Loading...
HomeMy WebLinkAboutCorrespondence October 3, 2008 Crry~6F . 82fRMEL Ms. Sherri Wilson, Pennit Specialist Cripe Architects + Engineers 7172 Graham Road Indianapolis, IN 46250 J~\i\'IES BRAINARD, lVIA\'OH RE: Carmel East Salt Barn-Project Review #3 Dear Ms. Wilson: The Cityhas received your comment letter and drawings dated September.l7, 2008 based upon the City review of June 19,2008, The comments from the City review haY~been satisfactorily addre.ssed with the following exception: CONSTRUCTION PLAN REVIEW COMMENTS 39. Sheet C30I. c. Please establish and id~ntifY the'MFPGand MLAGelevations on the plans, and add these defmidons ofMFPG and MLAG to the. plans. Repeat this comment. Did not find the. definitions of ~he MFPG and MLAG on Sheet (:301. If they are located elsewhere in the plans, please point Qut the location. 41. Sheet 0401. I a. Please indicate how the, heml will be restored and stabilized after utility work. ThanJ< you for explaining tha~ all utilities will be directional bored. Please indicate on the plans that all utilities Will be directional bored. If you have questions, please contact me at 571-2441. GocyD M~ Assistant C' y Engineer Departmen f Engineering CC (via email): Angelina Conn, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Distribution Paul Arnone, Carmel Utilities Collection Dave Huffman, Cannel Street Commissioner Greg.Hoyes, H.amiltonCbunty SUrveyor's Office Greg Jlko, Crossroad Erigin.eers, PC CC: DepartmentReview/File Copy 'll , \\Apps2\user dala\eng\shared\DHill\PROJ REVD8\sTREETDEPTEASTSAL TBARN#J.doc .~ DtI'ART/.IENT m' ENGINEERING ONE CIVIC SQUARE, CARNIE!., .r~ 46032' OI't'ICE 317.571.244'1 FAX 317.571.2439 EN-L>\ll eng.nCedlig@c:lflnd.in.gov j 3939 Priority Way South Drive Suite 400 . Indianapolis, Ilndiana 46240 317.844.67771 FAX# 317.706.6464 W'vVW.cripe.biz; ...- Cripe ~@ TRANSMITT AL , . ,~ Architects + Engineers RECEIVED , \, Solutions by Design Since 1937 Date: 9/12/08 I I Cripe Job#: 99048~-1 0700 \ DOCS . ....~~( .~ c:,(~~ ..' ',~ /r )/':''-'-'"7~ r ''-'':' ~,,' . To: ......... J ."'" Carmel DOCS One Civic Square. 3rd Floor Carmel, IN 46032 Re: Carmel East Salt Barn Re-design submittal \' t. Attention: Angie Conn - 571-2417 We are sending you the following items via: Courier Shop Drawings Prints X Plans Samples Specifications X Copy of Letter Change Order I X Attached X Report Other C~ies Date Description 1 9/5/08 Revised Construction Documents 1 9/12/08 Response Letter 1 5/16/08 DroinogeReport 1 9/12/08 CD w/electronic files, 1 Building Elevations I , 1 Site Lighting Plan - Sh.eet E 1 00 I 9/12/08 Copies of Response Letters I 9/12/08 Copies of Transmittals THESE ARE TRANSMITTED os checked below: X For A roval Submit A roved as Submitted Co For Your Use Return A roved as Noted Co les tor. Distribution .As Re uested NotA roved Reviewed lor Com lienee Resubmit Corrected Prints X For Review and Comment Remarks: Revised plans for the re-desigri of the Carmel East Salt Barn. Please contact Graham Lewis at 317-706-6365 or qlewis@cripe.bii with any questions. c: Scanned to file Signed: Sherri Wilson, Permit Specialist, 706-6419 Transmittal Only: Notice: Thedrawing/eomputer flies listed above ar!e the property of Cripe Architects + Engineers and are transmitted tor reproduction usee only. Any modification or reuse: of the documents withoul written permission from Cripe Architects + Engineers is prohibited. Any person or entity using t~ese documents for any purpose other than the project for which Ihey were originally intended, with or without permission from Cripe Architects + Engineers, by their use agrees to indemnify and hold h~rmless'Cripe Architects + Engineers from any 105s, including, but not limited to attorney's lees occurring from their use. 0:\ 1999\990488\ 1 0700\DOCS\PERMITS\EASr SALT BARN\ rAC, SUBMITT At 9c 12c08\TRANSMITT AL_CARMELDOCS_2008_09 _12.DOC '. o ~ Cripe -, --/@ ~- ~ Architects + Engineers Solu[ions by Design Since 1937 Telephone 317 844 6777 Facsimile 317 706 6464 3939 Priority Way South Drive, Suite 400 Indianapolis, Indiana 46240 www.r:ripe.biz September 12, 2008 Ii:./:i-'r- 1.:.1.,t./bt/J Angie Conn City of Carmel Department of Community Services One Civic Square Carmel, IN 46032 lJOOs ;'\ " "--~ RE: Carmel East Salt Barn Dear Angie: Please find our responses to your comments e-mailed May 19, 2008. Department of Community Service's Initial Review Comments: ,. Comment: Complying with the Alternative Transportation Plan may be required: check with David Littlejohn, the Alternative Transportation Systems Coordinator. Response: This building will not be occupied by employees. The building will be used fo store salt to be picked up by Street Department salt trucks during winter conditions. Therefore, bike parking and walking paths are not applicable fo this project. 2. Comment: Additional comments maybe made at the T AC meeting. Response: Comment noted. 3. Comment: PETITIONER: Please wait to submit revised materials until after the Technical Advisory Committee (T AC) has met on this application. The resubmitted materials should include edits addressing any comment or requirements that arise from the T AC meeting. Additional comments may be made after the requested revisions have been submitted, Response: Comment noted. 4. Comment: A copy of the revised landscape plan may be required. Please check with Scott Brewer, City Forester. Response: Scoff Brewer made comments at TAC meeting. We have no outstanding issues. ~ C~.e Architects + Engineers Solutions by D~5.ign Since 1937 Telephone 317 844 6777 Facsimile 317 706 6464 3939 Priority Way South Drive, Suite 400 Indianapolis. Indiana 46240 www.cripe.biz ( 5. Comment: Please show the trash dumpster location and how it is screened from view, if applicable. Response: There will not be a proposed trash dumpster. 6. Comment: Please provide digital copies of these plans, either pdf or jpg. Response: A CD has been included with this response letter. 7. Comment: Curb cut approval will be done through the Engineering Dept. with the BPW. Response: Comment noted. a. Comment: Show any parking spaces on the site plan. Response: There are no parking spaces for this facility. This facility wi(( not be occupied by employees. 9. Comment: Show any mechanical equipment and how it is screened from view. Response: There is no mechanical equipment for this facility. 10. Comment: Please provide building elevations that are to-scale and label the materials and colors. Response: Building elevations are enclosed with this response. 11. Comment: Please provide a copy of the drainage calculations. Response: A copy of the drainage calculations is enclosed with this response. 12. Comment: Please provide the lighting details and specs of any wall lights or pole lights. Response: A site lighting plan is enclosed with this response. 