments from the public-none was forthcoming. According to Charlie Frankenberger, the petitioner has agreed to install landscaping on some of the lots to further buffer from the residential area. Sample building materials were shown. At this point, the Committee began a page-by-page review of the PUD Ordinance. Additional informational booklets will be submitted to the Department on Thursday, May 15,2003, for inclusion with the Department Reports. There was open discussion regarding the lighting, ballard lights, and the photo-metric chart presented. The enclosure for the trash dumpster was discussed-the petitioner agreed to brick materials and this was deemed to be compatible. Marilyn Anderson moved to recommend approval of Docket No. 164-02 Z, Riverview Medical Park PUD, to the full Plan Commission. The motion was seconded by Wayne Haney, and roved '~-m:~;::':' " \~b.,. ..1 ;~\:' 2. e app lcant seeks to rezone a 107.36 acre prope y aID ";3, B-6, and 8-2 subject to the US 31 Overlay Zone to a Planned Unit Development District. The site is located at d th the northwest comer of US 31 an 116 Street. Filed by Joseph M. Scimia of Baker and Daniels for Clarian Health Partners, Inc. 3. Docket No. 30-03 DP/ADLS; Clarian North Hospital The applicant seeks Final Development Plan and Architectural Design, Lighting, Landscaping & Signage approval for a hospital and medical office building. The 68.164 acre site is located at the northwest corner of US 31 and 116th Street. There is a proposal filed to rezone the site to a Planned Unit Development District. Filed by Joseph M. 8cimia of Baker and Daniels for Clarian Health Partners, Inc. S: \PlanCornmission \Minutes 3 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 /q Note: Items 2 and 3 were heard together. Joe Scimia of Baker and Daniels appeared before the Committee representing Clarian Health Partners. Members of the Committee should have received black-line drafts of the PUD and most all items have been addressed at this time. Mr. Scimia commented that there were two factors of prime concern: one was preserving residential along Spring Mill, the other was extending retail .along Spring Mill. The petitioner proposed to make parcel 2C run the entire length of Spring Mill, from I 16th Street to the northern property line-except for the tree conservation area~and it would be limited to residential development. Dave Cremeans invited members ofthe public to ask questions and express concerns regarding the changes to the PUD. Jerry Golden, resident of Springmill Place, thought residential development would be on the west side of illinois Street; on the east side would be commercial development. Kathleen Lamb, also a resident of Springmill Place, said she had attended numerous meetings when the Illinois Street expansion was being discussed. At that time, there were resolutions passed that confirmed that the 20/20 Vision Comprehensive Plan was to be respected plus a buffer zone. It is not a proper presumption that Springmill Road would become four lanes; the development ofIllinois Street is supposed to be taken into conjunction with Springmill Road. Part of the Comprehensive Plan and the resolution supported by her neighborhood strives for nothing commercial west of illinois Street. Judy Hagan, Springmill Place, addressed the Committee saying she had written the Springrnill Road Amendment many years ago when the corridor was under some commercial encroachment and it has worked very well for the community in the interim. Ms. Hagan is concerned that this proposed development is totally off-track with the Comprehensive Plan. Ms. Hagan commented that she would like to see this proposal re-worked. If the entire property is going to be considered for a rezone, and a PUD in particular, then the entire. development needs to be flushed out. Also, with due respect to the substantial tree cover on this property, it has always been contemplated that this would remain and those development rights transferred to the open area and that unique and beneficial development of residential would be compatible with the existing corridor. Ms. Hagan was also concerned that this is the third hospital going in on the Meridian corridor and this proposal mayor may not be the best use for this site. The premiere comer in the corridor is this particular site and it has been contemplated and very elaborately planned either PUD or rezone over the years as something that would be a destination point-this has not yet happened. Ms. Hagan asked that this proposal be returned for a lot more work as the last, major comer in the corridor. Again, the understanding is that there was to be no commercial west of Illinois Street. Jim Dillon, 507 Cornwall Court, Cannel 46032, said he had been "on line" to look at the Comprehensive Plan and it is not at that location. Also, the land