HomeMy WebLinkAboutCorrespondence TAC
.~
':'tr
ICEMILLERLLP
October 30,2008
WRITER'S DIReCT NUMrJCR: (317) 236-5952
DIRECT FAX (lIT) 592-4720
I ~"I'EK.N ET' Tilnothy _ Och ~(q]jcellli IleL COlli
LEGAL COUNSEL
David Littlejohn
Alternative Transportation Coordinator
Department of Community Services
City of Carmel
On~ Civic Square, 3rd Floor
Carmel, fN 46032
Re: Prairie Landing CeRe (Legacy PUD) Docket No. 08090018 DP/ADLS
Dear David:
Thank you for your initial review and comments sent to Greg Ewing in my ottlce, by
letter dated October ] 0, 2008, regarding our initial 9-] 9-08 filing for the Prairie Landing CCRC
(Legacy PUD).
Following is a point-by-point response to your five (5) comments.
1, !I171e City of Carmel Parking Ordinance requires that multi-family residences include
bicycle parking. Bicycle parking jpaces are required at Cl rate of one (1) bicycle parking
space per evefY three (3) living units "Fith a maximum afforty (40) spaces. In this
instance the site will require at least forty (40) bicycle parking spaces. Please revise
your plans to show the requires bicycle parking spaces on your site. Please see the City
of Carmel's Parking Ordinance in order to determine appropriate localions,
specifications and construction details jar the above. 1/
Although the development will consist of a continuing care retirement community with
relati vel y few bicycle riders, particularly within the attached residential component, we
understand and appreciate the requirements of the Parking Ordinance. Therefore, future
plans to be submitted will provide at least the minimum number of forty (40) bicycle
parking spaces.
2. "The Legacy's Exhihit 3. Bicycle and Pedestrian Plan requires a primary walking path
along the east and south boundaries of this site. Please revise your plan to include this
change. 1/
Exhibit 3 of the Legacy PUD does indicate a sidewalk or walking path along the east and
south boundaries of the site.
One American Square I Suite 2900 I Indianapolis, IN 46282-0200 I P 317-236-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.icemiller,rom
David Littlejohn
October 30,2008
Page 2
The sidewalk or walking path along the east side would be along Community Drive,
which is off-site and not part of the subject real estate. East Carmel LLC, an entity of
Platinum Properties, will be installing Community Drive and will install the sidewalks or
\valking paths along that street in accordance with the Legacy PUD.
The sidewalk or walking path along the south side is identified as "conceptual" in
Exhibit 3 of the Legacy PUD. Therefore, sidewalks or walking paths should be provided
genera]]y east-west through the site, but are not required along the south propelty line. In
that light, we have provided sidewalks or walking paths from the westernmost properly
line to the easternmost property line through the site, some of which are relatively near
the south propel1y line.
3. "The Legacys Exhibit 6: Street Plan (Minimum Cross-Section Standards for Known
Streef Locations) requires a Primary Point a/Connectivity at the intersection of River Rd
and Community Dr. Please provide details of this connection. "
The Primary Point of Connectivity at the intersection of River Road and Community
Drive is off-site and not part of the subject real estate. East Cannel LLC, an entity of
Platinum Properties, \vill be installing this Primary Point of Connectivity.
4. "The Subdivision Control Ordinance and the Alternative Transportation Plan requires a
5' sidewalk on each side of all internal streets. Please consider revising your plans to
include this change. /I
We have discussed this issue at some length with you and Angie Conn subsequent to
your October 10 comment letter, and prior to this conespondence.
S inee we are not proposing to subdivide the property, we understand the provisions of the
Subdivision Control Ordinance will not apply.
\Ve understand the provisions of the Alternative Transportation Plan, in this context.
represent a recommendation of both the Comprehensive Plan and the Thoroughfare Plan,
rather than an ordinance requirement.
We have provided sidewalks or walking paths tlu-oughout the proposed development.
Although we have not provided sidewalks or walking paths on both sides of every pOltion
of every private street, we believe we have met the spirit and intent of the Alternative
Transportation Plan by providing convenient pedestrian connectivity throughout the
proposed development, while minimizing the hard-surface vvhere possible in order to
provide for a "green" development.
5. "Please indicate ADA compliant handicap ramps at all crosswalks. 1/
Future plans will indicate ADA compliant handicap ramps at all crosswalks.
~
David Littlejohn
October 30, 2008
Page 3
We look forward to working with you, other members of the Cannel City staff, and the
Plan Commissioners as we proceed through the DP/ADLS process. Should you have additional
comments or questions, please do not hesitate to contact me. Thank you.
cc: Angie Conn, DOCS
Greg Acqua, RLS Companies
Jim Rinehart, Stoeppelwerth
Scott Hall, EGA Architects
Larry Hemp, HempDesign
Paul Rioux, East Carmel, LLC
I/2242] 21 J
;;..
City of Carmel
October 10, 2008
Mr. Gregory Ewing
Ice Miller LLP
One American Square, ste 3100
Indianapolis, IN 46282
RE: Legacv pun - Prairie Lalldill~ CCRC
Dear Mr. Ewing:
The following letter represents comments for thIS project specifically addressing the area of alternative
transportation. T have reviewed the drawings submitted for the October 15, 2008 Teclmical AdvisOlY
Committee meeting and oiTer the following conm1ents:
ALTERNATIVE TRANSPORTATION REVIEW COMl\IENTS
1) The'City of Camle1 Parking Ordinance requires that multi-family residences include bicycle
parlcing. Bicycle parking spaces are rcquired at a rate of one (1) bicycle parking space per every
three (3) living units with a maximum of forty (40) spaces. In this instance the site will require at
least forty (40) bicycle parking spaces. Please revise your plans to show the required bicycle
parking spaces on your site. Please see the City of Carmel's Parking Ordinance in order to
detemline appropriate locations, specifications and construction details for the above.
2) The Legacy's Exhibit 3: Bicycle and Pedestrian Plan requires a primary walking path along the
east and south boundaries of this site. Please revise your plan to include this change.
3) The Legacy's Exhibit 6: Street Plan (Minimum Cross-Section Standards for Knovvn Street
Locations) requires a Primary Point of Connectivity at the intersection of River Rd and
Community Dr. Please provide details of this connection.
4) The Subdivision Control Ordinance and the Alternative Transportation Plan requires a 5'
sidewalk on each side of all internal streets. Please conSIder revising your plans to include this
change.
S), Please indicate ADA compliant handicap ramps at all crosswalks.
We request that all responses to our C0111111ent5 be provided In writing. Failure to provide written
responses may result in delay of the review process.
It is critical that this office be made aware of all modification made on the plans being re-submitted,
particularly if any such changes are considered "new" or fall outside of our previous reviews. Please
Page 1
ONE CIVIC SQUARE
C\fuvIEL,INDU\N:\ 46032
317/571~2417
.....J
#'
provide revised plans indicating all revisions. Please notify us of any changes and specifically state any
changes, including changes resulting from Plan Commission, Special Studies or other committee
meetings.
