Loading...
HomeMy WebLinkAboutCorrespondenceBabbitt, Pamela A From: Hoyt, Gary A Sent: Monday, June 09, 2003 8:24 AM To: Stahl, Gayle H; Hill, Dick B; McBride, Mike T; Weese, Kate K; Akers, William P; Babbitt, Pamela A; Blanchard, Jim E; Brewer, Scott I; Dobosiewicz, Jon C; Hancock, Ramona B; Keeling, Adrienne M; Kendall, Jeff A; Lillard, Sarah N; Lillig, Laurence M; Pattyn, Dawn E Cc: 'armdevine@aol.com' Subject: RE: Pre-Submittal Meeting: DAY FURS EXPANSION The fire department requested a Knox box for this project. Applications for Knox products is available through our office. Gary CFD -----Original Message----- From: Stahl, Gayle H Sent: Thursday, June O5, 2003 3:41 PM To: Hill, Dick B; McBride, Mike T; Weese, Kate K; Akers, William P; Babbitt, Pamela A; Blanchard, Jim E; Brewer, Scott I; Dobosiewicz, Jon C; Hancock, Ramona B; Hoyt, Gary A; Keeling, Adrienne M; Kendall, Jeff A; Lillard, Sarah N; Lillig, Laurence M; Pattyn, Dawn E Cc: 'armdevine@aoLcom' Subject: Pre-Submittal Meeting: DAY FURS EXPANSION The Dept. of Community Service, Building 8r Code Enforcement division, has received a request to schedule apre-submittal meeting for the purpose of obtaining abuilding permit. Project: Day Furs Expansion Meeting Date: Pending Related Planning & Zoning docket numbers: 82-03 ADLS Amendment; TAC May 2003 Representative: Bill Armstrong If there are concerns that might affect the issuance of this permit, please REPLY TO ALL on this a-mail. Babbitt, Pamela A From: Hill, Dick B Sent: Friday, June 06, 2003 4:00 PM To: Stahl, Gayle H; McBride, Mike T; Weese, Kate K; Akers, W illiam P; Babbitt, Pamela A; Blanchard, Jim E; Brewer, Scott I; Dobosiewicz, Jon C; Hancock, Ramona B; Hoyt, Gary A; Keeling, Adrienne M; Kendall, Jeff A; Lillard, Sarah N; Lillig, Laurence M; Pattyn, Dawn E Cc: 'armdevine@aol.com' Subject: RE: Pre-Submittal Meeting: DAY FURS EXPANSION As Laurence stated, they need a consent to encroach agreement. There is a Right of Way Permit and bonding requirement. I also need a revised development plan addressing the designation of the Rangeline Road right of way line issue and parking lot demo and construction issue that was discussed in TAC. The only BPW requirement is the consent agreement. There are no curb cut or water/sewer availability approvals required. I do not object td proceeding with the pre-submittal but our requirements will have to be satisfied before construction can start. -----Original Message----- From: Stahl, Gayle H Sent: Thursday, June OS, 2003 3:41 PM 70: Hill, Dick B; McBride, Mike T; Weese, Kate K; Akers, William P; Babbitt, Pamela A; Blanchard, Jim E; Brewer, Scott I; Dobosiewia, Jon C; Hancock, Ramona B; Hoyt, Gary A; Keeling, Adrienne M; Kendall, Jeff A; Lillard, Sarah N; Lillig, Laurence M; Pattyn, Dawn E Cc: 'armdevine@aol.com' Subject: Pre-Submittal Meeting: DAY FURS EXPANSION The Dept. of Community Service, Building & Code Enforcement division, has received a request to schedule apre-submittal meeting for the purpose of obtaining a building permit. Project: Day Furs Expansion Meeting Date: Pending Related Planning 8r Zoning docket numbers: 82-03 ADLS Amendment; TAC May 2003 Representative: Bill Armstrong If there are concerns that might affect the issuance of this permit, please REPLY TO ALL on this a-mail. Babbitt, Pamela A From: Lillig, Laurence M Sent: Thursday, June O5, 2003 4:30 PM To: Stahl, Gayle H; Hill, Dick B; McBride, Mike T; Weese, Kate K; Akers, William P; Babbitt, Pamela A; Blanchard, Jim E; Brewer, Scott I; Dobosiewicz, Jon C; Hancock, Ramona B; Hoyt, Gary A; Keeling, Adrienne M; Kendall, Jeff A; Lillard, Sarah N; Pattyn, Dawn E'_I.1~Zi Cc: 'armdevine@aol.com' %. % 'f~.