Loading...
HomeMy WebLinkAboutCorrespondence - TACC February 26, 2008 Mr. Brandon T. Burke, P.E. The Schneider Corporation 12821 East New Market Street, Suite 100 Carmel, [N 46032 RE: Village of West Clsy, NBI BsnWSectiom 6003B, Block A-Project Review #2 Deaz Mr. Burke: /..~- r~ ° `~\ ~~ ~ RECEIVED fE8 2 ~ 2aoa I DOCS The City has received your comment letter and drawings dated February 15, 2008 based upon the City review of December 13, 2007. The comments from the City review have been satisfactorily addressed with the following exceptions: CONSTRUCTION PLAN REVIEW COMMENTS 1. The Department rescinds previous comment 10. 2. Previous comment 42 -The Department rescinds this comment. 3. Previous comment 43 -Please verify that the location of all existing storm piping with top of curb and invert elevations, pipe sizes and types, and flow direction are noted on the plans. Thank you for your response. Is this information being obtained? 4. Previous comment 46 -All technical information requved by Section 100 of the Storm Water Technical Standards shall be indicated on the plans. Section 100 requires specific information for the plan sheet. Please refer to 102.02 (zi)(m) sod Section 102.02 in general. 5. Previous comment 63 -Please define MFPG on the plans per the Storm Water Technical Standards Manual. Please add the definition to the plan sheets. Please contact us to obtain the definition from the Storm Water Technical Standards Manual. If you have questions, please contact me at 571-2441. Sinc y, R. D can, Jr. P. Assistant tty Engin Department of Engineering cc: Angelina Conn, Depaztment of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Greg Ilko, Crossroad Engineers, PC Greg Hoyes, Hamilton County Surveyor's Office Department Review/File Copy \Wpps2\user data\eng~ShareA\DHill\PROJREV07\V(LLAGEOFWESTCLAYNBIBANK2.doc DEPARTMENT OF ENGINECR7NG ONE CIVIC SQUARE, CARMEL~ IN 46032 OFFICE 317.571.24-f 1}1 FAX 317.57I.Z~fj9 EMAIL engineering®cannel.in.gov JAMES BRAINARD, MAYOR A Cit of Carmel ~, y ~r ; ~~ ,(molat,P/ L?EPAR"I'~rii?N"1" (~I~ CC?b'[l~II?~ii1l" SERVIC4E5 Febmary 27, 2008 Mr. Brandon T. Burke, P.E. The Schneider Corporation 1282 ] E. New Market Street, Suite 100 Carmel, IN 46032 RE: Villaee of West Clav -National Bank of Indianapolis Dear Mr. Burke: The following letter represents comments for this project specifically addressing the area of alternative transportation. I have reviewed the drawings dated Febmary 14, 2008 and offer the following comments: The comments from the Alternative Transportation review have been satisfactorily addressed. Thank you for considering the recommendation. W e request that all responses to our comments be provided in writing. Failure to provide written responses may result in delay of the review process. It is critical that this office be made aware of all modification made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. The Department of Community Services reserves the right to provide additional comments based on subsequent reviews. If you have questions, please contact me at 571-2417. Sincerely, ~~/~ -~ David Littlejohn Alternative Transportation Coordinator Department of Community Services cc: Angie Conn, Department of Community Services Engineering Department Review Project File Page 1 ONE CIVIC SQUARE CARb~L, INDIr1NA 46032 317/571-2417 Page 1 of 1 Conn, Angelina V From: Brewer, Scott I Sent: Tuesday, January 29, 2008 4:33 PM To: 'Brandon Burke' Cc: Conn, Angelina V Subject: Follow-up on Village of West Clay National Bank of Indianapolis Oear Brandon: Thanks for taking my call. As discussed, my current comments on this project are as follows: 1. I need a detail of the planter area on the sidewalk to determine how much soil volume is being supplied for the Japanese lilac trees in the planters. Near 200 cubic feet (the 5' x 12' x 3' depth you described) would be adequate to support the small to medium trees for some number of years, but if further root space is needed, something like structural soils or Jim Urban's Silva- Cell technology under the pavement should be utilized. http;//www_deeproot com/ Silva-Cell website http_//www.hortcornell,edu/uhdoutreach/csc/article html Structural Soils Under Pavement 2. The two trees in the islands in front of the bank should be shade trees (I think your others are locust species), not small growing trees. 3. Some shade trees should be planted along the north perimeter, even if that are could potentially be developed into a parking lot. If planted near the pond, or in potential islands, they would not have to be moved. Or if planted at this time on site, they could be tree spaded to a slightly different location a few years from now. 4. On the east bufferyard, the potential for conflicts with overhead utility lines means that close attention must be paid to the planting, and maintenance, of the tree species there. You have chosen 'Moraine' variety of honey locust, you might also consider'Skycole' or'Wandell' variety or something like a 'Shangra-La' or 'Princeton Sentry' ginkgo as well. Please contact me if there are any further questions, by email or phone. These comments should, besides improving the health and look of the landscaping, should add value for the future of the bank in the West Clay Community. Scott Brewer, City Forester Environmental Planner, DOCS City of Carmel, One Civic Square Carmel, IN 46032 PH: 317-571-2478 FAX: 317-571-2426 1/30/2008 ~%r~ tt ~sN- $8~~` ~ '; RECENED DEC 19 2G~1 CI 0' EL ~ p0C5 December 13, 2007 JAMES BRAINARD, MAYOR Mr. Brandon T. Burke, P.E. \~~ ~ The Schneider Corporation 12821 East New Mazket Street, Suite 100 Carmel, IN 46032 RE: Village of West Clay, NBI BanWSection 6003B, Block A-Project Review #1 Dear Mr. Burke: The City has received the plans submitted for review at the December 19, 2007 Technical Advisory Committee meeting. We offer the following comments: GENERAL INFORMATION 1. These comments represent the Department of Engineering's first review of the construction plans for this project. We reserve the right to ptovide additional review comments as the project progesses thorough the approval process. 2. We request that all responses to our comments be provided in writing and be accompanied by a drawing reflecting the requested revisions. Failure to provide written responses may result in the delay of the review process. 3. It is critical that this office be made awaze of all modifications made on the plans being re- submitted, particulazly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. 4. We have engaged Crossroad Engineers, PC to review all drainage plans and dminage calculations submitted to this office for review. If you have not already done so, please provide a set of drainage plans and calculations to their office for review. We will share Crossroad's comments as they are received. 5. Final drawings will not be approved for construction until: a. All Carmel Engineering Department, Carmel Utility Department and Hamilton County Surveyor issues have been resolved. b. All bonds and performance guarantees are posted. c. All Board of Public Works and Safety approvals and any other governing agency approvals (if required) aze obtained. d. All off-site easements necessary to install utilities to serve the development are secured. e. Fees have been paid. f. Digital file submissions have been made. 6. The Department reserves the right to provide additional comments based upon subsequent reviews. 