Loading...
HomeMy WebLinkAboutCorrespondence September 10, 2003 ~;^ ~~ ~~~ oo~~ :~ Y, Mr. Dave Barnes \ Weihe Engineers, Inc. '- 10505 North College Avenue Indranapolis IN 46250 'Ballaiitrae Sub~divtsio•n,ConstruetionePlaris'-;Review,t#1 Dear Mr. Bames: We have reviewed the construction plans submitted for this project and offer the following comments: GENERAL INFORb1ATION 1. The project site is located within current City of Carmel Corporate Limits. 2. Jurisdictions: • Subdivision Internal Streets and Right of Way - City of Carmel. • 146`s Street and Right of Way -Hamilton County Highway Deparfirent. • Water -City of Carmeh • Sanitary Sewers -Clay Township Regional Waste District • Storm Sewers/Drainage -Hamilton County Surveyor's Office with City of Carmel input. • Regulated/ Legal Drains -Hamilton County Surveyor's Office. 3. Board of Public Works and Safety Requirements: • Water Availability. Additional Water Availability approval will be required for entrance and/or common area irrigation systems. Additionally, irrigation systems installed m the right of way of the internal subdivision streets or in dedicated easements will require a Consent to Encroach Agreement between the Owner/Developer and [he City of Carmel. • Any permanent improvement to be installed within dedicated right of way of intemal subdivision streets and/or dedicated easements. This approval would require a Consent to Encroach Agreement between the Owner and the City of Carmel. • Secondary Plat approvals - City of Carmel. • Reimbursement Agreements I have previously enclosed a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and/or the Board of Zoning Appeals (if npp[icable) and completion of review by the Technical Advisory Com»rit[ee. All written requests [o be placed on the Board's agenda must include the appropriate Docket Nuurber and the date (or dates) of approval by the Plan Commission mrd/or the Board of Zoning Appeals (if applicable). 4. T.A.C. Review/Drawings subnutted for approval: We request that all comments and connnent letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all Engineering Department and Utility Department issues have Dei~aaTaiexr or ENCt:veranc O,~e Cn°ic S~uaae, Cae~ua., IN 40032 Oreic~s 3175712447 Res 3]7.5712439 f;ALVL ko~ccsieOO ci.uinncl.in.us Jr1AIES BRAINARD, NLAI'OR Mr. Dave Barnes September 10, 2003 Page 2 been resolved. The design engineer must certify al] drawings submitted for final approval. This oftce will require aminimum offour-sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and will be signed by the City Engineer and the Director of Carmel Utilities. The Owner will receive one-set which is to be maintained on the constmction site at all times. Cannel Utilities will receive one-se[, our Public Works Inspector will receive one-set and one-set will be maintained in the Engineering Department. If the Owner/Developer requests more than one set of approved drawings, we will approve a maximum oftwo-additional sets. However, the additional sets must be submitted at the same time that the minimum 4-sets are submitted. 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way of internal subdivision streets and/or dedicated easements will require a Consent to Encroach Agreement with the City of Cannel. A copy of our Residential Subdivision and Commercial Irrigation System Requirements is available upon request. - 6. Carmel Utilities should be provided drawings for review of water issues. They will provide a separate review regarding these issues. 7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water main locations. 8. I have previously sent copies of the following to the developer: • Subdivision Project Approval Procedures • Performance Release Procedure • Subdivision Building Permits • Perrnit Data, Contacts, etc. BONDING REQUIREMENTS 9. Individual Performance Guarantees will be required for the following subdivision improvements: • Streets (internal subdivision only, not 146'" Street right of way) • Curbs (internal subdivision only, not 146`" Street right of way) • Water Mains (Site) • Monuments and Markers (This is also a requirement of the Hamilton County Surveyor's Office. Please determine whichjurisdiction will control this item) • Street Signs (Even though the one street sign will be installed in the right of way of 146th, it is my understanding the sign will be under our jurisdiction) • Sidewalks -Builders lot sidewalks and common area/perime[er right of way (not 146'" Street right of way) sidewalks may be bonded separately. Note: The Hamilton County Surveyor's Office will require bonding of Storm Sewers/Storm Drainage. The Developer should determine if the Hamilton County Surveyor wants the Monuments & Markers bonded with their office or wlth the City ojCarmel. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to constmct the individual improvements, to be provided by the design engineer. Please provide detailed Engineers Estimates for each improvement including unit costs, quantities, materials and types of materials, etc. Upon completion and release of individual Performance Guarantees, athree-year Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 16% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. Performance Guarantees may be Performance or Subdivision Bonds, Irrevocable Letters of Credit or Cashier's/Certified/Official Checks. Please reference the enclosures for more detailed explanation of our procedures. Mr. Dave Barnes September 10, 2003 Page 3 AVAILABILITY AND CONNECTION FEES ] 0. Availability (acreage) Fees must be paid after all other Engineering Department requirements have been satisfied and prior to start of construction activities (the exception is that you are allowed to move dirt on site with appropriate erosion control measures in place). Availability Fees are based upon total platted acreage for [he development at the rate of $1,010.00 per acre for Water Availability. We do not have a copy of the legal description nor have we seen a copy of the secondary plat for this development. 11, Connection Fees are $1,310.00 per single-fatnily residence for water. Connection Fees are paid when the infrastructure has been completed, satisfactory test results obtained and [he subdivision has been released for permits. Connection Fees are paid on a lot-to-lot basis. PROJECT COMMENTS 12. Title Sheet. - Subs[imte Cannel Utilities for Indianapolis Water as [his area is within the City of Carmel water service area. 13. Sheet 2 -Existing Conditions/Demolition Plan Demolition Pemrits will be required. Contact the City of Carmel Building & Code Enforcement Department regarding these permits. Contact Morris Hensley of Carmel Utilities regarding the abandonment of the existing well. Morris maybe reached at 571-2436. 14. Sheet 3 -Site Development Plan Please indicate spot elevations at each lot comer and at grade breaks on rear and side yard swales. Use flow avows to indicate rear and side yard surface drainage. 15. With [he exception of Lots #4 and #5, there are no side yard or rear yard drainage easements indicated for any of the lots. Is this acceptable to Hamilton County? 16. We are concerned with the substantial pad elevation differences between lots 3 and 4 and lots 8 and 9 and the surface drainage implications involved with the resulting steep slopes. There is a 5.5-foot difference between lot 3 and 4 and 3.4-feet between lot 8 and 9. 17. We request that the lake/pond be lined, either to Hamilton County standards or to Carmel Utility standards. 18. The Emergency Spillway should be identified on the Site Plan in addition to the Legend. 19. Where does Hamilton County's right of way jurisdiction terminate at the entrance? At the 80' dimension extended across the entrance or at the termination of the comer cuts at the entrance? 20. Please identify the internal sidewalk on the Site Development Plan (i,e. 5' concrete sidewalk). 21. The Water Plan should include: • Pipe size and material • The water main extension to the west property line of the development _ • It should be noted on the plans that Carmel Utilities will be responsible for the construction of the offsite water main from the west. 22. Site Construction Details Change the sidewalk width on the Typical Section Local Streets from 4' to 5'. Please share a copy of the drainage calculations for this project with us. The above comments are based upon the Engineering Department's initial review of the construction plans for this project. Please provide our office with a follow up letter regarding these comments and revised plans indicating all revisions. Second and subsequent reviews will focus only on revised items. It is Mr. Dave Barnes