~ Subject: RE: Pre-Submittal Meeting: DAY FURS EXPANSION ~~~". ' ~ ~ n sw°, `° ~ ~- ~ The dumpster enclosure will need BPW Consent to Encroach prior to being established. ' ~ `i° ov I c ~ ~~ Revised site plan with amended paving at rear of lot needs to be filed with DOCS. ~ <;` ----Original Message----- ~ ~ !~"~, '~~a_ i~ From: Stahl, Gayle H Sent: Thursday, June O5, 2003 3:41 PM To: Hill, Dick B; McBride, Mike T; Weese, Kate K; Akers, William P; Babbitt, Pamela A; Blanchard, Jim E; Brewer, Scott I; Dobosiewicz, Jon C; Hancock, Ramona B; Hoyt, Gary A; Keeling, Adrienne M; Kendall, Jeff A; Lillard, Sarah N; Lillig, Laurence M; Pattyn, Dawn E Cc: 'armdevine@aol.com' Subject: Pre-Submittal Meeting: DAY FURS EXPANSION The Dept. of Community Service, Building & Code Enforcement division, has received a request to schedule apre-submittal meeting for the purpose of obtaining a building permit. Project: Day Furs Expansion Meeting Date: Pending Related Planning 8 Zoning docket numbers: 82-03 ADLS Amendment; TAC May 2003 Representative: Bill Armstrong If there are concerns that might affect the issuance of this permit, please REPLY TO ALL on this a-mail. Babbitt, Pamela A From: Stahl, Gayle H Sent: Thursday, June 05, 2003 3:41 PM To: Hill, Dick B; McBride, Mike T; Weese, Kate K; Akers, William P; Babbitt, Pamela A; Blanchard, Jim E; Brewer, Scott f; Dobosiewicz, Jon C; Hancock, Ramona B; Hoyt, Gary A; Keeling, Adrienne M; Kendall, Jeff A; Lillard, Sarah N; Lillig, Laurence M; Pattyn, Dawn E Cc: 'armdevine@aoLcom' Subject: Pre-Submittal Meeting: DAY FURS EXPANSION The Dept. of Community Service, Building 8~ Code Enforcement division, has received a request to schedule apre-submittal meeting for the purpose of obtaining a building permit. Project: Day Furs Expansion Meeting Date: Pending Related Planning & Zoning docket numbers: 82-03 ADLS Amendment; TAC May 2003 Representative: Bill Armstrong If there are concerns that might affect the issuance of this permit, please REPLY TO ALL on this a-mail. i Babbitt, Pamela A From: Brewer, Scott I Sent: Thursday, June 05, 2003 4:25 PM To: Stahl, Gayle H; Hill, Dick B; McBride, Mike T; Weese, Kate K; Akers, William P; Babbitt, Pamela A; Blanchard, Jim E; Dobosiewicz, Jon C; Hancock, Ramona B; Hoyt, Gary A; Keeling, Adrienne M; Kendall, Jeff A; Lillard, Sarah N; Lillig, Laurence M; Pattyn, Dawn E Cc: 'armdevine@aol.com' Subject: RE: Pre-Submittal Meeting: DAY FURS EXPANSION We are working on a landscape design from Keith Bauchman of LawnPride, but that needs to be finalized before the permit is issued. -~-,~ ,,~' s, Scott Brewer Urban Forester, City of Carmel Department of Community Services One Civic Square Carmel, IN 46032 (317) 571-2478 ~Ca V ~~ O~ .' -----Original Message----- ~~!`~ i_rw From: Stahl, Gayle H Sent: Thursday, June O5, 2003 3:41 PM - To: Hill, Dick B; McBride, Mike T; Weese, Kate K; Akers, William P; Babbitt, Pamela A; Blanchard, Jim E; Brewer, Scott I; Dobosiewicz, Jon C; Hancock, Ramona B; Hoyt, Gary A; Keeling, Adrienne M; Kendall, Jeff A; Lillard, Sarah N; Lillig, Laurence M; Pattyn, Dawn E Cc: 'armdevine@aol.com' Subject: Pre-Submittal Meeting: DAY FURS EXPANSION The Dept. of Community Service, Building & Code Enforcement division, has received a request to schedule apre-submittal meeting for the purpose of obtaining a building permit. Project: Day Furs Expansion Meeting Date: Pending Related Planning 8 Zoning docket numbers: 82-03 ADLS Amendment; TAC May 2003 Representative: Bill Armstrong If there are concerns that might affect the issuance of this permit, please REPLY TO ALL on this