Loading...
HomeMy WebLinkAboutCorrespondence - TACPage 1 of 2 Conn, Angelina V From: Brewer, Scott I Sent: Tuesday, September 16, 2008 9:08 PM To: 'CDG Consulting Inc.' Cc: Conn, Angelina V; 'cwiseman@cripe.biz' Subject: RE: Hotel Indigo ADLS Submittal TAC Comments Dear Jay: Sorry that I have not had time to provide these comments before now, but at least you get them before the TAC meeting. ]. Because an existing site plan was not provided, I can not place this submittal exactly on the previous plans that I have received from Cripe Engineers (Re: 131 s~ Street and US 31 Phase 1 Infrastructure for 1328-1440 West Main Street). Since I can not do this, it is impossible forme to tell if and where tree preservation is required on portions of this site near the US 31 right-of-way. 2. The parcel is covered by the US 31 Corridor Overlay Zone and Section 26.04 Bufferyard Requirements. 3. A tree preservation plan is required for any existing vegetation still on the parcel or adjacent to it. 4. The planting area of the US 31 Greenbelt has been reduced because of inclusion of the stormwater detention area, care should be taken to ensure that proposed plant materials are not going in over existing material that is required to be preserved. 5. The landscape plan shows landscape materials planted below top of grade in the detention area. The Hamilton County Surveyor's Office does not allow this, and Carmel Engineering usually does not either. Please reposition these materials so that they area above the top of bank. 6. The number of plant materials specified by the Ordinance does not appear to have been met for PLANTING WITHIN PARKING LOTS, nor for PLANTINGS ADJACENT TO BUILDING (Sec 23B.10(C) (D)) 7. The small planting islands in the south east corner of the parking lot are too small to support the growth of shade trees. The soil volumes should either be enlarged (through the use of structural soil volumes under pavement) or the plant materials should be moved to another location. http://www.deenroot.com/ Jim Urban's Silva Cell Technology http://www.hort.cornell.edu/UHI/ Nina Bassuk's Structural Soil site http://online.caup.washington.edu/courses/larc433/UrbanTrees/Components.htm Sustainable landscapes After these comments have been answered in writing and revisions made to plans, further comments may be forthcoming. Please contact me by email, or at the address below if the are any questions. Scott Brewer, City Forester Environmental Planner, DOCS City of Carmel, One Civic Square Carmel, IN 46032 PH: 317-571-2478 FAX: 317-571-2426 Urban Forestry is the center of sustainability for municipalities From: CDG Consulting Inc. [mailto:cdginc@sbcglobal.net] Sent: Friday, August 22, 2008 1:31 PM To: Conn, Angelina V Cc: Akers, William P; Brewer, Scott I; Fogarty, Michael D; Ellison, Christopher M; Duncan, Gary R; Redden, Nick; wholt@carmel.in.gov; Duffy, John M; Littlejohn, David W; Krueskamp, Theresa A; Dave Lucas; Jason; bmg@co.hamilton.in.us; Shirley.hunter@duke-energy.com; Rfarrand@ccs.kl2.in.us; troy.yackle@sug.com; Westermeier, Mark; GRH@co.hamilton.in.us; Jason.kirkman@mybrighthouse.com; Jennifer.marlett@veoliawaterna.com; ryan.hartman@drwd.org; ron.morris@aes.com; gilko@crossroadengineers.com; dale.sparks@usps.gov; Foley, Amanda J; Huffman, David; cshupperd@vectren.com; Gary.McNamee@duke-Energy.com Subject: Hotel Indigo ADLS Submittal Dear Angie and TAC members: 9/ 17/2008 Page 1 of 1 Conn, Angelina V From: Boone, Rachel M. Sent: Tuesday, September 16, 2008 8:20 PM To; Conn, Angelina V l~P 5k ~ ~~ C~ ~~S I ~~'~~) ~ Subject: Hotel Indigo ~ C~M~ cN`W4 Angie, QP It looks like they want 2 large signs on the west and east fagade at 276 sq. ft. each. They also want a somewhat large sign on the NE corner at 71 sq. ft. The smaller, 16 sq. ft. size signs - I cannot tell where they want them. With the way the site is situated, I would only give them one sign at 100 sq. ft. facing Meridian. This parcel does not touch 13151 St. so that street doesn't help them. Even if it did -they haven't proposed a sign on that elevation. And there are no other public streets around this hotel. They're stuck. And this project is going to have a LOT of variances. Number of signs Sign not facing a public ROW x 2 (more depending on those smaller signs) Maximum sign area Number of signs facing one (non-public) street (And maybe more depending on the final drawings I get.........) And whal are those renewable signs? That looks to me like nothing more than advertising space. And that will not be supported. Are they going to have a restaurant in this hotel? The Renaissance was recently completed and they didn't think about their restaurant needing signage. So now they're going to have to come back to the BZA to get one. Let's have this hotel think ahead and do it right the first time. I found no drawings of signs on their own. I need these. Detailed versions of each sign that will be placed on the building or the property. (You know all the usual stuff -lighting style, colors, etc.) I hope this helps. Sorry it was so last minute. 