June 13, 2003
Jenny Chapman
Carmel City Engineering Office
One Civic Square
Carmel, Indiana 46032
~~ '
\\ L
~` ~ RFCF•IV~D
~l JIJN 16 20G3
DOCS ~~
tip"
~,..
RITZ-CHARLES EXPANSION SITE DRAINAGE PLAN
Dear Mrs. Shaw:
Paul I. Cripe, Inc. has prepared a revised site drainage plan for the new construction
proposed at the Ritz Charles. This drainage plan is aimed at a solution based upon
the new site development and anticipated relocation of existing Ritz Charles parking
due to the proposed Illinois street expansion as shown in the Master Plan drawing.
This site drainage plan has been revised in response to the comments submitted by
Jenny Chapman in a letter to Mr. E. Davis Coots, dated May 20,2003.
This drainage plan has been modeled to handle the new storm water runoff
associated with the new site development. This drainage plan is aimed at a
temporary solution based upon the new construction and anticipated relocation of
existing Ritz Charles parking due to the proposed Illinois street expansion.
Should you have any questions, please do not hesitate to contact the undersigned.
Sincerely,
UL I. CRIPE, INC.
David Clidence
Civil /Environmental Engineer
c. Chuck Lazzara, Ritz Charles Inc.
Gary Murray, Vice President, Paul I. Cripe, Inc.
O:\1999\990334@0000\engWOCS\ilreinage plan cover IetleratltlenCumtloc
Ritz Charles
`~
;'~ RECFII~ED
,iU~i 1~ 2ui3
DOCS
1\.
~'
New Site Construction
Revised Drainage
Report
Prepared for
Mr. Chuck Lazzara
Ritz Charles, Inc.
12156 NORTH MERIDIAN
CARMEL, IN 46032
°~ `,
'. i4 ..:Y ;' . .
7172 Graham Road
Indianapolis, IN 46250
Phone: (317)942-fi777
FAX: (317)941-4798
www.picripe.eom
00000o-00000 'S~~~O~
v~~Ct
A~
RITZ-CHARLES EXPANSION SITE DRAINAGE PLAN
Paul I. Cripe, Inc. has prepared a revised site drainage plan for the new construction
proposed at the Ritz Charles. This drainage plan is aimed at a solution based upon the
' new site development and anticipated relocation of existing Ritz Charles parking due to
the proposed Illinois street expansion as shown in the Master Plan drawing.
' The site in consideration is located in a predominately residential/commercial area, and
is 1.27 acres in area. The Site is bounded by the Existing Ritr Charles facility to the
north, residential-land to the west, vacanUresidential land use to the south, and a local
service road to its east.
Pre-Development Site
' The Site contains one residential building that has an approximately 3,165 ftZ and 2,450
ftZ of paved drive or walk areas.
' The property is generally flat. It slopes to its perimeter in most instances to the
southeast. No areas of flooding potential appear to be present for the Site.
The existing Site has a 2 year storm water runoff is 0.63 cfs and the 10 year storm water
runoff of 1.30 cfs. Calculations of these figures are shown in Appendix A.
Post-Development Site
The proposed new site development incorporates a building of approximately 5,100 ftZ
and 10,050 ftZ of concrete slab and walk areas.
This site drainage plan implements the following strategy: the northern and western
sides of the parcel will sheet drain to the existing Ritz Charles parking lot. The
remainder of the storm water runoff will be detained and transferred through a drainage
Swale that will run parallel to the southern property line and continue northward running
parallel to the site access road. This drainage Swale will serve both as a path for storm
water runoff and serve as a detention area in the case of a 100-year storm. A 12" HDPE
pipe will then transfer the runoff from the drainage Swale to an existing catch basin.
Surface drainage and detention strategies are detailed on the Site Drainage Plan.
r
The new construction storm water runoff fora 10 and 100-year storm are, 0.55 cubic feet
per second and 0.69 cubic feet per second, respectively. Calculations of these figures
are shown in Appendix A.