a-mail. ~~~ m>, /~' R~CF~U CITYt OF CARMEL' /UN Fo JA~~IES BELII~ARD, M~~~oR ~ ~0 S ~~`~ May 2Q, 2003 Mr. G. William Armstrong, GP t~zb3 /~~GS Armstrong Developments, Inc 10654 Sunset Point Lane Fishers, IV 46038 Day Furs Expanston/Remodel ProlectfRes tens-#17;~~ Dear Mr. Armstrong: We have reviewed your submission for the May 21, 2003 Technical Advisory Committee meeting. We offer the following comments: GENERALI\FORbIATIO\ 1. The project site is currently located within current City of Carmel Corporate Limits. The following jurisdictions will apply. 2. Jurisdictions: • Street and Right of Way - City of Carmel (Rangeline Road). • Water and Sanitary Sewer- City of Carmel • Storm Sewer - City of Carmel Board of Public Works and Safety Approval Requirements: • Additional Water and Sanitary Sewer Availability if applicable. Cortunercial Curb Cut. It appears that there will be some modification to the existing curb cut on ~r Raneeline Road. This will require Board of Works approval. The request for Board approval should include an 8 ''/:" x 11" exhibit that will indicate the existing curb cut, the proposed curb cut and all appropriate data and dimensions including width, radii, etc. • Temporary Construction Entrance. Same requirements as for the Commercial Curb Cut. This does not appear to be applicable to this project. • Any permanent improvement to be installed within dedicated right of way. • Consent to Encroach Agreements for any permanent improvement to be installed within dedicated easements and/or dedicated right of way. If an irrigation system is planned for this project, additional Water Availability approval will be required from the Board and additional Water Connection Fees will be due. • Plat approval. I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. Any submission to the Board requires prior firm! npprova( by tl+e Carmel Clay Plan Commission and/or the Board ofZm+ing Appeals and completion of review by the Technical Advisory Committee. All roritten requests to be place n« tl+e Board's agenda n+«st rnc(«de the appropriate Dneket i\'umbers and r/+e date (or dotes) of npprova/ h_t• the PIm+ Cw~+misslan and/or BZA. Devaer>~exr or F~ctneewvc Ose Crnc SQcvt<e, Cawsiri., I\ 46032 Once 317571.2441, F.vc 317.571-2439 Ei~LV I. kweese'~ci.cacmel-iaus :- bor. G. William Armsnong, GP \Iay 20, 2003 Page 2 ~~~J(~ 4. Water and Sanitary Sewer Connection Fees: ~~~ Additional Water and Sanitary Sewer Availability approval by the Board mayor may not be required. G. A~ Carmel Utilities will make this determination. Current Connection Fees are $1,310.00 per EDU for N' water and 579.00 per EDU for sanitary sewer. 5. TAC Review/Drawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until al] issues have been resohed. All Carmel Utility issues must also re resolved. The design engineer must certify all drawings submitted for final approval. This office will require a minimum of five-sets (maximum ofseven-sets) of approved drawings after all issues have been resolved. The drawings will be stamped approved and signed by both the City Engineer and Duector Carmel Utilities. The DevelopedOwner will receive one-set which is to be maintained on the construction site at all times. Carmel Utilities will receive two-sets. Our Public Works Inspector will receive one-set and one-set will be maintained in [he Department of Engineering. If more than the minimum five-sets are requested to be approved, the additional sets (maximum total of two additional) must be submitted with the five required sets. 6. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated easements and/or right of way will require a Consent [o Encroach Agreement between the Owrter/Developer and the Cit}' of Carmel. This Agreement requires Board of Public Works and Safety approval. Installations within dedicated right of way require separate Board approval. A copy of our Residential Subdivision and Commercial Irrigation System Requirements are available upon request. 7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water main and sanitary sewer main locations. 8. Carmel Utilities will provide a separate review of this project for water and sanitary sewer issues. 9. I am including copies of the following with [his correspondence: • Commercial Project Approval Procedures. • Pemvt Data, Contacts, etc. ~t~~ . / • Cotmercial Permitting Procedures. ~ J, p~t~' BONDING REOUIREb1ENTS t lltr' 10. Upon initial review, it appears the following bonding requirements may apply to this project: Street Cut/Right of ~Vay Permit and Bonding Requirements Any work in the dedicated right of way of Rangeline Road will require a Right of Way Permit and a License and Pemtit Bond. The bond amount will be determined by the number of instances of work in the right of way (curb cut, storm sewer work, etc.) rJ $2,000.00 per instance. Open pavement cuts in dedicated sheets require approval by our Board of Public Works and Safety. It appears that there will be demolition of existing parking and curb and landscaping in the right of way. Please contact our Right of Way Manager, Fred Glaser, to arrange permitting and bonding. f~`n~ PROSECT CObIMENTS-CONSTRUCTION PLANS 11. Has there been a hydraulic report prepared for this project? If so, please provide this office with a copy. ~~ 12. Please dimension, identify and label the right of way line of Rangeline Road. It is our assumption that [he 45-foot dimension on Sheet CL0 is the dimension of the half right of way of Rangline Road. ~'~ ~y Please extend this right of way line across the property. Tf this is not the case and the west property ~il~ r~ line is the existing right of way line, please reflect this on the drawing. Our Thoroughfare Plan _1~~d1J identifies Rangeline Road as a Secondary Arterial Thoroughfare in this area with a right of way /wl "1''u requirement of 45-foot half/90-foot total. If the existing right of way is not a 45-foot half, we request ~b the additional right of way required fora 45-foot half be dedicated to the City. .. f; . ~ • Mr. G. William Armstrong, GP May 20, 2003 Paee 3 13. The aforementioned 45-foot dimension appears to be from the centerline of Rangeline to the inside of ~,~~ r~(~ the new parking area curb. Please move the curb construction so that the curb is located entirely out of ,1~"°- the right of way. 14. If there existing easements on the property, they should be identified on the drawing. J. Are there any storm structures on the property? What is the outlet for surface storm water generated from the site? Please elaborate regarding a drainage plan for this development.(y(e- Ne reserve the opportunity for further review and submission of comments regarding drainage and the plans upon receipt of drainage calculations and review of the calculations and plans by the City Engineer. The above comments are based upon the Engineering Department's initial review. Please provide our office with a follow up letter regarding this review and revised plans, indicating all revisions. A second review' will focus only on detailed construction plans. It is critical that our office be made aware of all modifications made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our initial review. If you have questions, please contact Kale Neese, Mike McBride or me at 