9/17/2008 Page 1 of 1 Conn, Angelina V From: Redden, Nick Sent: Friday, September 12, 2008 9:11 AM To: Conn, Angelina V Cc: Foley, Amanda J; Hill, Dick B; McBride, Mike T; Duncan, Gary R; Barnes, David R Subject: Hotel Indigo development Angie, It would be a struggle to approve this DP/ADCs because of the following: • Phase 1 infrastructure plans have not been approved. • There is no access. • There is no sanitary. • There is no water. • The outlet to Indiana Department of Transportation right-of-way required Indiana Department of Transportation approval, but ultimate discharge per master plan is into second pond and then into legal drain. • Pond was. intended to be a storm water quality wetland system. It does not appear to be. • Current plans appears to have only one BMP. • There is possibly a legal drain easement on this site. Engineering cannot grant final construction plan approval until infrastructure is installed. At this point, Engineering prefers not to review unless you want us to. Nick 9/ 12/2008 August 25, 2008 Mr. Jay Gibson CDG Consulting, Inc 9510.10 Ross. Lane Indianapolis, IN 46268 RE: Hofel Indigo Dear Mr. Gibson: City of Carmel The following letter represents comments for this project specifically addressing the area of alternative transportation I have reviewed the drawings submitted For the September 17, 2008 Technical Advisory Committee meeting and offer the following comments: ALTERNATIVE TRANSPORTATION REVIEW COMMENTS 1) 1'he City of Carmel Parking Ordinance requires new developments to include bicycle parking. Bicycle parking spaces are required at a rate of five (5) bicycle parking spaces per one hundred (100) automobile spaces with a minimum of four (4) spaces. Please revise your plans to show these bicycle parking spaces on your site. Please see [he City of Carmel's Parking Ordinance in order to determine appropriate locations, specifications and construction details for the above. 2) Please indicate ADA compliant crosswalks at all crossings. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in delay of the review process. - It is critical that this office be made aware of all modification made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. The Department' of Community Services reserves the right to provide additional convnents based on subsequent reviews. if you have questions, please contact me at 571-2417. Sincerely, D~~lel Altemative Transportation Coordinator Department of Community Services cc: Angie Conn, Department of Community Services Engineering Department Review Project File ONE CIPIC SQUARE. C ~12i~fET., INDIdN A 46032 317/571-2417 _ ~ ~~ _ L7 ~ Page 1 of 1 Conn, Angelina V From: CDG Consulting Inc. [cdginc@sbcglobal.net] Sent: Friday, August 22, 2008 1:31 PM To: Conn, Angelina V Cc: Akers, William P; Brewer, Scott I; Fogarty, Michael D; Ellison, Christopher M; Duncan, Gary R; Redden, Nick; wholt@carmel.in.gov; Duffy, John M; Littlejohn, David W; Krueskamp, Theresa A; Dave Lucas; Jason; bmg@co.hamilton.in.us; shirley.hunter@duke-energy.com; Rfarrand@ccs.kl2.in.us; troy.yackle@sug.com; Westermeier, Mark; GRH@co.hamilton.in.us; jason.kirkman @ mybrighthouse.com; jennifer.marlett@ veoliawaterna.com; ryan.hartman @ ctrwd.org; ron.morris@aes.com; gilko@crossroadengineers.com; dale.sparks@usps.gov; Foley, Amanda J; Huffman, David; cshupperd@vectren.com; Gary.McNamee@duke-Energy.com Subject: Hotel Indigo ADLS Submittal Attachments: 1 81 401 1 1 22-TAC member letter....pdf; 1355985006-siteplan.pdf; 1265510760-landscape plan.pdf; 2891974521-lighting plan.pdf; 2878695584-A101.pdf; 4011562965-A101b.pdf; 3820132917-A102.pdf; 2888175589-A103.pdf; 34368931 1 1-A104.pdf; 3654561567-A105.pdf; 3778177579-A201.pdf; 978610709-A301.pdf; 4165767341-A302.pdf; 2707922288-Trash.pdf Dear Angie and TAC members: CDG Consulting, on behalf of Dykstra Building Company, will be submitting today an ADLS application for the proposed Hotel Indigo development, located at 1440 W. Main Street, Carmel, Indiana. By virtue of this email, I am transmitting copies (pdf format) of the Site, Landscape, Lighting and Architectural Plans for the proposed development. Should anyone require hard (paper) or digital (.dgn, .dwg) copies of any or all of the sheets, please reply to this email and I will transmit them asap. Thank you, Jay B. Gibson CDG Consulting, Inc. 9510-10 Ross Lane Indianapolis, IN 46268 P:317-876-7991 F:317-876-7999 Mailing Address: PO Box 692 Zionsville, IN 46077 ~~ ' U -1 C~ 2 v D l Z~ v ~3CJ20~25 ~C, Z -5~ ~~ 8/22/2008 CDG'CONSULTtNG, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 City of Carmel Technical Advisory Committee Member Re: Proposed Hotel Indigo Development 1402 W. Main Street (North of St. Christopher's Church) Carmel, In Dear Member: CDC Consulting, [nc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22nd, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office on or before July 17'h, 2008. I have included a prehminary site plan of the proposed development in pdf format for your use and to assist you in locating the project. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, Jay B. Gibson, P.E., Principal CDG Consulting, [nc. i._~A or C®G CONSULTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephoae(317)876~91 ~ Facsimile (31?)~876.7999r August 20, 2008 E ~~Cc~NE~~~ Bill Akers P~~'~ Carmel Clay Communications '~®~~ 31 First Ave. SW JL"' Carmel, IN 46032 ,~ ~ Re: Proposed Hotel Indigo Devekrpment 1440 W. Main Street (North of St. Christopher's Church) Carmel, In Dear TAC Member. CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applicarions for the above referenced project, with the intent of submitting to same to the City on August 22m, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative ofyour firm prepare the requested ktter and return same to our office as soon as possible. I have included a preliminary siteJdevelopmeat plan of the proposed development for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to contact me. Thank yon. Sincerely, ~~~ ~~ v Jay B. Gibson, P.E., Principal CDG Consuking, Inc. yr CDG CONSULTING, INC Glvll Engineering -Construction Staking PO Boa 692 Zionsville, IN 46079-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Scott Brewer, City Forester Urban Forestry-DOGS One Civic Square, 3'~ Floor Carmel, IN 46032 Re: Proposed Hotel Indigo Devebpmeot 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparieg Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22°", 2008. As a part of the sabmittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utifity service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, ~~~ Jay B. Gibson, P.E., Principal CDG Consulting, Inc. CDG CONSULTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Michael Fogarty Office of Police Chief Three Civic Square Carmel, IN 46032 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22°', 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and retain same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have auy questions, comments or rnncerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, ~~ ~-~/ 4 Jay B. Gibson, P.E., Principal CDG Consulting, Inc. f, CDG CONSULTING, INC Civil Engineering -Construction Staking PO Boa 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 200$ Chris Ellison Office of Fire Chiet; Fire Station #1 Two Civic Square Carmel, IN 46032 Re: Proposed Hotel Indigo Development 1440 W. Maio Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulfing, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADCs") applications for the above referenced project, with the intent of submitting to same to the City on August 22°", 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, ~l~ Jay B. Gibson, P.E., Principal CDG Consulting, Inc. CDG CONSULTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Gary Duncan/Nick Redden Carmel Engineering Dept. One Civic Square, 1°` Floor Carmel, IN 46032 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22°d, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your fum prepare the requested letter and return same to our office as soon as possible. I have included a preliminary siteldevelopment plea otthe proposed development for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, Jay B. Gibson, P.E., Principal CDG Consulting, Inc. CDG CONSULTING, INC Civil Engineering -Construction Staking PO Boa 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Bill Hohlt Deputy Building Commissioner One Civic Square Carmel, IN 46032 Re: Proposed Hotel Indigo Devekrpment 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22m, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or wnceros about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, Jay B. Gibson, P.E., Principal CDG Consulting, Inc. CDG CONSULTING, INC Civic Engineering -Construction Staking PO Boa 692 Zionsville, IN 46077-0692 August 20, 2008 Facsimile (317) 876-7999 John Duffy Carmel City Utilities 760 Third Ave. SW Carmel, IN 46032 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Chnrch) Carmel, Io Dear TAC Member: CDG Consulting, Iec ("CDG") is in the process of preparing Development Plan and Architectural Design, Eatertor Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22°x, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your 5rm prepare the requested letter and return same to our office as soon as possible. I Gave included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, J~C{ ~iGC Jay B. Gibson, P.E., Principal CDG Consulting, Inc. CDG CONSULTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 David Littlejohn Transportation Systems Coordinator - DOCS One Civic Square, 3`~ Floor Carmel, IN 46032 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22°", 