7, An approved Storm Water Management Permit is required prior to commencing any earth disturbing activity. 8. An approved right-of--way permit is required prior to commencing any work in the public right-of--way. 9. If it will be necessary to relocate existing utilities, the cost for such relocations shall be borne by the developer. If utility poles must be relocated, they must be relocated to within one foot of the proposed right-of--way. 10. Compliance with the Thoroughfare Plan includes construction of the improvements prescribed by the Thoroughfare Plan across the frontage controlled by the development DEPARTMENT OF ENGINEERMG ONe Gv~c SQuARe, CARMEL, IN 46032 OFF~ce 317.571.2441 Fax 317.571.2439 EMAIL engineering®carmel.ln.gov Mr. Brandon T. Burke December 13, 2007 RE: Village of West Clay NBI Bank Rev. #1 Page 2 of 6 (including sections with no access). This may apply to the Harleston Street and Towne Road Street frontages. Typically, developers provide a commitment equal to the value to construct these improvements for deposit into the City's non-reverting thoroughfare fund. Credit is typically given towards this commitment for construction of the improvements prescribed by the 20-Year Thoroughfare Plan and any milling and resurfacing of the perimeter streets. 11. The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primary plat, secondary plat, and construction drawings be made. The digital files must be submitted to the Department of Engineering prior to the approval of the construction plans. Please contact the City GIS Department for the requirements. 12. Jurisdictions: a. The project site is located within current City of Carmel Corporate Limits. b. Streets and Right of Way -City of Carmel (Harleston Street, Towne Road) c. Water -City of Carmel Utilities d. Sanitary Sewers -Clay Township Regional Waste District (CTRWD) e. Storm Sewers/Drainage -Hamilton County Surveyor's Office/City of Carmel. f. Legal Drains -Hamilton County Surveyor's Office. 13. Drawings submitted for approval: a. The design engineer must certify all drawings submitted for final approval. b. This office will require a minimum of 4 sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and signed by the City Engineer and by Carmel Utilities. The Owner will receive 1 set which must be maintained on the construction site at all times. If additional approved sets are desired, we will approve a maximum of 2 additional sets. However, the additional sets must be submitted with the requved minimum 5 sets. 14. Carmel Utilities will provide separate reviews of this project for water and sanitary sewer issues. Please assure that copies of all drawings are sent to: Paul Pace Carmel Utilities Distribution 3450 West 131" Street Westfield, IN 46074 15. Carmel Utilities does subscribe to "Holey Moley" who should be contacted directly for all water main locations. 16. Digital versions of the following information are available upon request. Please share these requirements with the developer and future contractors associated with the project: a. Project Approval Checklist b. Perfarmance/Maintenance Guarantee Requirements c. Performance/Maintenance Guarantee Release Procedure d. Engineering Requvements for Building Permit Approval e. Commercial Permitting Procedures f. Utility Jurisdictions/Right of Way Permit g. Water and Sanitary Sewer Fees BOARD OF PUBLIC WORKS AND SAFETY 17. A schedule for Board of Public Works and Safety meeting dates and agenda deadlines was previously submitted to you for your use. Please use the Engineering Department deadlines for submissions to the Board. 18. Any submission to the Board requires prior approval by the Carmel Cley Plao Commission and/or the Board of Zoning Appeals (if applicable) and completion of review by the Technical Advisory Committee. All written requests to be placed on the Mr. Brandon T. Burke December 13, 2007 RE: Village of West Clay NBI Bank Rev. #1 Page 3 of 6 Bosrd's agenda must include the appropriate Docket Number and the date (or dates) mf approval by the Plan Commission and/or the Board of Zoning Appeals (if applicable). 19. Water and Availability (EDU) approval from the Board is based upon the usage of the proposed buildings within the development. Reference Items #34-38 below far a more detailed explanation. If an irrigation system is planned far this development, approval for additional Water Availability must be obtained from the Board. 20. Commercial Curb Cut Approval -This approval will require a written request from the developer or the developer's engineer far each curb cut. The request must include 8'/~ x 11 exhibits of the curb cut or cuts with all pertinent data included such as radii, width, opposing existing curb cuts, etc. 21. Temporazy Construction Entrance approval if the location is at a site other than the location of the proposed permanent entrance to the development. 22. The installation of any permanent, privately owned and/or maintained improvement (signs, decorative street signs, walls, streetlights, etc.) or outdoor seating or other areas within dedicated right of way or dedicated easements requires the execution of a Consent to Encroach Agreement between the Owner and the City of Carmel. Such agreements aze executed by the Boazd of Public Works and Safety. The City Engineer may approve irrigation system agreements. 23. Secondary Plat approval if applicable. All performance guarantees must be posted prior to submission of secondary plats far Board of Public Works and Safety approval. 24. Dedication of Right of Way if not platted. Appropriate dedication documents aze available upon request. 25. Open pavement cuts of Towne Road or Hazleston Street would requve Board approval. BONDING REOUII2EMENTS 26. Upon initial review, it appears performance guarantees shall be provided for the following: a. Right of Way Improvements. This could include acceleration/deceleration lanes, passing blister, pavement widening, milling, resurfacing, thermoplastic striping, stone shoulders, curbs, etc. b. Water Mains (service laterals and associated construction) c. Erosion and Sediment Control and Storm Water Quality. Please contact Amanda Foley, Engineering Department Stornwater Administrator, fot details regazding engineer's estimates/performance guarantee requu•ements for these items. 27. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes and materials, etc. 28. Upon completion and release of individual Performance Guarantees, athree-yeaz Maintenance Guarantee will be required. The Maintenance Guazantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. 29. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. 30. Please reference the enclosures for more detailed explanation of our procedures. RIGHT OF WAY PERMIT AND BONDING 31. Any work in the dedicated right of way of Towne Road or Hazleston Street will requve an approved Right of Way Permit and a License & Permit Bond. 32. The bond amount is determined by the number of instances of work in the right of way at $2,000.00 per instance. However, if the work is included in the scope of work of a requred Mr. Brandon T. Burke December 13, 2007 RE: Village of West Clay NBI Bank Rev. #1 Page 4 of 6 and posted Performance Guarantee, the Performance Guarantee may be used to satisfy the bond requirements of the Right of Way Permit. 