The Department of Commumty Services reserves the right to provide additional comments based on
subsequent reviews.
lfyou have questions, please contact me at 571-2417.
Sincerely,
~J4L
David Littlejohn
Alternative Transportation Coordinator
Department of Community Services
cc: Angie Conn, Department of Community Services
Engineering Department Review
Project File
Page 2
ONE CIVIC SQUARE
C\RivIEL, INDIANA 46032
317/571-2417
:Y':
-~<' ICEMILLERLLP
LEGAL COUNSEL
October 10, 2008
WKITEK'S DIllEn NUMEEK (317) 236-5952
DIRECT FAX: (317) 592-4720
lNTERNET: Tilllo'lly,Och.s@icemillel,l.-'olll
~.- ~ --
<,:,.~ ~'~~-',
." y ~
// '\.
..-;.".:
Angie Conn, Planning Administrator
City of Carmel
Dept. of Community Services - Planning & Zoning
O C.. S "rd Fl
ne .]VIC quare, j oar
Carmel, IN 46032
\~/.
.....,',.!) l . -
'.,';: r ,'".
RE: Prairie Landing CeRe (Legacy PUD) Ducl(et Nu. 08090018 DPIADLS
Dear Angie:
Thank yoti for your prompt review and initial comments received via cmail on
Septem bel' 23, 2008, regarding our initial 9~ 19-08 filing for the Prairie Landing CeRC (Legacy
PUD).
Following is a point-by-point response to your initial 40 comments, to accompany our
updated submittals.
v*-/'
"Please add Docket No. 08090018 DPIADLS to the plans,"
We have added the docket number to the plans.
o*"" )/
"Place the zoning on the site plan as, Legacy PUD: Z-50 1-07."
We have placed the zoning on the site plan.
~/
b "P'
"Please provide a jilled out/notarized affidavit of notice of public hearing (\'ee
application). "
We will provide a completed and notarized affidavit of notice of public hearing once the
notice of the public hearing is mailed. We recognize that legal notice is required on or
before 10-24-08.
~f.
"Provide Ihe notarized Affidavit of the Public Notice Sign PlacemenC see application. I'
'y../e will provide the Affidavit of the Public Notice Sign Placement once the public notice
sign is placed on the property. We recognize that public notice SIgn placement is
required on or before 10-24-08.
"...- :/
6>1-'/ .
"Remember to include the Findings of Fact forming the Plan Commission injonnalion
packel.\'. "
One American Square I Suite 2900 I Indianapolis, IN 46282-0200 I P 317-236-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.icemiller.com
Angie Conn, Planning Administrator
October 10, 2008
Page 2
We will remember to include the FOF form with the Commission's packets.
/ "Provide a filled out Notice of Public Hearingfarm; see application."
Please note a copy of our proposed Notice of Public Hearing attached with this submittal
for your review.
./ "Provide a copy afthe site plan overlaid upon the aerial photo of the site."
We have placed the site plan over an aerial photo of the site.
./
"Scott Brewer, City forester, vvilf be reviewing the landscape plan againsl the Section 13
of the PUD requirements"
Our Landscape Architect, Lany Hemp, has been working with Scott Brewer and will
continue to do so.
/- "Please show/label the utilities and easements on the landscape plan. "
The utilities and easements have been added to the landscape plan.
./ "Please provide a copy of the drainage calculations"
We have included a copy of the drainage calculations with this submittal.
.y(. " Will this site be subdivided and platted. "
This site will not be subdivided and planed.
ft. "Show/label the mechanical equiprnenllocalion and how il is screenedfrom Viel1!."
We have added an additional drawing ADtS-A20 Mechanicul Equipment Screening to
clarify our intent.
13. "Showllabelthe lrash receplacle and how it is screened ji'orn view. "
This submittal includes plans which label the trash receptacle and show the means by
which it is screened from vie\v. We have darkened the outline for the dumpster to clarify
its location on drawing ADLS-A6. Also, ADLS-A 19 shows the screening at the delivery
area. --- .
p. "Will the private streets not have curbs? Ifso, this }vilf require BZA variance approval. "
Per our previous discussion on this issue, we understand that since the project will not be
utilizing the subdivision or platting process, it will not be subject to the provisions of the
Subdivision Control Ordinance (Sea), including the curbing standards of the sea. We
Angie Conn, Planning Administrator
October 10,2008
Page 3
understand other ordinance standards require curbs associated with parking areas and that
the Engineering Department may comment further. Curbs will be provided where
required, associated with parking areas.
.6 "Please provide copies of your correspondence with the TAC members."
We have previously provided copies of our lAC correspondence to your attention.
JK "Plea')'e provide digital copies of the site plan and huilding elevations, as pdftiles."
We forwarded digital copies of our original submittal documents and plans via email to
your attention when we filed the petitions on 9-19-08. Likewise, vve will send PDF
future copies of our plans to you via email.
y( "Bring materialleolor samples to the Plan Commission meeting"
~
.!7'
otur
,
,,2,('
/
22.
/
We will bring material/color samples to the Plan Commission meeting.
"Please consider using LEED or 'green' site and building practices, such as solar panels,
skylights, native plants. etc."
We will consider using LEED or 'green' site and building practices.
"Please consider using pervious pavers in all or part of the parking area and/or creating
a bioswale in the center olthe parking area."
We will consider using pervious pavers and/or creating a bioswale in the center of the
parking area.
"Signage' Provide the materials and colors. "
We will provide signage materials and colors at the Plan Commission and/or Committee
meeting(s).
"Signage. reduce the address signs to 3~fi tal! so that they are in compliance with the
Sign Ordinance. PI
We have reduced the address signs to 3 feet tall. ~. \('1\ OU'(\~J. CT-v'\ CQ H-c.ur::.
"Signage: Varianceswil/ be requiredfor signs not facing a public ruad, for lotal number
of signs, and possiblyfor sign height. IP
We have amended our proposed sign package per your comments in order to remove
variance requirements accordingly. We have reduced the height of some signs to cause
them to become "exempt", and reduced others to cause them to be in compliance.
Angie Conn, Planning Administrator
October 10, 2008
Page 4
,12{ "Signage. will the signs he externally illuminated or non-iiluminated?"
The two front entry signs will be illuminated.
.Y "Signage: please label the overall height of Sign A. "
We have labeled the overall height of Sign A on our latest submittal.
,;i
"PUD E\hibit 3 of the PUD shmvs a primary walking path along the south property line
of this site. Please show this connection. "
Our plans show significant pedestrian connectivity throughout the site. In particular,
pedestrian walkways have been provided traversing the site from cast to west, much of
\vhich is located near the south property line. With all respect, we believe we have met
the intent and spirit of PUD Exhibit 3.
.7'- 'The south drive (Street B) encroaches in/a the southern 15}i LMAE Please revise."
We have revised the south drive to eliminate the encroachment into the LMAE.
