• Narrative
Introduction
The project site is located at the southeast corner of intersection of 106th Street
and Commerce Drive in Carmel, Indiana, and is bounded by 106th Street on the
north, by a commercial building to the south, by future development to the east
and Commerce Drive to the west. The site is not within the 100-year flood zone
per Flood Insurance Rate map 180081 Panel 0205, Map Number 18057C0205F
effective February 19, 2003.
Description
This project consists of the construction of a proposed bank building and
associated parking. areas and landscaped areas. Additional project activities
include the construction of a proposed storm sewer system.
Existing Site Description
The site is presently undeveloped. Under existing conditions, the project site
consists of grass. A soil map from United States Department of Agriculture Soil
Conservation Service identifies Crosby and Brookstone soils on the property.
Existing drainage characteristics are such that the site generally flows to the
existing swale on the north that eventually discharges into storm sewer system
within Commerce Drive.
Proposed Conditions
Proposed drainage for the developed site consists of a system of new storm
inlets and connecting pipes. The developed site will drain to the west into an
existing storm sewer system within Commerce Drive. The storm drainage system
along Commerce Drive was designed to accommodate the direct runoff from the
subject site. All new storm sewers are designed to accommodate a 10-year
storm event using the Rational Method.
. Calculations are included in this report.
• Based on the study prepared by American Consulting, Inc, the subject site has been
included as the area in the proposed condition that will flow to the existing culvert under
US 421 and into the Park Northwestern drainage system.
•
i
to ~GYA
~'" Mm8 IBr `
Mt~~2,
Br
CrA D62 w-- -__Gr6____ ___Cr9_
~~ "~ {
1 Br ~ TE ~ CATION ~-
--~ ~ ~ Br ~~F ,~ ~~ !?
~r ~ En. j~1~A
". CrA ~ ~' \111 ~,,,.~'~
* CrA~ Br ~-"'~ '~
CrA
SOILS MAP
Mid~es Engineering, L.L.C.
STO IN FLO W TAB[ILATION FORM
PROJECT NAME UNION FEDERAL BANK AT CARMEL CENTRE WEST
STORM FREQUENCY DESIGN YEAR 10
DESCRIPTION DEVELOPED CONDITWrvS
PROJECT\o. 133-0121 COMPUTED BY: LI$
CHECKED BY:
LOCATION INLET ACRES COEFF. SUM TIME CONC Inun) INTEN. "Q^~ PIPE (fulq O.OIJ PIPE MazQ Max VEL REMARKS MH Dept LOCATION
FROM TO AREA SUB TOTAL "C^ CA CA INLET DRAfN TOTAL "1" CIA SIZE SLOPE VEL. LGTN SLOPE fup 0ov fuB OOr INV.O INV. IN TC-0UT FROM TO
LOCATION INLET ACRES COEFF. SUM TIME CONQ (mint IYFEN.- "Q" ~ PIPE (full) 0.01] PIPC Maz Q Maz VEl REMARKS MH Dep LOCATIOP
4 u u U.YU U.la 96 I) 48.1) 2.28 0.31
~~
~~
~~
., T.C. i 89523 I 1 )3 6'.
d 3
~ ~ 015 .;
~ 0.14 48.1) 1.18 49.35 228 0.31 ~ 1300 ( 001 0.39 ~ 102 ~ 0.10 1.13 149 f 893.50 89340 d 3
~ 3 015 0.90 U14 1000
~ 10.00 548 OJ4
~ S. T.C= 695A2 ~ 202 3:
J 3 _, 030 0'_) 49.35 062 49.98 234 061 f 12.00 ~ 0.03 0)] ~ 66 ~ 0.1< 1.38 176 ~ 893.40 693.30 J
~ 2 015 090 0.14 1000 10.00 548 0)4
~
~ : T.C= 895J1 ~ 241 Z:
2 1 p45 <. 041 49.98 042 5040 Z33 090 ~ {
1200 3 0.06 1.15 ' S4 ~ 0.22 1.68 3.13 ~ 893.30 893.18 ~ 2 1
l 015 fl3i1 ~ 090 0.14 1000 (344 -: 1044 548 0)4
~
~ T.C= 89600' 282 l~
1 eziaL ? 080 I! !''. 0.54 5040 048 SD8] 221 120 ~ 1200 ~ 0.11 152 ( SR ~ 220 I W 2Ui ' A9i IA I A9i OS 1 ..:<e
~ 6 UIU U.YU 2UY 1000 10.00 i48 049
~
~ T.C.- i 895.26 ( 1 ib S!
6 5
~ 010 ~
~ 0.09 10.00 12l IL2l 548 049 ~
1'_00 ~ D02 063 ' 134 I 0.15 1.38 1]6 ~ 69350 ~ 893.30 6 5
5
010 0.90
0.09 1000 ID00 546 049
~~ T.C= ~ 896.00 ~ 2)0 3:
~~
6 1 020 t 0.18 I12i 044 IIJI 520 0.94 ~ LOU ~ 0.0) 1.19 ~ 54 I 020 1.60 2.03 ~ 893.30 1 893.19 ~ 6 1
)00003 6:22 AM Page f a 1 - 122-0121 storm sewer