33. Please contact our Right of Way Manager, Fred Glaser, to amnge right of way permitting and bonding. AVAILABILITY AND CONNECTION FEES 34. The Water Availability and Connection Fees are current as of this date but are subject to future revisions. 35. Water Availability (acreage) Fees aze based on total platted acreage or legal description acreage at the current rate of $1,010.00 per acre. The acreage indicated on the legal description on Sheet C102 does not appeaz to include all of the property requred to support the construction of the building such as parking lots, etc. If the Developer does not intend to pay the total remaining Availability Fees due for Section 6003B, we will need a revised legal description for this property in order to calculate the fee. Additionally, as of July 2, 2007, a Development Application Review Fee of $150.00 will be assessed. This is based upon developments with one customer requiring a water connection. This fee is to be paid with the Availability Fees. 36. Water Connection Fees are based upon the proposed usage of the site at the current rate of $1,396.00 per EDU, including a Tap Inspection Fee of $86.00/EDU effective July 2, 2007. This Fee is based upon EDUs and should not be confused with Water Availability Fees, which are acreage based. The EDU calculation for the proposed bank is: 3,945 ft' @ 0.5 EDUs/1000 ft' (Office Classification) = 1.973 EDUs. 1.973 EDUs @ $1,396.00 Water Connection FeeBDU = $2,754.31. 37. Water Availability and Connection Fees are to be paid prior to pre-submittal review by Building Code Services. 38. If an irrigation system is planned for this development, additional Water Availability Fees and Water Connection Fees (and Sanitary Sewer Availability and Connection Fees if applicable) will be assessed based upon the size and usage of the system and upon the recommendations of the Director of Carmel Utilities. 39. General Comments a. This project is subject to the Storm Water Quality Ordinances. The City acknowledges that the storm water management system was previously master planned. b. Please contact Amanda Foley to review storm water quality/treatment requirements. c. Be advised that the Department of Engineering does no[ have approval authority of Landscaping and Lighting. Please do not include these items in future construction plans submitted for review and/or approval. 40. Please confirm with the Department of Community Services that the right-of- way sidewalk plans for this development are acceptable. 41. Please add the email for the main contact at the engineering fum and for the developer. 42. Please include the calculated building coverage ratio on the cover sheet. 43. Please verify that the location of all existing storm piping with top of curb and invert elevations, pipe sizes and types, and flow direction aze noted on the plans. 44. Please indicate any proposed on-site roof drains. 45. There aze no easements indicated on site. Are any required or proposed? Is an easement required over the off-site storm piping? 46. All technical information requved by Section 100 of the Storm Water Technical Standards shall be indicated on the plans. 47. Please verify that on-site turning radii aze appropriate for emergency vehicles and any vehicles expected to regulazly access the site. Mr. Brandon T. Burke December 13, 2007 RE: Village of West Clay NBI Bank Rev. #1 Page 5 of 6 48. Bicycle parking is requved. Please confirm with DOCS. 49. Are any cuts of the existing street anticipated? 50. Please verify that the fire hydrant indicated is the only one within 300 feet of the proposed development. Is this the only hydrant serving the site? 51. Please verify that the location of all electrical vaults, electrical transformers, and overhead and underground electrical, telecomm, and CATV lines and any gas lines are indicated an the plans. 52. Why is the width of the "entrance only" curb cut so wide? Seems excessive for one-way traffic and may create a conflict. 53. Sawcut and removal of the mainline pavement for the construction of any new curbing, the new entrances, and on-street parking spaces shall be indicated. Patching and restoration of such mainline pavement per City standard street cut patch detail shall be noted. 54. Please indicate City standard depressed curb across each entrance and on-street parking spaces unless the normal crown of roadway is continuing into the spaces. 55. The curb return radii are not 30 feet. Please verify that the 15' radii aze consistent with other entrances in the Village. 56. Any utility relocations requved by the project shall be the responsibility of the developer. Utility line relocations requved for road projects that result in a conflict with the proposed development shall be the responsibility of the developer to resolve with the utility. Existing pole lines requiring relocation shall be relocated to within one-foot of the proposed right-of- way line at the sole cost of the developer. 57. A maintenance of traffic plan shall be provided for the construction of the entrances and on- street pazking. The plan shall conform to the INDOT Work Zone Safety Manual. 58. Please indicate the City standards depressed curb detail. 59. Please indicate curb removal to the nearest joint past the requred removal limits and Sawcut of the full joint at this location. 60. Please verify that the proposed "c" value of the site does not exceed that value anticipated during master planning. 61. Add the following note to all sheets: All paving in the existing and proposed City right-of= way shall conform to the requirements of the Department of Engineering. Contractor shall contact the Department of Engineering to schedule apre-construction meeting to review the Department's construction requvements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right-of--way. Please update the note on C102 with the full language. 62. Please verify that other commercial entrances in the village are asphalt. 63. Please define MFPG on the plans per the Storm Water Technical Standards Manual. 64. Please provide the note per 102.20 (vii) of the Storm Water Technical Standards Manual unless storn system is private. 65. Please verify if the Urban Forester will require structural soil on site. 66. Please replace details 1/C80] and 2/C801 with current details from website. 67. Please place an "x" over brick surface tactile warning element on Detail 4/C801. The depth of the ribbing is 3/8: ' 68. Please hatch the right-of--way pavement section noted by keynote M for the portion of the entrances and on-street pazking in the right-of--way on Sheet C101. 69. The walls outside of the right-of--way shall be in a pedestrian I/E easement. 70. Why is the curbing being installed on the north side only? Why not leave off for future expansion similaz to the west curb line? 71. What is the disposition of water to the west in the short term? 72. Will the existing curbing be removed and replaced for the water tap? Will a walk closure be requred? . a • Mr. Brandon T. Burke December 13, 2007 RE: Village of West Clay NBI Bank Rev. #1 Page 6 of 6 If you have questions, please contact me at 571-2441. Sincer y, ary un r., .E. A slant Ci Engine Department f Engineering cc: Angelina Conn, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Greg Ilko, Crossroad Engineers, PC Greg Hoyes, Hamilton County Surveyor's Office Department Review/File Copy \\P.pps2\user dara\eng~shared\DHill\PRO7REV07\V[LLAGEOFWESTCLAYNB[BANK.doc Page 1 of 1 Conn, Angelina V From: Ron Farrand [RFarrand@ccs.kl2.in.us] Sent: Monday, December 10, 2007 11:00 AM To: Conn, Angelina V Subject: RE: December 19 Technical Advisory Committee agenda I have no comments on the current agenda items Ron Farrand, Jr. Director, Facilities and Transportation Cannel Clay Schools rfarrand@ccs k12,m.us 317-815-3962 Confidentiality No[ice: This e-mail message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. Ii you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. _~,_____ ®~ _.