Loading...
HomeMy WebLinkAboutDept Report 09-02-03CARMEL/CLAY PLAN COMMISSION SPECIAL STUDIES COMMITTEE DEPARTMENT REPORT September 2, 2003 5. Docket No. 110-03 DP Amend/ADCs; (03070007); West Carmel Center, Block B, Lot 1 -Union Federal Bank of Indianapolis The applicant seeks Development Plan Amendment and Architectural Design, Lighting, Landscaping & Signage approval to construct a financial institution. The site is located on the southeast corner of Commerce Drive and West 106`h Street. The site is zoned B- 5/Business and is subject to the US 421 Overlay requirements. Filed by E. Davis Coots of Coots, Henke & Wheeler, PC. The applicant is proposing to construct a bank at the southeast corner of 106`h Street and Commerce Drive. Please refer to the information packet provided by the applicant at the time the agenda for the August Plan Commission meeting was distributed. The following items are those that the Department feels require additional attention: Architecture: a. Please have the project architect present at the Plan Commission to review how this building conforms to the US 421 Overlay. (i.e. Red Brick, etc.) b. Please provide building elevations the call out the building materials and provide samples to the commission for review. c. Is an ATM proposed at the drive-thru? If so please provide details 3. Landscaping: The landscape plan needs to address changes to the existing parking lot to the south of the bank area. 4. Signage: A proposed sign for office development exists on the parcel today. With subdivision of the parcel the ground sign would no longer be located on the office site. A revised sign identifying all three lots within the Block would be preferable to individual ground signs. Center Identification Ground Signs are limited to the name of the complex. A revised sign design should be submitted that is reflective of the building on this site. Concerns raised at the August Plan Commission meeting included the following: 1. Request to see drive-thru located at south end of building 2. Questions regazding the style of building Design. 3. Desire to see more brick and less EIFS. The Department recommends that the Special Studies Committee forward this item to the full Plan Commission with a favorable recommendation after all questions and concerns have been addressed. Committee Report 2003-0902 V~U~y `<£ e w O q Q ~ R a:~ Lr~ One Civic Square Cannel, IN 4Ei732 (31 ~ 571-24t 7 Fax: (317) 571-2426 ra: ~ Gt vi'S From: Fax `~ 73 -_ S~'8S~ Pages: Phone: Date: ~- ZS i n : 3 U Re: CC: ^ Urgent ^ Far Review ^ Please Comment ^ Please Reply ^ Please Recycle ~~ ~~ S ~P~~ /~P2q/S ~h ~~ u~ r