HomeMy WebLinkAbout0001.94 Site PlanSENT BY:SCHNEIDER ENGINEERING :12-2,1-93 :11:10AM (317)895-2803—
317 582 2452;# 3/ 5
Jahn V. Schneider, PE., LS.
President
Slephen K Cower, L.S.
ViCe-President of Operations
Nancy Rumschiag
Controller —Treasurer
Vincent J. Schneider, P. E.; L.
1917-1990
PRIMARY'
VA rza �
_jr —
ff'7_2_1
78. V
StHNEIDER ENGINEERING CORPORATION
Civil Engineers - Land SurvEy urs * Land Planners
99th STREET
40' HALF R/W
EDGE OF PYAM
FLDW —LINE
OF SFALE
0 G
LOT # 2
6, 160 SF
— — — — — — GREBXBELT BUFFER
96, DU & SE M
F7-6.51
Mo
ALE
77.3
— 10, 6
WATER LJNV
Mal
MZL ar"
PER
PLAN
BROOKS BEND DRIVE
40 11 R/W.
I SAN SEWER
TC — 779.07 TC = 777.03
PER SAY SEWER, PXR SAN SEWER
RECORD DRAWING
RECOAD DRAWING
PLOT PLAN LOT # 2
BROOKS BEND
SECTION ONE
INSTR, # 92 447281
PC # I SLIDE # 350
2945 BROOKS BEND DRIVE
r-MfY It. Kent, LS.
Edward D. Giacoleld, L.S.
James M. Mulryan. LS,
Richard G. Rayback, L.S.
Wesley L. Day, L.&
Evan J. Evans, L.S.
AsSUMRb NuarN
SCALE I" - ?&'
moral
FOR BUILDING
FERM171 ONLY.
APPPDXIAlArt LOCATION
MXPIAM REFORE
CONSTREILTION V SAN. LAT.
AND VAUA SERVICE MjVZ.
PJWPVSPD CRAM
Flo, PJU- CONSTRUMOM GRADE
BLACK
I
!oar L, 1111—fi—
rYPICAL SWALIr fMOOM
MAL PLOT PLAN
12/20/spi =
40a A 93-229f-u
12,47193 DX