./!!f. "PUD Eyhibil 6 shows the intersection afCommunity Drive and River Road as a primary
point of connectivity Show this intersection and how it relates to the site, regarding
auto, joot and bike trafjie. "
This connection is the responsibility of the overall PUD developer, East Carmel, LLC, an
entity of Platinum Properties.
f
"Make sure to insert K,hibits 7, 8, 9, 12. and J 4 of the PUD Ordinance info the Plan
commission infhrmation brochure. "
Vie believe Exhibit 7 (Larger Detached Dwellings) is not applicable, and mueh of Exhibit
8 (Smaller Detached Dwellings) and Exhibit 9 (Attached Dwellings and Apartments) are
also inapplicable, as we are not creating plat1ed lots. However, as you have noted the
Commission's typical interest in fayade treatment matters, we will include Exhibits 8, 9,
12 and 14 in the Plan Commission information packet.
7
"Lighting: Section 14.3 of the PUD states: Street lighting on residential slreets shall be
confined to the intersections and corners. You show more than that. Please revise the
photometric plan II
We have revised the photometric plan to contine street lighting to intersections and
corners.
30. "TYhat is the maximum number of employees in the largest shift?"
Angie Conn, Planning Administrator
October 10, 2008
Page 5
We estimate approximately 120 fidl-time employees, spread over three shifts. We
anticipate the largest shift would consist of approximately 75-80 employees.
31. "Parking. Please provide a parking breakdown chart jar the whole development,
including the cottages, number of employees, and number of bedy in {he congregate
building. A Iso. note {he parking required for the congregate building is determined as I
parking space per bed plus 1 space per employee. "
We have discussed this matter extensively with you and Mike Hollibaugh, and have
submitted infol111ation regarding the true characteristics of the people residing in the
various housing types. At this writing, you and .tvfike have not completed your analysis
of this unique CCRC, the actual parking demand, within the context of other recently
approved ceRC's in Carmel.
y
"Bike parking: please show/label the bike parking areas, and provide the bike rack
details. "
We have shown and labeled the bike parking areas, with bike rack details.
Jf3.
"I-fames should have convenient pedestrian access to Community Drive or Cherry Creek
Boulevard, like the northeast corner o.f'the site shows. Please revise"
Our plans show significant pedestrian access throughout the site and la/from Community
Drive and Cherry Creek Boulevard, With all respect, we believe we have provided more
than adequate pedestrian accessibility to/fi'om the perimeter streets.
34. "Exhibit 4 of the PUD shows part of this site having primary environmental and/or
recreational open space. Please showl/abelthese specific areas on a site plan"
Vle intend to identify environmental and/or recreational open space on a site plan.
/ "Please label the square footage of the cottages on their.floor plans. r1
We have labeled the square footages of the cottages on their floor plans.
~.
"Regarding the detached homes: Do you consider the cottages (0 be smaller detached
dwellings or larger detached dwellings, as specified in the PUD?"
We do not consider the cottages to be "larger detached dwellings" as specified in the
PUD, However, we also consider the cottages in the ceRC to be a unique housing type,
to be differentiated from the "smaller detached dwellings". Although some elements of
the "smaller detached dwellings" as specified in the PUD may be applicable, such as the
specific garage type reference in Exhibit 8, we consider the cottages to be otherwise
unique and separate. Additionally, some cottages are attached and some detached. Plus,
without platted lots, many elements of Exhibit 8 are clearly inapplicable to the cottages.
Angie COlU1, Planning Administrator
October 10, 2008
Page 6
T
"Exhibit 8 states that Detached CCRe cottages are permitted to have a 1 cur garage
only. "
Exhibit 8 indicates that the CCRC cottages must have at least a one-car garage. This is a
minimum. Therefore, garages for two or more cars are also permitted.
,~
"Exhibit 8 states that the porch must be at least 6-}1 deep. Please revise the Cottage 2
floor plan. "
We have revised the Cottage 2 floor plan to provide for a minimum 6-foot deep porch.
y. "Please label the roofpitches of the cottages on the building elevations. "
We have labeled the roof pitches of the cottages on the building elevations.
;r
"Per P UD Exhibit 12, please shovv/label the proposed benches, garden plots, and other
amenities on the site plan"
We have shown}labeled the proposed benches on the site plan.
We look forward to working with you and the Plan Commissioners as we proceed
thmugh the DP/ ADLS process. Should you have additional comments or questions, please do
not hesitate to contact me. Thank you.
Very truly yours,
cc: Greg Acqua,RLS Companies
Jim Rinehart, Stoeppelwerth
Scott Hall, EGA Architects
Larry Hemp, HempDesign
Paul Rioux, East Carmel, LLC
1/22351561
~ ?d~~'~ \
LQ\.Q( {ieke
""
(()-fO-o8
"
.~~ i~~~ ~'.
:Kenton C. 7t'ard, (:E"M
SurlJeyor of ]{inniltoTl Coullty
''Phillie (3 I () 7(6-84:75
'Fux lJ17) 776-9618
Suile 1 SS
Onf ~'l{allli'IO/1 County Squurc
.Nobfewilk (1II1iiJ1IU 46060-22.10
October 9, 2008
Ice Miller, LLP
A TTN: Greg Ewing
One American Square
Suite 3100
Indianapolis, IN 46282-0200
VIA E-MAIL: Gregory.Ewing(cViccmiller.com
RE: Prairie Landing at Legacy
Dear Mr. Ewing:
We have reviewed the ADLS submittal to the Hamilton County Surveyor's Office on September
19,2008, for this project and have the following comments:
1. The proposed proj ect falls in the incorporated area & MS4 jurisdiction of the City of
Carmel.
2. The proposed project DOES fall in a Carmel Wellhead Protection Zone.
3. The proposed project is located in the Tunis Gerard Regulated Drain Watershed and
the Elizabeth Warner Regulated Drain Watershed.
4. Please submit a 2 outlet permits (4 outlets) for this project. Two of the discharge
points are indirect discharges to the Tunis Gerard Drai.n and the other two discharge
points are direct discharges to the Elizabeth Warner Drain. The application is
available on our wehsite at http://www.co.hamilton.in.us. go to Departments,
Surveyor, and Forms.
5. What is the composite eN value for thi s overall site, as it contributes to the east and
west master basins and how do they compare to the assumptions in the master
drainage design?
6. The calculations imply the detention volume for this area was accounted for in the
master drainage plans, but these detention basins are not constructed yet and are not
part of any current plan on file.. When is the anticipated constnlction of these
detention basins going to take place?
7. Please note that further comments may be necessary at a later date.
Should you have any questions, I can be reached at 317 -776-8495.