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your 5rm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, Jay B. Gibson, P.E., Principal CDG Consulting, Inc. CDG CONSULTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Terry Krueskamp City of Carmel -Information Systems Three Civic Square Carmel, IN 46032 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Eaterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22od, 2008. As a part of the submittal packet, we are regnired to submit letlers from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary siteldevebpment plan of the proposed development for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to rnntact me. Thank you. Sincerely, Jay B. Gibson, P.E., Principal CDG Consulting, Inc. CDG CONSULTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 David Lucas Hamilton County Highway Dept. 1700 South 10'" Street Noblesville, IN 46060 Re: Proposed Hotel Indigo Development 1440 W. Mafia Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22°d, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed devebpment with your respective atiGty service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or eoncerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, ~ ~~ 1 Jay B. Gibson, P.E., Principal CDG Consulting, Inc. C®G CONSULTING, INC Civil Engineering -Construction Staking PO Boa 692 Zionsvilk.IN 46077-0692 Telephone (317)876-7991 Facsimile (317) 876-7999 August 20, 2008 Jason Lemaster Hamilton Co. Health Dept. One Hamilton Square, Suite 30 Noblewille. IN.461)60:?.229-.___., .:... ._ Re: Proposed Hotel Indigo Devebpment 1440 W. Maio Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member. CDG ConsultingiInc ("CDG") is in the process of preparing Development Plan and ,, _. Architectural Des' n, Ezterior L' h ' Laadsca ing & Signage ("ADL~"~ _: ~ ~ ~g~ P applications for the above referenced project, with the intent of submitting to same to the City on August ZZod, 2008. As a part of the submittal packet, we are required to submit letters from TAC _ _ . _. members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your 5rm prepare the requested hater and rctuCn same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or eoncems about the proposed devebpment, please do not hesitate to rnntact me. Thank you. Sincerely, ~'„I Jay B. Gibson, P.E., Principal CDG Cousuking, Inc. v CDG CONSULTING, INC Civil Engineering -Construction Staking PO Boa 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Brooke Gajownik Hamilton County Sheriff s Office 18100 Cumberland Road Noblesville, IN 46060 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Ezterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22m, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/developmentplsn of the proposed development for your review and comment. Should you have any questions, wmments or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, ~~ ~ ~ Jay B. Gibson, P.E., Principal CDG Consulting, Inc. CDG CONSULTING, iNC Civil Engineering -Construction Staking PO Boa 692 Ziaasville, IN 46077-0692 Telep6oae (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Shirley Hunter Duke Energy 16475 Southpark Drive Westfield, IN 46074 Re: Proposed Hotel Indigo Devebpment 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member. CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Ezterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22m, 2008. As a part of the submittal paeket, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested hater and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, ~~ V Jay B. Gibson, P.E., Principal CDG Consulting, Inc. .r ", .i CDG CONSULTING, INC Civil Engineering -Construction Staking PO Boa 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Ron Farrand CarmeUCh-y Schools 5201 E. 131s` St Carmel, IN 46033 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG' is in the process of preparing Devebpment Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22°x, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested hatter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or rnncems about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, ~ ~ic.Q Jay $. Gibson, P.E., Principal CDG Consulting, Inc. .