use maps are not on line. Why? Everything today is a PUD and it is inappropriate to use that designation on this piece of S:\PlanCommission\Minutes 4 ONE CIVIC SQUARE CARMEL, INDL"u"JA 46032 317/571-2417 20 property. Jim Dillon expressed his concern about medical entities in the corridor that could be "Not-far-Profit." One of the secrets in Cannel is a commercial tax base in the corridor that is significant. If we erode that tax base, then our taxes will be higher than Westfield or Fishers. Jim Dillon "clearly" wanted the Committee to understand that he and Ms. Hagan were sponsors of the Springmill Road Amendment passed in 1988 and codified, Ordinance D-454, that is the law in this community. The Comprehensive Plan was altered with that document and as it has been revised, the last time in 1996, the land use map and the language reflect that. In Jim Dillon's opinion, the areas listed on all of the proposals to date, anything west oflllinois Street cannot be rezoned-that is to be residential. The Commission's job is to see that the City's standards are met, not to make the plan work for Clarian, the landowner, etc. Clarian probably does not want to buy all ofthe land, but the seller probably wants them to do so. The Commission is not obligated to make this proposal work for the applicant. If you commercialize any of this, there are four comers at 116th and Springmill that are going to fall like dominos. Dr. John Pittman was told once before that he could not commercialize his corner. I'm sure he would like to see this happen. Jim Dillon commented that this proposal is not ready to move on; there is a lot of work to be done to make this acceptable. Dr. John Pittman addressed the Committee with the following comments. At the time he tried to rezone his land, the Comprehensive Plan said the north two-thirds ,was commercial and the south one-third was transitional. Carmel could not say what transitional was, only to bring in a plan and Carmel would tell him whether he was right or not. A lot of money and time was spent putting a Comprehensive Plan together. It has been on the Thoroughfare Plan for several years that Springrnill Road was to be four lanes. Illinois Street is not meant to carry heavy traffic. Anyone that has done any development along Springmill Road has had to dedicate right-of-way to make Springmill Road four lanes. Springmill Road obviously needs to be four lanes and as the Clay West area begins to develop out, it will have to be widened because there will be a tremendous amount of traffic. The entire area will change tremendously, regardless of what happens at 116th and Meridian. There will be so much traffic, everyone will be begging to get the roads widened. It seems that there are a lot of misconceptions about the sacredness of the Comprehensive Plan and the sacredness of Springmill Road that will preserve it as a "country road." It isn't a country road any more-it is a major thoroughfare. . Jerry Golden had the following additional comments: There are other roads west ofSpringmill- is every north/south road going to be four lanes? This will always carry some conflict. Springmill Road had a good concept in terms of anticipating a two-lane road and a middle road, and with the advent of Illinois Street, it is a good thing. Joe Scimia touched on what the Comprehensive Plan actually does say and not what people thought it said-there are definitely some misconceptions. The applicant is not trying to alter the Comprehensive Plan. By state law, the Comprehensive Plan sets forth the general policies and patterns of developrnent-:it isa road map. A body such as the Plan Commission is required to give consideration to the Plan, but it doesn't say that you should never depart from it or that it must be followed in every circumstance. Even if it did, as times change, you must adjust for what occurs. S:\PlanCommission\Minutes. 5 ONE CIVIC SQUARE CARlvIEL, INDIANA 46032 317/571-2417 Z'L The property is zoned B-6. The hospital could be built today with DP/ADLS approval from the Plan Commission-it is a permitted use within the corridor. Jon Dobosiewicz said the 20/20 Vision Comprehensive Plan as well as the 1997 study and Thoroughfare Plan is a 20-year build-out. We have tried to plan enough right-of-way to accommodate streets with the limited'resources available. We will make every effort to improve lllinois Street across the extent of the corridor to provide access, presuming that the majority of . traffic substantiated by a traffic study is going to utilize the 31 corridor. We will do what we can to discourage through traffic on Springmill. As US 31 and illinois Street are improved, it is unlikely that traffic will use Springmill as a maj or thoroughfare. The intersection improvements will build capacity in Springmill and allow it to function in the future. There is an