Sincerely,
~n4w
Greg Hayes, AC, CFM
Plan Reviewer
CC: Christine Barton-Holmes - Cannel DOCS
Amanda Foley - Carmel Engineering
Dick Hill - Cannel Engineering
Dave Lucas - HCHD
Greg Ilko - Crossroad Engineers
Jim Rinehart - Stoeppelwerth and Associates
Greg Acqua - Bapti st Homes of Indiana
CarmeR
September 24, 2008
Gregory J. Ewing
Ice Miller
One American Square
Suite 3100
Indianapolis, IN 46282-0200
RE: October 15, 2008 Technical Advisory Committee (T AC meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west comer of 146th Street and River Road)
Dear Mr. Ewing:
Information for the above-referenced project has been received and
reviewed.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
~ ~'c/'1~-
Michael D. Fogarty
Chief of Police
MDF:vb
cc: Dept. of Community Services
1317) 571-2500
A Nationally Accredit
'forcement Agency
i-
IFu ~;;]]j 57[-25 t2
/ '
u
Page 1 of 2
u
Conn, Angelina V
From: Conn, Angelina V
Sent: Tuesday, September 23,200810:45 AM
To; 'Ewing, Gregory'
Cc: 'timothy .ochs@ icemiller.com'; 'jrinehart@stoeppelwerth.com'
Subject: Planning/Zoning Dept Review for Prairie Landing CCRC (#08090018 DP/ADLS)
Please add Docket No. 08090018 DPI ADLS to the plans.
Place the zoning on the site plan as: Legacy PUD: 2-501-07.
Please provide a filled outinotarized affidavit of notice of public hearing (see application).
Provide the notarized Affidavit of the Public Notice Sign Placement; see application.
Remember to include the Findings of Fact form in the Plan Commission information packets.
Provide a filled out Notice of Public Hearing form; see application.
Provide a copy of the site plan overlaid upon the aerial photo of the site.
Scott Brewer, City Forester, will be reviewing the landscape plan against the Section 13 of the PUD requirements.
Please show/label the utilities and easements on the landscape plan.
Please provide a copy of the drainage calculations.
Will this site be subdivided and platted?
Show/label the mechanical equipment location and how it is screened from view.
Show/label the trash receptacle and how it is screened from view. L \ *" SU.;!.O cLt\J;cU V1'Q; .
~-vaW-&~~111 require I::!Z.n: vanance approval:- '4'-' Q> \ _ . '\J J 'A (\~/e ,.
Please provide copies of your correspondence with TAC members. I V\ "r'(nDr p( I (jJr€ G'- 'l
Please provide digital copies of the site plan and building elevations, as pdf files.
Bring material/color samples to the Plan Commission meeting.
Please consider using LEED or 'green' site and building practices, such as solar panels, skylights, native plants, etc.
Please consider using pervious pavers in all or part of the parking area and/or creating a bioswale in the center of the
parking area.
Signage: provide the materials and colors. !c.: . "\
Signage: reduce the address signs to 3-ft tall so that they are in compliance with the Sign Ordinance. ~\5\'\{\ 6)
Signage: variances will be required for signs not facing a public road, for total numJe:r of signs, and possitj/y for sign . I l'
height. ~L~ ).0 <;.<212...- -E:'. y h \ lal ~ - Lo
Signage: will the signs be externally illuminated or non-illuminated? . r\- yC I "" "":h ~U D,)
Signage: please label the overall height it Sign A. ' ::J u
PUD Exhibit 3 of the PUD shows a pgmary walking path along the south property line of this site. Please show this
connection. -r- (19 V1CiLp /-Ut1.....~ ~ OC.(W'a i"- -
The south drive (Street B) encroaches into the southern 15-ft LMAE. Please revise.
PUD Exhibit 6 shows the intersection of Community Drive and River Road an a primary Point of Connectivity. Show this
intersection and how it relates to the site, regarding auto, foot, and bike traffic.
Make sure to insert Exhibits 7,8,9,12, and 14 of the PUD Ordinance into the Plan commission information brochures.
Lighting: Section 14.3 of the PUD states: Street lighting on residential streets shall be confined to the intersections and
corners. You show more than that. Please revise the photometric plan.
Whatis the maximum numbers of employees in the largest shift?
Parking: please provide a parking breakdown chart for the whole development, including the cottages, number of
employees, and number of beds in the congregate building. Also, note that the parking required for the congregate
building is determined as 1 parking space per bed plus 1 space per employee.
Bike parking: please show/label the bike parking areas, and provide the bike rack details.
Homes should have convenient pedestrian access to Community Drive or Cherry Creek Boulevard, like the northeast
corner of the site shows. Please revise.
Exhibit 4 of the PU. D shows part of this site having primary environRJental and/or recrea!i-onal ope,n space. Please.
show/label these specific areas on a site plan. 6:x\ C v-.o.~tl.lL . - c;. ~l3\.0 .;.(j)-v..Qw\^-QA..Q.. (l"Y\ S I~e .
Please label the square footage of the cottages on their TIoot plans.
Regarding the detached homes: Do you consider the cottages to be smaller detached dwellings or larger detached
dwellings, as specified in the PUD? J ~. ,r I'Y1 i VL
CiV Exhibit 8 states that Detached CCRe cottages are permitted to have a 1 car garage only. ...... C~::,. V\.ot ~peGl t'i O'{' .
38. Exhibit 8 states thatthe porch must be at least 6-ft deep. Please revise the Cottage 2 floor plan. \t'AO-X.
39. Please label the roof pitches of the cottages on the building elevations.
40. Per PUD Exhibit 12, please show/label the proposed benches, garden plots, and other amenities on the site plan.
41. Additional comments may be voiced at the T AC meeting.
Thank you, -~ ~uloM'W::. L 2L/11YS/,p1l
Angie Conn, Planning Administrator
Depl. of Community Services (DOCS) - Planning & Zoning
1 Civic Square, 3rd Floor
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
~
@
35.
36.
9/23/2008
Please c_ompJetelr:eply_to_the5oJh)_wing~e-Y.ie.\OLCj)mme.lJjllY or before the October 15_l"l\C_meeting:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
Page I of 1
Conn, Angelina V
From: McNamee, Gary S [gary.mcnamee@duke-energy.com]
Sent: Monday, September 22, 2008 2:39 PM
To: gregory.ewing@ icemiller.com
Cc: Conn, Angelina V
SUbject: Prairie landing
Attachments:, Revised RW Restrictions MIDWEST FINAL 5-02-08 (2).doc; ROW Approved Plantings- Revised 4-6-
05 .doc
Hi Gregory,
I have received a set of drawings for the project Prairie Landing. As the drawings do not depict any
Duke Energy transmission line easements involved in this project, Duke Energy's office of Asset
Protection does not have any objections to this project. Please contact our distribution engineering
office of Carmel for distribution power service when necessary. I have included a copy of our
standards for using Duke Energy transmission line easements for any future projects you may have
that involve our easements.