571-2441. r ,~~~~~~ Dick Hill, Assistant Duector Department of Engineering Enclosures cc: M. Kate Weese, City Engineer (w.o. encl.) Mike McBride, Assistant City Engineer (w.o. encl.) Jon Dobosiewicz, Department of Community Services (w.o. encl.) Laurence Lillig, Department of Community Services (w.o. encl.) John Duffy, Duector of Carmel Utilities (w.o. encl.) Paul Pace, Distribution (w.o. encl.) Jim Haag, Collection(w.o. encl.) S:APROIREV03VDAYFURS x~ l c~ ~m b m Y O i / R ll ~y _< a nl 0 x~~~'~ A I ~ z ~ ~ o 0 ~ sag ~ ~ m ~ gu fl~ $ ~ ~ a ~ ~ ~ 1 a ~ ~o~~~ ~~a ~ D ~ a a ; ~s~~$ _e x ~ 9x ~ B 9 ~ c Ri ~ y~ Dey Furs m w 1381 South Rangegne Roed /~ a ~ c n CARMEL. IPIDIANA / °' Armstrong Developments, Inc. : 4 ~ ~ C ~e G ~ m ~ ~ < . A Y Ne P f ~ A S ~ ~ ~ .~ ~app " ~ _ad LEECIi•l~li$I,EYMCH RECTS i ; r `mss ~l°a ii95Fd P0M1 9. ~ialen,W,tl-B 1 J 1!&19111a ]V N1i4Y I s Q N ° 2 r ~ ~ e l . a ~.S?: ` ~ a nwA ~» ~ ~~~ ~ ~7z ^a~ a~ P~ a° _;May.~ti 03 07:52a 7320 canaanr ode. InrLarepors, Indiana 46237 317~8232~0 souet 377-251E809 north 317-682.9711 fax To: From: Keiitch S~OQ ~~-03 , ,, ~ { ~. ~a , ,4~SA a~r.~~ J;`1, Faoo 571-2426 Pages: 2 nhong 571-2478 oar May 30, 2003 Re: _ ~: ^ UrgerR X For Review ^ Please Comment X Please Reply ^ Please Rxyele In addition to the front landscape, we will add the necessary trees for the back to replace any Vees that have to be removed. • Comenenls: SCOtt, Here is a rough sketch of what I am thinking r Day Furs. Give me a call to let me know if you have any questions or if you think this will work for you. I will get you a final copy of the plan next week once I have it finished. Take care, Keith Baughman La~Pride Inc 317 ~ 9711 p.1 714-3692 _,.May ~0 03 07:52a { _._., La~Pride Inc tY po ~s~ !f cV N O a ,ter p.2 ~f I I ,:- ~ ~~ C~ ~J C~ ~ ' ~ \~. -r 317 ~ 9711 ,~~~ - --- $ - -- ~~r ,. - -- - - -J----- --- --------- - A ~~ s -~_ d1G1~_.~I:~.-,btu-1~(LA~w~N~~-_ Q- c~~,/ __~- _~/vim P_~2_h.~T_-~.-- -- -- -- _~ Z S ~'T~~ sf_oT~ _~ ~ 5 P~Pn? S ( Yh£ETw~ o.a _ --- _-- _- B -~-*T K~ ~~ T . ._._ - ---- - ---------~ _ JO~,b = PtGf~H~ oF- Llsti#T-_.I^''tX1?~~---- -- - - -- ------------- Babbitt, Pamela A From: Sent: To: Subject: Hello everyone: Andy Kern [Andy.Kern@ctrwd.org] Tuesday, May 20, 2003 3:25 PM rfarrand@ccs.kl2.in.us; AKeeling@ci.carmel.in.us; CTingley@ci.carmel.in.us; DHill@ci.carmel.in.us; DPattyn@ci.carmel.in.us; Ghoyt@ci.carmel.in.us; GStahl@ci.carmel.in.us; JBlanchard@ci.carmel.in.us; JDobosiewicz@ci.carmel.in.us; JKendall@ci.carmel.in.us; JPFoster@ci.carmel.in.us; LLillig@ci.carmel.in.us; MFogarty@ci.carmel.in.us; MHollibaugh@ci.carmel.in.us; MMcBride@ci.carmel.in.us; MSnyder@ci.carmel.in.us; PBabbitt@ci.carmel.in.us; PMorrissey@ci.carmel.in.us; PPace@ci.carmel.in.us; RHancock@ci.carmel.in.us; SBrewer@ci.carmel.in.us; slillard@ci.carmel.in.us; WAkers@ci.carmel.in.us; Dean.Groves@Cinergy.COM; sprater@crosenergy.com; sjb@co.hamilton.in.us; stc@co.hamilton.in.us; Jay Alley; john- south@iaswcd.org; Jeffry.farmer@timewarnercable.com; tskolak@usps.gov; CShupperd@vectren.com Re: Carmel Clay TAC Agenda -May 21, 2003 Following are CTRWD comments on the agenda items effecting our sanitary sewers or service area for the May 21, 2003 TAC meeting. Please feel free to copy and distribute this email or attach it to your meeting minutes. We have also created a new page on our website linked to the "Construction" page where we have posted all CTRWD TAC comments from 2001 and 2002 meetings held to date. We will continue to add to this page every month so please let everyone know they can view our comments online now too. Eagle Ridge Subdivision, (Revised Primary