Boone,RacheIM.
From: Conn, Angelina V
Sent: Monday, October 27,20084:18 PM
To: Boone, Rachel M.
Subject: FW: s1. Vincent - variance for parking in front of building
FYI.
Angie Conn, Planning Administrator
Dept. of Community Services - Planning & Zoning
1 Civic Square. 3rd Floor
City of Carmel, IN 46032
p,317-571-2417 f.317-571-2426
.3conn@carmel.in.gov
~ Please consIder the environmem before printing Ihl:< ('~mail
Fr::Om: ConrJ" AlJgelina V
Sent: MondaYI June 09, 2008 11:44 AM
To: 'Davis/Brent'
Cc: Hollibau'gh,.Mike P
Subject: st. Vincent - variance for parking in front of building
Hi, Brent - below is 'what I found about a prior variance approval for S1. Vincent for parking in front of the building.
Yo'u will most likely need to seek BZA variance or plan commission waiver approval to have parking in front of
your proposed building.
BOARD OF ZONING AP.PEALS, SEPTEMBER 25, 2000 meeting minutes excerpt:
1..8h-19h .St. Vincent's - Carmel Hospital (V-1l5-00, V -1l6-00)
'. , . 'petiti'oner seeks Developnlental Standards Varianccs of Sections 23B J 2: Parking Requirements; and 23BJ 6. f. to permit an
Accessory Bur/ding . -
Filed by James J. Nelson of Nelson & Frankenberger for St. Vincent Hospital & Health Care Center, Inc.
Jim Nelson, 3663 Brumley Way, Carmel, appeared before the Board representing the applicant. Becky Feigh of BSA Design was also
present. Thc 30 acrc campus of the Carmel St. Vincent's I-Iospitallies south and west of the intersection of Old and New Meridian
In the summer of 2000, the Plan Commission approved the plans for expansion of the hospital, the surgery center, two adjacent
professional office, buildings, and the attendant site improvements that accompany this expansion, i,e. the addition or replacement of
parking in the northeast corner.and in the noithw'est corner of the site,
Some of the parking spaces encroached slightly, namely 27 feet, into the 90 foot setback of the US 31 Overlay Zone. The parking spaces
thatencro,ach arc adjaee[1t and parallel to US 3 I. The petitioner is seeking a variance from this section to permit approximately llipaces
to encroach into the 90 foot setback as established by the most recent amendment of the US 31 Overlay Zone. The practical difficulty is
that. the primary parking area that is being partially re-designed was developed under the Old US 3] Ordinance that permitted parking
within the right-of-way. .In order to be consistent with the old, tllcnew area also encroaches into.the ~O foot setback. The petitioner has,
however, provided the required perill1eterbuffer adjacent and parallcllo US 31..", .
In regard to the variance for an accessory building, the tn-lsh refuse building has been redesigned at the request of the Department so that
the exterior building materials match that of ,the adjacent office buildings. The I?test amendnlent to the Overlay Zone provides that trash
refuse areas shall be under roof. If the trash. area were .under roof, it would mean that the trash area would have to be 13 feet high, As a
.result, it \~as requested that the height of the dunlpstel' be I imitcd to 6 and one-half feet ~nd the. exterior building materials be consistent
with that of the office buildings. .'
Members of the' public w~re invited'to"speal; in f~vor of or opposition to these pelitlons; '~o[ bile appear~d.
Department Report, Steve Engelking. The Oepartment is recommending that these petitiQi:s ~eceive favorable 'consideration.
The public hearing was then closed.
Michael Mohr moved for the approval of St. Vincent's - Carmel Hospital V-1l5-00 and Vc1l6-00, seconded by Leo Dierckmarl:
APPROVED 4 in favor, none opposed.
r_.f
10/27/2008
Boone, RachelM.
Page 1 of3
From: Reis, Paul [preis@boselaw.com]
Sent: Wednesday, September 24, 20084:22 PM
To: Boone, Rachel M,
Subject: RE: Docket No. 'Assignment: (V) St. Vincent Sports Performance Center - Signage (#08090013-15,
20-22, 24-26 V)
Rachel
It is my understanding that the ground sign will be moved out of tbe proposed right-of-way for 131 st
Street. J will provide revised plans as soon as possible. Many thanks,
Best regards,
Paul
Paul "G. R~is
Bose McKinney 8. Evans LLP
E-mail: PReis@I:lQSElLaw,cQtTI
Direct phol'le: 317-684~536'9
"""'!1'I,tlQ~E:'lil",,9()rn
From: Boon~, Rachel M. (mailto:rboone@carmel.in.gov]
Sent: Tues'da'y, September 2.3; 2008'4:36 PM . "".",. . ,
To: Blanchard; Jim E; Brewer, 'Scott I; Conn, Angelina V; Coy, Sue E; DeVore, Laura B; Donahue-Wold, Alexia K;
Hancock, Ramona Bi Hollibaugh, Mike P; Holmes, Christine B; Keeling, Adrienne M; Littlejohn, David W; Stewart,
Lisa; Tingley, Connie S
Cc: Reis, Paul
Subject: Docket No. Assignment: (V) St. Vincent Sports Performance Center - Signage (#08090013-15, 20-22,
24-26 V) ,
I have updated the file. I have contacted the petitioner and issued the necessary Docket Numbers for (V) St.