Sincerely,
Gary S. McNamee
Duke Energy
Midwest North Asset Protection
office-812-375-2021
Fax 812-375-2014
Gary .McNamee@duke-energy.com
external mail
2727 Central Ave.
Columbus,IN 47201
internal mail WF500
9/22/2008
Page 1 of 1
Ewing, Gregory
From: Ewing, Gregory
Sent: Friday, September 19, 2008 9:45 AM
To: 'tkrueskamp@carmel.in,gov'; 'Conn, Angelina V'
Cc: Ochs, Timothy
Subject: Prairie Landing (DP and ADLS Submittals)
Attachments: ADLS Plans 9-18-08 zip; Prairie Landing DP ADLS (9-19-08 subrilittals).pdf; Prairie Landing-ADLS-
A1,pdf; Prairie Landing-ADLS-A2,pdf; Prairie Landing-ADLS-A3,pdf; Prairie Landing-ADLS-A4, pdf;
Prairie Landing-ADLS-A5.pdf; Prairie Landing-ADLS-A6 pdf; Prairie Landing-ADLS-A 7, pdf; Prairie
Landing-ADLS-A8.pdf; Prairie Landing-ADLS-A9.pdf; Prairie Landing-ADLS-A 1 O.pdf; Prairie Landing-
ADLS-A 11.pdf; Prairie Landing-ADLS-A 12, pdt; Prairie Landing-ADLS-A 13.pdt; Prairie Landing-ADLS-
A 14. pdt; Prairie Landing-ADLS-A 15.pdt; Prairie Landing-ADLS-A 16 pdf; Prairie Landing-ADLS-
A17.pdt; Prairie Lal1ding-ADLS-A18pdf; Prairie Landilig-ADLS-A19 pdf
Terri Krueskamp and Angie Conn,
Re: BHI Retirement Communities, Inc, at Legacy PUD
Please find attached herein the various digital copies of our DP / ADLS petitions, plans and other information as filed
today (9-19-08) in the DOCS office, regarding the proposed Prairie Landing - Continuing Care Residential Community
(ceRe) at the Legacy PUD, filed on behalf ofBHI Retirement Communities, Inc, Thanks,
Greg Ewing
LL,P
t I' i~
GREGORY J, EWING
Practice Group Specialist - Real Estate
Phone (317) 236-2124
Fax (317) 592-4226
Email gregory.ewing@icemiller.com
One American Square
Suite 2900
Indianapolis, IN 46282-0200
www.icemiller.com
Open as vCard
10/1/2008
~
ICE~ILLERLLP
lEG Ale 0 U N S E l
September 18, 2008
Angie Conn I Christine Balion-Holmes
Dept. of Community Services (DOCS)
One Civic Square, 3rd Floor
Carmel, IN 46032
Re: October 15, 2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRe)
- a portion of the Legacy Planned Unit Development
(near the south west corner of 146th Street and River Road)
Dear Ms. Conn and Ms. Barton-Holmes:
On behalf of Baptist Homes of Indiana, Inc., we are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRC). The 35-acre site \vould have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on tills matter before the Carmel Plan Commission on
November 18, 2008.
Should you have any questions or need clarifications prior to the TAC meeting, please
contact me. Thank you.
Sincerely,
d/!. (?
V
Gregory 1. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One American Square I Suite 3100 I IndianapolJS. IN 46282-0200 I P 317-236-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY Il I WASHINGTON DC
www.icemiller.com
ICE~ILLE~LLP
u
LEG ALe 0 U N S E L
September 18, 2008
Gary Duncan I Nick Redden
Carmel Engineering Dept
One Civic Square, 1 st Floor
Carmel, IN 46032
Re: October 15, 2008 Tcchnical Ad,'isory Committce (TAC) mecting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west corner of 146th Street and River Road)
Dear Mr. Duncan and Mr. Redden:
On behalf of Baptist Homes of Indiana, Inc., we are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CeRe). The 35-acrc site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
November .18, 2008.
Should you have any questions or need clarifications prior to the T AC meeting, please
contact me. Thank you.
Sincerely,
tl!~
Gregory J. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One American Square I Suite 3100 I Indianapolis, IN 45282-0200 I P 317-:136-2100 I F 317,236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
W\"lw.icemi II er.COrTl
ICEt1ILLE~L.L.p
u
LEG ALe 0 U N S E L
September 18,2008
Bill Akers
Cannel Clay Communications
31 First Avenue NW
Carmel, IN 46032
Re: October 15, 2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west corner of 1461h Street and River Road)
Dear Mr. Akers:
On behalf of Baptist Homes of Indiana, Inc., we are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Cannel - Department of Community Services. The requ~sted development would consist of a
Continuing Care Residential Community (CCRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18,2008.
Should you have any questions or need clarifications prior to the T AC meeting, please
contact me. Thank you.
Sincerely,
!/Ie;;
L/ ~
Gregory J. E\:ving
Practice Group Specialist ~ Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One American Square I Suite 3100 I Indianapolis, IN 46282-0200 I P 317-136-2100 I F 317-236-2219
INDIANAPOLIS I CH ICAGO I DUPAGE COU NTY IL I WASH INGTON DC
wwwjcemlller.com
ICEt:1ILLE~LLP
u
LEGAL COUNSEL
September IS, 200S
Bill Hohlt
Deputy Building Commissioner
One Civic Square
Carmel, IN 46032
Re: October 15, 2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Community (CeRe)
- a portion of the Legacy Planned Unit Development
(near the south west comer of ] 46111 Street and River Road)
Dear Mr. Hohlt:
On behalf of Baptist Homes of Indiana, Inc., we are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Cannel - Department of Community Services. The reque.~ted development \vould consist of a
Continuing Care Residential Community (CCRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
NOYember 18, 2008.
Should you have any questions or need clarifications prior to the lAC meeting, please
contact me. Thank you.
Sincerely,
tIY~~
Gregory J. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Oehs, Attorney, Tee Miller
One Amer;can Square I Suite 3100 I Ind;anapolis, IN 46282-0200 I P:J17-236-2100 I F317-236-2219
INDIANAPOLIS I CHICAGO I OlJPAGE COUNTY IL I WASHINGTON DC
www.icemlller.com
y. U
ICE~ILLERLLP
u
LEG ALe 0 U N S E L
September 18, 2008
Scott Brewer, City Forester
Urban Forestry ~ DOCS
One Civic Square, 3rd Floor
Carmel, TN 46032
Re: October 15,2008 Technical Advisory C()mmittee (T AC) meeting
Prairie Landing, a Continuing Care Residential COl11munity (CCRe)
- a portion of the Legacy Planned Unit Development
(near the south west corner of 146lh Street and River Road)
Dear Mr. Brewer:
On behalf of Baptist Homes of Indiana, Inc., \ve are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. 'fbe requested development would consist of a
Continuing Care Residential Community (CeRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building,
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18,2008.
Should you have any questions or need clarifications prior to the T AC meeting, please
contact me, Thank you.
Sincerely,
$?
vL/ 7
Gregory J. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E, Oebs, Attorney, Ice Miller
One American Square I Suite 3100 I Indianapolis, IN 46282-0200 I P 317~235~2100 I f 317-235-2219
INOlllNAPOLlS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.iccmillcLcom
ICE j:J II.. LE ~LLP
u
lEG Ale 0 U N S E L
September 18, 2008
John Duffy
Carmel City Utilities
760 Third Avenue SW
Carmel, fN 46032
Re: October lS~ 2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRe)
- a portion of the Legacy Plmmed Unit Development
(near the south west corner of 146111 Street and River Road)
Dear Mr. DutTy:
On behalf of Baptist Homes of Indiana, lnc., \ve are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter belore Lhe Carmel Plan Commission on
November 18,2008.