~ j f. CDG CONSULTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 August 20, 2008 Troy Yackle Panhandle Eastern Pipetine/TrunkGne Gas Co. 9371 Zionsville Road Indianapolis, IN 46268 Celephone (317) 876-7991 Facsimile (317) 876-7999 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22od, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of yoar 5rm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, rnmments or rnncerns aboat the proposed development, please do not hesitate to contaM me. Thank you. Sincerely, J ~~ ~_...,~, 8 Jay B. Gibson, P.E., Principal CDG Consulting, Inc. ~ " f. CDG CONSULTING, INC Civil Engineering -Construction Staking PO Boz 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Gregory Ilko, PE CrossRoad Engineers 3417 South Sherman Drive Beech Grove, IN 46107 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Devebproent Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADCs") applications for the above referenced project, with the intent of submitting to same to the City on August 22od, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/developmentplxn of the proposed development for your review and rnmment. Should you have auy questions, wmmeuts or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, ,~~~~11,, Jay B. (Gibson, P.E., Principal CDG Consalting, Inc. y ^ .i CDG CONSULTING, INC Civil Engineering -Construction Staking PO Bo: 69Z Zionsville,lN 46077-0692 Telephone (3l7) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Amanda Foley, Storm Water Administrator Carmel Engineering Dept. One6vic Square, 1° Floor Carmel, IN 46032 Re: Proposed Hotel Indigo Development 1440 W. Maio Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of snbmitting to same to the City on Aagust 22°", 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/devebpment plan of the proposed devebpment for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, =~~ ~ ~° Jay B. Gibson, P.E., Principal CDG Consulting, Inc. ray M ~' CDG C®NSULTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Dave Huffman Carmel Street Department 3400 W. 131" Street Westfield, IN 46074 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADCs") applications for the above referenced project, with the intent of submitting to same to the City on August 22°x, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment Should you have any questions, comments or rnncems about the proposed development, please do not hesitate to rnntact me. Thank you. Sincerely, ~ ~•-~ Jay B. Gibson, P.E., Principal CDG Consulting, Inc. M T ~ CDG CONSULTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Gary McNamee, Asset Protection Associate Duke Euergy Indiana, Inc. WF500/27227 Central Ave. Columbus, IN 47201 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG''') is is the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADCs''') applications for the above referenced project, with the intent of submitting to same to the City on August 22°d, 2008. As a part of the submittal packet, we are regained to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your 5rm prepare the requested letter and return same to our oflice as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or cooce~vs aboat the proposed development, please do not hesitate to contact me. Thank you. Sincerely, '~. ~~ Jay B. Gibson, P.E., Principal CDG Consulting, Inc. V ,~ r C®G CONSULTING, INC Civil Engineering -Construction Staking PO Boa 692 Zionsville, I1V 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Jason Kirkman Brighthouse Networks 3030 Roosevelt Avenue Indianapolis, IN 46218 Re: Proposed Hotel Indgo Development 1440 W. Maio Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Developmeut Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22od, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective atiTity service. At this time, we are formally requesting you or a representative of your 5rm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/devebpment plan of the proposed development for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to rnntact me. Thank you. Sincerely, l Jay B. Gibson, P.E., Principal CDG Consulting, Inc. CDG CONSULTING, 9NC Civil Engineering -Construction Staking PO Boa 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Ron Morris Indianapolis Power & Light Co. 3600 North Arlington Ave Indianapofis,IN 46218 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Desiga, Exterior Lighting, Landscaping & Signage ("ADCs") applications for the above referenced project, with the intent of submitting to same to the City on August 22od, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective ability service. At this time, we are formally requesting you or a representative of your £um prepare the requested letter and return same to our office as soon as possible. I have included a preliminary siteldevebpment plea of the proposed development for your review and commenk Should you have any questions, comments or concenas about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, ~~ ~~ Jay B. Gibson, P.E., Principal CDG Consuhing, Inc. CDG CONSULTING, INC Civil Engineering -Construction Staking PO Boz 692 ZioasviBe,IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Chuck Shupperd Vectren Euergy P.O. Box 1700 Noblesville, IN 46061-1700 Re: Proposed Hotel Indgo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG' is in the process of preparing Devebpment Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADCs") applications for the above referenced project, with the intent of submitting to same to the City on August 22°", 