opportunity for everyone to take both the Comprehensive Plan and the 1997 study and extract from it and take things out of context. The one salient feature in this design that calls for an expansion of the 31 Overlay into this entire parcel, Springmill Road to 31, is defined by one sentence: "This roadway (referring to Illinois Street) will serve as a boulevard bisecting the officelhotellspecialtyl Retail component to the east and the high intensity residential uses to the west." Comments from the public relate to that issue and when the discussion was made of illinois Street or the corridor expanding, it was that Illinois Street creates a dividing line. The dividing line would be benveen much, much more intense uses of office and a combination of components on this side of retail, with a higher intensity residential useto the west. The Ordinance also calls for other things and excellence in overall design. It is ultimately the Plan Commission's responsibility to determ~ne whether this overall design fits within everything discussed from the 20/20 Vision Plan to the Springmill Road Amendments to the 1997 study. Right now, the issue stands that anything other than residential west of Dlinois Street is unacceptable. The Commission would need to make a determination and forward on to the Council. Jon Dobosiewicz confirmed to the Committee that this development does not conform with every aspect and every area of the Comprehensive Plan. It does, in many cases, and this is one area where it does deviate from the Plan. Marilyn Anderson asked about the Springmill Road Amendment. . Judy Hagan clarified that the Amendment passed in 1988 was an amendment to the then existing 1985 plan. The language and context was moved forwarded into every land use map and was as a result of a retail issue. Joe Scimia responded that the Comprehensive Plan was amended and superceded by today's law and that statement is not in the Plan. Judy Hagan said the land use map is respective of the 1988 amendment. Joe Scimia is correct about the expansion of development plan and ADLS requirement in the corridor, but that would not change the land use. Under the old Comprehensive Plan, a development plan and ADLS only required the first 600 feet of the corridor. When it was contemplated that lllinois Street, in order to work, needed to be shifted farther" west, then everything benveen 31 and Springmill was captured and required a development plan. Jon Dobosiewicz said that issues with regard to uses west of Illinois Street have come up at previous meetings and have been drawn to the Committee's attention by the public. In addition, S:\PlanCommissionlMinutes' 7 ONE CIviC SQUARE CARMEL, ThIDLA.NA 46032 317/571-2417 2.3 in the Department discussions with the petitioner, it has been indicated that "these are the rules." The areas were identified, including where Parkwood West was approved, and the amendment to the 1997 plan that opened the door. There was significant public debate at the Plan Commission and City Council level on that issue, and the City Council made a decision for a plan to best serve the community. In a nutshell, what the amendments to the Comp Plan to date have done is open up this I DO-acre parcel for an overall design that could be considered by the Plan Commission as well as the City Council. What is does not do by letter is support commercial uses west of Illinois Street. It is the petitioner's charge to illustrate to the Plan Commission as well as the City Council that this plan is the best plan for this parcel and to illustrate how it conforms to the requirements of the Comprebensive Plan. Joe Scimia responded thatthey have tried to put together a proposal th:;1t meets both objectives. In talking about area 2C, the repeated comment was "We want to see that all residential." Pat Rice said this discussion should bave been held at the beginning of the process, not after adjustments were requested by the Conumttee and subsequently made by the applicant. The Committee should have had information provided earlier. Dave Cremeans commented that he did not think there has been any attempt at deception. At each meeting, it has been said that they were working to come up with the very best plan for the community-the plan may not be approved by the Commission-it could be approved by City Council. Dave said he was led to believe that development could not happen west of Illinois Street, therefore everything on Springmill would be a natural buffer. Joe Scimia said the other point was not to set a precedent for the other three comers going commercial. This is a large development and we have to make sure we service the area. Illinois Street is a minimum of 51 0 feet west of US 31. Dave Cremeans asked the applicant to look at everything west of Illinois Street as residential, to do something to protect the