Loading...
HomeMy WebLinkAboutMinutes TAC 01-21-09CARMEL TECHNICAL ADVISORY COMMITTEE MEETING MINUTES Date: Wednesday, January 21, 2009 Place: Planning2oning Dept. Conference Room, 3rd Floor, Carmel City Hall ' Docket No. 08110009 UV: Brunson & Co Office he applicant seeks the following use variance approval: Appendix A: Use Table -- Office uses in residential district/building. The site is located at 501 East 116~h Street and is zoned R1/Single-family residential. Filed by Michael Godfrey and Kumiko Brunson, owners. Mike Godfrey presented for the petitioner. He was accompanied by his wife Kumiko Brunson. We have areal-estate business, currently our home office is on 96th St. just east of Westfield. We are in a fortunate situation in that our business is growing, which is interesting in this kind of economy. We have been fortunate in Carmel and in Hamilton Country who have been good to us. I don't now how many of you have this information (blue folder). But in here we are requesting a use variance for a second property that we are either going to sell or open a second branch office in. That area needs a little refreshing right now. We bought the property 2 years ago, went completely through, inside and out, remodeling it by a building permit that we got from Carmel. We have tenants in it currently. We don't think it is a good use for the property. We have 4 new sales going on as of last year and half so our property on 96~h is getting cozy. This would be an asset to the immediate neighborhood. We think it is more appropriate for it to be used as light commercial or small office as opposed to residential. We don't believe it would draw resident occupants. So we request the use variance. Joanie Clark, Vectren Energy- Are you going to be adding any more load to it? Mike Godfrey - No all the rehab is completed in fact we are not even going to ask for a sign at this point. Joanie Clark, Vectren Energy- No Further Questions. Greg Hoyes, Hamilton County Surveyor's Office- Have no objections to the use variance. Nick Redden, City Engineers Office- Should-have received an email on Jan 6`h about the situation that needs to be taken care of before we will support the use variance. Mike Godfrey- and I may have that with me; you want to recap that quickly. Nick Redden-I believe it had to deal with the right of way Mike Godfrey- the eng. Had requested that we agree to a future release of the easement of what will be the north end of the property Nick Redden- yes Mike Godfrey- we have no objection, which is fine, I e-mailed Gary Duncan to see if there were any steps or something to sign but at this point we have lost communication. So if someone could please let us know the steps we need to take to commit to that. Chris Ellison, CFD-What is the Square Footage? Any structural additions? Page t of 1 Mike Godfrey- 1800 total Square Feet. We took an attached two car garage and made it into a large office space which will not be adding to the physical existing foundation plan. Chris Ellison- I have no further questions Scott Brewer, Urban Forestry- W e talked about certain landscape plans, no objection to land use variance, once use change I would need you to submit a plan Mike Godfrey-absolutely, just let us know what you would like us to submit. Steve Volumber, Duke Energy- IPL territory, no comments. Ryan Hartman, CTRWD- Do you know how many employees will be occupying the space? Mike Godfrey- No more than 6 total David Littlejohn, DOCS - We spoke on the phone about the letter I sent you. I think as part of a resolution with our engineering office we can discuss the path with them. Christine Barton-Homes, DOCS- To eco Nick and David we do need to get the right of way taken care of. Lately the BZA has been tabling issues that have things that are un- resolved;just cc me on the a-mail to get resolved prior to the hearing. You should get our department report sometime later this after noon. No further comments. END Docket No. 08120009 TAC: Remco Expansion The~appiicant seeks TAC approval to construct a warehouse addition, expanded parking rea, and dry detention area. The site is located at 4715 W 106"' t. and is zoned I-1/ ustrial. Filed by Ben Deichmann of Roger Ward Engineeri or Garrison Enterprises, L Ben Deichmann pres ed. We are proposing a roughly 21 square foot warehouse distribution addition to an eady existirg warehouse. is west of 106"' at the intersection of 106`h and Mic ~ an. Currently it is no ~ the corporate limits of Carmel. Joanie Clark, Vectren Energy- Sho activ ervice already there, are you going to be adding any new load? She gave out her ntact information. Ben Deichmann- I am sure we are, I of know exactly all of it Greg Hoyes, Hamilton Cou Surveyor's Offic -Sent you a letter, and followed up with an email. Still need o et permit and still need t ddress water quality. Other than that no further comme Nick Redden, C' Engineers Office- This is out of our juris tion Chris Elli n, CFD- Any changes from our reading I got a couple o eeks ago? Ben D 'chmann- Not at this time, the sprinkler design went and had a test done out the main at 106"'. I think they are having to re-due that. The results p them rig t_on the curve for needing a boost. Chris'Ellison- Keep me informed Page 2 of 1