____ W.__. From: Conn, Angelina V [mailto:Aconn@carmel.in.gov] Sent: Friday, December 07, 2007 2:18 PM Subject: December 19 Technical Advisory Committee agenda Seasons Greetings! Please see the attached agenda for the Technical Advisory Committee (TAC) meeting on Wednesday, December 19. (TAC members, please let me know if you have-not yet received plans.) Angie Conn, Planning Administrator Dept. of Community Services -Planning & Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317-571-2417 f. 317-571-2426 adonn@carmel.io.gov I2~], 0~2~07 Page 1 of 1 Conn, Angelina V From: Wood, Mark A. [Mark.WoodQSUG.com] Sent: Friday, December 07, 2007 3:16 PM To: Conn, Angelina V Subject: RE: December 19 Technical Advisory Committee agenda Panhandle Eastern Pipe Line Company has no conflicts with the items listed on this agenda. Thanks for keeping us informed. -----Original Message----- From: Conn, Angelina V [mailto:Aconn@carmel.in.gov] Sent: Friday, December 07, 2007 2:18 PM To: Hollibaugh, Mike P; Shirley Hunter; cholmes@carmel.in.gov; nredden@carmel.in.gov; gduncan@carmel.in.gov; Wakers@carmel.in.gov; whohlt@carmel.in.gov; Sbrewer@carmel.in.gov; JDuffy@carmel.in.gov; Mfogarty@carmel.in.gov; dlittlejohn@carmel.in.gov; cellison@carmel.in.gov; Tkrueskamp@carmel.in.gov; del@co.hamilton.in.us; mwestermeier@carmel.in.gov; jtl@co.hamilton.in.us; GRH@co.hamilton.in.us; bmg@co.hamilton.in.us; kirkman@mybrighthouse.com; marlett@veoliawaterna.com; Rfarrand@ccs.kl2.in.us; malone@SUG.com; morris@aes.com; gilko@crossroadengineers.com; dhuffman@carmel.in.gov; sparks@usps.gov; cshupperd@vectren.com; afoley@carmel.in.gov; Jennifer.marlett@veoliawaterna.com; Malone, David G.; dale.m.sparks@usps.gov; Jason.kirkman@mybrighthouse.com; ryan.hartman@ctrwd.org; Blanchard, ]im E; Boone, Rachel M.; Carter, Ronald E; cshupperd@vectren.com; DeVore, Laura B; Donahue-Wold, Alexia K; Foley, Amanda J; Hancock, Ramona B; Hill, Dick B; Huffman, David; Keeling, Adrienne M; Knott, Bruce; Lillard, Sarah N; McBride, Mike T; Pace, Paul V; Schmiesing, Rebecca; Snyder, M Todd; Stewart, Lisa M; Tingley, Connie S; Joel Thurman; Ron & Judy Hagan; rcastetter@Cinergy.com; Jason LeMaster; Marilyn Anderson; Wood, Mark A.; webteam@heckweb.net; ron.morris@aes.com; Ryan Hartman; Chastain, Jenny A Cc: bburke@schneidercorp.com; Matt.Skelton@bakerd.com; Conn, Bryan D. Subject: December 19 Technical Advisory Committee agenda Seasons Greetings! Please see the attached agenda for the Technical Advisory Committee (TAC) meeting on Wednesday, December 19. (TAC members, please let me know if you have not yet received plans.) Angie Conn, Planning Administrator Dept. of Community Services -Planning & Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317-571-2417 f. 317-571-2426 aconn @carmel.in.gov Private and confidential as detailed here. If you cannot access hyperlink, please e-mail sender. 12/7/2007 ~V~A~.nrrsx~~Fl~~, ~ ~' ~ A ,Cit of Carmel ~~ Y ~ ,!nrpipt,A% DEiPARTiVII?iVT OF COMIVIUNI'fY SC31tVICES December 7, 2007 Mr. Brandon T. Burke, P.E. The Schneider Corporation 12821 E. New Market Street, Suite 100 Carmel, IN 46032 RE: Vi11aEP of West Clav -National Bank of Indianapolis Dear Mr. Burke: The following letter represents comments for this project specifically addressing the area of alternative transportation. I have reviewed the drawings submitted for the December 19, 2007 Technical Advisory Committee meeting and offer the following comments: ALTERNATIVE TRANSPORTATION REVIEW COMMENTS 1) The City of Carmel Parking Ordinance requires all commercial venues to include bicycle parking. Bicycle parking spaces are required at a rate of five (5) bicycle parking spaces per one hundred (100) automobile parking spaces with a minimum of four (4) spaces. In this instance it is highly recommended that at least four (4) bicycle parking spaces are provided. Please revise your plans to show the bicycle parking spaces on your site. Please see the City of Carmel's Parking Ordinance in order to determine appropriate locations and construction details for the above. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in delay of the review process. It is critical that this office be made aware of all modification made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. Page 1 ONE CIPIC SQUARE CAR1bfEL, INDIANA 46032 317/571-2417 /G~~Y nrve~gg~F! ~, ~, Y " ~ - ~ ` Clt of Carmel ~ ~~ ~ ,~ ~.!NOinN?% DEP~IIt"1'M14f \"C OF COLIA~IL~iITti' S1Rti 1CL;S The Department of Community Services reserves the right to provide additional comments based on subsequent reviews. If you have questions, please contact me at 571-2417. Sincerely, ~ ~ David Littlejohn Alternative Transportation Coordinator Department of Community Services cc: Angie Conn, Department of Community Services Engineering Department Review Project File Page 2 ONE CIVIC SQUARE CARng'.L, INDIr1Nd 46032 317/571-2417 ~~ ~~ ,' ,w NoV~ ~ anFO November 29, 2007 Q~~ S Brandon T. Burke, P.E. The Schneider Corporation 12821 E. New Market Street, Suite 100 Carmel, IN 46032 RE: Village of West Clay -National Bank of Indianapolis Updated TAC Submittal Dear Mr. Burke: The information for the above-mentioned project has been received and reviewed. At the present time, I see nothing in the plans that would hamper law enforce- ment efforts. If we can be of any further assistance to you, please contact us. Respectfully, Michael D. Fogarty Chief of Police MDF:vb cc: Dept. of Community Services (317D 571_5®® =`_'~ g- A Nationally Accredit d?Ld,_,Eforcement Agency Fax C3fl7D 571-25Il~ bAt N ~~ ire; November 26, 2007 Brandon T. Burke, P.E. The Schneider Corporation 12821 E. New Market Street, Suite 100 Carmel, IN 46032 RE: Village of West Clay -National Bank of Indianapolis Dear Mr. Burke: ~~~ :fry? ~, -P~. ~~ RFCFi~ NpV a . ~~ ~,.. Dp~s The information for the above-mentioned project has been received and reviewed. At the present time, I see nothing in the plans that would hamper law enforce- ment efforts. If we can be of any further assistance to you, please contact us. Respectfully, Michael D. Fogarty Chief of Police MDF:vb cc: Dept. of Community Services ...:_~ ,~-- _, d~f ~yf 1 t w~ ,~/f~ Q3Il7D571-~5(D® ANationallyAccredit'd}Q.,k~.._;EnforcementAgency m a 1''ex (317D 571-25Il2 11/20/2007 16:22 3177769628 HAMILTON CO SURVEYOR PAGE 01/02 i~ November 20, 2007 The Schneider Corporation ATTN: Brandon Burke 12821 East New Market Street Suite 301 Cannel, IN 46032 VIA FACSIMILE: 826-6410 RE: Village of West Clay -National Bank of Indianapolis Dear Mr. Burke: We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office on November 20, 2007 for this project and have the following comments: 1. The proposed project falls within the incorporated area and M54 jurisdiction of the City of Carmel. 2. This proposed site DOES NOT fall in a Carmel Well Head Protection Area. 3. The proposed project falls in The Village of West Clay Regulated Drain Subdivision and The Village of West Clay watershed. 