Plat) The plans received by the District need to be revised to show labeled sewer profiles and manhole, lateral and bedding details which are in accordance with District specifications. The plans also need show the most recent version of the nistrict specifications. Revised plans need to be submitted. An IDEM permit will be required and the submittal packet should be sent to the District for review. The District will then submit the project to IDEM for permit approval. A preconstruction meeting will need to be held before the construction of the proposed sanitary sewers. Building permits should NOT be issued unless the District has issued connection permits. Coxhall Park & Garden (Development Plan) The plans received by the District need to be revised to show the water and storm infrastructure in the sewer profiles. The manhole and bedding details need to be revised in accordance with District specifications. The influent hub shown in the grinder pump station is not the same size as the pipe shown in the sanitary plan and profiles. Revised plans need to be submitted. An IDEM permit will be required and the submittal packet should be sent to the District for review. The District will then submit the project IDEM forpermit approval. A preconstruction meeting will need to be held before the construction of the proposed sanitary sewers. Building permits should NOT be issued unless the District has issued connection permits. Hearthview Residential PUD (Rezone) to The plans received by the District need to be revised to show individual laterals for every lot. The manhole and bedding details need to be revised in accordance with District specifications. The most recent version of the District specifications need to be included on the plans. Revised plans need to be submitted. An IDEM permit will be required and the submittal packet should be sent to the District for review. The District will then submit the project to ZDEM for permit approval. A preconstruction meeting will need to be held before the construction of the proposed sanitary sewers. Building permits should NOT be issued unless the District has issued connection permits. College Park Baptist Church (Development Plan Amendment) The plans received by the District need to be revised to show the lateral and bedding details in accordance with District specifications. The plans also need show themost recent version of the District specifications for lateral connections. Note #2 on sheet C103 needs to be modified to state that Clay Township Regional Waste District specifications apply for all sanitary sewers. Revised plans need to be submitted. Building, permits should NOT be issued unless the District has issued connection permits. Ritz Charles (Amended Development Plan) The plans received by the District need to be revised to show the lateral and bedding details in accordance with District specifications. The plans also need show the most recent version of the District specifications for lateral connections. Revised plans need to be submitted. Building permits should NOT be issued unless the District has issued connection permits. Please remind all TAC applicants to provide plans directly to the District at our main office address in care of Andy Kern at: 10701 N. College Ave., Suite A, Indianapolis, IN 46280-1098. If there are questions about the District's requirements, then please refer to our website for current information on the District's construction specification and permit standards. We are a member of the IUPPS underground locate network so call 1-800-382-5544 before you dig! Please feel free to contact Jay or me if