. Vincent Sports Periormance Center. Signage. It will be the following:
'.'. ...
Docket No, 08090013V
DocketNo.08090014V
Docket No. 08090015V
DocketNo.08090020V
DocketNo.08090021V
DocketNo.08090022V
Docke~.No.68090,o24V
Docket No. 0809002q\)'
Docket No.08090026V
Total Fee:
$1090.00
$515.00
$515,00
$515.00
$515.00
$515.00
$515,00
$515.00
$515.00
$5210.00
Development Standards Variance fee
Each ar;lditional variance fee
Each additional variance fee
Each additional variance fee
Each additional variance fee
Each additional variance fee
Each additional variance fee
Each additional variance fee
Each additional variance fee
(V) 51. Vincent Sports Performance Center - Signage
The applicant seeks the following development standards variance approval:
Docket No. 08090013 V Ch. 25.07.02-10 c) Increase in wall sign area - east
Docket No. 08090014 V Ch. 25.07.02.10 c) Increase in wall sign area - west
Docket No. 08090015 V Ch. 25.07.02-10 b) Total number of signs
9/24/2008
Page 2 of3
Docket No. 08090020 V
Docket No. 08090021 V
Docket No. 08090022 V
Docket No. 08090024 V
Docket No. 08090025 V
Docket No. 08090026 V
Ch. 25.07.02-10 b)
Ch. 25.07.02-10 b)
Ch. 25.07.02-10 b)
Ch. 25.07.02-10 b)
Ch. 25.07.02-10 b)
Ch. 26.04.02
Two signs facing one right of way
Ground sign height
Ground sign located in the right of way
Wall sign not facing a right of way - east
Wall sign not facing a right of way - west
Reduction in perimeter yard buffering
The site is located at 13400 N. Meridian St. It is zoned 8-6, Light commercial and office uses adjacent to limited
access highways. Filed by Paul Reis of Bose McKinney and Evans.
-
Petitioner, please note the following:
1. This Item will not be on an agenda of the Technical Advisory Committee
2. Mailed and Published Public Notice needs to occur no later than Thursday, October 2. Published notice
is required within the Indianapolis Star. Note: the placement of a public hearing sign on the property is
also required by the BZA Rules of Procedure, Article VI, Section 6 (see atta.ched pdf).
3. The Proof of Notice will need to be received by this Department no later than noon, Friday, October 24.
Failure to submit Proof of Notice by this time will result in the tabling of tl)e petition.
4. The Filing Fee and Nine (9) Informational Packets must be delivered to BZA Secretary Connie Tingley
no later than NOON, Friday, October 17. Failure to submit Informational'Packets by this time will result in the
automatic tabling of the petition to the November 24, 2008 agenda of the BZA.
5. This Item will appear on the October 27,2008 agenda of the Board of Zoning Appeals under Public
Hearings. . co,
6. The petitioner will need to provide a fully filled-out Findings-of-Fact'sheet for each petition the night of
the meeting for the Board's use (Sheet 8). On Ballot sheets, only fill out docket number, petitioner, and date
(Sheet 7). Ballot sheets must be collated.
7. Either the Petitioner or sOmeone representing the Petitioner must'be'present at the meeting for the item to
be heard. If no one appears, it will be tabled to the November 24,2008 meeting.
8. PETITIONER: refer to your instruction sheet for more details.
Mr. Reis can be contacted at 317 ~684-5369.
Degartment's Review Comments: Retitioner. please complete the following:
1.) Make sure the public notice meeting time to the newspaper and neighbors reads 6:00 PM, It is suggested to
send the notice to the Indianapolis Star newspaper by Noon, two days prior to the printing deadline (317-444-
7163 or email: publicnotices@indystar.com).
2,) Please make checks payable to the'City of Carmel.
3.) Please provide filled out and notarized placement of public notice sign affidavit:
4.) Please provide proof of notice from the Indy Star. .
5.) The following variances were added but were not mentioned in any of the submitted applications: two signs
facing one right of way, ground sign height and ground sign located in a right of way. If the Petitioner would
please resubmit statements/findings for these variances, we would greatly appreciate it.
6.) The maximum height for a ground sign in this area is 6' tall. 9'6" was req,uested.
7.) There is a 60' proposed half right of way according to the Thoroughfare Plan. The sign is proposed at 17' from
the existing right of way line. This is 35.5' too close to the proposed half right of way of the Thoroughfare Plan. .
