Conn, Angelina V
From: Fox, Jason [JFox@StratfordCompanies.com]
Sent: Thursday, October 02, 2008 11:47 AM
To: Conn, Angelina V; gsnelling@snellingeng.com
Subject: Re: Stratford at Westclay Parking numbers
132 garage parking. 27 private street surface parking. Each cottage has a 1 car garage. We don't allow driveway parking
or street parking for the cottages. Jason
From: Conn, Angelina V
To: Greg Snelling; Fox, Jason
Sent: Thu Qct 0209:10:372008
Subject: Stratford at Westclay Parking numbers
Hello - can either of you provide me with a parking breakdown for the Stratford main building and cottage, where it breaks
it down by unit types, such as assisted living, nursing care, etc? and then the total number for parking for the site?
I would very much appreciate it!
10/212008
Page 1 of 2
Conn, Angelina V
From: Greg Snelling [gsnelling@snellingeng.com]
Sent: Wednesday, October 01, 2008 8:39 AM
To: Brewer, Scott I
Cc: 'Fox, Jason'; Conn, Angelina V
Subject: RE: Stratford at Westclay Parking Lot
Attachments: L 101 093008.pdf
Scott, please see the attached revised landscape plan for the subject project. I apologize for the last e-mail. It was our
recollection from the TAC meeting that you agreed to provide a recommended species for the street trees and that we
would check your recommended species vs. the Westclay design guidelines. In any event, we have revised the species
of the street trees to honey locust per your response.
We continue to show the street trees between the sidewalk and curb since this is where street trees have been appmved,
installed and thrived, in close proximity to water lines and other utilities, throughout Westclay. Furthermore, it is also my
understanding that trees are preferred by engineering in the right-of-way rather than the easement. With this in mind,
added to the fact that I believe there is a build-to line where the parking lot must go, I don't think we have any other
options.
Please note that, as was stated in the meeting, if the trees die, the owner will replace them. Let me know if this plan can
be approved and I can send you and Angie hard copies. If you have any further comments or questions, please contact
me. Thank you and have a good day.
Greg Snelling, PE
Snelling Engineering, LLC
13295 Illinois Street, Suite 142
Carmel, IN 46032
(317) 663-3206 (telephone)
(317) 663-3208 (fax)
From: Brewert Scott I [mailto:SBrewer@carmel.fn.gov]
Sent: Thursday, September 25t 2008 6:07 PM
To: Greg Snelling
Subject: RE: Stratford at Westclay Parking Lot
On 9/16/08 I wrote: The landscape plan shows you planting trees directly over an 8"nwater line on the east and over a
storm sewer and gas line on the north. The planting areas all appear to be within 12' DU&S Easements. Please either
move the utility lines or provide some other planting areas for trees and shrubs. You have to be able to fit all the pieces of
the puzzle together on the site.
And your question now is "...have you had a chance to come up with a recommended species..." (to plant over utility lines
in a drainage and utility easement?) I am an arborist and environmental planner - and you are asking me to make a
recommendation on trees the need to grow large, develop canopy, and live long lives in very reduced spaces that in all
likihood will produce conflicts in years to come because they have not been afforded the soil volumes and root clearances
they need.
The species that will provide the most urban benefits for this parking out and are the least affected by urban conflict are
probably London plane tree and honey locust, but I do not know how they fit into the "master-plan" for the streetscape in
West Clay.
Scott Brewer, City Forester
Environmental Planner, DOCS
City of Carmel.
One Civic Square
10/1/2008
Page 1 of 1
Conn, Angelina V
From: Brewer, Scott I
Sent: Tuesday, September 16, 2008 6:29 PM
To: 'gsnelling@snellingeng.com'
Cc: Conn, Angelina V; Holmes, Christine B
Subject: Stratford West Clay Parking
Dear Greg:
The landscape plan shows you planting trees directly over an 8"nwater line on the east and over a storm sewer and gas
line on the north. The planting areas all appear to be within 12' DU&S Easements. Please either move the utility lines or
provide some other planting areas for trees and shrubs. You have to be able to fit all the pieces of the puzzle together on
the site.