4. Storm water detention foz the site is provided in the master plan for Village of West Clsy. 5. Please submit the following procedural item: outlet permit for the discharge into the Village of West Clay Regulated Drain. The application is available on our website at httv'~/www•co.hamilton.in.us, go to Depardnents, Surveyor, and Forms. `:~'ti~ II , 1 C~. 6. With the outlet permit, please submit a final set of construction plans or drainage calculations with any revision that are made at the request of the TAC agencies. '>;rninn C.'!t''nrd, (?'R?v[ .rdrr rns ~tirrrp~nr n'.J'(!i(tlll(nn Caunhr Oue .Hamilton ('nunry SgrrnrP ~f'Ironc (_ r7) ~ 7r-•<4ag ,Nnhlmidllc Indinmr gdni o-_z 3o 'For i,;r77;; e=ar:a; 11/20/2007 16:22 3177769628 HAMILTON CO SURVEYOR PAGE 02/02 7. Please note the additional comments maybe warranted at a later date. Sbould you have any questions,l can be reached at 31.7-776-8495. Sincerely, ~ i~ G~ re kioyes, rAC, CFM g Plan Reviewer CC: Christine Barton-Holmes -Carmel DOCS Amanda Foley -Carmel Engineering Dick HiA -Carmel Engineering Greg Ilko -Crossroad Engineers Kevin Krulik - Brenwiek The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 INDIANA November 19, 2007 RECEIVEp Corporate Headquarters r ~" Historic Fort Harrl$en V I y ~fli~:~ 8901 Otis Avenue Intlianapolis, IN 46216 p DoCJ Toll-Free: 866.973.7100 Angie Conn Department of Community Services Avan Office One Civic Square auadinglooo 5250 E US Highway 36 CarmeI,IN46032 Suite 250 Avon, IN 46123 RE: VILLAGE OF WESTCLAY, NATIONAL BANK OF INDIANAPOLIS Carmel Office 12821 E New Marke[ Street Dear Angie suite 301 , Carmel, IN 46032 Please find enclosed the following materials related to the above referenced project: Merrillville Office 9800 Connecticut Drive ~ . 2 sets of the Site Construction Plans Suite 61-508 2. TAC Application Merrulviue, w 463m 3. Land Description West Lafayette Office 4. Sewer Service Report 133o win Hentschel eowevard 5. Copies of letters to TAC members Suite 100 west ~atayette, IN 479os The above referenced materials are for your review and suggestions with respect to this project. I am requesting this matter be placed on the agenda for the December 19, 2007 Iowa Technical Advisory Committee meeting. In the interim, if you should have any questions, or Ames Office are in need of additional information, please feel free to contact me at your convenience. 1606 Goltlen Aspen Drive suite 11o Sincere) y Ames, IA 50010 , NORTH CAROLINA Charlotte office THE SCHNEIDER CORPORATION 8001 Arrowridge Boulevartl Charlotte, NC 28273 1 ^~` ~_ i ~- TENNESSEE Nashville Office 400 7th Avenue south P.E. Brandon T. Burke Nashville, TN 37203 , Project Manager Enclosure N:A 1238V071 AdocsVConn 11190Zdoc The Schneider Corporation Schneider 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.5112 Fax: 317.826.6410 INDIANA Corporate Headquarters Historic Fort Harrison 89010tis Avenue Indianapolis, IN 46216 Tol I-Free: 866.973.7100 November 19, 2007 David Littlejohn Transportation Systems Coordinator Carmel Engineering Department One Civic Square, 1~' Floor Carmel, IN 46032 `~ RECEIVED Avan Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrillville Office 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 Wes[ Lafayette, IN 47906 IOWA Ames Office 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 NORTH CAROLINA Charlotte Otfice 8001 Arrowridge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, 7N 37203 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear David: NOV 1 9 Ofi7 Docs Please find enclosed one set of the site Title Sheet, Site Plan, and Grading, Drainage, & Utility Plan for the above referenced project. We wilt be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~n~ \ ~^~.. ~__ Brandon T. Burke, P.E. Project Manager Enclosure N:A1238\071Adocs\Tacsubl 1190Zdoc Schneider INDIANA Corporate Headquarters Historic Fort Harrison 89010tis Avenue Indianapolis, IN 46216 To I I-Free: 866.97 3.7100 Avon Office Builtling 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrillville Office 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 West Lafayette, IN 47906 Iowa Ames Office 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowridge Boulevartl Charlotte. NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 The Schneider Corporation 12821 E New Market Street. Suite 301 Carmel. IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 November 19, 2007 Michael Fogarty Office of Police Chief Three Civic Square Carmel. IN 46032 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Michael: Please find enclosed one copy of the site Title Sheet, Site Plan, and Grading, Drainage, & Utility Plan for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION '__~. ~~_ r ---- ~~ • ~ -. _-- Brandon T. Burke, P.E. Project Manager Enclosure N:\ 1238\071 \docs\Tacsub I 1 1907.doc Schneider INDIANA Corporate Headquarters Historic Fart Harrison 8901 Otis Avenue Intlianapolis, IN 46216 To I I-Free: 866.973.7100 Avon Office Builtling 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrillville Office 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel 8ouleva rd Suite 100 West Lafayette. IN 47906 Iowa Ames Office 1606 Golden Aspen Drive Suite 110 Ames. IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowritlge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 November 19, 2007 Dave Klingensmith Carmel Street Department 3400 W. 131st Street Westfield, IN 46074 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Dave: Please find enclosed one copy of the site Title Sheet, Site Plan, and Grading, Drainage, R Utility Plan for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION r-'--J 1 ~---t-:-: ~--__------ Brandon T. Burke, P.E. Project Manager Enclosure N:\1238\071 \docs\Tacsub I 1 190Zdoc The Schneider Corporation Schneider 12821 E New Market Street, Suite 301 Carmel. IN 46032-7258 Phone: 312569.8112 Pax: 317.826.6410 INDIANA Corporate Headquarters Historic Fort Harrison 89010tis Avenue Indianapolis, IN 46216 To I I-Free: 866.973.7100 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrillville OHice 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 West Lafayette. IN 47906 IOWA Ames Office 1606 Golden Aspen Drive Suite 110 Ames, !A 50010 NORTH CAROLINA Charlotte Office 8001 Arrowridge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 November 19, 2007 US MAIL ONLY Postmaster c/o Cindy Klaiber Carmel Post Office United States Postal Service 275 Medical Drive Carmel, IN 46032-9998 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Cindy: Please find enclosed one copy of the site Title Sheet, Site Plan, and Grading, Drainage, & Utility Plan for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~/> "^~_, Brandon T. Burke, P.E. Project Manager Enclosure N:U 238V071 Adocs\Tacsub l 1190Zdoc Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Intlianapolis, IN 46216 To I I-Free: 866.973.7100 Avon Office Builtling 1000 5250 E lJS Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrillville Office 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Henschel Boulevartl Suite 100 West Lafayette, IN 47906 IOWA Ames Office 1606 Golden Aspen brive Suite 110 Ames, IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowridge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7[h Avenue South Nashville, TN 37203 The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 fax: 317.826.6410 November 19, 2007 Jerry Breeck Vectren