Loading...
HomeMy WebLinkAboutApplication _v u Griffin, Matt L From: Sent: To: Cc: Griffin, Matt L Tuesday, July 12, 20056:53 PM Tingley, Connie S Hollibaugh, Mike P; Keeling, Adrienne M; Kendall, Jeff A; Brewer, Scott I; Hancock, Ramona B; Brennan, Kevin S; Conn, Angelina V; Morrissey, Phyllis G; Wold, Alexia K; Littlejohn, David W; Anderson, Nathan K; 'Brandon Burke' Docket Number Assignment: Goldwater Park - Village of West Clay (05070012 SP) Subject: I have issued the necessary Docket Number for (TAC) Khara Spa_ It is the following: Docket No. 05070012 SP: Goldwater Park - Village of West Clay SP Application Fee: $772.50 $103perlotx1, $103.00 Total Fee: $875.50 Docket No. 05070012 SP: Goldwater Park - Village of West Clay The applicant seeks to plat 1 lot on 7.13 acres for the purpose of creating a multi amenity park The site is located near the SW corner of W_ 131s1 Street and Towne Rd and is zoned PUD_ Filed by Brandon Burke of Schneider Engineering for DBA Beyond the Image, LLC. Petitioner, please note the following: 1. This item will be on the July 20, 2005, agenda of the Technical Advisory Committee (TAC) agenda. 2. Mailed and published public notice does not need to OCCUL 3. Proof of Notice is not needed. 4. The Filing Fee must be paid on or before July 20, 2005. Failure to do such will result in this application being tabled to the August 17,2005, TAC agenda. 5. This item will be reviewed administratively. PETITIONER: refer to your instruction sheet for more detail. Mr. Burke can be contacted at 317.826.7100 (fax: 317.826.7200). Thanks_ Matthew Griffin, AICP Planning Administrator Department of Community Services City of Carmel One Civic Square Carmel. IN 46032 P 317.571.2417 f 317.571.2426 1 w w APPLICA nON FOR SECONDARY PLAT OR REPLAT Fee: $772.50 + $103 per Lot Date: 7 -05-05 Docket #: The undersigned agrees that any construction, reconstruction, enlargement, relocation of alteration of structure, or any change in the use of land or structures requested by this application will comply With,and conform to, all applicable laws of the State of Indiana, and the Zoning Ordinance of Carmel, Indiana - 1980, adopted under the authority of Acts of 1979, Public Law 178, Sec. 1, et.seq, General Assembly of the State of Indiana, and all Acts amendatory thereto. Name of Applicant: Brenwick TND Communites, LLC Phone # (317) 574-3400 Address of Applicant: 12821 E. New Market Street 5-200, Carmel, IN 46032 Name of Subdivision: Village of West Clay Goldwater Park Legal Description (To be typewritten on separate sheet and attached). Area (in acres) 7.13 Numbefof Lots: 0 Lots - 1 Park Length of miles of new streets to be dedicated to public use: 0 Surveyor certifying plat: Edward D. Giacoletti Surveyor's address and phone#: 6 826-7100 Signature of Applicant: inted) Kevin Krulik TITLE:. Project Manager - Brenwick DevelopmentCo., agent of Brenwick TND Communities, LLC *r***********.**********************************;*******************************************,**,*****'***************************************** 5TATEOF INDIANA 55 County of --=/1P rYL\ l-tan Before me, the undersigned, a Notary Public for ~ County, State of Indiana, personally appeared Keu ~ Kru \ ~ k. and acknowledge the execution of the foregoing instrument this ?!J< Day of :fu ! I./. 2005. BARB BOX t:~r~!.~~~. ;\ Hamilton County '1"'~ .i/ My Commission Expires ~~...."., October 6,2007 5.1.10 Application for Secondary Plat Two (2) copies, or more if necessary, of the secondary p at an t e construction plans, together with supporting documents, shall be submitted to the Building commissioner with this application and the application fee as indicated in Section 29.6 of the Zoning Ordinance. My Commission Expires: Nck-tr.J. & ( 2C07 Notary Public Additional plans to be distributed to necessary authorities by applicant. Fee: $ ReceiVed by: N:\1238\042\docs\SECONDARY PLAT.doc land Description w w A part of the SoLitheast Quarter of Section 29, Township 18, Range 3 East, in Clay Township, Hamilton County, Indiana described as follows: Commencing at the Northwest Corner of said Southeast Quarter; thence North 89 degrees 13 minutes 03 seconds East along the north line of said Southeast Quarter a distance of 1212.53 feet; thence South 00 degrees 00 minutes 53 seconds East a distance of 299.17 feet to the Point of Beginning; thence North 89 degrees 59 minutes 07 seconds East a distance of 111.81 feet; thence South 45 degrees 00 minutes 00 seconds East a distance of 150.11 feet; thence South 45 degrees 00 minutes 00 seconds West a distance of 59.00 feet; to a point on a tangent curve having a radius of 75.00 feet, the radius point of which bears South 45 degrees 00 minutes 00 seconds East; thence southerly along said curve an arc distance of 117.81 feet to a point which bears South 45 degrees 00 minutes 00 seconds Westfrom said radius point; thence South 45 degrees 00 minutes 00 seconds East a distance of 389.53 feet; thence North 89 degrees 48 minutes. 