Should you have any questions or need clarifications prior Lo Lhe T AC meeting, please
contact me. Thank you.
Sincerely,
IJ.~
Gregory.1. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, lee Miller
One American Square I Suite 3100 I Indianapolis, IN 46282-0200 I P 317-<36-2100 I F 317-236-2219
INDIANAPOliS I CHICAGO [ DUPAGE COUNTY IL I WASHINGTON DC
www.icemillrr.mm
:Y: U
ICEMILLERLLP
u
LEG ALe 0 U N S E L
September 18,2008
Michael Fogarty
Office of Police Chief
Three Civic Square
CarmeL IN 46032
Re: October 15, 2008 Technical Advisory Committee (TAC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west corner of 146111 Street and River Road)
Dear Mr. Fogarty:
On behalf of Baptist Homes of Indiana, Inc., "ve are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Phm Commission on
November HI, 2008.
Should you have any questions or need clarifications prior to the TAC meeting, please
contact me. Thank you.
Sincerely,
$~~
Gregory J. bving
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
OnrAmerican Square I Suite 3100 I Indianapolis, IN 46282-0200 I P 317-136-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.jcemiller.com
ICE~ILLE~LLP
u
lEG Ale 0 U N S E L
September 18, 2008
David Littlejolm, Transportation Systems Coordinator - DOCS
One Civic Square, 3rd Floor
Carmel, IN 46032
Re: October 15, 2008 Technical Advisory Committee (TAC) meeting
Prairie Landing, a Continuing Care Residential Community (CeRC)
- a portion of the Legacy Planned Unit Development
(near the south west comer of 146lh Street and River Road)
Dear IvIr. Littlejohn:
On hehalf of Baptist Homes of Indiana, Inc., we are filing Development Plan (OP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRe). The 3S-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
\\le anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18, 2008.
Should you have any questions or need clarifications prior to the T AC meeting, please
contact me. Thank you.
Sincerely,
tit(;
Gregory 1. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
On~ Am~ricJn 5quar~ I Suit~ 3100 I Indianapolis, IN 46282-0200 I P 317-'236-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DLJPAGE COUNTY II I WASHINGTON DC
wwwx~millercom
ICE~ILLE~LLP
u
LEGAL COUNSEL
September 18, 2008
Chris Ellison
Office of Fire Chief: Fire Station #1
Two Civic Square
Carmel, IN 46032
Re: October 15, 2008 Technical Advisory Committee (TAC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRe)
- a p0l1ion of the Legacy Planned Unit Development
(near the south west corner of 1461h Street and River Road)
Dear Mr. Ellison:
On behalf of Baptist Homes of Indiana, Inc., we are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRe). The 35-acre site would have 47 buildings,
incl uding single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18, 2008.
Should you have any questions or need clarifications prior to the TAC meeting, please
contact me. Thank YOll.
Sincerely,
t1I c;;
Gregory J. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One Amencan Square I Suite 3100 I Indianapolis. IN 45282-0200 I P 317-<36-2100 I F 317-236-2219
INDIMJAPOLlS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.iccmiller.com
:Y: U
ICEl'iILLERLLP
u
LEGAL COUNSEL
September 18, 2008
Terry Krueskamp
City Df Carmel - Information Systems
Three Civic Square
Carmel, TN 46032
Re: October 15, 2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
~ a portion of the Legacy Planned Unit Development
(near the south west comer of 146th Street and River Road)
Dear Mr. Krueskamp:
On behalf of Baptist Homes of Indiana, Inc., \ve are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signagc (ADLS) approval petitions with the City
of Carmel - Department of Community Services. 'rhe requested development would consist of a
Continuing Care Residential Community (CCRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
\Ve anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18, 2008.
Should YOLl have any questions or need clarifications prior to the 'lAC meeting, pleClse
contact me. Thank you.
Sincerely,
4/C;
(/II'
Gregory J, Ew"ing
Practice Group Specialist ~ Real Estate
cc: Timothy E, Gchs, Attorney, Ice Miller
One Amnican Square I Suite 3100 I Indianapolis, IN 46282-0200 I P J17-:236-2100 I F 317-236-2219
I~WIANAPOllS I CHICAGO I DUPAGE COUNTY Il I WASHINGTON DC
www.icerniller,colll
:y: U
ICEt'1ILLERLLP
u
lEG ALe 0 U N S E l
September 18,2008
David Lucas
Hamilton County Highway Dept.
1700 South 10th Street
Noblesville, IN 46060
Re: October 15~ 2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRe)
- a portion of the Legacy PImmed Unit Development
(near the south west corner of 146th Street and River Road)
Dear Mr. Lucas:
On behalf of Baptist Homes of Indiana, Inc., we are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
,,^ie anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18,2008.
Should you have any questions or need clarifications prior to the T AC meeting, please
contact me. Thank you.
Sincerely,
tite;
Gregory 1. Ev.ring
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Jee Miller
One American Square I Suite 3100] Indionapnlis, IN 46282-0200 I f' 317-236-2100 I F 317-236-2219
INDIANAf'OLlS I CHICAGO I DUPAGE COUNTY IL I W/\SHINGTON DC
wwwjcerniller.cnm
ICE t:1 I LLEftLP
u
LEGAL COUNSEL
September 18, 2008
Mark Westenneier
Carmel/Clay Parks Department
1411 E 116th Street
Carmel, IN 46032
Re: October 15,2008 Technical Advisory Committee (TAC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west comer of 146lh Street and River Road)
Dear Mr. Westermeier:
On behalf of Baptist Homes of Indiana, Inc" we are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services The requested development would consist of a
Continuing Care Residential Community (CCRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18,2008.
Should you have any questions or need clarifications prior to the TAC meeting, please
contact me. Thank you.
Sincerely,
(!!. c;
Gregory J, Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One American Square I Suite 3100 I Indianapolis. IN 46282-0200 I P 317-:;36-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.icemiller.com
ICE i::j I L LE ~LLP
u
LEG Ale 0 U N S E L
September 18,2008
Jason Lemaster
11amilton County Health Dept.
One Hamilton County Square, Suite 30
Noblesville, IN 46060-2229
Re: October 15,2008 Technical Advisory Committee (TAC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west corner of 146tb Street and River Road)
Dear Mr. Lemaster:
On behalf of Baptist Homes of Indiana, Inc., we are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CeRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18,2008.
Should you have any questions or need clarifications prior to the T AC meeting, please
contact me. Thank you.
Sincerely,
tf/f c9/
Gregory J. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One American Square I Sl.ite 3100 I IndianapoliS, IN 46282-0200.1 P 317-23r;-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I OUPAGE COUNTY IL 1 WASHINGTON DC
www.lcemiller.com
~ U
ICEi'1ILLERLLP
u
LEG ALe 0 U N S E L
September 18,2008
Greg Hayes
J-Iamilton County Surveyor's Office
One Hamilton Square, Suite 188, Hamilton County Judicial Center
Nablesville, IN 46060
Re: October 15,2008 Technical Advisory Committee (TAC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west comer of 146lh Street and River Road)
Dear Mr. Hoyes:
On behalf of Baptist Homes of Indiana, Inc., we are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the CarmcJPJan Commissiun on
November 18, 2008.