tree buffer to the north of the subject site, and to continue to work with the Department. After a short recess to review the Illinois Street amendment that went to the City Council in November 2001, the Committee continued with its review. Dave Cremeans referred to Council Resolution No. CC-12-17-01-02, formerly Resolution CC- 11-05-01-07 as amended. This document defines TIlinois Street as the line of demarcation. Jon Dobosiewicz explained the major concern at the time the amendment was approved--the location oflllinois Street (adjacent to Judy Hagan's neighborhood, adjacent to Spring Lake Estates, between Spring Lake and the Ritz Charles), and how Illinois Street would progress as far as maturing into the ultimate road that it wants to be. All indications were that illinois Street would not be constructed from 106lh to 1361h Streets in one bite-it was intended to serve uses as developed along the corridor. It would not be constructed at one time as a four-lane cross- section. There were talks about staging, contact sensitive design, etc. The two neighborhoods S: \P lanCornmission \Minutes\ 8 ONE CIViC SQUARE CARlvlEL, INDIANA 46032 317/571-2417 2,/ discussed at tbat time, Spring Mill Place and Spring Lake Estates to the north were discussed at that time. Future refinements were also discussed. Joe Scimia said tbe applicant was willing to install the buffer on his property. The Comprehensive Plan drew this area as potential expansion because the surrounding property isn't developed. The petitioner is asking for some relief. Additional buffers to the site are provided by the Frenzel property, the Hilbert property, and potentially, the Pittman property. The site does not abut any property except Spring Lake and the standard for Spring Lake is 30 feet. Ifwe were hearing the hospital today and Illinois Street to Meridian today, it would be easier to digest, but wee would like to see a plan for review. Pat Rice commented the new proposal seemed to protect the Springmill Corridor in terms of residential. Ms. Rice also asked for something more definitive and how this impacts the Springmill Corridor if the Springmill Corridor is residential. Maureen Pearson was uncomfortable with any of the commercial uses, especially the area referred to in section N such as hotels, food services, restaurants, all types of retail. Marilyn Anderson said she would like to see a better transition of residential. Joe Scimia responded the Plan carved this area out as an acceptable place to develop. That's why this piece of property is different. Mr. Scimia said they could adjust lots for the townehomes to 200 feet in area 2C. At this point, Jon Dobosiewicz cautioned the Committee that the Rules of Procedure are not structured to allow open public dialogue at the Committee level. The dialogue should be behveen the petitioner and the Committee members to address those concerns brought up at public hearing. Pat Rice had questions regarding the colors on signage. Joe Scimia responded there are two colors: gray and silver on a limestone base. The emergency sign is red. Dave Cremeans was specific,in his instructions that comments this evening should be limited to the hospital only. Development between Illinois and Springmill is not being discussed this evenmg. Pat Rice asked for clarification this evening on any approval recommendation from the Committee. Joe Scimia responded that any recommendation for approval this evening would be for DP/.ADLS only. Jon Dobosiewicz commented the petitioner desires to have a presumption on the hospital layout and design. With that in hand, the petitioner could go back to the property owner saying "The whole piece doesn't work, but we have approval for the Development Plan of area 1 A, and we are ready to close on area IA if you can bifurcate the property and sell us what is illinois Street over to Meridian." VYhatever happens between Illinois and Springmill may happen at some point in the future, but if the hospital has approval of the DP/ADLS subject to zoning of area lA, they s: \P lanCommission \Minutes 9 ONE CIVIC SQUARE CARMEL, INDLA.NA 46032 317 /571-2417 '25 would have confidence in moving forward and negotiating with the property owner on making modifications. Joe Scimia said he really wanted to know that the issues are done with the hospital so that there is no major issue that must be designed around. A lot oftime has been spent on the PUD, but the only real plan in front of the Committee is for the hospital. Maureen Pearson moved for a positive recommendation on Docket No. 30-03 DP/ADLS, Clarian North Hospital, contingent upon appropriate zoning. The motion was seconded by Pat Rice and Approved 5-0. 