RE: Carmel Fire Departmeut Ststion #44 Demo/Rebufld-Project Review #3
Dear Ms. Collins:
The City has received your letter and drawings dated September 12, 2006 based upon the City review of
August 9, 2006.
The comments from the City review have been satisfactorily addressed. Please submit all copies necessary
for approval and we will approve the drawings. All bonds and performance guarantces (if required) must
be posted prior to Engineering Department approval. Also, Board of Public Works and Safety approval
and any other governing agency approvals (if required) must be obtained prior to Engineering Department
approval.
If you have questions, please contact me at 571-2441.
Sin
Gary Dun Jr, P.E.
Assistant Ci Engineer
Cc: Matt Griffin, Department of Community Services
Joha Duffy, Carmel Utilities
Paul Pace, Carmel Utilities
Paul Arnone, Carmel Utilities
Grog Ilko, Crossroad Engineers
Engineering File Copy
Engincering Depazmrent Review
S:~DF~.L~PROJRE V06~CFDSTA7TONM44REV 3
DEPARTMENT OF ENGINEERING
ONE Crnc SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAx 317.571.2439
EMAIL engineering®carmeLin.gov
JAMES BRAINARD, MAYOR
August 9, 2006
:, ~ 4
RECEIVED
Ms. Karen Collins, PE
Paul I Cripe
7172 Graham Road
Indianapolis, IN 46250
oca' :,~ o ~-~---
t o ~ ov_(e:: 1 ~ti.
AUG 1 1 2006
~;.
RE: Carmel Fire Department Station #44 Demo/Rebuild-Project Review #2
Dear Ms. Collins:
The City has received your letter and drawings dated June 27, 2006 based upon the City review of April 1 Q,
2006. We offer the following comments:
PROJECT COMMENTS
Thank you for submitting the completed seven-page Plan Certification Form. However, the Department of
Engineering did not receive a separate letter explaining the non-applicable and "no" responses. As part of
your next submittal, the Department requires justification for the "no" and "N/A" responses.
1. Please remove sheets A101, A102, A103, A501, A502, L101, and L102 from the sets of plans
submitted to the Depattntent of Engineering for approval. Also please remove these from the
index on the cover sheet. The Department of Engineering does not approve these sheets.
2. The Department requires that the construction drawings be developed in accordance with the City
of Carmel digital submission standards and that all required submittals for construction drawings
be made.
3. For work in the right-of--way, the City has adopted a new paving policy. Please revise any notes,
specifications, and details to accommodate this policy. The language of these policies must be
added to a specification sheet on the plans.
4. The City has adopted a new curbing policy. Please revise any notes, specifications, and details to
accommodate this policy. The language of these policies must be added to a specification sheet on
the plans.
5. Please confirm that the fire apparatus can rum from eastbound into the site and not clip the 10-foot
curb radius on the west side of the east entrance.
6. You responded "na" to the statement "Any additional rightrof--way required by the Department of
Community Services has been provided" but did not provide a written explanation. Please verify
the existing right-of--way. If additional right-of--way is required by the Thoroughfare Plan, it needs
to be dedicated.
7. Please indicate and label the owner of the property east of the Fire Department property.
8. Please confirm that the existing roadside drainage does not drain east or west across the frontage
and that culverts under the drives are not required.
These comments represent the Department of Engineering's second review of the construction plans for
this project. We request that all responses to our comments be provided in writing. Failure to provide
written responses may result in the delay of the review process.
It is critical that this office be made aware of all modifications made on the plans being re-submitted,
particularly if any such changes are considered "new" or fall outside of our previous reviews. Please
provide revised plans including all revisions. Please notify us of any changes and specifically state any
changes, including changes resulting from Plan Commission, BZA or other committee meetings.
DEPARTMENT OF ENGINEERING
ONE Crvlc SQunxE, CARMEL, IN 46032 OrFlce 317.571.2441 FAx 317.571.2439
EMAIL engineering~carmeLin.gov
JAMES BRAINARD, MAYOR
f-
All bonds and performance guarantees must be posted prior to Engineering Department approval of ,
construction plans. Board of Public Works and Safety approvals and any other governing agency approvals
(if required) must be obtained prior to Engineering Department approval. All performance guarantees must
be posted prior to submission of secondary plats for Board of Public Works and Safety approval.