Scott Brewer, City Forester
Environmental Planner, DOCS
City of Carmel,
One Civic Square
Carmel, IN 46032
PH: 317-571-2478
FAX: 317-571-2426
Urban Forestry is the center of sustainability for municipalities
9/l 712008
Date:
Place:
Time:
CTRWD's TAt Comments
CARMEL TECHNICAL ADVISORY COMMIITEE MEETING AGENDA
Wednesday, September 17,2008
Planning/Zoning Dept. Conference Room, 3rd Floor, Carmel City Hall
9:00 AM
9:00 a.m. Docket- No. 08080001SP: Stafford Place, Section 2 (former Stafford Lane)
The applicant seeks secondary plat approval for 28 lots on 15.31 acres. The site is
located along 146[h St., west of Gray Rd., and is zoned R lIResidence - ROSO. Filed by
Lantz McElroy of The Schneider Corporation for The Drees Company.
Docket No. 08080002 SP: Stafford Place, Section 3 (former Stafford Lane)
The applicant seeks secondary plat approval for 18 lots on 9.58 acres. The site is located
along 146[h St., west of Gray Rd., and is zoned Rl/Residence - ROSO. Filed by Lantz
McElroy of The Schneider Corporation for The Drees Company.
_ This project is outside of CTRWD's setvice area and therefore we have 110 issues with the project.
9:15 a.m. Docket No. 08080018 DP/ADLS: Carmel City Center, Parcel7C, Village on the
Green - The applicant seeks to .create a multi-building mixed use development with a
parki ng garage. The site is located NE of Gradle Dr & 3rd Ave SW. and is zoned C-
lICity Center. Filed by Pede or.
. This projelc.t is outside of CTR'Vn's service area and therefore we have no issues with the project.
9:25 a.m. Docket No. 08080017 DP/ADLS: Parcel 47 . Carmel Arts District Lofts
The applicant seeks to create a mixed-use residentiallretail building with underground
parking. The site is located at the NW corner oflS[ Ave NW & Main S1. and is zoned C-
2/01d Town. Filed by the Carmel Redevelopment Commission.
_ This project is outside of CTRWD's service area and therefore we have no issues w'ith the project.
9:35 a.m. Docket No. 08080023 ADLS Amend: Opus Landmark at Meridian - Building 3
The applicant seeks architecture/design approval for a L5-story office building.
The site is located at 12711 N Pennsylvania St. and is zoned B-2/Business within the US
31 Overlay. Filed by Ryan Albright of Opus North Corporation.
_ This project is outside of CTR"'U's service area and thereforc wc have no issues with the project.
9:45 a.m. Docket No. 08080020 ADLS: Hotel Indigo
The applicant seeks design approval for a 5-story hotel building. The site is located
northeast of 13151 St. & US 31 and is zoned B-6/Business within the US 31 Overlay.
Filed by Jay Gibson of CDG Consulting, Inc.
. This project is outside of CTRWD's service arca and therefore we have no issues with the pro.ject.
9:55 a.m. . Docket No. 08080021 SP: The Domain at Legacy
The applicant seeks secondary plat and construction plan approval of 33 lots on 5.46
acres. The site is located at the northeast corner of Community Dr. and Cherry Creek
Blvd. and is zoned PUDlPlanned Unit Development. Filed by Nick Churchill of Pittman
Partners.
. This project is outside of CTRWD's service area and therefol"e we have no issues with the project.
10:05 a.m. Docket No. 08080024 TAC: Stratford Assisted Liying - parking lot (Village of
WestClay). The applicant seeks T AC approval to constnlct a parking lot. The site is
located at the southeast corner of Manigault St. & Pettignl Dr. The site is zoned
PUDlPlanncd Unit Development. Filed by Greg Snelling of Snelling Engineering, LLC
for The Stratford Companies.
. Sanitary Sewers are not heing affected and therefore CTRWD has no issues with the Stratford
Assisted Liying Parking Lot Project.
Page 1 of2
Page I of I
Conn, Angelina V
From: Brewer, Scott I
Sent: Monday, September 08, 20086:08 PM
To: Conn, 'Angelina V; (gsnelling@.snellingeng.com)
Subject: Docket No. 08080024 T AC: Stratford Assisted Living - parking lot (Village of WestClay Landscpape plan
comments
Docket No. 08080024 TAC: Stratford Assisted Living - parking lot (Village of WestClay). The applicant seeks
TAC approval to construct a parking lot. The site is located at the southeast comer of Manigault 51. &
Peaigru Dr. The site is zoned PUD/Planned Unit Development. Filed by Greg Snelling of Snelling
Engi neeri ng, LLC for The Stratford Companies.