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you Lave any questions, comments or rnnceros about the proposed development, please do not 4esitate to contaM me. Thank you. Sincerely, ~l.LU1 ~ t/l~/ Jay B. Gibson, P.E., Principal CDG Consulting, Inc. CDG CONSULTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991. Facsimile (317) 876-7999 August 20, 2008 Postmaster do Dale Sparks Carmel Post Office United States Postal Service 275 Medical Drive Carmel, IN 46032-9998 Re: Proposed Hotel Iudigo Development 1440 W. Maiu Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22°d, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowMdging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your Srm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or coneems about the proposed development, please do not hesitate to rnntact me. Thank you. Sincerely, J Jay B. Gibson, P.E., Principal CDG Consulting, Inc. C®G CONSULTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Ryan Hartman Clay Township Regional Waste District 10701 North College Avenue, Suite A Indianapolis, IN 46280-1098 Re: Proposed Hotel Indigo DeveMpment 1440 W. Main Stmt (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Erterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22°d, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of yoar film prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed devebpment for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, t Jay B. Gibson, P.E., Principal CDG Consulting, Inc. C®G CONSULTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Ryan Hartman Clay Township Regional Waste District 10701 North College Avenue, Suite A Indianapolis, IN 46280-1098 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22°d, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, ~~ ~. l~ Jay B. Gibson, P.E., Principal CDG Consulting, Inc. ~~ J CDG CONSlJLTING, INC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 Telephooe(317)876-7991 Facsimile (317) 876-7999 August 20, 2008 Mark Westermeier CarmeUClay Parks Dept. 1411 E. 116'" Street Carruel, IN 46032 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, Io Dear TAC Member: CDG Consulting, Inc ("CDG'' is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22od, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed devebpment with your respective utifity service. At this time, we are formally requesting you or a representative of your 5rm prepare the requested hater and return same to our office as soon as possible. I have included a preliminary siteldevelopment plan of the proposed devebpment for yonr review and comment. Should you have any questions, comments or concerns about the proposed development, please do not hesitate to contact me. Thank you. Sincerely, J~ ~,~ Jay B. Gibson, P.E., Principal CDG Consulting, Inc. .. C®G C®NSULTING, INC Civil Engineering -Construction Staking PO Boz 692 Zionsville, IN 46077-0692 Telephone (317) 876-7991 Facsimile (317) 876-7999 August 20, 2008 Greg Hoyes Hamilton County Surveyor's Office One Hamilton Square, Suite 188 Hamilton County Judicial Center Noblesville,lN 46060 Re: Proposed Hotel Indigo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consulting, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADLS") applications for the above referenced project, with the intent of submitting to same to the City on August 22°d, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a ropresentative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or concerns about the proposed devekopment, please do not hesitate to contact me. Thank you. Sincerely, Jay B. Gibson, P.E., Principal CDG Consulting, Inc. ,. ~. CDG C®IdSUL.TIIVG, IIVC Civil Engineering -Construction Staking PO Box 692 Zionsville, IN 46077-0692 August 20, 2008 Jennifer Marlett Indianapolis Water Company 1220 Waterway Blvd Indianapolis, IN 46206 Pelephone (317) 576-7991 Facsimile (317) 876-7949 Re: Proposed Hotel Iadgo Development 1440 W. Main Street (Northwest of St. Christopher's Church) Carmel, In Dear TAC Member: CDG Consuking, Inc ("CDG") is in the process of preparing Development Plan and Architectural Design, Exterior Lighting, Landscaping & Signage ("ADCs") applications for the above referenced project, with the intent of submitting to same to the City on August 22°d, 2008. As a part of the submittal packet, we are required to submit letters from TAC members acknowledging the ability to serve the proposed development with your respective utility service. At this time, we are formally requesting you or a representative of your firm prepare the requested letter and return same to our office as soon as possible. I have included a preliminary site/development plan of the proposed development for your review and comment. Should you have any questions, comments or concerns about the proposed development, please do oot hesitate to contact me. Thank yon. Sinceyrel`y, ~~''] ~~ Jay B. Gibson, P.E., Principal CDG Consulting, Inc.