13. Comment: please provide sign age details, such as location, height, design, text. color, etc. Response: There is no proposed signage at this time. 0:\ ;999\990488\ 10700\docs\Permils\Eost Salt Barn\Response Letter_City of Carmel OOCS_2008_09_12.doc ~ Cripe ---@ - Architects + Engineers Solutions by Design Since 19~7 Telephone 317 844 6777 3939 Priority Way South Drive. Suite 400 Indianapolis, Indiana 46240 www.cripe.biz ( Please contact me at 317-706-6365 with any questions. Thank you, CRIPE ARCHITECTS + ENGINEERS ~kL Graham Lewis Project Manager cc: Dave Huffman, Carmel Street Department 0:\1999\990488\ 10700\docs\Permils\Eosl Solt Barn\Response Letter_City of Carmel DClCS_2008_09_12.doc Facsimile 317706 6464 ~ Cripe ! ......... -' 'B\ Architects + Engineers 5olutions by Desjgn Since 1937 Telephone 317 844 6777 'Facsimile 317 706 G-1G'l 3939 Prlotity Way South lDrive, Suite 400 Indianapolis, IndiFlni'l 46240 www.cripe.biz September 12, 2008 --..... Mr. Nicholas Redden, PE City of Carmel. Engineering Department One Civil Square Carmel, IN 46032 "...1 '", ljJfC&~ ,~ ,SFr f/) "' ,1;; L, iJ'.? /J 'c. VeS '. '" .. .-......~ ..' RE: Carmel East Salt Barn Dear Nick: Please find out responses to your comment letter dated June] 3. 2008. Construction Plcn Review Comments 34. Comment: storm Water Management a. This project is subject to the City's Storm Water Management and Storm Water Quality Ordinances. b. Please contact John Thomas to review storm water quality/treatment requirements. Response: John Thomas has commented on the plan and his comments have been addressed. 35. Comment: All asphalt pavemen~ within the City right-af-way shall be 1.5 inches HMA #] 1 surface on 2 inches HMA #8 binder on 3 inches HMA #5D base on 7 inches #53 stone on 4 inches #2 stone. I Response: Detail PV-36A on Sheet C202 has been revised to illustrate the City of Carmel. standard pavement section noted above. 36. Comment: Please develop and provide maintenance of traffic pions for the storm sewer connection and entrance construction. Such plans shall conform to the Indiana Department of Transportation Work Zone Safety Manual. Response: Please see Sheet C60 1 for Maintenance of Traffic Plan. 37. Comment; Please add a note to all sheets that "NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT." Response: Please see note added to all sheets in attached set of construction plans. 38. Comment: Please revise keynote 3 on C 1 0 1 to indicate sawcut and removal of existing curb to the nearest existing joint. . Response: Keynote has been reVIsed. Please see Sheet C 101. ~ C~e.e I Arohitects O' Engineers , SoJutions by Dt!sign Since '1937 Telephone 317 844 6777 F"lcsill1ile 3J7 706 G/lGtl 3939 Priority Wa~r Southl Drive, Suite -100 lndiilnapolis, Indiana 46240 wV/w,ciipe.biz 39. Comment: Sheet C301 a._P-Le.os.e.-add-D-sp.oLeLe.v..otLooJoctb.eJD_YLSp.o.Lioj,b.e-Qr.o..v_eLdri}Le_o.v.er_pipB_lOA::.l.OS.. b. The 1 OO-year elevation of :the pond is less thon 50 feet tram the right-af-way. Please revise. (Very slight:encroachment into this 50-foot setback). c. Please establish and identify the MFPG and MLAG elevations on the plans, and add these definitions of MFPG and MLAG to the pions. d. Please add the summary drainage information required by Section 100 of the Storm Water Technical Standards Manual. e. Please revise the contours of the proposed entrance such that water will flow in the proposed gutters. Are curb turnouts necessary? f. What is the slope of the "gutter" being created at the new/existing pavement interface? g. All swales ore required to have subsurface drains. h. Curbing in the right-at-way is required to have subsurface drains. Is such subsurface drain does not' hove a positive outlet, it still needs to be installed so that it may be connected, in the future Response: a. The spot has been added. b. The pond has been movei;J. c. The MFPG and MLAG havfi'; been identified. d. The drainage summary ha,s been added. e. Curb-turnouts have been added and the drive regarded for positive drainage. f. Minimal, however there is i, % from the middle of the drive to the turnouts. g. SSD's are not required on water quality swales. The swales are also at 1.00% slope. I h. Through conversations wit~ Gary Duncan it has been decided that SSD's will not be required under the curb in the right-of-way. 40. Comment: Please indicate on all sheets that "approval is pending" until plans are approved. I Response: Plans have been stamped by registered engineer for bidding and construction. Construction will not, commence until all approvals are obtained. 41. Comment: Sheet C401 a. ,Please indicate how the berm will be restored and stabilized after utility work. Response: The existing berm will n'ot be disturbed. AU proposed utilities will. be directional bored. 42. Comment: Sheet C501 a. The pipe under the new dr;ive shall be 18" minimum. Response: The pipe size has been revised. Please see Sheet C50 1. (;:r\ I Q9;l\ QQ~lr1l3-R\ 10:7nn' r-l,.....,,-.-r-\ Po,.....,...,lh\ r:r""Id ~I"'lll ~nrn"\ It.r:\cr'\'-~n~,ij' I.f'itp.~ rity (7lt r-'--'~mol k'c.rl,".k:ir-. ";,"''\IIC'1: n~'., ~.-..,... .~ Cripe /@ Architects + Engineers S~lution.s by DesIgn Since 1937 Telerhone 317 844 6777 Facsimile 317 706 6464 3939 Pr~ority Vllay South; Drive, SlJite 400 Indianapolis, Indian.a 4G2LlO www.Cripc.biz If you have any comments or questions, please feel free to contact me at 317-706-6365. Thank you. CRIPE ARCHITECTS + ENGINEERS ~/1~ Graham Lewis Project Manager cc: Dave Huffman, Carmel Street Department Angie Conn, Carmel DOCS o.~ 199~~904S~ ~Q7((l\ rJC\c:~~ Pnr.....-;~r\ I=,...,e+ ~,..,I+ rt<""1rn\ I?t:lo:u...,,........t~ I ~+;pr rillr!'lF rnrqJol_P=rlrlPQ 70nR a~ r? 9:"")..... ~ Cr~ ~.e Arc~itects + Engineers Sal.utioos by Design Sir"lcl2 1037 Telephone 317 844 6777 Fac~imilc 317 706 6-'1611 3939 Priority Way South Drive, Suita 400 InrJlanilpolis, Indiana 46240 www.cripC..biz September 12, 2008 Mr. John Thomas City of Carmel, Engineering Department One Civic Square Carmel, IN 46032 RE: Carmel East Salt Barn Dear John: Please find our responses to your comment letter emailed to us June 17.2008. 1. Comment: I recommend that native salt-tolerant plants be used within dry detention basin and all vegetative swales. 1'1 would also be ideal if these tolerant species could be used along both sides oUhe drive as well. . I Response: A plant mixture has been created to resist salts. Please see Sheet C40 I for plant mixtures and areas of application. 2. Comment: I would like to emphasize that 011 applicable environmental permits must be obtained for the onsite incinerator. These may include, air. land, and water permits. I would suggest colling the Compliance and Technical Assistance Program line ((800) 988- 7901) at the Indiana Deportment :of Environmental Management to determine which/if any permits are needed. Applicdble permits may require specific design criteria that could affect the project layout. Response: The incinerator does not need to be permiHed per conversations with an engineer at IDEM Air compliance :department. 3. Comment: Per Greg Hoyes response letter, please make sure any wellhead protection zone requirements are met. Response: I spoke with Greg Hayes about this comment. There are no outstanding issues regarding this comment. Thank you, CRIPE ARCHITECTS + ENGINEERS ~s)( ew.. Project Manager , o'~ I ~..9);99C4&B\ lQ:QQ~ 99--'[\ f}mm;t-\ ~-...~I. I=l.....r,...,\ RaIpO'1ie j".e.thir r;:<Grm9'...f~:J~ lh.-...-.-,...,r '")(l.nQ" no ~ 1") --1......,.