Should you have any questions or need clarifications prior to the TAC meeting, please
contact me. Thank you.
Sincerely,
tit !f:;
Gregory J. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. OCh5, Attorney, Ice Miller
One American Square I Suite 3100 I Indionapolis, IN 462B2-0200 I f' 317-236-2100 I I: 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.iccmlllrLcom
~ W
ICEt1ILLERLLP
u
LEG ALe 0 U N 5 E L
September 18, 2008
Brooke Gajownik
Hamilton County Sheriffs Office
18100 Cumberland Road
Noblesville, eN 46060
Re: Octoher 15, 2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west corner of 146th Street and River Road)
Dear Ms. Gajownik:
On behalf of Baptist Homes of Indiana, Inc., we are filing Development Plan (DP)
approval and Architectural, Desig'n, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRe). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18, 2008.
Should you have any questions or need clarifications prior to the T AC meeting, please
contact me, Thank you,
Sincerely,
iJ!J cC;;
!/ l
Gregory 1. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, lee Miller
One Ameri(3n Squar~ I Suite 3100 I Indianapolis, IN 46282-0200 I P 317-~36-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.icemillcLcom
y U
ICEMILLERLLP
u
LEGAL COUNSEL
September 18, 2008
Jn~on Kirkman
Urighthouse Networks
3030 Roosevelt Avenue
Indianapolis, IN 46218
Re: October 15,2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Commtmity (CCRe)
- a portion of the Legacy Planned lJ nit Development
(near the south west corner of 146tl1 Street and River Road)
Dear Mr. Kirlanan:
On behalf of Baptist Homes of Indiana, Inc., we are filing Development Plan COP)
approval and ArchitecturaL Design, Lighting, Signage (ADLS) approval petitions with the City
of.Carmel - Department of Community Services The requested development would consist of a
Continuing Care Residential Community (CCRe). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on Ihis matter before the Carmel Plan Commission on
Novemher 18,2008.
Should you have any questions or need clarifications prior to the T AC meeting, please
contact me. Thank you.
Sincerely,
l/JI.c;
V
Gregory J. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Tee Miller
One American Square I Suite 2900 [ Indianapolis, IN 46282-0200 I P 317-236-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY II I WASHINGTON DC
www.icemiller.com
:Y' W
ICEMILLERLLP
u
LEGAL COUNSEL
September] 8, 2008
Shirley Hunter
Duke Energy
16475 Southpark Drive
Westfield, IN 46074
Re: October 15,2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west corner of 146th Street and River Road)
Dear Ms. Hunter:
On behalf of Baptist Homes of Indiana, Inc., \ve are filing Development Plan (OP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Cannel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRe). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
\Ve anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18, 2008.
Should you have any questions or need clarifications prior to the 'lAC meeting, please
contact me. Thank you.
Sincerely,
t$.c;
Gregory J. Ew'ing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One American Square I Suite 2900 I Indianapolis, IN 46282-0200 I P 317-236-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.icemiller.com
~ U
ICEMILLERLLP
u
lEG ALe 0 U N 5 E L
September 18,2008
Jennifer Marlett
Indianapolis Water Company
1220 Waterway Blvd
Indianapolis, IN 46206
Re: October 15, 2008 Technical Advisory Committee (TAC) meeting
Prairie Landing, a Continuing Care RcsidentialCommunity (CCRe)
- a portion ofthe Legacy Planned Unit Development
(near the south west corner of l461h Street and River Road)
Dear Ms. Marlett:
On behalf of Baptist Homes of Indiana, Inc., \ve are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CeRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18,2008.
Should you have any questions or need clarifications prior to the TAC meeting, please
contact me. Thank you.
Sincerely,
t1I.~
Gregory J. Evving
Practice Group Specialist- Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One American Square I Suite 2900 I Indianapolis. IN 46282-0200 I P 317-236"21001 f 317-236-2219
INDIANAPOLIS I CHICAGO 1 DUPAGE COUNTY IL I WASHINGTON DC
www.icemiller.com
y W
ICEMILLERLLP
u
LEGAL COUNSEL
September 1 8, 2008
Ron Farrand
Carmel Clay Schools
5201 East 131ST Street
Carmel, TN 46033
Rc: October 15,2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRe)
- a portion of the Legacy Planned Unit Development
(near the south west corner of 146lh Street and River Road)
Dear Mr. Farrand:
On behalf of Baptist Homes of lndiana, Inc., \ve are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADiS) approval petitions with the City
of Carmel - Departmen1 of Community Services. The requested development would consist of a
Continuing Care Residential Community (CeRe), The 35-ane site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
Vv'e anticipate an initial hearing on this maller before the Carmel Plan Commission on
N ovcm be.- 18, 2008.
Should you have any questions or need clarifications prior to the T AC meeting, please
contact me, Thank you.
Sincerely,
Off c;;
Gregory J. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One American Square I Suite 2900 I IndianapoliS, IN 46282-0200 I P 317-236-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.icemiller.com
:Y' U
ICEMILLERLLP
u
LEGAL COUNSEL
September 18, 2008
Ryan Hartman
Clay Tovmship Regional Waste District
10701 North College Avenue, Suite A
Indianapolis, IN 46280-1098
Re: October 15, 2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west comer of l46\h Street and River Road)
Dear Mr. [-Iartinan:
On behalf of Baptist Homes of Indiana, Inc., \ve are filing Development Plan (OP)
approval and Architectural, Design, Lighting, Signage (AOLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
Novem her 18, 2008.
Should you have any questions or need clarifications prior to the TAC meeting, please
contact me. Thank you.
Sincerely,
t1I.~
Gregory J. Evy'ing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, lee Miller
One American Square I Suite 2900 I Indi3napolis.IN 46282-0200 I P 317-236-21001 F 317-236-2219
INDIANAPOLIS I CHICAGO I [)IJPAGE COlJNTY IL I WASHINGTON DC
www.lcemiller.com
y U
ICEMILLERLLP
u
LEGAL COUNSEL
September 18,2008
Troy Yackle
Panhandle Eastern Pipeline Co. / Trunkline Gas Co.
9371 Zionsville Road
Indianapolis, IN 46268
Re: October 15,2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRe)
- a p0l1ion of the Legacy Planned Unit Development
(near the south west comer of 146lh Street and River Road)
Dear Mr. Yackle:
On behalf of Baptist Homes of Indiana, Inc., we arc filing Development Plan (OP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRe). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this malLer before the Carmel Plan Commission on
November 18,2008.
Should you have any questions or need clarifications prior to the lAC meeting, please
contact me. Thank you.
Sincerely,
ti/f. ~
Gregory J. Evving
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One American Square I Suite 2900 I Indianapolis, IN 46282-0200 I P 317-236-2100 I F 317~236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.icemiller.com
~ U
ICEMILLERLLP
u
LEGAL COUNSEL
September 18, 2008
Ron Morris
J:iJJcmapolis Power & Light Co.