01 seconds East a distance of 98.71 feet; thence South 00 degrees 00 minutes 00 seconds East a distance of 156.93 feet; thence North 90 degrees 00 minutes 00 seconds East a distance of 156.03 feet; thence South 00 degrees 11 minutes 59 seconds East a distance of 103.43 feet; toa point on a tangentcurve having a radius of 25.00 feet, the radius point of which bears South 89 degrees 48 minutes 01 seconds West; thence southwesterly along said curve an arc distance of 39.27 feet to a point which bears South 00 degrees 11 minutes 59 seconds East from said radius point; thence South 89 degrees 48 minutes 01 seconds West a distance of 483.31 feet; to a point on a tangent curve having a radius of 75.00 feet, the radius point of which bears South 00 degrees 11 minutes 59 seconds East; thence southwesterly along said curve 'an arc distance of 57.48 feet to a point which bears North 44 . degrees 06 minutes 47 seconds West from said radius point; thence South 89 degrees 13 minutes 03 seconds West a distance of 146.41 feet; thence North 00 degrees 00 minutes 53 seconds West a distance of 839.27 feet to the Point of Beginning, containing 7.13 acres, more or less. N:\ 1238\042\docs\landdesc1238042.doc Jim Fisher 6/30/2005 u u SUBDIVIDER AGREEMENT FORM Project: Village of WestClay Goldwater Park 9.6 THE SUBDIVIDER The following agreement shall be included as a submittal with the final plot application AGREEMENT The .developer shall be responsible for any drainage problems including standing water, flooding and erosion control, which arise or become evident at any time during the 3 year maintenance period after release of subdivision bonds, and which is attributable to a deficiency in subdivision drainage design or construction of drainage improvements. This shall include all pipes, structures, swales, ditches and ponds which are pertinent features to the proper drainage of the subdivision. This responsibility of the developer created, subsequent to the completion grading by individual builders, or accomplished by individual homeowners. shall not, however, include problems which are of the subdivision improvements by the improper structures and improper grading installed or It is the intent of this requirement, that the developer .shall, specifically, provide such sub-surface drains, or storm sewers or ditches as are required to properly rectify any drainage problem or sub-surface water problem which was not contemplated in the original approved subdivision design, including, but not restricted to, disposal of sub- surface water from footing drains of individual lots. ROAD IMPROVEMENTS: The typical agreement of existing contiguous Hamilton County Roads which are substandard, with Hamilton County is: None The developer will put in l2-inch stone base to the required width of the road, and grade the shoulders to a minimum of 6 feet width and construct proper side-ditches, or, provide storm sewers and curbs. This will be the black top grade during construction of subdivision. Then the county will come in and cut out 3 inches and put in 3 inch binder asphalt after which the developer will be responsible for 1 inch of asphalt topping. This is being done as joint projects between county and developer. An agreement shall be executed, in writing, between the developer. and Hamilton County specifically detailing the exact work to be accomplished by the developer and that to be accomplished by the County/and sh.all also state the road or roads or portions thereof which are included. If the subdivision is contemplated to be annexed to the City of Carmel, then the agreement shall include the City of Carmel Board of Public Works as a signatory, which shall be for the purpose of the City of Carmel a reein to accept for maintenance and operation the improved road facili t completion of sa 0 mprovemen ts and completion of annexation. """-;? --'0. f _.~.--- -~ , ~_.--._\... --' WITNESS Brandon Burke, P. E. Project Manager The Schneider Corporation Kevin Krulik Project Manager- Operations Brenwick Development Co. agent of Brenwick TND Communities, LLC July 51 2005 DATE N:\1238\042\docs\subdivider.doc u u VILLAGE OF WEST CLAY -GOLDWATER PARK Report on Water Distribution, Sanitary Sewer and Stonn Sewer System 1. Water Distribution The potable water to the site will be provided by the City of Carmel Utilities. Connection onto the existing main will be made at the following location: . A 2" water service lateral will be extended to the clubhouse from an 8" watcnnain on the southside of Manigault Street. Approval for the extension of water mains will be required from the Indiana Departm~nt of Environmental Management, and all mains will be designed and installed in accordance with the Indianapolis Water rules and regulations. 