-. ~ c r! ~.e Architects + Engineers So!uHons by Design Since 1937 Telepho/le 317844 6777 Facsimile 317 706 6464 3939 Priority Way South Drive, Suite 400 l/ldi"napolis, Indiana 46240 www.cripe.biz September 12,2008 Mr, steve Cook City of Carmel Water utilities 3450 W 13 pt street Westfield, IN 46074 RE: Carmel East Salt Barn Dear steve: Please find our responses to your comment letter dated May 30, 2008. 1. Comment: Resubmit plans sho~ing water tap on 1 06th st. Carmel water main. Response: The tap location has been revised. Please see Sheet C50 J for revisions. Sincerely, CRIPE ARCHITECTS + ENGINEERS /1LlL Graham Lewis Project Manager cc: Angie Conn, Carmel DOCS Dave Huffman, Carmel Street Department I I I 0.\177, ,7'i~h\[""i Se,11 B", \1.,.,,,,,,,,,, LGtt~r_C"ffi,61 ,'I~~de.., I I '.~ c r.i e,e Architects"" Engineers I Solutiorts hy Df::'sign S3tlCE 1937 Telephone 317 844 6777 Facsimile 317 706 5464 3939 Priority Way SoulhiOrive. Suite 400 Indianapolis. Indiuna 46240 I www.cripe.biz September 12, 2008 Mr, Greg Hoyes Hamilton County Surveyor's Office One Hamilton County Square Suite 188 Noblesville, IN 46060 RE: Carmel East Salt Barn Dear Greg: Please find out responses to your comment letter dated June 5, 2008. 1. Comment: The proposed project falls in the incorporated area and MS4 jurisdiction of the City of Carmel. Response: Noted. 2. Comment: The proposed proj'ect DOES fall in a Carmel Wellhead Protection Zone. Response: Noted. 3. Comment: The proposed project falls within the Moffitt Williamson Regulated Drain Watershed. Response: Noted. 4. Comment: Please submit an indirect outlet permit (Fee waived for governmental entity) for the discharge into the Moffitt Williamson Regulated Drain. The application is available on our:website at http://www.co.hamilton.in.us. go to Departments, Surveyor, and Forms. Response: An outlet request fdrm has been included with this response letter. 5. Comment: The design does nGt meet the 6" minimum orifice size per the HCSTSM. but with the downstream restriction and the fact this is a facility that will be maintained by the City of ~ormel, we hove no objection to the orifice layout as designed. Response: Thank you. , . I,~ Cri8@e Architects, Engineers Solution5 by Design Since 1937 Telephone 317 844 6777 Facsimile 317 706 6464 3939 PriorHy Way South Drive, Suile 400 Indianapolis, Indiana 46240 www.c.-ipc.biz 6. Comment: Please note the additional comments may be warranted at a later El Elte , Response: Noted. Sincerely, CRIPE ARCHITECTS + ENGINEERS ~A~ Graham Lewis Project Manager cc: Angie Conn, Carmel DOCS Gary Duncan/Nick Redden, Carmel Engineering I C'\19Y'9'\~.Q.4~G-;ZOO\d~iliC\nijT1i~r\ ~~~4 'i~111 ~QW''.Ra.~~lll..tAGQ~\JN-ii''y<;)ol~1J l'-l-;l~~ ii 3939 Priority Way South Drive Suite 400 I Indianapolis, Irdiono 46240 317.844.6777 FAX# 317.706.'6464 www.cripe.biz TRANSMITT Al t:.'.. .' '-".- , [' '. ~.~~. i , ....... RECElVEO I Cripe ~. Architects + Engineers SalUIklnIl by Dull1n 5mce1lB7 \ \ Sff 1 ~) . DOCS Date: 9/4/08 I Cripe Job #: 99048~-1 0700 ... To: Carmel Building Department One Civic Square, 1 st Floor Carmel, IN 46032 Re: Carmel East Salt Barn Re-design submittal Attention: Bill Hohlt 571-2444 We are sending you the following Items via: Courier end of Day Shop Drawings Prints X Plans Samples Specifications Copy of Letter Change Order Attached Report Other , Copies Date Description 1 9/5/08 Revised Construction Documents 1 Building Elevations , THESE ARE TRANSMITTED as checked below: X For A roval Submit A roved as Submitted Co roval For Your Use Return A roved as Noted Co ies for Distribution .As Re uested Not A roved Reviewed for Com liance Resubmit Corrected Prints For Review and Comment Remarks: Revised plans for the re-design of the Carmel East Salt Barn. Please contact Graham Lewis at 317.706-6365 or qlewis@cripe.bii with any questions. c: Dave Huffman, Carmel street Dept. Angie Conn, Carmel DOCS Scanned to file Signed: Sherri Wilson, Permit Specialist, 706-6419 Transmittal Only: Notice: The drawing/computer files listed above are the property of Cripe Architects + Engineers and are transmitted lor reproduction use only. Any modification or reuse! 01 the documents without written permission from Cripe Architects + Engineers is prohibited. Any person or entity using these documents lor any purpose other than the project for which they were originally intended, with or without permission from Cripe Architecls + Engineers. by their use agrees to indemnify and hold harmless Cripe Architects + Engineers from anyl'oss, including, buf not limited to attorney's fees occurring from their use. I 0:\1999\990488\ 107DD\DOCS\PERMITS\EAST SALT BARN\TACiSUBMITTAL 9-12-08\TRAN$MITTAL_CARMELBLDG_2008_09_12.DOC i 3939 Priority Way South Drive Suite 400 Indianapolis. I,ndiano 46240 317.844.6777 . . FAX# 317.706.'6464 www.cripe.biz TRANSMITT Al Cripe ~. Architects + Engineers Salullan. blr Caalan 5lnca B7 Date: 9/12/08 I Cripe Job #: 99048~-10700 To: Carmel DOCS One Civic Square. 3rd Floor Carmel, IN 46032 Re: Carmel East Salt Barn Re-design submittal Attention: AnQie Conn - 571-2417 We are sending you the tollowing items ~ia: Courier Shop Drawings Prints I X Plans Samples Specifications X Copy 01 Letter Change Order X Attached X Report Other Copies Dale Description 1 9/5/08 Revised Construction, Documents 1 9/12/08 Response Letter I 1 5/16/08 Drainage Report . 1 9/12/08 CD w/electronic files 1 Building Elevations 1 Site Lighting Plan - Sheet E100 1 9/12/08 Copies of Response Uetters I ] 9/12/08 Copies of Transmittals THESE ARE TRANSMIITED as checked below: X For A roval Submit A roved as Submitted Co For Your Use Return A roved as Noted Co ies for Dislribution As Re uesled Not A roved Reviewed for Com lIance Resubmil COllected Prints x For Review and Comment Remarks: Revised plans for the re-design ofthe Carmel East Salt Barn. Please contact Graham Lewis at 317-706-6365 or Qlewis@cripe.bi~with any questions. c: Scanned to file , Signed: Sherri Wilson, Permit Specialist, 706-6419 Transmittal Only: I Notice: The drawlng/compufer flies Iislecl above are the property of Cripe Architects + Engineers and are transmitted for reproduction use only. Any moditication or reuse 01 the documents without written permission Irom Cripe Architects + Engineers is prohibited. Any person or entity using these documents for any purpose other than the project for which they were originally intended, with or wilhoutp~rmisslon from Cripe Archilects + Engineers, by their use agrees to indemnify and hold harmless Cripe Architects + Engineers from any ioss, including, but not limited to attorney's fees occurring lrom their use. I I 0:\ 1999\990488\ 10700\DOCS\PERMITS\EAST SALT BARN\TACj SUBMITTAL 9-12-08\ TRANSMITTA L_CARMELDOCS_2008_09 _12.DOC Cripe ~. An::::hitects+ Engineers 3939 Priority Way South Drive Suite 400 , Indianapolis, Indiana 46240 317.844,6777 FAX# 317.706.6464 www.cripe.biz : TRANSMITTAL Sa!utiana bjr O&aIlln Slnca '1!187 Date: 9/12/08 I Cripe Job #: 99048~-10700 To: Carmel Engineering Deportment One Civic Square, 1 st Floor Carmel, IN 46032 Re: Carmel East Salt Barn Re~design submittal Attention: John Thomas - 571-2441 We are sending you the following items via: Courier Shop Drawings Prints X Plans Samples Specincations Copy of Letter Change Order Attached X Report other Copies Date Description 1 9/5/08 Revised Construction! Documents 1 9/12/08 