Energy 16000 Allisonville Rd P.O. Box 1700 Noblesville, IN 46060 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Jerry: Please find enclosed one copy of the site Title Sheet, Site Plan, and Grading, Drainage, 8 Utility Plan for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~- ~ 1 ~•~._ ~ 1 ~_ Brandon T. Burke, P.E. Project Manager Enclosure N:\l 238\071 \docs\Tacsub I 1 190Zdoc The Schneider Corporation Schneider 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 INDIANA November 19, 2007 Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Jason Kirkman mdianapolis, w 4621s Toll-Free: 866.973.7100 Brighthouse Networks 3030 Roosevelt Ave Avon Office Indianapolis, IN 46218 Builtling 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Carmel ONice 12821 E New Market Street Suite 301 Dear Jason: Carmel, IN 46032 Merrillville Office Please find enclosed one copy of the site Title Sheet, Site Plan, and Grading, Drainage, & 9800 Connecticut Drive Utility Plan for the above referenced project. We will be presenting this project at the Suite B1-508 December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please Merrillville, IN 46307 review the enclosed material and forward to me, any comments or concerns that you may West Lafayette Office have. 1330 Win Hentschel Boulevard suite 10o If you have any questions or require additional information, please feel free to contact me at west ~atayette, IN a7sos your convenience. IOWA Sincerely, Ames Office 1606 Golden Aspen Drive THE SCHNEIDER CORPORATION Suite 110 Ames, IA 50010 ~'~ ~` r-- ~ 1 S _` ~ NORTH CAROLINA Charlotte Office Brandon T. Burke, P.E. 8001 Arrowridge Boulevard Project Manager Charlotte, NC 28273 TENNESSEE Enclosure Nashville Office 400 7th Avenue South Nashville. TN 37203 N:\1238\071\docs\Tacsu6111907.doc The Schneider Corporation Schneider 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 INDIANA November 19, 2007 Corporate Headquarters Historic Fart Harrison 89010tis Avenue Indianapolis, IN 46216 Toll-Free: 866.973.7100 Jason Lemaster Hamilton County Health Dept. Avon Office Hamilton County Judicial Center, Suite 30 Building 1000 Noblesville, IN 46060 5250 E US Highway 36 Suite 250 Avon, IN 46123 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Carmel Office 12821 E New Market Street Suite 301 Dear Jason: Carmel, IN 46032 Merrillville Office Please find enclosed one copy of the Title Sheet, Site Plan, and Grading, Drainage, & Utility 9800 Connecticut Drive Plan for the above referenced project. We will be presenting this project at the December 19, Suite 81-508 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the Merrillville. w 46307 enclosed material and forward to me, any comments or concerns that you may have. West Lafayette Offlce 1330 Win Hentschel Boulevartl If you have any questions or require additional information, please feel free to contact me at suite 10o your convenience. West Lafayette, IN 47906 Sincerely, IOWA Ames office THE SCHNEIDER CORPORATION 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 ^ ^ ~~ ', J \ )~ r ~ \ \, ~ ~~ NORTH CAROLINA J Charlotte Office 8001 Arrowridge Boulevartl Brandon T. Burke, P.E. cnadotte. Nc 28273 project Manager TENNESSEE Enclosure Nashville Office 400 7th Avenue South Nashville, TN 37203 N: \ l 23 R\07 I \docs\Tacsub 1 1 1907. doc The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 INDIANA November 19, 2007 Corporate Headquarters Historic Fort Harrison 89010tis Avenue Intlianapolis, IN 46216 Toll-Free: 866.973.7100 BIII HOhlt Deputy Building Commissioner Avon Office City of Carmel Building 1000 One Civic Square 5250 E US Highway 36 IN 46032 Carmel Suite 250 , Avon, IN 46123 Carmel office RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrillville Office Dear Bill: 9800 Connecticut Drive swte 81-sos Please find enclosed one copy of the Title Sheet, Site Plan, and Grading, Drainage, & Utility Merrillviue, IN 46307 Plan for the above referenced project. We will be presenting this project at the December 19, West Lafayette Office 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the 1330 Win Hentschel Boulevard enclosed material and forward to me, any comments or concerns that you may have. Suite 100 west tafayete, IN a7sos If you have any questions or require additional information, please feel free to contact me at your convenience. IOWA Ames Office Sincerely, 1606 Golden Aspen Drive Suite 110 THE SCHNEIDER CORPORATION Ames, IA 50010 ~\ ~ ~_- ~ l NORTH CAROLINA Charlotte Office Brandon T. Burke, P.E. 8001 Arrowridge Boulevard Project Manager Charlotte, NC 28273 TENNESSEE Enclosure Nashville Otflce 400 7th Avenue South Nashville, TN 37203 N:\ 1238\071 \docs\Tacsub l 11907.doc -~~`r~~,:~ ?,'wwwschneidercorp coms• Schneider INDIANA Corporate Heatlquarters Historic Fort Harrison 89010tis Avenue Indianapolis, IN 46216 Tol I-Free: 866.973.7100 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrillville Office 9800 Connecticut Drive Suite 61-508 Merrillville. IN 46307 West Lafayette Oftice 1330 Win Hentschel Boulevard Suite 100 West Lafayette, IN 47906 IOWA Ames Office 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 NORTH CAROLINA -Charbtte Office 8001 Arrowridge Boulevard Charlotte. NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville. TN 37203 The Schneider Corporation 12821 E New Market Street. Suite 301 Carmel. IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 November 19, 2007 Teresa Magee/Mark Wood Panhandle Eastern Pipe Line Company 9371 Zionsville Road Indianapolis, IN 46268 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Teresa: Please find enclosed one copy of the Title Sheet, Site Plan, and Grading, Drainage, & Utility Plan for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION r-"~-' ~ ~ Brandon T. Burke, P.E. Project Manager Enclosure N:\1238\071 \docs\Tacsub 1 11907.doc The Schneider Corporation Schneider 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 INDIANA November 19, 2007 Corporate Headquarters Historic Fort Harrison 89010[is Avenue Indianapolis, IN 46216 Toll-Free: 866.973.7100 Steve Krebs SBC Avon Office 5858 North College Avenue Building 1000 Indianapolis, IN 46220 5250 E US Highway 36 Suite 250 Avon, IN 46123 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Carmel Office 12821 E New Market Street Suite 301 Dear Steve: Carmel, IN 46032 Merrillville Office Please find enclosed one copy of the Title Sheet, Site Plan, and Grading, Drainage, 8 Utility 9800 Connecticut Drive Plan for the above referenced project. We will be presenting this project at the December 19, Suite 61-508 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the Merdlroine, IN 46307 enclosed material and forward to me, any comments or concerns that you may have. West Lafayette Office 1330 Win Hentschel Boulevard If you have any questions or require additional information, please feel free to contact me at suite 10o your convenience. West Lafayette, IN 47906 Sincerely, IOWA AmesOftice THE SCHNEIDER CORPORATION 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 '--~~ I ^~ - NORTH CAROLINA Brandon T. Burke, P.E. Charlotte Oftice Project Manager 8001 Arrowridge Boulevartl Charlotte, NC 28273 Enclosure TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 N:U 238V071 Adocs\Tacsubl 1 1909.doc The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 INDIANA November 19, 2007 Corporate Headquarters Historic Fort Harrison 89010tis Avenue Indianapolis, IN 46216 Toll-Free: 866.973.7100 Shirley Hunter Duke Energy Avon Office 16475 Southpark Drive Building 1000 Westfield, IN 46074 5250 E US Highway 36 Suite 250 Avon, IN 46123 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Carmel Office 12821 E New Market Street Suite 301 Dear Shirley: Carmel, IN 46032 Merrilivllle Office Please find enclosed one copy of the Title Sheet, Site Plan, and Grading, Drainage, 8 Utility 9800 Connecticut Drive Plan for the above referenced project. We will be presenting this project at the December 19, suite B1-5os 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the Mernuvole. IN 46307 enclosed material and forward to me, any comments or concerns that you may have. West Lafayette Office 1330 Win Hentschel Boulevard If you have any questions or require additional information, please feel free to contact me at suhe 10o your convenience. West Lafayette, IN 47906 Sincerely, IOWA Ames office THE SCHNEIDER CORPORATION 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 ~-+~ ~ .