Dear Greg:
My comments on the landscape plan are as follows:
1. The landscape plan must show curb. sidewalks, utilities and other hardscape features.
2. The oaks on the north perimeter conflict with a couple utility lines.
3. Because of soil volumes and sidewalk conflicts, I believe that the trees should be placed on the inside on the
sidewalk.
Please feel free to contact me to answer any further question.
Scott Brewer, City Forester
Environmental Planner, DOCS
City of Carmel,
One Civic Square .
Carmel, IN 46032
PH: 317-571-2478
FAX: 317-571-2426
Urban Forestry is the center of sustainability for municipalities
9/9/2008
Page 1 of 1
Conn, Angelina V
From: Keith Lash [keithl@brenwick.com)
Sent: Thursday, September 04, 2008 3:00 PM
To: Conn, Angelina V
Cc: gsneIJing@snellingeng.com; Hollibaugh, Mike P; Fox, Jason
Subject: Docket No. 08080024 TAC: Stratford Assisted Living - parking lot (Village of WestClay)
Angie - to follow up on our conversation last week, please allow this email to serve as
Brenwick's acknowledgement and approval of the conversion of use of Block C in Village of
WestClay Section 6001 from three townhome units to a 27 space parking lot to be built and
used by The Stratford Companies. This block is located within the Primary Area (MUl
which, per Section 5.1 of the WestClay Village PUD, permits Civic Uses and Commercial
Uses .that would obviously contain parking lots for such uses. With that said, we believe
the parking lot as proposed is in accordance to what the WestClay Village PUD
contemplated. This parking lot will be subject to requirements of Sections 16 and 19 or
.the PUD and will be reviewed by the WestClay Architectural Review Board. Should you need
anything further I will be happy to assist.
Sincerely
Keith Lash, P.E.
Brenwick Development Co., Inc.
Executive Vice President
12821 E. New Market Street, Suite 200
Carmel, IN 46032
317-574-3400 (Main Line)
317-574-3919 [Fax)
317-574-3923 ext. 2120 (Direct)
keithl@brenwick.com (Email)
www.Brenwick.com (Website)
9/4/2008
Xenlon C. "Ward, CE/)'f
SUnJeyor of .71flmihon County
<"P/ione (317) 776-8495
'Fax CJ 17) 776-962t
Suite rS8
One Jlamilton COUf/ty Square
J\'ob{esv;{!t:, j/lJil.lfllJ 46060-2230
August 26, 2008
Snelling Engineering, LLC
ATTN: Greg Snelling
13295 Illinois Street, Suite 142
Carmel, IN 46032
VIA E-MAIL: gsnelling(c4snellingeng.com
RE: Village of West Clay - Stratford Parking Lot
Dear Mr. Snelling:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office
on August 22, 2008, for this project and have the following comments:
1. The proposed project falls in the incorporated area and MS4 jurisdiction of the City of
Cannel.
2. The proposed project DOES NOT fall in a Carmel Wellhead Protection Zone.
3. The proposed project falls in The Village of West Clay Regulated Drain Subdivision
and The Village of West Clay Regulated Drain Watershed.
4. Detention volume for this site is provided in the master plan for Village of West Clay.
5. PLease submit a Non-enforcement of Drainage Easements on lndividual Tracts for the
encroachment of the parking lot, entrances, curbs, sidewalks, and landscaping into the
existing Village of West Clay Regulated Drain Easements. The application is
available on our website at http://www.co.hamilton.in.us. go to Departments,
Surveyor, and Forms.
6. Please"note that additional comments may be wa1Tanted ata later date.
Should you have any questions, I can be reached at 317 -776-8495.