Response Letter THESE ARE TRANSMITTED as checked below: X For Approval Submit ~ Approved as Submitted Copies for Approval For Your Use Return Aooroved as Noted CODies for Distribution I As Requested Not Approved Reviewed lor Compliance SiQnoture Requested Resubmit Corrected Prints I For Review and Comment Remarks: Revised plans for the re-design' ofthe Carmel East Salt 8arn. Please contact Graham Lewis at 317-706-6365 or Qlewis@cripe.biz with any questions. c: Dave HufflJ1an, Carmel Street Dept. Angie Conn, Carmel DOCS Scanned to file Signed: Sherri Wilson, Permit Specialist, .706 -6419 Transmittal Only: Notice: The drawing/computer files listed above ar~ the property of Cripe Architects + Engineers and ore transmitted lor reproduction use only. . Any modification or reusel.of the documents without written permission from Cripe Architects + Engineers is prohibited. Any person or entity using these documents lor any purpose other than Ihe projecl for which they were originally Intended, with or without permission Irom Cripe Architects + Engineers, by their use agrees to indemnity and hold harmless Cripe Architects + Engineers trom any loss. including. but not limited to attorney's tees occurring from their use. I 0:\ 1999\990488\ 1 0700\DOCS\PERMITS\EAST SALT BARN\TAC,SUBMITTAl 9-12-08\TRANSMITT Al_CARMELENGINEERING- THOAMS_2008_09 ~ 12.DOC 3939 Priority Way South Drive $ui.te 400 Indianapolis, Indiana 46240 317.844.6777 I FAX# 317.706.'6464 I www.cripe.biz ' TRANSMITTAL Cripe ~. Archrtects + Engineers Salutlans bjr D;algn Stnca IIl87 Date: 9/12/08 , Cripe Job #: 990488-10700 To: Carmel Engineering Department One Civic Square, pf Floor Carmel. IN 46032 Re: Carmel East Salt Barn Re-design submittal Attention: Nick Redden - 571-2441 We are sending you the following items "';ia: Courier Shop Drawings Prints X Plans Samples Specifications , Copy of Letter Change Order Attached X Report Other Copies Date Description 1 9/5/08 Revised Construction Documents 1 9/12/08 Response Letter I 1 9/12/08 ReVised O&M Manual THESE ARE TRANSMITTED as checked below: X Far Approval Submit Approved as Submitted Copies for Approval For Your Use Return Approved as Noted Copies for Distribution As Reauested Not Approved Reviewed lor Compliance Sionature Reauesled Resubmit CorrecledPrints I For Review and Comment Remarks; Revised plans for the re-desig~ of the Carmel East Salt Barn. The drainage report did not change but the O&M Manual was updated and we have attached that. Please contact Graham Lewis at 317-706-6365 oralewis@crioe.bizwith any questi(ms. c: Dave Huffman, Carmel Street Dep.t Angie Conn, Carmel DOCS Scanned to tile Signed; Sherri Wilson, Permit Specialist, 706-6419 Transmittal Only: Notice: The drawing/computer files listed above are the property of Cripe Architects + Engineers and are transmitted for reproduction use only. Any modificotion or reuse! ,olthe, documents without written permission trom Cripe Architects + Engineers is prohibited. Any person or entity using these documents for any purpose other than the project for which they were originallyihtended, with or without permission tram Cripe Architects + Engineers, by their use agrees to indemnify ond hold harmless Cripe Architects" Engineers from any loss, including, but not limited to attorney's fees occurring from their use. 0;\ 1999\990488\ 1 0700\DOCS\PERMITS\EAST SALT BARN\TACSUBMITTAL 9-12-08\TRANSMITT AL_CARMELENGINEERING-REDDEN_2008_09 _12.DOC 3939 Priority Way South Drive Suite 400 I Indianapolis, Irdiana 46240 317.844.6777 ; FAX# 317.706.;6464 www.cripe.biz I TRANSMITT AL Cripe ~Gt AochFtects 0/- Engineers Salutlanll b:Ir DmIIlgn SInce 1IB7 Date: 9/12/08 I Cripe Job#: 990488-10700 I To: CrossRoad Engineers 3417 Soulh Sherman Drive Beech Grove, IN 46107 Re: Carmel East Salt Barn Re-design submittal Attention: GreaolV IIko I We are sending you the following items via: Courier - 1 hour Shop Drawings Prints , X Plans Samples Specifications Copy of letter Change Order Attached X Report Other Copies Date DescriptIon 1 9/5/08 Revised Construction Documents 1 9/12/08 Revised O&M Manual 1 9/12/08 Copy of Response Leitter to Carmel Engineering THESE ARE TRANSMITTED as checked below: x For A roval Submit A roved as Submitted Co roval For Your Use Return A roved os Noted Co ies for Distribution As Re uested Not A roved Reviewed tor Com lionce Resubmit Corrected Prints For Review and Comment Remarks: Revised plans fl)r the re-desi9'l of the Carmel East Salt Barn. Please contact Graham Lewis at 317-706-6365 or alewis@crioe.biz with any questions. c: Carmel Engineering Dave Huffman, Carmel Street Dept. Angie Conn, Carmel DOCS Scanned to file Signed: Sherri Wilson, Permit Specialist, 706-6419 I Transmittal Only: Notice: The drawing/computer tiles listed above are fhe property of Cripe Architects + Engineers and are transmitted for reproduction use only. Any modification or reuse, of fhe documents wifhout written permission from Cripe Arc"ltects + Engineers is. prohibited. Any person or entity using t~ese. documents for any purpose other thon the project for which they were originally intended, with or without permission tram Cripe Architects + Engineers, by their use agrees to indemnity and hold harmless Cripe Architects + Engineers from any loss, including, but not limited to attorney's fees occurring irom their use. I I 0:\ 1999\990488\ 1 0700\DOCS\PERMITS\EAST SALT 8ARN\TAC,SUBMITTAL 9-1 2-08\TRA NSMITTAL_CROSSROA D_2008_09 _12.DOC 3939 Priority Way South Drive . , SUite 400 , Indianapolis, Ilj'ldiono 46240 317.844.6777 I FAX# 317.706.6464 www.cripe.biz ' TRANSMITT AL Cripe ~. Architects + Engineers Salutlon. ter Dull1n smell 'IlB7 Date: 9/12/08 I Cripe Job #: 990488-10700 To: Hamilton County Surveyor's Office One Hamilton County Square, Sui'te 188 Noblesville, IN 46060 Re: Carmel East Salt Barn. Re-design submittal Attention: Greg Hoyes . (317)776.8495 We are sending you the following items ~ia: Courier - end of day Shop Drawings Prints I X Plans Samples Specifications Copy 01 Letter Change Order Attached Report Other Copies Date Description 1 9/5/08 Revised Co nstruction' Documents 1 9/12/08 Outlet Request 1 9/12/08 Response Letter 1 9/12/08 Revised O&M Manual THESE ARE TRANSMITTED as checked below: X For A roval Submit A roved as Submitted Co For Your Use Return A Toved as Noted Co ies tor Distribution AsRe uested Not A roved Reviewed for Com Iiance Resubmit Corrected Prints For Review and Commenl Remarks: Revised plans tor the re-designof the Carmel East Salt 8arn. Please contact Graham Lewis at 317-706-6365 or glewis@cripe.bi~ with any questions. c: Dave Huffman, Carmel Sfreet Dept. Angie Conn, Carmel DOCS Scanned fo file . Signed: Sherr! Wilson, Permit Specialist, 706-6419 . I Transmittal Only: Nolice: The drawing/computer files listed above ar~ the property of Cripe Architects + Engineers and are transmitted for reproduction use only. Any modification or reuse, of the documents without written permission from Cripe Architects + Engineers is prohibited. Any person or entity using these documents for r:iny purpose other thon the project lor which they were originally intended, with or without permission from Cripe Archite,cts + Engineers, by their use agrees to indemnify and hold