Loading...
HomeMy WebLinkAboutDept Report 05-20-03CARMEL/CLAY PLAN COMMISSION ~~ ~~ DEPARTMENT REPORT / ~ , ; May 20, 2003 9h. Docket No. 69-03 DP/ADLS; Carmel Cemetery The applicant seeks approval to construct an addition to a cemetery. The site is located at 1000 North Range Line Road. The site is zoned R-1/Residence within the US 31 Overlay Zone. Filed by Ronald L. Bussell for the Carmel Cemetery Association. The applicant is requesting approval of a Development Plan and ADLS for the construction of an auto dealership. The site is located on lot three of the East 96`h Street Auto Pazk. Please see the informational packet prepared by the applicant for an overview of the site and proposed building. It is evident that the Cemetery Association is seeking a significant level of relief from Ordinance requirements necessary for them to achieve approval. I have listed the Ordinance requirements where relief is necessary and noted an alternative the Department can support in this regard: 1. Setbacks for grave sites -Along US 31 Right of way: 90' required 20' proposed You will need to file a letter with IDOT regarding this proposal. If they do not file objection to the plan the Department will support this request for relief. - Along west and faz south property lines: 45' required 30' proposed As you proposed you client desires to dedicate an area along the south property line to the City for the construction of the ATP Trail. If this area is between 20' and 45' +/- along the south property Zine it would occupy the location of the ATP Trail resolve the requirement to construct the trail. In addition the Department would support a O'setback request along the new property line. - Along south property line adjacent to commercial: 15' required 10' proposed The Department will support this request for relief. 2. Identify construction of path per Alternative Thoroughfare Plan (ATP): - Provide connection to ATP path from Monon, developers aze required to construct paths per the ATP plan. Not shown on plan. 3. Landscape Requirements (no landscape plan provided): - The site must comply with the buffer yazd requirements along all but the US 31 exposure. This consists of either 15' or 25' width depending on adjacent use and zone planted with 5 or10 trees and 9 or 27 shrubs per 1001ineaz feet also depending on adjacent use. Without the benefit of a Landscape Plan the Department has indicated that they will support reductions in the required width of Buffer areas. - A 30' buffer is required along the US 31 right-of--way line planted with 8 trees and 15 shrubs (or 3 evergreens) per 1001inear feet of frontage. The applicant should be prepared to address these items the night of the meeting. The Department recommends that this item be forwarded to the Subdivision Committee on June 3` for further discussion.