September 10, 2003 Page 4 critical that this office be made aware of all modifications made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our initial review. If you have questions, contact Kate Weese, Mike McBride or me at 571-2441. Si~el~~'~~ "' _ _. Dick Hill, Assistant Director Department of Engineering Enclosures Cc: M. Kate Weese, City Engineer (w/o encl.) Mike McBride, Assistant City Engineer (w/o encl.) Jon Dobosiewicz, Department of Community Services (w/o encl.) John Duffy, Director Carmel Utilities (w/o encl.) Paul Pace, Distribution (w/o encl.) S:\PROJ RE V 03\BA LLANTRAECON STIi l EROSION AND SEDIMENT CONTROL PLAN TECHNICAL REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9`h Street, Noblesville 1N 46060 Ph- 317-773-1432 or Email at .john-south(a~iaswcd.org PROJECT NAME. all'antrae Co~risican SUBMITTED BY: Anderson Corporation 12900 North Meridian Street Suite 380 Carmel, In 46032 Ph 317-848-5001 REVIEWED BY: John B. South P.E. Mr. Dave Barnes Weihe Engineers 10505 North College Ave. Indianapolis, IN 46280 Certified Professional in Erosion and Sediment Control PLAN REVIEW DATE: September 8, 2003 Acreage: 5.17 LOCATION: South side of 146`h Street, 1 /2mile west of Springmill Road LEGAL DESCRIPTION: Sec. 22 TOWNSHIP: 18N RANGE: 3E CIVIL TOWNSHIP SOIL SURVEY MAP SHEET: 44 Clay The technical review and comments are intended to evaluate the completeness of the erosion and sediment control plan for the The erosion and sediment control plan submitted was not reviewed for the adequacy of the engineering design. All included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualifred engineer. The plan has not been reviewed for local, slate, or federal permits that may be required to proceed with this project. Additional information, inck+ding design calculations may be requested to fi+rther evaluate the erosion and sediment control plan. The erosion and sediment control plan has been reviewed and it has been determined that the plan: X Satisfies the minimum requirements and intent of 3271AC 15-5 (Rule 5). Notification will be forwarded to the Indiana Department of Environmental Management. Note Where the sanitary crosses the Osbourne Drain, the banks should be protected with erosion control blanket immediately after the crossing is completed and silt fence installed at the top of each bank at the crossing site. Silt fence was not recommended for both sides of the Osborne Drain. The banks o f the Osborne Drain should be seeded and mulched immediately after any clearin~pertatins. Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a representative are necessary to minimize off-site sedimentation. The developer should be aware that unforeseen construction activities and weather conditions might affect the performance of a practice or the erosion and sediment control plan. The plan must be a flexible document, with provisions to modem or substitute practices as necessary. Revised 4 / 97 Cc: Carmel, Surveyor, IDEM, File EROSION AND SEDIMENT CONTROL PLAN TECHNICAL REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9°i Street, Noblesville IN 46060 Ph- 317-773-1x32 or Email at 'ohn-south iaswcd.or PROJECT NAME: ` Ballanttae~Con~ cYion Plan SUBMITTED BY: Anderson Corporation Mr. Dave Barnes 12900 North Meridian Street Weihe Engineers Suite 380 10505 North College Ave. Carmel, In 46032 Indianapolis, IN 46280 Ph 317-848-5001 REVIEWED BY: John B. South P.E. Certified Professional in Erosion and Sediment Control PLAN REVIEW DATE: August 18, 2003 Acreage: 5.17 LOCATION: South side of 146'x' Street, 1/2mile west of Springmill Road LEGAL DESCRIPTION: Sec. 22 ,p3Q~ TOWNSHIP: 18N RANGE: 3E CIVIL TOWNSHIP: Clay SOIL SURVEY MAP SHEET: 44 The technical review and comments m e intended to evaluate the completeness of the erosion and sediment control plan for the project. The erosion and sediment control plan submitted was not reviewed for the adequacy of the engineering design. AU practices included in the plan, as well as those recomrnended in the comments should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. The plan has not been reviewed for local, stale, or federal permits that may be required to proceed with this project. Additional information, including design calculations may be requested to further evaluate the erosion and sediment control plan. The