The Department reserves the right to provide additional comments based upon subsequent reviews. Please
confum with Crossroad Engineers, P.C. that the detention pond to the east has adequate capacity to detain
the runoff from the developed site and not negatively impact the maximum water surface elevations of the
pond. Are modifications to the existing outlet control structure required? Please confirm that
permission/agreements are in place with the Home Owners Association to receive and manage the runoff
from the site. An easement to protect the outfall should be provided by the Home Owners Association.
if you have questions, please call me at 571-2441.
Cc: Matt Griffm, Department of Community Services
John Duffy, Carmel Utilities
Paul Pace, Cannel Utilities
Paul Arnone, Carmel Utilities
Greg Ilko, Crossroad Engineers
Engineering File Copy
Engineering Department Review
S:\DHILL\PROIREV06\CFDSTATION#44RE V 2
Enclosures
04/11/2006 14:36
3177769628 HAMILTON CO SURVEYOR
RVg,YOR'S OFFI
F
:Kenton C.'ll?ard, Sumcynr
P(nnr i ; r ~ 7 ~ ~ i-849$
'Fur (jri)~i6-qG_~
Paul I. Cripe, inc.
ATTN: Karen Collins
7].72 Graham Road
Indianapolis, IN 46250
ViA FACSIMILE: 841-4798
RE: Carmel Fire Station #44
Deaz Mrs. Collins:
RECEIlIED
iaPR 1 1 2006
DOCS
We have reviewed the wnstruction plans submitted to the Hamilton County Surveyor's Office on
Apri14, 2006 far this project and have the following comments:
1. This project falls within the corporate limits and MS4 jurisdiction of the City of Carnoel.
2. This proposed site DOES fall in a Carmel Well Head Protection Area.
3. Please direct all storm sewer and water quality questions to the Ciry of Carmel
Engineering Deparhnent.
4. This proposed project falls in the U.G. Mitchner Regulated Drain watershed.
S. Please submit an indirect outlet permit {Fee waived), for the discharge into the Emily
Vestal Regulated Drain, to this otlice. The application is available on our website at
htto•//www co hamilton.in.us, go to Depaztments, Surveyor, and Forms.
6. From the sketchy records in our office, it appears the drainage for this site has been.
included in the development of Avian Glen, in the pond to the west of the site.
7. Please note the additional comments may be warranted at a later date.
Should you have any questions, I can be reached at 31.7-776-8495.
Sincerely,
Greg oyes, AC
Plan Reviewer
CC: Matt Griffm -Carmel DOCD
Amanda Foley -Carmel Engineering
Dick Hill -Carmel Engineering
Greg Ilko -Crossroads Engineers
Mike McBride - HCHD
PAGE 01/01
1~
I _ - - _ _ ~~-~ ~ ~^
• IZ~ C
-- =~>l _ .
Suifc rdR
Onr.7~fnrnillon Cnnoi<~ Srlunrr
7~'ahlr;arillr, lndimm 4""'.~4'p'rll?gl 2006
.r, >>
C
April 10, 2006
Ms. Karen Collins, PE
Paul I Cripe
7172 Graham Road
Indianapolis, IN 46250
RE: Carmel Fire Department Station #44 Demo/Rebuild-Project Review #1
Dear Ms. Collins:
i` . tea- ~`"`.~--~-
O~~a~~~:o~so~~yT~~c
~.
,c s _,~~
~;.
Q~~J
We have reviewed the construction plans submitted for review at the April 19, 2006 Technical Advisory
Committee meeting. We offer the following comments:
GENERAL INFORMATION
L The project site is located within current Ciry of Carmel Corporate Limits.
2. Jurisdictions:
• Streets and Right of Way -City of Carmel (East 131 s' /Main Street)
• Water -City of Carmel Utilities
• Sanitary Sewers -City of Carmel Utilities
• Storm Sewers/Drainage -City of Carmel
• Legal Drains -Hamilton County Surveyor's Office.
3. Board of Public Works and Safety Requirements:
• Commercial Curb Cut approval -Please provide 8 '/z x 11 exhibits with your request for
Board approval. The exhibits should reflect all dimensional data including overall width at
the street, throat width, radii, etc.
• Temporary Construction Entrance approval if the location is at a site other than the permanent
curb cuts on 131" Street. Submission requvements are the same as for commercial curb cut.
• Any permanent improvement to be installed within dedicated right of way or dedicated
easements.
• Dedication of Right of Way if applicable.
I am including a copy of the 2006 Schedule of Board of Public Works and Safety meeting dates
and agenda deadlines. Please use the Engineering Department deadlines for submissions to the
Board.
