Loading...
HomeMy WebLinkAboutCorrespondenceON-SITE EVALUATION FOR EROSION AND SEDIMENT CONTROL Hamilton County Soil and Water Conservation District 1108 South 9°i Street, Noblesville, IN 46060 Ph:317-773-2181 Fax:317-776-1101 ~ ly v ~S I Date: Qr t4 03 ~%oio I_`' 7r,"t\_Y,,".9-,n,~~ Project Name: PAIeK u)oo~ EASP' b Present at Site: John South, Hamilton Co. SWCD~~, / This Report Provided To: DUKE ~OhS/Y6~GI'iila C4RKEL c% L~~i Y ~'6~.xo s :tom Su 2v~YOIZ sass kErsroa~ r',~zcss.~vG Ft~~ Su is ~ r,•.lptaN.al~q~/s, Su S/G2Y0 TYPE OF EVALUATION: o Initial o Routine ~ Follow-up O Complaint This evaluation is intended to assess the level of compliance with 327IAC IS-5 (Rule 5). It is also intended to identify areas where additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be evaluated as to their jeasibiliry by a qualified individual with structural praclices designed by a qualified engineer. All erosion and sediment control measures shall meet the design criteria, standards, and specifrcations outlined in the "Indiana Handbooh.for Erosion Control in Devel/oping Areas"or simi/lar guidance document/s. 1 / Current Site Information: 3eCCL~i~. C ~.0~ /x~ s`* ~~/O S~'~~ ~~ ~Bkp'. J The Following Items Have Seen Svamatea ana nssrgneu n „~~.g..a•..... ~•• S =Satisfactory M =Marginal U =Unsatisfactory NA =Not Applicable Construction Site Management for Erosion and Sediment Control (~ M U NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and sediment control measures. h~ M U NA (2) Appropriate perimeter sediment control measures have been implemented. ,~~ U NA (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures. ~3j M U NA (4) Erosion & sediment control measures are installed properly. M U NA (5) Storm drain inlets have been adequately protected. .87 M U NA (6) Outlets have been adequately stabilized. M U NA (7) Existing erosion & sediment control measures are being maintained. Q M U NA (8) Public & private roadways are being kept clear of accumulated sediment or tracked soil. S M U ~~ (9) Erosion & sediment control measures have been installed and maintained on individual building sites. Status of Sediment Retention On-Site o Site conditions present a high potential for off-site sedimentation. O There is evidence of off-site sedimentation. Describe: o Please Refer to the Comments Section of this Report Satisfactory: Marginal: Unsatisfactory: Not Applicable: The item is currently in compliance with the Rule A concern has been identified; corrective action is strongly recommended to remain in compliance A violation has been identified and the site is not in compliance; corrective action is required Does not apply at this stage of constmction ttevised a/9s Dobosiewicz, Jon C From: Sent: To: Subject: another new one Tingley Connie S Friday May 09-2003 3:3'4. M ostewicz~Jo"n C; B`~ utY Ier,~Angelina V; Lillig, Laurence M; Brewer, Scott I; Hollibaugh, Mike P; Pattyn, Dawn E new submittal P ~~~~~... ~i~al'son DLS Amepd° Atlas Sign Co ,;si'A~"~ Bob Zeltman 484-4620 I have placed it on the PC shelf behind the reception area. o~ ~ ~~ ~ ~b5°~ ct