Loading...
HomeMy WebLinkAboutCorrespondencePage 1 of 2 Boone, Rachel M. From: Granner, Steven [sgranner@boselaw.com] Sent: Wednesday, March 18, 2009 4:38 PM To: Boone, Rachel M. Subject: FW: Carmel Firestone Signs Rachel, See below. The sign height on the south elevation was an error. He indicates he will correct it on the copies he's bringing to the hearing. Did I confirm to you that Firestone has approved the revised elevations? Thanks, Steve Steven B. Granner, AICP Zoning Consultant Bose McKinney 8 Evans LLP E-mail: SGranner~n boselaw.com Direct phone: 317-684-5304 www.boselaw.com __ From: Freeman Smith [mailto:fsmith@agisign.com] Sent: Wednesday, March 18, 2009 4:16 PM To: Granner, Steven Subject: RE: Carmel Firestone Signs No , we will make them the same height. I am assuming the developer did not check it. From: Granner, Steven [mailto:sgranner@boselaw.com] Sent: Wednesday, March 18, 2009 3:49 PM To: Freeman Smith Subject: RE: Carmel Firestone Signs Freeman, The sign on'the south elevation is shown slightly higher above grade than the other two signs. Is there a reason? Carmel will want all 3 of them at the same height. Let me know. Thanks, Steve Steven B. Granner, AICP Zoning Consultant Base McKinney 8 Evans LLP 3/18/2009