2. Sanitary Sewer Sanitary sewer effluent for the site will be accepted by the Clay Township Regional Waste District (CTRWD). A lift station is proposed along the Eastern boundary of the site which will pump effluent via a force main into the existing 18" interceptor located in Springmill Road.. Two additional lift stations are proposed within the Village of West Clay to serve areas which cannot be served by gravity sewers. One will be placed within the common area located along Hoover Road, South of the Claridge Farm entrance. It will servc the Southern third of the project, and will pump North into the gravity system described above. The station is temporary in nature, and will be taken off line upon extension of the interceptor proposed to the South and East shown in the CTRWD's master plan. The second station is also temporary, and is located along the project's Westernmost boundary near 126th Street. The station will also pump to the gravity sewers to the East, and it serves the portion of the project located West of Towne Road. Proposed Goldwater Park will be serviced by a proposed 6" sanitary lateral connecting to sanitary manhole #114 at the northwest comer of Manigualt Street and Pettigru Drive. Approvals for the design and construction of the sanitary sewers must also bc obtained, from CTRWD, it's consultant and from the Indiana Department of Environmental Management. 3. Storm Sewer The surface runoff on the site will be conveyed by a system of swales and pipes to a network of retention lakes within the Village of We siC lay. In accordance with the requirements of the Hamilton COWlty Surveyor's requirements, the retention lakes will provide storm water management control in order to restrict the discharge rates onto the site's various outfall points. The discharge points for the site are as follows: . Elliot Creek; which traverses the site along the Northern third, then crosses 131"t Street and leaves the site just East of the existing 8.5 acre lake on the Perez parcel. . Claridge Fanus Legal Drain; which was sized per the County Surveyor's calculations, to accept a 146 acre drainage area that lies within the boundary of the Village of West Clay. Connection onto the Claridge Farm drain will be made at an existing 36" concrete pipe just South of the existing mound bordering the Perez property, and will addtess.drainage problems evident at that location. II Clay Creek; Which traverses the site along the Southern third, then crosses Hoover Road near the proposed common area South of Claridge Farm entrance. . Brendle Legal Drain; which flows along the site's Western boundary, then crossed 126th Street West of N: I 123 8\042 Idocs\sewreprt.doc u u Towne Road. Goldwater Park drainage will consist of one detention pond and private stonn sewer located within the proposed parking lot. Approval of the pond system is consistent with the overall master drainage report submitted to all agencies during review and approval of Section 600 I. Storm sewers shall be reviewed by the City of Carmel engineering and the Hamilton County Surveyor's Office. It is the intent that all main storm sewer linesaIld all lines intercorrnecting lakes and serving as outlet points be petitioned to be accepted by the County Surveyor as regulated drains. A limited portion of the storm sewers that serve to drain rear and side yards may remain within the maintenance jurisdiction of the project's homeowner's association; however, most storm sewers and all retention lakes will be maintained by the County Surveyor. Subsurface drains, or pavement base drains, are proposed to be in."talled under the street curbs, in order to provide an outlet point tohorne sump pumps, and in order to intercept groundwater seepage before reaching and compromising the pavement stability. 4. Erosion Control During all phases of the construction the Site General Contractor and all Subcontractors shall exercise measures to prevent the erosion of soils due to the action of water and wind. All erosion and sediment control measures shall be implemented prior to earth moving activities. Sediment in run-off water shaH be trapped by the use of such methods as debris basins, siltation sumps and silt fences until the disturbed area is stabilized. These shall be in place before any land alterations/grading. Trapping devices shall be periodically 'inspected during dry periods and after each rainfaH event by the Site Contractor. Trapping devices shaH be replaced if detcrmined to be incapable of performing intended function of sediment trapping. The Contractor shall have available on the construction site a water source capable of applying water to dry exposed soil in order to prevent wind erosion. The application rate and manner shall be such that soil moisture is attained and no surface run~off is created. . N: \ 123 8\04 2 \docs\sewreprt. doc I !' I I .~ :r-.'i' q ""'l ;t ',,, "." 1,~ \ , I I I l I 3;1 p!- ,_. -....--..... -- .......- ...--..-..--..--..-----..---..-- _. ...._- --. . ,. ! I .. I I if ;f f :!~' ~~~;,~. r--&:.~._~..~