erosion and sediment control plan has been reviewed and it has been determined that the plan: Satisfies the minimum requirements and intent of 3271AC 15-5 (Rule 5). Notification will be forwarded to the Indiana Department of F,m~ironmental Management. Refer to the comments section for additional information. X Does not satisfy the minimum requirements and intent of 327IAC 15-5 (Rule 5); deficiencies are noted in the checklist and in the comments section. Deficiencies constitute potential violations of the rule and must be adequately addressed for compliance. The information necessary to satisfy the deficiencies must be submitted: Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a representative are necessary to murimize off-site sedimentation. The developer should be aware that unforeseen construction activities and weather conditions might affect the performance ofa practice or the erosion and sediment control plan. The plan must be a flexible document, with provisions to modify or substitute practices as necessary. Revised 4 / 97 J PROJECT: Ballanhac Construction Plan Page 2 of 3 ARE THE FOLLOWING ITEMS ADEQUATELY ADDRESSED ON THE PLANS ? (AIL Plans Must Ltclude Appropriate Legends, Scales, and North Arrow) (/terns that are Not Applicable fo Nis Project are designated by NA) Yes No PRO.IECT INFORMATION X lA Project Location Map (Show project in relation to other areas of the county) X 1B Nan'ativc Describing the Nature and Purpose of the Project x tC Location of Planned and/or Existing Roads, Utilities, Structures, Highways, etc. x 1D Lot and/or Building Locations x 1 E Landuse of Adjacent Areas (Show the Entire Upstream Watershed and Adjacent Areas Within 500 Fee[ ojthe Property Lines) Yes No TOPOGRAPHIC, DRAINAGE, AND GENERAL SITE FEATURES X 2A Existing Vegetation (identify and Delineate ) X 26 Location and Name of All Wetlands, Lakes and Water Courses On and Adjacent to the Site x 2C 100 Year Floodplains, Floodway Fringes, and Floodways (Note tjNone) X 2D Soils Information (ffhydric soils are present, it is the responsibility ojthe owner/developer to investigate the existence of wetlands and to obtain permits from [he appropriate government agencies.) x 2E Existing and Planned Contours at an Interval Appropriate to Indicate Drainage Patterns x 2F Locations of Specific Points Where Stormwater Discharge Will Leave the Site X 2G Identify All 12eCeiving Waters (/f Discharge is to a Separate Municipal Storm Sewer, /dentify the Name ojdre Aunicipal Operator and the Ultimate Receiving Water) x 2H Potential Areas Where Storm water May Enter Groundwater (Note ijNone) X 2I Location of Stormwater System (Include Culverts, Storm Sewers, Channels, and Swoles~ Yes No LAND DISTURBING ACTIVITIES x 3A Location and Approximate Dimensions of All Disturbed Areas [i. e., Construction Limits] (~l teas Where Vegetative Cover Will 6e Preserved Shou/d be Clearly Designaletl) X 3B Soil Stockpiles and or Borrow Areas (Show Locutions or Note ijNone) Yes No EROSION AND SEDIMENT CONTROL MEASURES x 4A Sequence of When Each Measure Will Be Implemented (Relative to Earth Disturbing Activities) x 4B Monitoring and Maintenance Guidelines for Each Measure x 4C Perimeter Sediment Control Measures (Location, Construction Detail, Dimensions, and Specifications) X AD Temporary Seeding (Specifications; Jncludtng Seed Mix, Fertilizer, Lime, and Mulch Rates) x AE Tempm'ary Erosion and Sediment Control Measures (Location, Construction Detail, Dimensions, and Specifications) x 4F Permanent Erosion and Sediment Control Measures (Location, Construction Detail, Dimensions, and Spec cations) x 4G Storm Drain Inlet Protection (Location, Construction Detail, Dimensions, and Specifications) X 4H Stormwater Outlet Protection (Location, Construction Detail, Dimensions, and Specifications) X 41 Stable Conslruction Entrance (Location, Construction Uetail, Uimensions, and Specifications) x 4J Erosion and Sediment Control on Individual Building Lots (Specifications) X 4K Permanent Seeding (Specifications; Including Seed Mix, Fertilizer, Lime, and Mulch Rates) Revised 4 / 97 EROSION AND SEDIMENT CONTROL PLAN TECHNICAL REVIEW COMMENTS PROJECT: Ballantrae Construction Plan Page 3 of 3 Note: Al[ erosion and sediment cords! measures ,Hawn on the plans and referenced in this review must meet the design criteria, standards, and specificntion.c outlined in the "Gfdiuna Hrrndbnnk far Erosion Control in Deve/opingAreas"from the Indiana Department of Natural Resvmrces, Division of Soil Conservation or similar Guidance Documents. 