4. Docket No. 49-03 PP; Towne Pointe The applicant seeks approval of a Primary Plat for a 28-10t residential subdivision on 25.1::l: acres. The site is located on the northeast comer of West 13lst Street and Towne Road. The site is zoned S-l/Residence - Estate. The petitioner also seeks approval of the following Subdivision Waiver for one street: 49-03a SW scq 6.3.7 cul-de-sac length Filed by tbe Elliot Wright Group, LLC. Chuck Wright, 14349 Colby Court, Cannel, principal member of Elliott Wright Group appeared before the Committee representing the applicant. There were three issues presented at public hearing. Members of the public have been noticed in regard to the subdivision waiver and this can now be discussed. Jon Dobosiewicz confirmed the notice situation. The waiver is for the,cul-de-sac on the south end of the development and the Department is not in favor of another access point onto 1315t Street. Chuck Wright commented that he had spoken with Mark Hartman, at remonstrator at public hearing, and Mr. Hartman is not interested in any process that would not allow him to sub-divide his property in the future. There continues to be open dialogue. Jon Dobosiewicz said he had received a letter from Kent Ward, County Surveyor, assuring the Plan Commission the water issue from the subj ect site at 131 st Street will be addressed. If water crosses another property onto 131 S\ the County cannot assure that a problem wouldn't exist. The rationale was discussed for not continuing the cul-de-sac. Jon Dobosiewicz said the Department would like to limit driveway cuts onto 131 st Street; there is only one proposed point of access. It would be possible to drive through Brenwick's subdivision to the east and get on 131 st Street without going onto Towne Road, but there would be no advantage to that. A round- about is anticipated at 131 st and Towne Road and also at 126th and Towne Road. Pat Rice asked about stormwater into Elliot Creek. Jon Dobosiewicz said there is a problem- because it is so flat-it is difficult to hold water. The reason it is dry detention on the site plan is because they can't "build a bathtub." The applicant is working with Brenwick on the off-site because they must provide discharge into the creek across their site. The applicant must pull s: \P lanCormnission \Minutes \" 10 ONE CIVIC SQUARE Cl\.RMEL, INDL'\NA 46032 317/571-2417 2..6 City of Carmel CARM~EL/CLA Y PLAN COMMISSION The regularly scheduled meeting of the Subdivision Committee was held in the Caucus Rooms of City Hall on June 3, 2003 at 7:00 PM. Members present: Marilyn Anderson; Stephanie Blaclanan; Dave Cremeans, Chairperson; Wayne Haney; Maureen Pearson; Pat Rice; and Pam Williams. Mike Hollibaugh attended the meeting on behalf of the Department of Community Services. Before the review of ClarianHealth, Pat Rice read a statement regarding the preservation of Springmill as a residential area. The Committee considered the following items: e applicant seeks to rezone a 107.367 acre prope yomB-3, B-6, and S-2 subject to the US 31 Overlay Zone to a Planned Unit Development District. The site is located at h . th the nort west comer of US 31 and 116 Street. Filed by Joseph M. Scirnia of Baker and Daniels for Clarian Health Partners, Inc. Joe Scimia of Baker & Daniels and Boyd Zoccola appeared before the Committee representing the applicant. The Clarian PUD discussion included: 1) Use of the he1ipad limited to transport patients only, and only in the event of emergency. 2) Access to lllinois Street would be a single cut from Springmill and should be aligned with hospital entrance. 3) Location ofRetail/commercial space. 4) Hotel on the site. 5) Location of Physician Office Buildings. 6) Relocating the water/retention ponds. 7) Tree Preservation Area. 8) Residential Area. 9) US 31 Overlay. The project would return to the Plan Commission for Development Plan and Architectural Design, Lighting, Landscaping & Signage review and approval as each section is proposed. Members of the public were invited to comment: Randy Miller, 325 Mallard Court, Spring Lake Estates, was in favor of the proposal but was S:\Plan~ornrnission~ll1ute 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 2.7 concerned with the 2B area and buffering possibilities. Tammy Readdy, 313 Mallard Court, Spring Lake Estates, questioned if there were wetlands on the site and how it was represented on the plan. Buffering with any tree other than evergreens would disappear in the winter. Ms. Readdy suggested mounding or 8-10 foot brick wall to buffer lights and noise. William Carr, 331 Pintail Court, Spring Lake Estates, thought mounding was not an option, in view of the previous controversy with mounding at the Dr. Perez residence location. Dick Wickliff, 10300 Springmill Road, thought that additional area was needed for future expansion of the hospital-the map looks like a commercial entrance to the hospital from Springmill Road. Mark Rattermann, 12548 Scottish Bend, Cannel 4603 3, wanted to know if the location for Illinois Street had shifted. Kathy Haag, 357 Pintail Court, Spring Lake Estates, asked for clarification of the Overlay and when the decision was made for Illinois Street extension. Jim Dillon, 507 Cornwall Court, was opposed to ANY curb cut on Springmill Road. Jim Dillon also thought this proposal. should be done in one fell swoop rather than piece-meal in different sections and return for Development Plan and ADLS for each parcel. Kathy?? 