you have questions or need additional information. Thanks! Andy Kern, Project Specialist Clay Township Regional Waste District Hamilton County, IN, USA http://www.ctrwd.org/ 317-844-9200 (phone) 317-844-9203 (fax) »> "DObosiewicz, Jon C" <JDobosiewicz®ci.carmel.in.us> 05/12/03 12:48PM »> TO all, Please find attached the agenda for the May 21, 2003 Carmel TAC meeting. «TAC2003-0521.rtf » Thanks, Jon C. Dobosiewicz Planning Administrator . Department of Community Services City of Carmel One Civic Square Carmel, IN 46032 Phone: 317.571.2417 Fax: 317.571.2426 - jdobosiewiczOCi.carmel.in.us 2 NA' PLAN REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9th Street, Noblesville IN 46060 Ph- 317-773-1432 or Email at john-south(a~iaswcd.org Project Name- ~ ~~"iFzpansion Location- 1361 S. Rangeline Road Acreage- O.Sac Sec. 31 T-18N R-4E Owner/Developer- Armstrong Development lnc. 10654 Sunset Point Lane Fishers, IN 46038 Engineer- N/A ' Plan Review Date: May 13, 2003 Soils Information: ~~ I" 5. ~~, ~ /! ,. Site has been previously disturbed. Soils listed in the Hamilton County Soil Survey will not adequately describe current soil conditions. Additional information about soils is available in the "Soil Survey of Hamilton County". The engineer and/or developer should consider the need for an onsite soils investigation. Due to the limited amount of land disturbance shown on the plan, I have no comments. Submitted By: John B. South P.E. Certified Professional in Erosion and Sediment Control Cc: Jon Dobosiewicz, Carmel DOCS Jenny Chapman, County Surveyor File ~'> ~~~°mrfle~ ~'~D~2 May 13, 2002 G. William Armstrong, GP Armstrong Developments, Inc. 10654 Sunset Point Lane Fishers, IN 46038 RE: ~ a f§'~;` 361 S. Range Line Road Carmel, IN 46032 Dear Mr. Armstrong: RECEIVED ~= I ~aY 13 2fifi3 e DOCS `~ I have received and reviewed the information for the above-mentioned project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. y J. Green Chief of Police TJG:vb cc: Dept. of Community Services (3Il7) 57185m® ar. q.,. << ~~°®4 ~~ A Nationally Accredit iJ~L wsEriforcement Agoncy m p 1'a: f3fl7D 57Il-2512 MAY-09-2003 11:07 FROM:HRMILTON C~HWY DEP 3177769814 T0:317 571 2426 P.001~001 ~~~{ CP ..hA~'f ~ HAMILTQI~I C4~.I,1`ITY I-~IG,f~WA Y DEPARTME1 YT s9r~ op 1NO\p~s May 8, 2003 Mc G. WIINam Armstrong Armstrong Developments. Inc. 10654 Sunset Point Lane Fishers, IN 46038 RE: Day Furs Expansion 1361 S. Bengaline Road Clay Township Dear Mr. Armstrong: ,. RECEIVED HAY 8 2003 ~.- DOCS \, . \a This letter serves to acknowledge receipt of a transmittal received 518103 containing the plans for the above-mentioned protect. After reviewing the plans the Highway Department has the following comments: 1. It appears that this project lies entirely within the limits of the City of Cannel. Therefore, all future comments should be directed toward the City. If you have any information contrary to this statement, please contact me immediately. If you have any questions or comments concerning this letter, please feel free to contact me at anytime. ' Sincerely, ~~ ~ /~i~r.~.~r~.-fir Steven J. Broertnann Staff Engineer cc: Jon Dobosiewicz Jenny Chapman GaUSERSISB403rec10$-p8.03dayNre.COc 1700 Bouth 10'" Street Oriitt (317) 773-7770 Noblesville, In. 46060 www.co.ha i .us Fax (317) 776-9814 Dobosiewicz, Jon C From: Babbitt,.Pam~ela~A :-~ Sent: "r da ~Q$,2003 10:08 AM To: Brewer, Scott I; Butler, Angelina V; Dobosiewicz, Jon C; Hollibaugh, M; Pattyn, Dawn E Subject: new submittal v-t a ~~" s. rangeline rd., ADLS amend contact wm. armstrong, 579-9746. O~ ~$t'~rejp•4 ,. y7 i ((fj~ 7i Mike P; Lillig, Laurence us X30 S'~ ~ 3~