The sign will need to be moved back 70' from the center line of the road .to be in compliance. (10' back from the
right of way line)
8.) The variance submitted for 100% logo was not issued a docket number because the Department feels that
since the entire building is for St. Vincent and its affiliates/departments, a variance for logo percentage is not
necessary.
Thank you.
RacJuiI.; 13 00l1.e-'
Sign Permit Specialist
Department of Community Services
9/24/2008
Page 3 of3
City of Carmel
One Civic Square
Carmel, IN 46032
317.571.2417
317.571.2426 fax
httR :/Iwww.ci.carmel.in.us/services/communit}.service.html
This message is from the law firm Bose McKinney 8. Evans lLP. This message and any attachments may
contain legally privileged or confidential information, and are intended only for the individual or entity identified
above as the addressee.
If you are not the addressee, or if this message has been addressed to you in error, you are not authorized to
read, copy, or distribute this message and any attachments, and we ask that you please delete this message and
attachments (including all copies) and notify the sender by return e-mail or by phone at 317-684-5000. Delivery of
this message and any attachments taany person other than the intended recipient(s) is not intended in any way
to waive confidentiality or a privilege.
All personal messages express views only of the sender, which are not to be attributed to Bose McKinney &
Evans llP, and may not be copied or distributed without this statement.
9/24/2008
Xenton C. Ward; LJ:M
Surveyor of J{a;mi{ton County
Thone (317)776-8495
:Fax (317)776-9628
Suite .188
One J[ami{ton County Square
:No6Cesvi{{e, lnc{iana 4606()-2230
ww')v, co.liamilton, in. tiS
August 5, 2008
Woolpert, Inc,
ATTN: Jon Sheidler
7140 Waldemar Drive
Indianapolis, IN 46268
VIA E-MAIL: jO!1,sheidler(rl)woolperLcom
RE: St. Vincent Sports Performance - Carmel
Dear Mr. Sheidler:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office
on July 17,2008, for this project and have the following comments:
1. The proposed project falls in the incorporated area and MS4 jurisdiction of the City of
Carmel.
2, The proposed project DOES NOT fall in a Cannel Wellhead Protection Zone,
3, The proposed project does not fall in a Hamilton County Regulated Drain Watershed,
4. No permits will be needed from our office,
5, Please direct all stomldrainage questions to the City of Cannel Engineering
Depaliment
Should you have any questions, I can be reached at 317-776-8495.
Sincerely,
~V4~...
'--, .,"
- -.-,. - -,' :-, ". ,.-..... './
.........:".........:-...._.,.....,........ ......................:i.;_.....
,".' ,.'Y.. ". '.. _, :'" _....:.)
. .' . .. . ..
Greg Hoyes, AC, CFM
Plan Reviewer
CC: Christine Barton-Holmes - Carmel DOCS
Amanda Foley - Carmel Engineering
Dick Hill- Carmel Engineering
Greg Illco - Crossroad Engineers
"
II
\
Page 1 of 1
Holmes, Christine B
From: Holmes, Christine B
Sent: Tuesday, July 22, 2008 3:20 PM
To: 'Reis, Paul'
Cc: Conn, Angelina V; Boone, Rachel M.
Subject: Additional variances for St. Vincent Sports Performance Center
Paul,
In reviewing the submittals for the variances and DP/ADLS petitions, we have found that you may need a few
additional variances, based on the site's location within wo overlay districts, the site design, and the materials
proposed. P-lease look over the list below, and let me know if there are any variances you think may not apply. If
you hav ny questions, please let me know,
t" /C3ncrete block as a finish material, Section 23B,09.B...... rlL#L.6)6/1!Y1.1, vt-6.f m V, rd 10 'Zl UZ().
l'/Exceeding. permitted gross floor area of 40%/35%, Section 238,08.05,B 1?t" fl,trO'f 1-
~. Adopted site plan, Section 20G.04.01.A~
. EIFS parapC't;also Section 23B.09,B.
.5 Reduction in required bufferyard plantings, Sections 26.04 and 23B.0802A
~ Integral signs over three square feet, Section 25.07.01-03
~ Number of wall signs, Section 25.0702-05j..,
, .' Size of wall signs, Section 25,07.02-05, .... iN 1M h:~rtt M W/i ftJ ql9!:f ,J 11 D.
9. Signs facing a non-public right-of-way, Section 25.07.02-05.. E }, V1 + Q., CJ (l.Oect) fDt:}q;, 61'0 {j
Thanks, .pa ~o ~q(l /J.aJ1~ -
Christine
Christine Barton-Holmes, LEED AP
Planning Administrator
Department of Community Services
City of Carmel
One C.ivic Square
Carmel, Indiana 46032
317,571,2424
317.571.2426 fax
~ PICLlSC l;onsldcr the environmen! .bef{iiD prinli-ng
9/12/2008