Loading...
HomeMy WebLinkAboutDept Report 10-30-08~/' CARMEL PLAN COMMISSION SPECIAL STUDIES COMMITTEEE DEPARTMENT REPORT OCTOBER 30, 2008 7. Docket No. 08080020 ADLS: Hotel Indigo The applicant seeks design approval fora 5-story hotel building. The site is located northeast of 131x` St. & US 31 and is zoned B-6/Business within the US 31 Overlay. Filed by Jay Gibson of CDG Consulting, lnc. The applicant seeks design approval fora 5-story hotel building. The original development plan for the overall development of 5 buildings was approved last year under docket no. 07040024 DP. There will be 10 employees in the largest shift. Across-parking easement will be secured, to alleviate the need to seek variance approval for the number of parking spaces. The large renewable signs might be able to be considered public art, which is permitted and promoted within the US 31 Overlay Corridor. Tlus will be interpreted by the Plan Commission. Please see the petitioner's informational brochure for more detail. Outstanding issues/concerns: 1. DOCS still needs a revised copy of the construction plans to make sure all items were addressed in the initial review letter. 2. 8ngineeriug Dept cannot review the construction plans for the hotel at this time, because the infrastructure plans for the whole development have not yet been approved. 3. The Forestry Dept sent out review continents on 9/16/2008. They need a revised, to-scale landscape plan that also shows utility mains and easements, irr addition to the plant locatioivs. 4. No sign renderings depicting size, lighting style, or color, etc. have been submitted to date. We need these for all wall, awning, and ground/directional signs. These renderings are required for review and to check that the square footage proposed in the application is correct. If it is correct, all signs for the site will require variances. At We October 21 meeting, the commission requested the following to be provided at the Oct. 30 cmrnnittee meeting: color renderings, overall development plan for the whole Browning site, and bike/pedestrian access. The Dept. of Community Services recommends the Commission forward this item to the November 18 Plan Commission meeting with a favorable recommendation, ONLY after all concerns/questions are addressed. ([f the committee deems the petitioner not ready to move to the full plan commission for a fnral vote, the item will be continued to the December 2 committee meeting.)