Loading...
HomeMy WebLinkAboutDept Report CARMEL PLAN COMMISSION SPECIAL STUDIES COMMITTEEE DEPARTMENT REPORT OCTOBER 7, 2008 3. Docket No. 08080023 ADLS Amend: Opus Landmark at Meridian - Building 3 The applicant seeks architectme/design approval fOT a 1.5-story office bu.:ilding. The site is located at 12711 N Pennsylvania St. and is zoned B-2!Busilless within the US 3 I Overlay. Filed by RYall Albright of Opus North Corporation. The applicant seeks approval of the new proposed building architecture/design. The building's materials and colors complement Buildillgs 1 and 2 and also comply with the US 31 Overlay matelials requirements. This building design was originally approved in 2000 with the original petition, Docket No. 151-00 DP! ADLS. However, the new building is shorter in height, and the design is slightly different. This building is part of a 3-building complex and will serve at the mail set'vice distribution building for the campus. At the SeptellIDcr 22 BZA meeting, a Valiance for the reduction of the required building height was granted. (The US 31 Overlay standards require a minimum building height of 38 feet with 3 occupiable floors at this site.) Outstanding DOCS comments/concerns: 1. Please bring color and material samples to the committee meeting. 2. l(possible, show/provide a pedestrianlbike connection south from Cannel Drive up north to the building. The Dept. or Community Servic.es recommends the Committee approve this item, after all questions/concerns are addressed.