Sincerely,
~{~
Greg Hoyes, AC, CFM
Plan Reviewer
CC: Christine Barton-Holmes - Carmel DOCS
J 600 Thomas - Cannel Engineering
Dick Hill- Cannel. Engineering
Greg Ilko - Crossroad Engineers
Page I of 1
Conn, Angelina V
From: Conn, Angelina V
Sent: Monday, August 25, 2008 11 :07 AM
To: 'Greg Snelling'
Cc: Hollibaugh, Mike P
Subject: Stratford a1 westclay, proposed parking tot
Attachments: Fiery X3e2334.pdf
Hi, Greg - I am not sure that this parking lot can be approved without some type of development plan amendment in front
of the plan commission, as a public hearing. If you look at the attacheq development plan/primar.y plat for the area, it
shows this area as being subdivided for townhomes. This was submitted under docket no. 04060035 OA. This site plan
was submitted with the pud ordinance amendment in 2004. Maybe you can do some research on your end, and I will
continue to do research here, to see what the approval process needs to be.
Angie 'Conn, Planning Administrator
Dept. of Community Services - Planning & Zoning
1 Civic Square, 3rd Floor
City of Carmel{ IN 46032
p.317-571-2417 f. 317-571-2426
aconn@carmel.in.gov
8/2612008
Conn, Angelina V
From:
Sent:
To:
David Lucas [del@co.hamilton.in.us]
Thursday, August 21, 2008 7:43 AM
ron.morris@aes.com; Ellison, Christopher M; Huffman, David; Littlejohn, David W; Duffy, John
M; Fogarty, Michael D; Westermeier, Mark; Krueskamp, Theresa A; Akers, William P; Hohlt,
William G; rfarrand@ccs.k12.in.us; Brooke Gajownik; Jason LeMaster; 'Ryan Hartman';
gary .mcnamee@duke-energy.com; Shirley' 'Hu nter; jason. kirkman@mybrighthouse.com;
Greg Snelling; Troy' 'Yackle; dale.m.sparks@usps.gov; cshupperd@vectren.com; Jennifer
L.' 'Marlett
Conn, Angelina V; Holmes, Christine B
Re: Stratford af West Clay Parking Lot
Cc:
Subject:
Greg,
This project is outside of Highway jurisdiction. We have no comments or concerns.
Sincerely,
David E. Lucas
HCHD Staff Engineer/Road
1700 South lOth Street
Noblesville, IN 46060
(317) 770-4474 - Direct Line
(317) 773-7770 - Office
(317) 776-9814 - Fax
e-mail: del@co.hamilton.in.us
website: www.co.hamilton.in.lis
>>> "Greg: Snelling" <gsnelling@snellingeng.com> 8/20/2008 3:50 PM >>>
Attached is pdf file of a site development plan for a new 26 space surface parking lot
within the Village of West Clay just west of The Stratford at the BE corner of Manigault
Street and pettigru Drive. The plans are submitted for the 9-17-08 Technical Advisory
Committee meeting in Carmel.
Please contact me if you have any questions or comments. Hard copies are being delivered
to other TAC members. If you would like hard copies, please let me know. Thank you.
Greg Snelling, PE
Snelling Engineering, LLC
13295 Illinois Street, Suite 142
Carmel, IN 46032
(317) 663-3206 (telephone)
(317) 663 - 3208 ( fax )
1
Page 1 of 1
Greg Snelling
From:
Sent:
To:
Attached is pdf file of a site development plan for a new 26 space surface parking lot within the Village of West
Clay just west of The Stratford at the SE corner of Manigault Street and Pettigru Drive. The plans are submitted
for the 9-17-08 Technical Advisory Committee meeting in Carmel. Please contact me if you have any questions
or comments. Hard copies are being delivered to other TAC members. If you would like hard copies, please let
me know. Thank you.
Greg Snelling, PE
Snelling Engineering, LLC
13295 Illinois Street, Suite 142
Carmel, IN 46032
(317) 663-3206 (telephone)
(317) 663-3208 (fax)
8/20/2008
SNELLING
ENGINEERING, LLC
Date:
1.\2'1, Illin,.o;:; Stiff.. Suile 14:.'.