Any submission to the Board requires prior approval by the Carmel Clay Plan Commission
and/or the Board ojZoningAppeals (Ijapplicable) and completion ojreview by the Technical
Advisory Committee. Al! written requests to be placed on the Board's agenda must include the
appropriate Docket Number and the date (or dates) ojapproval by the Plan Commission anrUor
the Board ojZoning Appeals (ijapplicable).
4. T.A.C. Review/Drawings submitted for approval:
We request that all comments and comment letters generated by this office be answered in writing
and be accompanied by a drawing reflecting requested revisions. Final drawings will not be
approved far construction until all Engineering Department and Utility Department issues have
been resolved. The design engineer must certify all drawings submitted for fmal approval. This
office will require a minimum of five-sets of drawings after all issues have been resolved and the
final review set of constmction drawings have been approved. The drawings will be stamped as
approved and will be signed by the City Engineer and Director of Carmel Utilities. Distribution of
DEPARTMF,NT OF ENGINEERING
ONS Civic SQonRa, CeaMEi, IN 46032 OFFICE 317.571.2441 Fnx 317571.2439
EMntt engineering@ci.carmel.in.us
JAMES BRAINARD, MAYOR
~~
a-
approved drawings will be 2-sets to City of Carmel Engineering, 2-sets to Carmel Utilities and 1-
set to the Developer and/or Contractor. We will approve an additional 2-sets if requested, but the
additional sets must be submitted with the requved 5-sets. Additionally, we requve one digital
copy of the approved construction plans based upon City of Carmel standard requirements for
digital submissions.
5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
right of way or dedicated easements will require a Consent to Encroach Agreement with the City
of Carmel. This agreement, with the exception of irrigation systems, requires BPWS approval.
The City Engineer may approve irrigation system agreements.
6. Carmel Utilities should be provided drawings for review of water systems and issues. They will
provide a separate review regarding these issues.
7. Carmel Utilities subscribes to "Holey Moley". Contact Carmel Utilities directly for all water main
and sanitary sewer main location requests.
S. I am including copies of the following with this correspondence:
• Commercial Project Approval Procedures
• Permit Data, Contacts, etc.
• Commercial Permitting Procedures
9. Upon initial review, it appears the following bonding requirements may apply to this project:
Performance Guarantees/Engineer's Estimates
Since this is essentially a project for a City of Carmel entity, it does not appear that there aze
Performance Guarantee requirements.
Right of Way Permit and Bonding
Any work in the dedicated right of way of 131 ~` Street will require an approved Right of Way
Permit. However, the bonding requirement will be waived. Please contact our Right of Way
Manager, Fred Glaser, to arrange right of way permitting.
10. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations
submitted to this office for review. We will shaze Crossroad's comments as they are received.
When construction plans are submitted for review for this development, please provide a set of
drawings and drainage calculations directly to Crossroad.
AVAILABILITY AND CONNECTION FEES
11. Availability (acreage) Fees are not applicable for this project.
Connection Fees - We defer to Cannel Utilities regarding this issue.
A seven-page Plan Certification Form has been enclosed. This form was created with the desire and intent
to streamline the plan review process. We request that you please complete this form and return it to the
Department of Engineering as soon as possible. Additional comments will be provided by the Department
of Engineering after the Certiftcation Form is returned.
Please treat each item on the form as a requirement of the Department of Engineering. Providing a "no" or
"N/A" response to any of the items does not relieve the Developer of the responsibility of meeting the
requirements of the Department of Engineering. The Department of Engineering will make the final
determination as to the acceptability of any "no" or "N/A" responses.
12. Please remove sheets A101, A102, A103, A501, A502, L101, and L102 from the sets of plans
submitted to the Department of Engineering for approval. Also please remove these from the
index on the cover sheet. The Department of Engineering does not approve these sheets.
13. The Department requves that the construction drawings be developed in accordance with the City
of Carmel digital submission standards and that all requved submittals for construction drawings
be made.
l4. The City has adopted a new paving policy. Please revise any notes, specifications, and details to
accommodate this policy. The language of these policies must be added to a specification sheet on
the plans.
:'
>-
] 5. The City has adopted a new curbing policy. Please revise any notes, specifications, and details to
accommodate this policy. The language of these policies must be added to a specification sheet on
the plans.
16. This project is subject to the Carmel Stormwater Management Ordinance, which was adopted
February 6, 2006.
These comments represent the Department of Engineering's initial review of the construction plans for this
project. We request that all responses to our comments be provided in writing. Failure to provide written
responses may result in the delay of the review process.