harmless Cripe Architects + Engineers horn any (ass, including, but nof limited to attorney's fees occurring from their use. 0:\ 1999\990488\ I 0700\DOCS\PERMITS\EAST SALT BARN\TAC;SUBMITTAL 9-12-08\TRANSMITTAL_HSCO_2008_09_12.DOC 3939 Priority Way South Drive Suite 400 Indianapolis. Indiana 46240 317.844.6777 , FAX# 317.706.0464 www.cripe.biz I TRANSMITTAL Cripe ~e A.rchltects + Engineers SalutlanD bv D;u!lIn 5lnctl 'Ii87 Date: 9/12/08 I Cripe Job #: 990488~ 10700 To: Indianapolis Power & Light 1230 W. Morris Street Indianapolis, IN 46221 Re: Carmel East Salt Barn Re-design submiftol Attention: Ron Morris 261 "5261 We are sending you the following items via: Next Day (Monday) I Shop Drawings Prints I X Plans Samples Specifications Copy 01 Letter Change Order , Attached Report Other Copies Dote Description 1 9/5/08 Revised Construction Documents THESE ARE TRANSMITTED as checked below: X For A roval Submit A roved as Submitted For Your Use Return A roved as Noted AsRe uested Not A roved Reviewed tor Com lIance Resubmit Corrected Prints X, For Review and Comment Co roval Co les for Distribution Remarks: Revised plans for the fe-design ot the Carmel East Salt 80m. Please contact Graham Lewis at 317 -706-6365 or C1lewis@crioe.biz with any questions. c: Dave Huffman, Carmel Street Dept. Angie Conn, Carmel DOCS Scanned to file Signed: Sherri Wilson. Permit Specialist. 706-6419 Transmittal Only: Notice: The drawing/computer files listed above arb the property of Cripe Architects + Engineers and are transmitted tor reproduction use only. Any modification or reusel of the documents without written permission from Cripe Architects + Engineers is prohibited. Any person or entity using these documents tor any purpose other than the project for which they were originally intended, with or without permission from Cripe Architects + Engineers, by Iheir use agrees 10 indemnity and hold harmless Cripe Architects + Engineers from any loss, including, but nol limited to attorney's fees occurring from their use. I 0:\ 1999\990488\ I 0700\DOCS\PERMITS\EAST SALT BARN\ TACiSUBMIITAL 9-1 2-08\TRA NSMIITA UP L.-2008_D9 _4.DOC Cripe ~It Ardlltects + Engineers 3939 Priority Way South Drive Suite 400 Indianapolis, l(1diano 46240 317.844.6777 I FAX# 317.706.6464 www.cripe.biz TRANSMITT AL $cII~tIonD illlI' cz...Illn 51n1;lll 'Ili87 Date: 9/12/08 I Cripe Job #: 990488-10700 To: Carmel Engineering Department I One Civic Square, 1st Floor Carmel, IN 46032 Re: Carmel East Salt Barn Re-design submittal Attention: Amanda Foley - 571-2441 We are sending you the following items ~ia: Courier Shop Drawings Prints I X Plans Samples Specifications Copy of Letter Change Order , Attached X Report Other , Caples Date Description 1 9/5/08 Revised Construction Documents 1 9/12/08 Revised O&M Manudl THESE ARE TRANSMITTED os checked below: As Re uested Not A roved Reviewed for Com liance x For A roval Submit A roved as Submitted Co roval For Your Use Return A roved as Noted Resubmit Corrected Prints For Review ond Comment. Remarks: Revised plans for the re-design of the Carmel East Salt Barn. The Drainage Report did not change but the O&M was update and is enclosed. Please contact Graham Lewis at 317-706- 6365 or Qlewis@cripe.biz with any questio,ns. c: Dave Huffman, Carmel Street Dept. Angie Conn, Carmel DOCS Scanned to file Signed: Sherri Wilson, Permit Specialist. 706-6419 Transmittal Only: Notice: The drawing/computer tiles listed above aie the .property of Cripe Architects + Engineers and are transmitted for reproduction use .only. Any modification or reuse' 'of the documents without written permission from Cripe Architects + Engineers is prohibited. Any person or entity using these documents for any purpose other than the project for which they. were originally' intended, with or without permissIon trom Cripe Architects + Engineers. by their use agrees to indemnify and hald harmless Cripe Architects + Engineers from any loss, including, buf notlimit,ed to attorney's fees occurring from their use. 0:\ 1999\990488\ 10700\DOCS\PERMITS\EAST SALT BARN\TACISUBMITTAL 9-12-08\ TRANSMITTAL STORMWA TER 2008 09 12DOC I - - -- 3939 Priority Way South Drive Suite 400 Indianapolis, Irdiana 46240 317.844.6777 FAX# 317.706:6464 wW\iV.cripe.biz : TRANSMITT AL Cripe ~. Archrtects + engineers SdUllanfll b)I Dullln s.,1CD 'IlEI1 Date: 9/12/08 I Cripe Job #: 990488-10700 To: Carmel street .Dept. 3400 West 131 sl Street Westfield. IN 46074 Re: Carmel East Salt Barn Re-design submittal Attention: Dave Huffman - 733-2001 We are sending you the following items ~ia: Courier - end of day Shop Drawings Prints , X Plans Samples Specifications , Attached Copy of Letter Change Order Report Other Copies Date Description 1 9/5/08 Revised Construction Documents 1 9/12/08 Copies of Response l:etters 1 9/12/08 Copies ot Transmittals THESE ARE TRANSMITTED as checked below: X For Approval Submit Aooroved as Submitted Cooies for Aooroval For Your Use Return , ADDrOved as Noted CODies for Disfribution As Requested Not Aooroved Reviewed tor Comoliance Sianature Reauested , Resubmit Corrected Prints >i For Review and Comment Remarks: Revised plans for the re-desigl\l of the Carmel East Salt Barn. Please contact Graham Lewis at 317-706-6365 or !::lIewis@cripe.biz with any questions. c: Angie Conn, Carmel DOCS Scanned to file Signed: Sherri Wilson. Permit Specialist. 706-6419 Transmittal Only: Notice: The drawing/computer files listed above are the property ot Cripe Architects + Engineers and are transmitted for reproduction use only. Any modification or reuse ot the documents without written permission from Cripe Architects + Engineers is prohibited. Any person or entity using fhese documents for any purpose of her than fhe projecf for which they were originally intended. with. or without permission itrom Cripe Architects + Engineers. by their use agrees to indemnity and hold harmless Cripe Architects + Engineers from any ,loss, including, but not limited to attorney's fees occurring trom their use. 0:\ 1999\990488\ 1 0700\DOCS\PERMITS\EAST SALT BARN\ TAC SUBMITIAL 9-12-0B\TRAN$MITTAL_$TREETDEPL200B_09_12.DOC 3939 Priority W,ay South Drive Suite 400 Indianapolis, Ir;ldiana 46240 317,844.6777 FAX# 317.706.6464 www.cripe.biz TRANSMITTAL Cripe ~Iit Architects + Engineers ScdutlllnlJ _ DIullln 5lnca 'IllIl7 Date: 9/12/08 I Cripe Job #: 99048~-1 0700 To: Carmel Water 3450 W. 1315t street Westfield, IN 46074 Re: Carmel East Salt 80m Re-design submittal Attention: Steve Cook 733-2855 We are sending you the following items via: Courier - End of Day Shop Drawings Prints , X Plans Samples Specifications Copy of Letter Change Order , X Attached Report Other Copies Date Description I 1 9/5/08 Revised Construction Documents 1 9/12/08 Response Letter THESE ARE TRANSMITTED as checked below' X For Approval Submit Approved as Submitted Copies for Approval For .Your Use Return Approved as Noted Copies for Distribution As Reauested Not Approved, Reviewed for Compliance Sh:mature Requested Resubmit Corrected Prints. I For Review and Comment Remarks: Revised plans for the re-design, of the Carmel East Salt Barn. Please contact Graham Lewis at 317-706-6365 or Qlewis@cripe.bii with any questions. c: Dave Huffman, Carmel street Dept. Angie Conn, Carmel DOCS Scanned to file Signed: Sherri Wilson, Permit Specialist. 