(,ll'm..-J Ii' ~;JO.)l
~)h~ U j 7.) {\I)::<L~D(;'. F(1X: L; 'I :::' 6Cd<L<~O~:;
I:'.'\V\V. Sllt.ol ~ i Ilg1!n~.ulm
To: Angie Conn/Christine Barton-Holmes
DOGS
One Civic Square
Carmel, IN 46032
WE ARE SENDING YOU VIA:
o Mail
o Overnight Delivery
o Courier
X Hand Delivery
The following:
COPIES DATE DESCRIPTION
2 8-20-08 Site Construction Plans
1 8-20~O8 TAG Correspondence
1 8-20-08 T AC Application
1 8-20-08 Check
THESE ARE TRANSMITTED as checked below:
o For approval
o For your use
X For review and comment 0 As requested
REMARKS:
The enclosed information is submitted for the 9-17-08 TAC meeting in Carmel.
From: Gregory S. Snelling, PE
SNELLiNG
ENGINEERING, llC
~) ~.Letter of Transmittal
RfC~~D ~~
Mil;" . ~~~!
Docs: g; Dat., August 20, 2008
.L, 0'.":~,,..
^ '\ 'A/,4
-'~ \ ..~ Project: Stratford WestClay Parking Lot
1.\2~)j Illinois 51",,,,. Suite 14:,',
(iHTnr~L IN ~h032
Ph: 17.1 b()~~-':L~O(;. h.n: I.:~ I!:' 6b3-?,202; i
V.' \ \'\v.sllcll i Illj:l...'1l ~ ).~i.llll
To: Scott Brewer
Urban Forestry - DOCS
One Civic Square, 3rd Floor
Carmel, IN 46032
WE ARE SENDING YOU VIA:
o Mail
o Overnight Delivery
o Courier
x Hand Delivery
The following:
COPIES DATE DESCRIPTION
1 8-20-08 Site Construction Plans
THESE ARE TRANSMITTED as checked below:
o For approval
o For your use
X For review and comment 0 As requested
REMARKS:
The enclosed information is submitted for the 9-17-07 TAC meeting in Carmel.
From: Gregory S Snelling, PE
SNELLING
ENGINEERING, LtC
Letter of Transmittal
J
!Docs
'fJ
il:t"/J
~_-Date: August 20, 2008
J-.c. '
It-C\../
~::~'; Project: Stratford WestClay Parking Lot
1..C9:i Illi"u;s 5lle.ct Suite 1.P
C:lrrnel, IN .l()D32
Ph: j.~~17) 6h3<L!O(~ ~ hi,: 1_~;'17.! 6c.._}-:~'Z()(.;
',.c' W'.V. s!lcll i r-lgcIl ~ .U)1n
To: Angie Conn/Christine Barton-Holmes
DOCS
One Civic Square
Carmel, IN 46032
... _,^t-...
. '~1./
/
WE ARE SENDING YOU VIA:
o Mail
o Overnight Delivery
o Courier
X Hand Delivery
The following:
COPIES DATE DESCRIPTION
2 8-20-08 Site Construction Plans
1 8-20-08 T AC Correspondence
1 8-20-08 T AC Application
1 8-20-08 Check
THESE ARE TRANSMITTED as checked below:
o For approval
o For your use
X For review and comment 0 As requested
REMARKS:
The enclosed information is submitted for the 9-17-08 TAC meeting in Carmel.
From: Gregory S. Snelling, PE
SNELLING
ENGINEERING, LLC
Letter of Transmittal
I J:"!S Illm"is 511ie''''. SlIilo' 1.j')
Cilrmd. IN ,HltU2
f)h: ~~',17,1 b(}:;~32()h. ~."!\~ r:; -J 7) (i6]<r,:ori
\\1\ \"\v:s 11(~ II Lngen:~ .cprn
To: Amanda Foley
Carmel Engineering Department
One Civic Square, 151 Floor
Carmel, IN 46032
Date: August 20, 2008
Project: Stratford WestClay Parking Lot
WE ARE SENDING YOU VIA:
o Mail
o Overnight Delivery
o Courier
X Hand Delivery
The following:
COPIES DATE DESCRIPTION
1 8-20-08 Site Construction Plans
THESE ARE TRANSMITTED as checked below:
D For approval
D For your use
X For review and comment 0 As requested
REMARKS:
The enclosed information is submitted for the 9-17-08 TAC meeting in Carmel.