It is critical that this office be made aware of all modifications made on the plans being re-submitted,
particularly if any such changes aze considered "new" or fall outside of our previous reviews. Please
provide revised plans including all revisions. Please notify us of any changes and specifically state any
changes, including changes resulting from Plan Commission, BZA or other committee meetings.
All bonds and performance guarantees must be posted prior to Engineering Department approval of
construction plans. Board of Public Works and Safety approvals and any other governing agency approvals
(if required) must be obtained prior to Engineering Department approval. All performance guarantees must
be posted prior to submission of secondary plats for Board of Public Works and Safety approval.
The Department reserves the right to provide additional comments based upon subsequent reviews and on
the grading and drainage system upon receipt of drainage calculations and more detailed construction
drawings that provide grading elevations, pipe sizing and invert elevations. These comments may affect
the drainage system layout presented on the development plans.
If you have questions, please call me at 571-2441.
Sincerely, ~ D
Nicholas J. Redden, P.E. ~/
Plan Review Coordinator
Department of Engineering
Enclosures
Cc: Matt Griffin, Department of Community Services
John Duffy, Carmel Utilities
Paul Pace, Catmel Utilities
Paul Arnone, Carmel Utilities
Greg Ilko, Crossroad Engineers
Engineering File Copy
Engineering Department Review
S:\OH ILL\PROJRE V 06\C FDSTATION#44
TRANSMITTAL
7172 Graham Road e\ /
Indianapolis, IN 46250 ,~~~ li
3'17-842-6777 ~F' `: ~'•
FAX: 317-841-4798
www.cripe.biz ~~ ~~~L-i ~,~1
~'1;.. ~i~~,~',
Date: 414106 PIC Job #: 050358-10100
To: Dept. of Community Service Re: Carmel Fire Station #44 - TAC Submittal
One Civic Square for April 19 meeting
Carmel, IN 46032
Attn:
We are sending you the following items via: Hand delivery
Shop Drawings Prints X Plans Samples Specifications
Copy of Letter Change Order Attached Report Other
Copies Date Description
1 4/4/06 Construction Drawings
1 4/4/06 Technical Advisory Committee Application
THESE ARE TRANSMITTED as checked below:
X For Approval Submit Approved as Submitted Copies for Approval
For Your Use Return Approved as Noted Copies for Distribution
As Requested Not Approvetl Reviewed for Compliance Signature Requested
Resubmit Corrected Prints For Review and Comment
Remarks: For questions, please contact me or Karen Collins via phone or email.
c: Karen Collins, 845-7171 Signed: Sherri Wilson, Permit Specialist
kcollins(")a cripe.biz 845-7119, swilson(a crige.biz
Transmittal Only:
Notice: The drawing/computer files listed above are the property of Paul I. Cripe, Inc. and are transmitted for reproduction use
only. Any modification or reuse of the documents without written permission from Paul I. Cripe, Inc. is prohibited. Any person
or entity using these documents for any purpose other than the project for which they were originally intended, with or without
permission from Paul 1. Cripe, Inc., by their use agrees to indemnify and hold harmless Paul I. Cripe, Inc. from any loss,
including, but not limited to attorney's fees occurring from their use.
O'. \2005\050358\10100\DOCS\E N GlP E RM ITS\TACTRANS_DOCS. DOC
s jLLs OF'F a
!.$~tif alF~y h
j('+ ..//~~ y1 ~~/_~ ray 4^'~ ~ (~~ T /~
¶¶III i'~ ~ ~~ 1.ifl3 PA3 ~`i1 .,_Q~a~b ~..~~-/V~v+.~m. \ ~\4
~(~~~l~~ill ~®~Il~i ~i y~~~~~l~~~t~~i~~
~ (~ r
i.li'IG=~(j41ffi1'C
:y `~R: ~~zK, _~
IaD~.
i
~/
February 20, 2006
Sherri Wilson
Cripe
7172 Graham Road
Indianapolis, IN 46250
RE: Carmel Fire Station #44 - TAC Submittal -April 19 meeting
Dear Ms. Wilson:
I have received and reviewed the information for the above mentioned
projects.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
Michael D. Fogart
Chief of Police
MDF:vb
cc: Dept. of Community Services
1317)Si1-2500
~l_ '+Zt
~~ 7t ':e
=s,~.r;
A Nationally Accredited?L•aw,:Enforcement Agency
a
1
I %
i
r
Fex (317) 571-2512