706 -6419 Transmittal Only: Notice: Thedrawingjcomputer files listed above ar~ the property of Cripe Architects + Engineers and are transmitted tor reproduction use only. Any moditication or reuse! of Ihe documents without written permission from Cripe Architects + Engineers is prohibited. Any person or entity lJsing these documents lor any purpose other than tlie project for which they were originally Intended. with or without permission Irom Cripe Architects + Engineers. by their use agrees to indemnify and hold harmless Cripe Architects + Engineers from any I'oss. including. but not limited to offorney's fees occurring from their use. 0:\ 1999\990488\ 1 0700\DOCS\PERMITS\EAST SALT BARN\TACSUBMIITAl 9-12-08\ TRANSMITTAL_CARMEL WATER_2008_09 _12.DOC Page 1 of 3 Conn, Angelina V From: Graham Lewis (glewis@cripe.biz] Sent: Thursday, August 28, 2008 3:32 PM To: Conn, Angelina V Cc: Sherri Wilson Subject: RE: Carmel East Salt Barn Thank-you for your help! Certain areas of the site are within the 500 year floodplain (Zone X). We determined the nearest base flood elevalion to be 741.00. Our building finish floor \,viII be at 747.50 Thanks Again, Graham M. Lewis Project Manager Cripe Architects + Engineers 3939 Priority Way South Drive, Suite 400 Indianapolis, IN 46240 Phone: (317) 706~6365 Cell: (317) 250-0079 Fax: (317) 706-6365 From: Conn, Angelina V [mailto:Aconn@carmel.in.gov] Sent: Thursday, August 28, 20083:21 PM To: Graham Lewis Cc: Sherri Wilson Subject: RE: Carmel East Salt Barn Graham: I think you do not have to attend another TAC meetjng. You can just provide the revised plans via email and mail to all TAC members and work with them individually. Is this site in a floodplain? Here are my prior review comments from the original submittal: D~partment of Q/LrnmUJli!y Service's Initial Review Comments: 1.) Complying with the Alternative Transportation Plan may be required; check with David Littlejohn, the Alternative Transportation Systems Coordinator. 2.) Additional comments maybe made at the 1AG meeting. 3.) PETITIONER: Piease wait to submit revised materials until after the Technical Advisory Committee (TAG) has met on this application. The resubmitted materials should include edits addressing any comment or requirements that arise from the TAG meeting. Additional comments may be made after the requested revisions have been submitted. 4.) A copy of the revised landscape plan maY,be required. Please check with Scott Brewer, city forester. 5.) Please show the trash dumpster location and how it is screened from view, it applicable. 6.) Please provide digital copies ofthese plans, either pdf or jpg. 7.) Curb cut approval will be done through the' Engineering Dep't, with the BPW. 8.) Show any parking spaces on the site Plan.: 9.) Show any mechanical equipment and how it is screened from view. 10.) Please provide building elevations that arJ to-scale and label the materials and colors. 11.) Please provide a copy of the drainage ca1c~lations. 12.) Please provide the lighting details and spets of any wall lights or pole lights. 13.) Please provide signage details, such as lo~ation, height, design, text,. color, etc. 9/15/2008 June 19, 2008 Ms. Sherri Wilson, Permit Specialist Cripe Architects + Engineers 7172 Graham Road Indianapolis, IN 46250 JAMES BRAINARD, MAYOR EL RE: Carmel East Salt Barn - Project Review #2 Dear Ms. Wilson: The City received your construction plans on May 16, 2008 for the June 18 Technical Advisory Committee meeting. We offer the following comments: GENERAL INFORMATION 1. These comments represent the Department of Engineering's first review of the construction plans for this project. 2. We request that all responses to our future comments be provided in writing and be accompanied by drawings reflecting the requested revisions. Failure to provide written responses may result in the delay of the review process. 3. It is critical that this office be made aware of all modifications made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. 4. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. If you have not already done so, please provide a set of drainage plans and calculations to their office for review. We will share Crossroad's comments as they are received. 5. Final drawings will not be approved for construction until: a. All Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved. b. All bonds and performance guarantees are posted. c. All Board of Public Works and Safety approvals and any other governing agency approvals (if required) are obtained. d. All off -site easements necessary to install utilities to serve the development are secured. e. Any required fees are paid in full. f. Required digital files have been submitted. 6. The Department reserves the right to provide additional comments based upon subsequent reviews as more detailed information is submitted. 7. An approved Storm Water Management Permit is required prior to commencing any earth disturbing activity. 8. An approved right -of -way permit is required prior to commencing any work in the public right -of -way. 9. If it will be necessary to relocate existing utilities or other infrastructure, the costs for such relocations are to be borne solely by the developer. Any utility poles required to be relocated within the right -of -way shall be relocated to within one foot of the proposed right -of -way. 10. The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primary plat, secondary plat, and construction drawings be made. The digital files must be submitted to DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineering@carmel.in.gov Ms. Sherri Wilson June 19, 2008 RE: Carmel Street Dept. East Salt Barn-Rev. #2 Page 2 of 4 the Department of Engineering prior to the approval of the construction plans. Please contact the City GIS Department for the requirements. 11. Jurisdictions: a. The project site is located within current City of Carmel Corporate Limits. b. Streets and Right of Way — City of Carmel (Gray Road/106t Street) c. Water — City of Carmel Utilities d. Sanitary Sewers — City of Carmel Utilities e. Storm Sewers /Drainage — City of Carmel. f. Legal Drains — Hamilton County Surveyor's Office. 12. Drawings submitted for approval: a. The design engineer must certify all drawings submitted for final approval. b. This office will require a minimum of 7 sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and signed by the City Engineer and by Carmel Utilities. The Owner will receive 3 -sets, 1 of which must be maintained on the construction site at all times. 13. Carmel Utilities will provide separate reviews of this project for water and sanitary sewer issues. Please assure that copies of all drawings are sent to: Paul Pace Paul Arnone Carmel Utilities Distribution Carmel Utilities Collection 3450 West 131x` Street 901 North Rangeline Road Westfield, IN 46074 Carmel, IN 46032 14. Carmel Utilities does subscribe to "Holey Moley" who should be contacted directly for all water main locations. 