~` ~~_ - NORTH CAROLINA Brandon T. Burke, P.E Charlotte Oftice Project Manager 8001 Arrowridge Boulevard Charlotte, NC 28273 Enclosure TENNESSEE Nashville Office 400 7th Avenue South Nashville, iN 37203 N:\1238\071 \docs\Tacsub 111907.doc -fwwwschneidercorp.com Schneider INDIANA Corporate Heatlquarters Historic Fort Harrison 89010tis Avenue Intlianapolis, IN 46216 Ta I I-Free: 866.973.7100 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrillville Office 9800 Connecticut Drive Suite 61-508 Merrillville. IN 46307 West Lafayette Office 1330 Win Hentschel Boulevartl Suite 100 West Lafayette. IN 47906 IOWA Ames Office 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowritlge Boulevartl Charlotte, NC 28273 TENNESSEE Nashville OfTice 400 7[h Avenue South Nashville, TN 37203 The Schneider Corporation 12821 E New Market S[reet, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 November 19, 2007 Mark Westermeier Carmel/Clay Parks Department 760 Third Avenue SW Suite 100 Carmel, IN 46032 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Mark: Please find enclosed one copy of the Title Sheet, Site Plan, and Grading, Drainage, & Utility Plan for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~- ~ J Brandon T. Burke, P.E. Project Manager Enclosure N:A 1238V071 Adocs\Tacsub I 1 1907.doc Schneider INDIANA Corporate Headquarters Historic Fort Harrison 89010tis Avenue Indianapolis, IN 46216 Tol I-Free: 866.973.7100 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel. IN 46032 Merrlliville Office 9800 Connecticut Drive Suite BS-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 West Lafayette, IN 47906 IOWA Ames Office 1606 Goltlen Aspen Drive Suite 110 Ames. IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowridge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 November 19, 2007 Brooke Gajownik Hamilton County Sheriff's Department 18100 Cumberland Road Noblesville, IN 46060 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Brooke: Please find enclosed one copy of the Title Sheet, Site Plan, and Grading, Drainage, & Utility Plan for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION `mss- ~ -~ - -- Brandon T. Burke, P.E. Project Manager Enclosure N:V 238V071Adocs\Tacsubl 1190Zdoc ;•~. wwwschneidercorp.com-' Schneider INDIANA Corporate Headquarters Historic Fort Harrison 89010tis Avenue Indianapolis, IN 46216 Tol I-Free: 866.973.7100 Avon Oftice Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel, I N 46032 Merrillville Office 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 West Lafayette, IN 47906 Iowa Ames Office 1606 Goltlen Aspen Drive Suite 110 Ames. IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowridge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 November 19, 2007 Ron Farrand Carmel/Clay Schools 5201 East 131 ~t Street Carmel, IN 46033 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Ron: Please find enclosed one copy of the Title Sheet, Site Plan, and Grading, Drainage, & Utility Plan for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~ \\ ^'~ Brandon T. Burke, P.E. Project Manager Enclosure N:\1238\071 \docs\Tacsub l 11907.doc ,,. r_;-wwwschneidercorp.com).; The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 INDIANA Corporate Headquarters Historic Fort Harrison 89010tis Avenue Intlianapolis. IN 46216 Tol I-Free: 866.973, 7100 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Stree[ Suite 301 Carmel, IN 46032 Merrillville Office 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 West Lafayette, IN 47906 IOWA Ames Office 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowridge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville. TN 37203 November 19, 2007 Bill Akers Carmel/Clay Communications 31 First Avenue, N.W. Carmel. IN 46032 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Bill: Please find enclosed one copy of the Title Sheet, Site Plan, and Grading, Drainage, 8 Utility Plan for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ^\ Brandon T. Burke, P.E. Project Manager Enclosure N:\1238\071\docs\Tacsu6111907.doc Schneider INDIANA Corporate Headquarters Historic For[ Harrison 8901 Otis Avenue Intlianapolis, IN 46216 Tol I-Free: 866.973.7100 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market SVeet Suite 301 Carmel. IN 46032 Merrillville Of/ice 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 West Lafayette, IN 47906 IOWA Ames Office 1606 Gomen Aspen Drive State 110 Ames, IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowridge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7255 Phone: 317.569.8112 Fax: 317.526.6410 November 19, 2007 Gary Hoyt City of Carmel Fire Department Two Civic Square Carmel, IN 46032 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Gary: Please find enclosed one copy of the Title Sheet, Site Plan, and Grading, Drainage, & Utility Plan for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE~SCHNEIDER CORPORATION _J `~~ Brandon T. Burke, P.E. Project Manager Enclosure N: \ 123 8\071 \docs\Tacsub 1 1 1907, doc Schneider INDIANA Corporate Headquarters Historic For[ Harrison 8901 Otis Avenue Intlianapolis. IN 46216 Toll-Free: 866.973.7100 Avon Office Builtling 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Offlce 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrillville Office 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 West Lafayette, IN 47906 IOWA Ames Office 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowridge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel. IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 Novomber 19, 2007 Greg Hoyes Hamilton County Surveyor's Office One Hamilton County Square, Suite 188 Noblesville, IN 46060 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Greg: Please find enclosed one set of Construction Plans and Drainage Report for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~_~~ f ^~ \ ~~----~. Brandon T. Burke, P.E. Project Manager Enclosure Cc: Gary Duncan, City of Carmel Engineering Greg Ilko, Crossroads Engineering N: V 238\071 \docs\Tacsub l 11907.doc The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Intlianapolis, IN 46216 To I I-Free: 866.973.7100 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrillville Office 9800 Connecticut Drive Suite 61-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 West Lafayette, IN 47906 IOWA Ames Office 1606 Goltlen Aspen Drive Suite 110 Ames, IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowridge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 November 19, 2007 Ryan Hartman Clay Township Regional Waste District 10701 North College Avenue, Suite A Indianapolis, IN 46280 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Ryan: Please find enclosed lwo sets of the site Construction Plans for the above referenced project and CTRWD applications. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~„ \ I ~_ ~~ Brandon T. Burke, P.E. Project Manager Enclosure N:\ 1238\071 \docs\Tacsub 1 1 1907.doc Schneider INDIANA Corporate Headquarters Historic Fort Harrison 89010tis Avenue Indianapolis, IN 46216 Tof I-Free: 866.973.7100 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmei, IN 46032 Merrillville Office 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Bouleva rtl Suite 100 West Lafayette, IN 47906 Iowa Ames Office 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowritlge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 November 19, 2007 John Duffy City of Carmel Utilities 760 Third Avenue SW Carmel, IN 46032 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear John: Please find enclosed one copy of the construction plans for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION _ /~-\, !' ~ f ~---'~~ Brandon T. Burke, P.E. Project Manager Enclosure Cc: Steve Cook, City of Carmel Utilities N:\1238\071 \docs\Tacsub I 1 1907.doc Schneider INDIANA Corporate Headquarters Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 Tol I-Free: 866.973.7100 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrlllvtlle Office 9800 Connecticut Drive Suite 81-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 West Lafayette, IN 47906 IOWA Ames Office 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 NORTH CAROLINA Charlotte OfFlce 8001 Arrowridge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 November 19, 2007 Steve Cook City of Carmel Utilities 130 1 ~' Avenue SW Carmel, IN 46032 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Steve: Please find enclosed one copy of the construction plans for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ^\ Brandon T. Burke, P.E. Project Manager Enclosure Cc: John Duffy, City of Carmel Utilities N:V 238V071 Adocs\Tacsub I 1 1907.doc The Schneider Corporation 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 INDIANA November 19, 2007 Corporate Headquarters Historic Fort Harrison 89010tis Avenue Gre Ilko g Intlianapolis, IN 46216 roll-Free: s6ss73.t1oo CrossRoads Engineers, PC 3417 S. Sherman Drive Avon Office Beech Grove, IN 46107 Builtling 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Carmel Office 12821 E New Market Street Dear Greg: Suite 301 Carmel, IN 46032 Please find enclosed one set of the site Construction Plans and drainage calculations for the Merrillville Office above referenced project. We will be presenting this project at the December 19, 2007 9800 Connecticut Drive meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed spite 81-sob material and forward to me, any comments or concerns that you may have. Merrillville, IN 46307 West Lafayette Office If you have any questions or require additional information, please feel free to contact me at 1330 Win Hentschel Boulevartl your convenience. Suite 100 West Lafayette, IN 47906 Sincerely, IOWA THE SCHNEIDER CORPORATION Ames Office 1606 Golden Aspen Drive " Suite 110 '~ ~ Ames, IA 50010 1 ~ ~ "--- NORTH CAROLINA Brandon T. Burke, P.E. Charlotte Office Project Manager 8001 Arrowritlge Boulevard Charlotte, NC 28273 Enclosure TENNESSEE Nashville Office 400 7th Avenue South Cc: Nick Redden., City of Carmel Engineer's Office Nashville, TN 37203 N:\ 1238\071 \docs\Tacsub l 1 1907.doc Schneider INDIANA Corporate Headquarters Historic Fort Harrison 89010tis Avenue Indianapolis, IN 46216 Tol I-Free: 866.973.7100 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrtllvllle Office 9800 Connecticut Drive Suite 61-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 West Lafayette, IN 47906 IOWA Ames Office 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowritlge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 The Schneider Corporation 12821 E New Marke[ SVee[, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 November 19, 2007 Gary Duncan Jr. Carmel Engineering Department One Civic Square, 1st Floor Carmel, IN 46032 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Gary: Please find enclosed one set of the site Construction Plans, BPWS Water Availability, BPWS Curb Cuts, and Carmel checklist. Also enclosed is one drainage report for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION f ~ ~ ~ ~~. Brandon T. Burke, P.E. Project Manager Enclosure Cc: Greg Ilko., Crossroads Engineers N:A1238V07lAdocs\Tacsub111907.doc The Schneider Corporation Schneider INDIANA Corporate Headquarters Historic For[ Harrison 89010tis Avenue Indianapolis, IN 46216 Tol I-Free: 866.973.7100 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Office 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrillville Office 9800 Connecticut Drive Suite B1-508 Merrillville, IN 46307 West Lalayette Office 1330 Win Hentschel Boulevard Suite 100 Wes[ Lafayette, IN 47906 IOWA Ames Office 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowritlge Boulevard Charlotte, NC 28273 TENNESSEE Nashville Otilce 400 7th Avenue South Nashville. TN 37203 12821 E New Market Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 November 19, 2007 Scott Brewer Department of Community Services One Civic Square Carmel, IN 46032 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Scott: Please find enclosed one copy of Title Sheet, Site Plan, Landscape Plan, and Grading, Drainage, & Utility Plan for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~~,~ t ~ , ^--. Brandon T. Burke, P.E. Project Manager Enclosure N:A 1238V071 Adocs\Tacsub 111907.doc Schneider INDIANA Corporate Headquarters Historic Fart Harrison 8901 Otis Avenue Intlianapolis. IN 46216 To I I-Free: 866.97 3.7100 Avon Office Building 1000 5250 E US Highway 36 Suite 250 Avon, IN 46123 Carmel Oftice 12821 E New Market Street Suite 301 Carmel, IN 46032 Merrillville Office 9800 Connecticut Drive Suite 61-508 Merrillville, IN 46307 West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 West Lafayette, IN 47906 IOWA Ames Office 1606 Golden Aspen Drive Suite 110 Ames, IA 50010 NORTH CAROLINA Charlotte Office 8001 Arrowridge Boulevartl Charlotte, NC 28273 TENNESSEE Nashville Office 400 7th Avenue South Nashville, TN 37203 The Schneider Corporation 12821 E New Marke[ Street, Suite 301 Carmel, IN 46032-7258 Phone: 317.569.8112 Fax: 317.826.6410 November 19, 2007 Amanda Foley Carmel Engineering Department One Civic Square, 1 ~t Floor Carmel, IN 46032 RE: VILLAGE OF WESTCLAY -NATIONAL BANK OF INDIANAPOLIS Dear Amanda: Please find enclosed one set of the site Construction Plans, BMP Manual (BMP Exhibit to be incorporated in the Overall BMP Manual for VOWC), Carmel Stormwater Permit, and 11x17 exhibit for the above referenced project. We will be presenting this project at the December 19, 2007 meeting of the Carmel Technical Advisory Committee. Would you please review the enclosed material and forward to me, any comments or concerns that you may have. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION Brandon T. Burke, P.E. Project Manager Enclosure N:\1238\071\docs\Tacsu6111907.doc