2-yr Pre- 10-yr Pre- 10-yr Post- 100-yr Post-
Basin ID Developed Developed Developed Developed
Discharge (cfs) Discharge (cfs) Discharge (cfs) Discharge (cfs)
Basin 1 0.63 1.30 0.55 0.69
CA/PE - t -
0 \1999\990334\20000\eng\tlocs\tlrainage report antl talcs retised.tloc
is;o ooi
h1sUM~ 'l
1
Conclusion
This drainage plan has been modeled to handle the new storm water runoff associated
' with the new site construction. The detention swale has been designed to provide the
necessary storage volume to comply with the maximum allowable release rate.
Consequently, no adverse impacts are anticipated from this development.
~, _.-
' CR//DE ~ z - Aso\w o"
0 \1999\99033a@0000\engWOCS\tlrainage repon and nlcs reWSetl.Ew ~SgOfta
~~` ~,
Swale
Existing Flow
Type.... Master Network Summary page 2.01
Name.... Watershed
File.... 0:\1999\990334\20000\eng\SWALE.PPW
MASTER DESIGN STORM SUMMARY
Network SCorm Collection: Hamilton Co.
Total
Depth Rainfall
Return Event in Type RNF ID
____________
100yr ______
5.7500 ________________
Synthetic Curve ________
TypeII ________
24hr
2yr 2.9500 Synthetic Curve TypeII 24hr
l0yr 4.1500 Synthetic Curve TypeII 24hr
'MASTER NETWORK SUMMARY
SCS Unit Hydrograph Method
('Node=Outfall; +NOde=Diversion;)
(Trun= HYG Truncation: Hlank=None; L=Left; R=Rt; LR=Left&Rt)
Max
Return HYG Vol Qpeak Qpea k Max WSEL Pond Storage
Node ID
_ Type
_
_ Event
______ ac-ft Trun
_______
_ hrs cfs ft ac-ft
'CULVERT _____ __
JCT
100 __
__
.397 _________
12.8000 _____
. ___
69 ______ __ ____________
*CULVERT JCT 2 .141 12.7000 . 41
'CULVERT JCT 10 .246 12.7000 . 69
*EXISTING FLOW JCT 100 .315 12.5500 2. 33
•EXISTING FLOW JCT 2 .093 12.6000 . 63 '
'EXISTING FLOW JCT 10 .181 12.5500 1. 30
EXPANSION AREA 100 .398 12.1000 6. 20
EXPANSION AREA 2 .142 12.1000 2. 21
EXPANSION AREA 10 .247 12.1000 3. 88
SWALE IN POND 100 .398 12.1000 6. 20
SWALE IN POND 2 .142 12.1000 2. 21
SWALE IN POND 10 .247 12.1000 3. 88
SWALE OUT POND 100 .397 12.8000 . 69 859. 49 .199
SWALE OUT POND 2 .141 12.7000 . 41 857. 68 .059
SWALE OUT POND 10 .246 12.7000 . 56 058. 50 .114
S/N: 321DOSA070C9 Paul I. Cripe, Inc.
PondPack Ver. 8.0068 Time: 4:30 PM Date: 6/13/2003
Type.... Master Network Summary Page 2.02
Name.... Watershed
File.... O:\1999\990334\20000\eng\SWALE.PPW
MASTER NETWORK SUMMARY
SCS Unit Hydrograph Method
(~NOde=0utfa1l; +NOde=Diversion;)
(Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left6Rt)
Max
Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage
Node ID
_ Type
__ ____ Event
______ ac-ft Trun
__________ __ hrs
________ cfs ft ac-ft
_____________
UNDEVELOPED
AREA
100
.315 _
12.5500 ________
2.33 ________ _
UNDEVELOPED AREA 2 .093 12.6000 .63
UNDEVELOPED AREA 10 .101 12.5500 1.30
S/N: 321D09A070C9 Paul I. Cripe, Inc.
PondPack Ver. 8.0060 Time: 4:30 PM Date: 6/13/2003