10009 Springmill Lane, (neighbor to Judy Hagan) Kathy Stetler, Spring Lake Estates was opposed to the overall proposal. Ms. Stetler said it is difficult to obtain information from the Department of Conununity Services; she has written letters to the editor-they are not published; the newspaper is not willing to cover the meetings. Jerry 'Golden, 308 Springmill Lane, was defInitely opposed to this proposal saying Springmill is "Sacred" and always considered residential. Mr. Golden cautioned members of the public to be leery of "legalese." Approving this proposal would have a "domino effect" and it is outrageous! Jan ??? Mallard Court, said this could be a win/win situation if the buffer were increased. Mike Hollibaugh responded to public comments. Mounding can be adjacent to the right-of- way-mounding at the Perez residence was within the right-of-way and of huge magnitude. The location for llliDois Street has not changed but has always been conceptual in nature. The illinois Street extension has been on the Thoroughfare Plan of the Comprehensive Plan, most recently adopted in 1996. Public input was solicited for the Comprehensive Plan; it was publicized in the newspaper, flyers were sent home with school children, there were a number of public informational meetings held at local schools, City Hall, and different locations throughout the City, including an ice-cream social. S: \PlanCornnrission \Minutes \ 2 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 "2B Jan ???, Mallard Court in Spring Lake Estates, said she was a 6-month resident of Carmel and not aware of the Comprehensive Plan. Joe Scimia was hopeful of coming out of Committee this evening with a vote. However, in view of the current suggestions and requests from Committee members in terms of relocating the ponds, switching some of the buildings, the height of the buildings adjacent to residential, (buildings within the 2D area are to be a minimum of two stories) looking at the buffer, exploring a location for the retail, location of a hotels, perhaps-restaurants, access, etc., the petitioner agreed to review again and present another plan. Mr. Scimia agreed to furnish revisions first to the Department and probably hand-deliver to the Committee. If they need to explore changes to area 2A, (the buffer area) they are open to that~however, someone from the neighborhood group will need to take the lead-if it is Greg Silver, that's fine; they will also look at reducing the 2C area. The goal is for the hotel NOT to be on the west side oflllinois Street. Joe Scimia said he needed to understand what the options are with retail. The consensus ofthe Committee was that retail on 116th Street was not a viable option and would not be supported at the Council level. Perhaps Mr. Scimia could talk to City Council members and see what their direction would be. Pat Rice asked the petitioner to again look at bringing in a trapper for re-Iocating the wildlife currently at this location, especially the raccoons. Mike Hollibaugh said the intent of the plan was to screen retail and this comer does not do that. Retail on 116th Street is not advisable; however, ifit were moved to the east of Illinois Street and part of an overall development, it would be more desirable. th Dave Cremeans had in mind moving the future office and garage areas to 116 Street and making Illinois Street retail. The office buildings would then blend in with the US 31 Corridor and give the petitioner an opportunity for retail to support the changes. Joe Scimia said they would not put retail in front of a $100 million hospital. Retail would be put on the ground floor or the atrium. Mike Hollibaugh commented that if you read the plan for US 31. it describes what the amenity node wants to be and also talks about community elements. This current proposal is all about Clarian and making the plan work for Clarian. However. the plan must also work for the community and what the community wants to see happen at this location. The Committee and petitioner agreed to meet on June 12th at 6:30 PM at City Hall for hopefully a final review and recommendation to the full Commission at its June 1 ih meeting. The petitioner undertook to deliver revisions to the Department and Committee by June 10th in order to allow time for review. S:\PlanC:ornrrrission~ll1utes 3 ONE CIVIC SQUARE CARlvIEL, INDL'ti"\1'A 46032 317/571-2417