3600 North Arlington Avenue
Indianapolis, IN 4621 g
Re: October 15, 2008 Technical Advisory Committee (T AC) meeting
Prairie Landing; a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west corner of 146th Street and River Road)
Dear Mr. Morris:
On behalf of Baptist Homes of Indiana, Inc., \\'e are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CeRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18,2008.
Should you have any questions or need clarifications prior to the TAC meeting, please
contact me. Thank you.
Sincerely,
tf/!. C;;
Gregory J, Ewing
Practice Group Specialist ~ Real Estate
cc: Timothy E. Oehs, Attorney, lee Miller
One AmericiJn Square I Suite 2900 I IndianiJpolis, IN 46282-0200 I P 317-236-2100 I F 317-2]6-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.irrmiller.com
y U
ICEMILLERLLP
u
LEGAL CDUNS E L
Septeinber 18, 2008
Gregory Ilko, PE
CrossRoad Engineers
34] 7 South Sherman Drive
Beech Grove, IN 461 07
Re: October 15, 2008 Technical Advisory Committee (T AC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
~ a portion of the Legacy Planned Unit Development
(near the south west corner of 146th Street and River Road)
Dear Mr. Ilko:
On behalf of Baptist Homes of Indiana, Inc., we are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CeRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate ,m initial hearing on this matter before the Carmel Plan Commission on
November 18,2008.
Should you have any questions or need clarifications prior to the TAC meeting, please
contact me. Thank you.
Sincerely,
tt~
Gregory J. Ewing
Practice Group Specialist - Real Estate.
cc: Timothy E. Ochs, Attorney, lee Miller
One American Square I Suite 2900 I Indianapolis, IN 46282-0200 I P 317-236-2100 I F 317-236-2219
I~JDIANAPOLlS I CHIC^GO I DUPAGE COUNTY IL I WASHINGTON DC
www.iremiller.com
v U
ICEMILLERLLP
u
LEGAL COUNSEL
September 18,2008
Dave HutIman
Carmel Street Department
3400 W. 1315t Street
Westfield, IN 46074
Re: October 15, 2008 Technical Advisory Committee (TAC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west corner of l46th Street and River Road)
Dear Mr. Huffman:
On behalf of Baptist Homes of Indiana, Inc., \ve are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CeRe). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this' matter before the Carmel Plan Commission on
November 18, 2008,
Should you have any questions or need clarifications prior to the TAC meeting, please
contact me. Thank you.
Sincerely,
,ct(7
Gregory J. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, lee Miller
One Americ<Jrl Square I SuitE 2900 I Indianapolis, IN 46282-0200 I P 317-236-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.icemiller.com
v U
ICEMILLERLLP
u
LEGAL COUNSEL
September 18, 2008
Dale Sparks, Postmaster
Carmel Post Oftlce
United States Postal Service
275 Medical Drive
Carmel, IN 46032-9998
Re: October 15, 2008 Technical Advisory Committee (TAC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRe)
- a portion of the Legacy Plmmed Unit Development
(near the south west corner of 1461h Street and River Road)
Dear Mr, Sparks:
On behalf of Baptist Homes of Indiana, Inc" we are filing Development Plan (OP)
approval and Architectural, Design, Lighting, Signage (AOLS) approval petitions with the City
of Carmel - Department of Community Services, The requested development would consist of a
Continuing Care Residential Community (CeRe). The 3S-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the CarmeJPlnn Commission on
November] 8, 2008.
Should you have any questions or need clarifications prior to the T AC meeting, please
contact me. Thank you,
Sincerely,
dt.c;~
Gregory J. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One American Square I Suite 2900 I Indianapolis, IN 46282-0200 I P 317-236-21001 F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.icemiller.com
~ U
ICEMILLERLLP
u
LEGAL COUNSEL
September 18,2008
Chuck Shupperd
Vectren Energy
P.O. Box 1700
Noblesville, IN 46061-1700
Re: October 15, 2008 Technical Advisory Committee (TAC) meeting
Prairie Landing, a Continuing Care Residential Community (CeRe)
- a p0l1ion of the Legacy Planned Unit Development
(near the south west corner of 1461h Street and River Road)
Dear Mr. Shupperd:
On behalf of Baptist Homes of lndiana, Inc., we are filing Development Plan (OP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRe). The 35-acre site would have 47 buildings.,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18,2008.
Should you have any questions or need clarifications prior to the TAC meeting, please
contact me. Thank you.
Sincerely,
If/! ~;
Gregory]. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One American Square I Suite 2900 I Indianapolis, IN 46282-0200 I P 317-236-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY III WASHINGTON DC
www.icemlller.com
:Y' U
ICEMILLERLLP
u
LEG ALe 0 U N S E L
September 18, 2008
Amanda Foley, Storm Water Administrator
Carmel Engineering Dept
One Civic Square, 1 st Floor
Carmel, IN 46032
Re: October 15,2008 Technical Advisory Committee (TAC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy PImmed Unit Development
(near the south west comer of ] 46th Street and River Road)
Dear Ms. Foley:
On behalf of Baptist Homes of Indiana, Inc., \ve are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Cannel - Department of Community Services. The requested development \vould consist of a
Continuing Care Residential Community (CCRC) The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plun Commission on
November 18, 2008.
Should you have any questions or need clarifications prior to the T AC meeting, please
contact me. Thank you.
Sincerely,
III c;;
v
Gregory J. Evving
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, lee Miller
One American Square' Suite 2900 I Indianapolis. IN 46282~0200 I P 317-236-2100 I F 317-236-2i19
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY IL I WASHINGTON DC
www.icemiller.com
y U
ICEMILLERLLP
u
lEGAL COUNSEl
September 18, 2008
Gary McNamee, Asset Protection Associate
Luke Energy Indiana, Inc.
WF 500/27227 Central A venue
Columbus, IN 47201
Re: October 15, 2008 Technical Advisory Committee (TAC) meeting
Prairie Landing, a Continuing Care Residential Community (CCRC)
- a portion of the Legacy Planned Unit Development
(near the south west corner of 1461h Street and River Road)
Dear Mr. McNamee:
On behalf of Baptist Homes of lndiana, Inc., \ve are filing Development Plan (DP)
approval and Architectural, Design, Lighting, Signage (ADLS) approval petitions with the City
of Carmel - Department of Community Services. The requested development would consist of a
Continuing Care Residential Community (CCRC). The 35-acre site would have 47 buildings,
including single cottages, duplex cottages, and a congregate building.
We anticipate an initial hearing on this matter before the Carmel Plan Commission on
November 18, 2008.
Should you have any questions or need clarifications prior to the T AC meeting, please
contact me. Thank you.
Sincerely,
$~
1/
Gregory J. Ewing
Practice Group Specialist - Real Estate
cc: Timothy E. Ochs, Attorney, Ice Miller
One American SqUine I Suite 2900 I Indianopolis,lN 46282-0200 I P 317-236-2100 I F 317-236-2219
INDIANAPOLIS I CHICAGO I DUPAGE COUNTY II I WASHINGTON DC
www.icemiller.com