15. Digital versions of the following information are available upon request. Please share these requirements with the developer and future contractors associated with the project: a. Project Approval Checklist b. Performance/Maintenance Guarantee Requirements c. Performance /Maintenance Guarantee Release Procedure d. Engineering Requirements for Building Permit Approval e. Commercial Permitting Procedures f. Utility Jurisdictions /Right of Way Permit g. Water and Sanitary Sewer Fees BOARD OF PUBLIC WORKS AND SAFETY 16. I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. 17. Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and /or the Board of Zoning Appeals (if applicable) and completion of review by the Technical Advisory Committee. All written requests to be placed on the Board's agenda must include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission and /or the Board of Zoning Appeals (if applicable). 18. Water and Sewer Availability (EDU) approval from the Board will not be applicable for this project. 19. Commercial Curb Cut Approval — Please provide a letter of request with exhibits including width at throat, width at pavement, radii, opposing existing curb cuts if applicable, etc. 20. Temporary Construction Entrance — It appears that the construction entrance will be in the same location of the permanent curb cut and will not require separate Board approval. 21. The installation of any permanent, privately owned and/or maintained improvement (signs, decorative street signs, walls, streetlights, etc.) within dedicated right of way or dedicated easements requires the execution of a Consent to Encroach Agreement between the Owner and the City of Carmel. Such agreements are executed by the Board of Public Works and Safety. The City Engineer may approve irrigation system agreements. Ms. Sherri Wilson June 19, 2008 RE: Carmel Street Dept. East Salt Barn-Rev. #2 Page 3 of 4 22. Secondary Plat approval if applicable. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. 23. Dedication of Right of way if applicable. 24. It appears that there will not be open pavement cuts of Gray Road for the Water service lateral and the Storm Sewer connection. If open cuts are required, these cuts would require Board approval. BONDING REQUIREMENTS 25. Upon initial review, it appears Performance Guarantees shall be provided for the following: a. Erosion and Sediment Control and Storm Water Quality. Please contact Amanda Foley, Engineering Department Stormwater Administrator, for details regarding engineer's estimates /performance guarantee requirements for these items. b. Improvements in the right -of -way (entrance, construction, storm piping, water connection). 26. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes and materials, etc. 27. Upon completion and release of individual Performance Guarantees, a three -year Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. 28. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. 29. Please reference the available enclosures for more detailed explanation of our procedures. RIGHT OF WAY PERMIT AND BONDING 30. Any work in the dedicated right of way of Gray Road and/or 106t3i Street will require an approved Right of Way Permit and a License & Permit Bond. 31. The bond amount is determined by the number of instances of work in the right of way at $2,000.00 per instance. However, if the work is included in the scope of work of a required and posted Performance Guarantee, the Performance Guarantee may be used to satisfy the bond requirements of the Right of Way Permit. 32. Please contact our Right of Way Manager, Fred Glaser, to arrange right of way permitting and bonding. AVAILABILITY AND CONNECTION FEES 33. Water and Sanitary Sewer Availability (acreage) Fees / Connection Fees / Development Application Review Fees will not be applicable to this project. CONSTRUCTION PLAN REVIEW COMMENTS 34. Storm Water Management a. This project is subject to the City's Storm Water Manangement and Storm Water Quality Ordinances. b. Please contact John Thomas to review storm water quality/treatment requirements. 35. All asphalt pavement within the City right -of -way shall be 1.5 inches HMA #11 surface on 2 inches HMA #8 binder on 3 inches HMA #5D base on 7 inches #53 stone on 4 inches #2 stone. Please revise Detail PV -36A. Please also revise Detail PV -36A to include the following note: "ALL PAVING SHALL BE COMPLETED IN THE SAME SEASON." 36. Please develop and provide maintenance of traffic plans for the storm sewer connection and entrance construction. Such plans shall conform to the Indiana Department of Transportation Work Zone Safety Manual. Ms. Sherri Wilson June 19, 2008 RE: Carmel Street Dept. East Salt Barn-Rev. #2 Page 4 of 4 37. Please add a note to all sheets that "NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT." 38. Please revise keynote 3 on C101 to indicate sawcut and removal of existing curb to the nearest existing joint. 39. Sheet C301. a. Please add a spot elevation for the low spot in the gravel drive over pipe 704 -705. b. The 100 -year elevation of the pond is less than 50 feet from the right -of -way. Please revise. (Very slight encroachment into this 50 -foot setback). c. Please establish and identify the MFPG and MLAG elevations on the plans, and add these defmitions of MFPG and MLAG to the plans. d. Please add the summary drainage information required by Section 100 of the Storm Water Technical Standards Manual. e. Please revise the contours of the proposed entrance such that water will flow in the proposed gutters. Are curb turnouts necessary? f. What is the slope of the "gutter" being created at the new /existing pavement interface? g. All swales are required to have subsurface drains. h. Curbing in the right -of -way is required to have subsurface drains. If such subsurface drain does not have a positive outlet, it still needs to be installed so that it may be connected in the future. 40. Please indicate on all sheets that "approval is pending" until plans are approved. 41. Sheet C401. a. Please indicate how the berm will be restored and stabilized after utility work. 42. Sheet C501. a. The pipe under the new drive shall be 18" minimum. If you have questions, please contact me at 571 -2441. Sincer gra4 G. R. D an, W, '.E. Assistant C ty Engineer Department of Engineering CC (via email): Angelina Conn, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Distribution Paul Arnone, Carmel Utilities Collection Dave Huffman, Carmel Street Commissioner Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers, PC CC: Department Review/File Copy \\Apps2 \user data \eng \shared\DHiII\PROJREV08 \STREETDEPTEASTSALTBARN.doc (>). . J /..:;~____5Y;J--_ /;.~ __.j</,^>-----=~_-. A . 'v '--. . n I C,.. --- '--- Xenton C. 1.fJard, (<T.7\{ Surve;'or Of .J{amilton County 'Phone (317) 776-5495 'Fax CjT7) 776-962~ I Suite IS5 Olle .Jlamilton County Square )VobLesvi[{e, Indiana 46060-2230 June 5, 2008 Cripe Architects and Engineers A TTN: Graham Lewis 7172 Graham Road Indianapolis, IN 46250 VIA E-mail: glewis@cripe.biz RE: Carmel East Salt Barn Dear Mr. Lewis: We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office on May 16,2008, for this project and have the following comments: I. The proposed project faUs in the incorporated area and MS4 jurisdiction of the City of Carmel. 