From: Gregory S. Snelling, PE
SNELLING
ENGINEERING, LlC
Letter of Transmittal
I]:~(() Illinois Sli't'~1c Sllltt' 1.12
(;m))('" IN .n,I):12
Pll: !JI7,)()I):l-_L~06. F;i\:: I_~'lf: riC1-?,2(J.'-;
w\\'\ v.sllf'f I ini:~('ll~i .,-'urn
To: Gregory IIko, PE
CrossRoad Engineers
3417 South Sherman Drive
Beech Grove, IN 46107
Date: August 20, 2008
Project: Stratford WestClay Parking Lot
WE ARE SENDING YOU VIA:
X Mail
o Overnight Delivery
o Courier
o Hand Delivery
The following:
COPIES DATE DESCRIPTION
1 8-20-08 Site Construction Plans
THESE ARE TRANSMITTED as checked below:
o For approval
o For your use
X For review and comment D As requested
REMARKS:
The enclosed information is submitted for the 9-17-08 TAC meeting in Carmel.
From: Gregory S. Snelling, PE
SNELLING
ENGINEERING, LLC
Letter of Transmittal
I.L~i}5 Illil,OIS Sirt'-t't, .s[lill~ 14}
Cnrr1t,L IN 4',1)'12
Ph: IJ ~7j bbJ-.-L~n(~. Fd'C n-I!] hCd-Jjl).~;
'I.vwl,\-'.sndl ingcng_lJ1nl
To: Greg Hoyes
Hamilton County Surveyor's Office
One Hamilton Square, Suite 188
Hamilton County Judicial Center
Noblesville, IN 46060
Date: August 20, 2008
Project: Stratford WestClay Parking Lot
WE ARE SENDING YOU VIA:
X Mail
o Overnight Delivery
o Courier
o Hand Delivery
The following:
COPIES DATE DESCRIPTION
1 8-20-08 Site Construction Plans
THESE ARE TRANSMITTED as checked below:
o For approval
o For your use
X For review and comment 0 As requested
REMARKS:
The enclosed information is submitted for the 9-17 -08 T AC meeting in Carmel.
From: Gregory S Snelling, PE
To: Gary Duncan/Nick Redden
Carmel Engineering Dept.
One Civic Square, 1 st Floor
Carmel, IN 46032
SNELLING
ENGINEERING, LLC
'.~. ~lPi~ Letter of Transmittal
'zi: :A,
C"
IRECEWED .~\
c.t
AV ~ ^~~8 'r ,
,j..';f:''!1
DOCS ~I Date: August 20, 2008
~~\,/ !Project: Stratford WestClay Parking Lot
II I~JI,'; \" \~ ::ti,....
;;.Jc..~ .
WE ARE SENDING YOU VIA:
o Mail
o Overnight Delivery
o Courier
X Hand Delivery
The following:
COPIES DATE DESCRIPTION
1 8-20-08 Site Construction Plans
THESE ARE TRANSMITTED as checked below:
o For approval
o For your use
X For review and comment 0 As requested
REMARKS:
The enclosed information is submitted for the 9-17-08 TAC meeting in Carmel.
From: Gregory S. Snelling, PE
Page 1 of 1
Conn, Angelina V
From: Conn, Angeliha V
Sent: Wednesday, August 06, 2008 1 :50 PM
To: 'Greg Snelling'
Subject: village of westclay parking lot standards
Attachments: Fiery X3e2286.pdf
Greg - attached are the requirements for parking spaces and aisle widths for the village of westclay, from PUD ordinance
Z-465-04. You may want to view the whole ordinance, because there are also requirements for landscaping of parking
lots, You can view the pub ordnance online at: http://c:Q<<;dQ(:;s.c.<U;;~9.r.-'I1?J.jO-,~l,L~I.Y'{l2t?JLo.k/DQ_g_\!t~YY_,_Q_~Q.xiig:.=2Q21.f,,1.4 You can
'download it as a pdf by clicking the red a 'at the top right part of the screen. It may take awhile. Look specifically at pages
32-36.
Angie Conn, Planning Administrator
Dept. of Community Services - Planning & Zoning
1 Civic Square, 3rd Floor
City of Carmel, IN 46032
p.317-571-2417 f.317-571-2426
aconn@carmel.in.gov
8/20/2008