HomeMy WebLinkAboutCorrespondenceON-SITE EVALUATION FOR EROSION AND SEDIMENT CONTROL
Hamilton County Soil and Water Conservation District
1108 South 9°i Street, Noblesville, IN 46060
Ph:317-773-2181 Fax:317-776-1101 ~ ly v ~S I
Date: Qr t4 03 ~%oio I_`' 7r,"t\_Y,,".9-,n,~~
Project Name: PAIeK u)oo~ EASP' b
Present at Site: John South, Hamilton Co. SWCD~~, /
This Report Provided To: DUKE ~OhS/Y6~GI'iila C4RKEL
c% L~~i Y ~'6~.xo s :tom Su 2v~YOIZ
sass kErsroa~ r',~zcss.~vG Ft~~
Su is ~
r,•.lptaN.al~q~/s, Su S/G2Y0
TYPE OF EVALUATION: o Initial o Routine ~ Follow-up O Complaint
This evaluation is intended to assess the level of compliance with 327IAC IS-5 (Rule 5). It is also intended to identify areas
where additional measures may be required to control erosion and sedimentation. All practices recommended in this report
should be evaluated as to their jeasibiliry by a qualified individual with structural praclices designed by a qualified engineer.
All erosion and sediment control measures shall meet the design criteria, standards, and specifrcations outlined in the "Indiana
Handbooh.for Erosion Control in Devel/oping Areas"or simi/lar guidance document/s. 1 /
Current Site Information: 3eCCL~i~. C ~.0~ /x~ s`* ~~/O S~'~~ ~~ ~Bkp'.
J
The Following Items Have Seen Svamatea ana nssrgneu n „~~.g..a•..... ~••
S =Satisfactory M =Marginal U =Unsatisfactory NA =Not Applicable
Construction Site Management for Erosion and Sediment Control
(~ M U NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and
sediment control measures.
h~ M U NA (2) Appropriate perimeter sediment control measures have been implemented.
,~~ U NA (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures.
~3j M U NA (4) Erosion & sediment control measures are installed properly.
M U NA (5) Storm drain inlets have been adequately protected.
.87 M U NA (6) Outlets have been adequately stabilized.
M U NA (7) Existing erosion & sediment control measures are being maintained.
Q M U NA (8) Public & private roadways are being kept clear of accumulated sediment or tracked soil.
S M U ~~ (9) Erosion & sediment control measures have been installed and maintained on individual building sites.
Status of Sediment Retention On-Site
o Site conditions present a high potential for off-site sedimentation.
O There is evidence of off-site sedimentation.
Describe:
o Please Refer to the Comments Section of this Report
Satisfactory:
Marginal:
Unsatisfactory:
Not Applicable:
The item is currently in compliance with the Rule
A concern has been identified; corrective action is strongly recommended to remain in compliance
A violation has been identified and the site is not in compliance; corrective action is required
Does not apply at this stage of constmction ttevised a/9s
Dobosiewicz, Jon C
From:
Sent:
To:
Subject:
another new one
Tingley Connie S
Friday May 09-2003 3:3'4. M
ostewicz~Jo"n C; B`~ utY Ier,~Angelina V; Lillig, Laurence M; Brewer, Scott I; Hollibaugh, Mike
P; Pattyn, Dawn E
new submittal P
~~~~~...
~i~al'son DLS Amepd° Atlas Sign Co
,;si'A~"~ Bob Zeltman
484-4620
I have placed it on the PC shelf behind the reception area.