2. The proposed project DOES fall in a Carmel Wellhead Protection Zone. 3. The proposed project falls within the Moffllt Williamson Regulated Drain Watershed. 4. Please submit an indirect o~tlet permit (Fee waived for governmental entity) for the discharge into the Moffitt Wi Iliamson Regulated Drain. The application is available on our website at http://www.co.hamilton.in.us. go to Departments, Surveyor, and Forms. 5. The design does not meet t~e 6" minimum orifice size per the HCSTSM, but with the downstream restriction and the fact this is a facility that will be maintained by the City of Carmel, we have no objection to the orifice layout as designed. 6. Please note the additional c6mments may be warranted at a later date. Should you have any questions, I can be reached at 317-776-8495. Sincerely, ~~ Greg Hoyes, AC, CFM Plan Reviewer CC: Christine Bmton-Holmes - Carmel DOCS John Thomas - Carmel Engineering Dick Hill - Carmel Engineering Greg liko - Crossroad Engineers Dave Huffman - Carmel Street Department CillJrnJl eel ~ Rt.CtS~t\) \!If\{ '2. \ 'IS}':)'6 "f';oCS May 20, 2008 Sherri Wilson Cripe 7172 Graham Road Indianapolis, IN 46250 RE: Job #: 990488-10700 Dear Ms. Wilson: The above mentioned project has been received and reviewed. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, ~F~~!~ Chief of Police MDF:vb cc: /Dept of Community Services A Nationally Accredit 13 JI 7) 571-2500 forcement Agency Ifi'"" (317) 571-25]2 Conn. Angelina V Subject: David Lucas [del@co.hamiltan.in.us] Monday, May 19, 2008 11 :32 AM glewis@cripe.biz Ron Morris; Conn, Angelina V; Foley, Amanda J; Ellison, Christopher M; Holmes, Christine B; Klingensmith, David W; Littlejohn, David W; Duncan, Gary R; Duffy, John M; Fogarty, Michael D; Westermeier, Mark; Redden, Nick; Brewer, Scott I; Krueskamp, Theresa A; Akers, William P; Hohlt, William G; Ron Farrand; Brooke Gajownik; Greg Hayes; Jason LeMaster; Robert Chadwell; Gregory IIko;,Ryan Hartman; Shirely Hunter; Jason Kirkman; Chuck Shupperd; Jennifer Marlett Carmel East Salt Barn From: Sent: To: Cc: Graham, The above referenced project is outside of Hamilton County Highway jurisdiction. We have no comments concerning this project. Sincerely, David E. Lucas HCHD Staff Engineer/Road 1700 South 10th Street Noblesville, IN 46060 (317) 770-4474 - Direct Line (317) 773-7770 - Office (317) 776-9814 - Fax e-mail: del@co.hamilton.in.us website: www.co.hamilton.in.us 1 Page 1 0[2 Conn, Angelina V From: Conn, Angelina V Sent: Thursday, May 08, 2008 11 :02 AM To: 'Graham Lewis' Cc: Sherri Wilson; Karen Collins; David Lach; Haimes, Christine B; Hollibaugh, Mike P Subject: RE: Carmel Street Dept. - East Salt Bani Project Hi, Graham: This should answer all of yom"question's: Chapter 28.07.05 of the zoning ordinance states: Ali City of Carmel and Clay Township governmental facilities and buildings are exemgt from the zoninQ reQuirements and procedures fisted herein. This means you do not need BZA approval for the proposed land use (salt barn), you are not bound by the setbacks or bufferyards (but it would not hurt to try and comply with them), and you will notneed a~ariance for building height or lot cover percentage (perhaps you can shift the building further from the road). Since you are within a wellhead protection zone, you will have to work closely with the Carmel utilities dept (contact John Duffy) and perhaps the Hamilton County Surveyor's office. They are both on the TAC members list. By the way, is the City purchasing or leasing this lal!d from American Aggregates Inc? The new Water Treatment Plant will have to come before TAC when that phase of the project is ready to be built. Angie Conn, Planning Administrator Dept. of Community Services - Planning & Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p.317-571-2417 f.317-571-2426 aconn@carmel.in.gov ~'~"~~~,,"~--CC"""'_".~c=c~'-""~-"''''''.''"'''''''''~'''.'''''.~~'.'''''''''-'''''' __~;c".-o-:.".==-,"~"",c-~~",_~_",~_",~,-~-~-__,-~~~~."c~",,~---.~_.A~,~~~~T~"_~n""''''''-,~ From: Graham Lewis [mailto:glewis@cripe.biz] Sent: Wednesday, May 07, 2008 4:33 PM To: Conn, Angelina V Cc: Sherri Wilson; Karen Collins; David Lath Subject: Carmel Street Dept. - East Salt Barn Project Angie, Thank-you getting back with Sherri on the ques'tions she had. I have attached the current landplan for your use. Please also understand that the remainder of this site will be a new Water Treatment Plant for Carmel Utilities. I have couple more questions that I w0uld like to ask; I. Our site is zoned S-l and we are surrounded by 5-1 and S-2. Will our project be P - "permitting" or be considered a SU - "special use"? I understand that you stated we would be exempt from Plan Commission, but I want to make sure we don't have issues that would need to go before BZA. 2. Per the ordinance we believe the Yards to be; Front == 40 foot. Side == 20 foot, and Rear::;: 15 foot. Currently this site is surrounded on the East and North with 13 foot tall berms with trees on top. Will we have Buffer Yard requirements? 3. Per the ordinance, we understand that the maximum allowable building height is 35 feet. The new Salt Barn will be 45 feet tall. Will this require variances and/or BZA approval? 4. Per the ordinance, the maximum lot coverqge is 35%. Will this requirement apply to our project? If yes and if we don't meet the requirement, what are the permitting impacts? 5. I'm pretty sure that our project is in a Wellhead Protection Zone, are there any other permit forms/applications that we will need for that? Thank-you, 5/19/2008 Page 1 of 1 Conn, Angelina V From: Graham Lewis [glewis@cripe.biz] I Sent: Wednesday, May 07,20084:33 PM To: Conn, Angelina V Cc: Sherri Wilson; Karen Collins; Daviq Lach Subject: Carmel Street Dept. - East Salt Ba~n Project Attachments: Landplan 5-7 -08.pdf Angie, Thank-you getting back with Sherri on the questions she had. 1 have attache-d the current land plan for your use. Please also understand that the remainder of this site will be a new Water Treatment Plant for Carmel Utilities. I have couple more questions that I wO,uld like to ask; I , 1. Our site is zoned 5-1 and we are surrounded by 5-1 and 5-2. Will our project be P - "permitting" or be considered a SU - "special use"? I understand that you stated we would be exempt from Plan Commission, but I want to make sure we don't have issues that vvould need to go before BZA. 2. Per the ordinance we believe the Yards to be; Front = 40 foot, Side = 20 foot. and Rear = 15 foot. Currently this site is surrounded on the East and North with 13 toot tall berms with trees on top. Will we have Butfer Yard requirements? 3. Per the ordinance, we understand that the rrnaximum allowable building height is 35 feet. The new Salt Barn will be 45 feet tall. Will this require variances and/or BZA approval? 4. Per the ordinance, the maximum lot coverage is 35%. Will this requirement apply to our project? If yes and if we don't meet the requirement, what are the permitting impacts? 5. I'm pretty sure that our project is in a Wellhead Protection Zone, are there any other permit forms/applications that we will need for thdt? Thank-you, Graham M. Lewis Project Manager Cripe Architects + Engineers 7172 Graham Road Indianapolis, IN 46250 Phone: (317) 845-7065 Cell: (317) 250-0079 Fax: (317) 845-7065 5/19/2008