Loading...
HomeMy WebLinkAboutPacket 03-23-09 Supplement,.. -~ o-oo~'n; ~;-Q.~fl CITY OF ,-CAxNIEL Jn~wrs BtU~t~~.ari~, 1VIAYOR March 18, 2009 Board Members, In reference to the Firestone signage variances, I have asked the applicant to submit a supplemental drawing showing the new roof line after the south elevation was changed. It changed from a hip roof to a gable roof, in order to better accommodate the proposed signage. When this original change was made, the applicant did not change the views of the roof line from the west and east. The attached drawing will show a rough estimate of what the new roof line will look like. I will be available to answer any of your questions at the meeting on Monday night. Have a good day! Sincerely, ~~UL~G/'ll~/ 1 dCi l/~/ L'~ Rachel Boone UHPA2TbIL?]7 QF COA1g~p~llTS S6AVECGJ O;7E C~14"LC SQ(,i,1RE, I.AI:MF, L, IN 4~~j? PH02:G 317.i/l.?4t/, F'.1~ ~l ~.j/l.?=k2b iV11CHn Ll. Y. }-I CiLLI i~aUUH. I~1Iti GTOR Architettural Graphics Incorporated /,-III 2655 International Parkway ~,/~(`V^J^ Virginia Beach, VA 23452 1.800.877.7868 • www.agisign.com FRONT (WEST) ELEVATION "i ~ ~ ' ' COMPLE~'E ALJ'P'C C1lRE- Site 1D: NIA Scale: NTS AGI Red: F. Smith Date: Drawn by: M. Reynolds Date Revised: 1/29/49 O6 RIGHT S1bE (SOUTH) ELEVATION ~,::. - levations Survey ID: N/A Project Title: Bridgestone Firestone Address: Carmel, IN Site fD: N/A Scale: NTS AGI Rep: F. Smith x COMPLETE AUTO CARE" Date: Drawn by: M. Reynolds Date Revised: 1/29/09 ~.