3A. Show construction lunits. 4A. A construction sequence is needed. 4C. The silt fence, the proposed ,wales (extend swales all the way to the pond and show it on the plan), the pond and a temporary or permanent outlet with appropriate inlet protection make up the perimeter defenses. Please identify in the construction sequence and show on the plan. 4F. Show silt fence on top of each bank and erosion control blankets for the ditch cut for the sanitary sewer. 4G. I would not recommend using the rock check dams infront of strs# 2 & 5. Standard inlet protection should be sufficient. 4H. Show storm pipe outlet protection at the open ditch. 4I. Provide a typical detail for erosion and sediment control for individual lots. Note: IDEM will be notified when the plan is approved. Cc: Carmel DOCS Ha. Co. Surveyor Ha. Co. Highway File ~~ THE ANDERSON CORPORATION Dazlene Lorenz 12900 North Meridian Street o Suite 380 ~ Carmel, IN 46032 Fax 317.S4S.5001 ~ Phone 317.848.5000 E-mail: dlorenz®TheAndersonCorporation.tom www.TheAndersonCorporation.com RUG-13-2003 09:17 FROM:HRMILTON CO HWY DEP 3177769814 T0:317 571 2426 P.001~001 8~{ °F "~~~~ HAM~LTOn COuI`ITY HIGHWAYD,EPARTML7YT P August 13, 2003 ~~ Mr. Dave Bames /i 9 ~ / 6, Welhe Engineers, Inc. o ~ 10506 North College Avenue 46260 di I n ~ ~ p (- ~ N ana n Indlenapolls, p RE: Ballentrae Subdivision w Revised Construetlon Ptans S of 14fi`" Street / W of Springmlll Road - % - ~~- J Clay Township - Dear Mr. Bames: This letter serves to acknowledge receipt of a transmittal hwaro0e ertmernt has thle following ramments p ns the Hi y P th l a , g e p mentioned subdivision. After reviewing 2003 and July 30, 2003 letters): 8 May from m i b , , y er ng have maintained the num 1. A PubliclPrivate Road Approach permit will be required for the eonstruetlon of the entrance. Pleaso eontad Mr. Robb Chadwell, Highway Department Permit Inspector, for the necessary forms and Information. The perrrrlt has not been obtained at this time, 2. OK. 3. OK 4. OK 5. OK 6. OK 7. OK 6. The C-210 ennoxetlon included the Ballantrae property; therefore, all review of Interior street design will be performed by the CIty Of Carmel. All perTnits, including the enirence permN end any utility work performed within the right of way of 1461" Street, will need to be permitted through the Highway Department. 9. OK. 10. OK. 71. OK. It appears that all comments have been completed. Please be reminded that all permits must be obtained before any construction may begin on-site. If you have any comments or questions regarding this letter or project, please }eel free to contact me at any time. Thank you for your attention and ceoperetlon. Sin ely, ~~~~~-. S even Broermann Staff Engineer cc o os w arty Liston Robb Chadwell Dick Hitl G;IUSERSISBV03b3c10&73-03ballenfrae.doc ~~ i i 1700 Soutlr 10'" Street Ofllce (317) 771-7770 Noblesville, ln. 46060 ww w.c_ozhamilton.in.ve Fay (3171776-9814 l~.L WEIH~E ENGI!_NE'IE_RS, INC. CIVIL ENGINEERS. LAND SURVEYORS. LAND PLANNERS, LANDSCAPE ARCHITECTS i,^~~~ AU);USY t ~. Zt)O~ ~DCfiVEp Department of Community Services ~~6 12 ATTN: Ms. nngelina Butler >?~~? One Civic Square D~~S Cv met, Indiana 46032 RE: Ballantrae Subdivision, Secondary Plat Dear Ms. Butler: I am returni~~g prints of the above subdivision with revisions per your letter dated ilugust 6, 2003. The following comments have been addressed: Plat: Comments 1, 2, 3, 6, 7, 8, and 9 have been added to plat. (Please note that the R/W for 14(ill' Street is 80' per half per Hamilton County Flighway Deportment) Covenants/restrictions will be furnished by the developer (comrnent #4). The Source of 'Chic has been placod on the Secondary Plat. Actual Instrument number will be stamped on original plat when recrv~dcd (comment #5) SUPPORT DATA: C.onnncnts N10, I I, ! 5 & 16 nle Cu. nishec~. ~.,~ith this Ict(cr. "Che developer will furnish the signagc plan as weU as the liglaing plan (il' applicable). Approval tellers will be ltrr:varded to ynur office as received from Scott Brewer amt Dick 1-lilt. Please call should you have any additional concerns or questions. Thank you. Sincerely, ~~ `. Uavc Barnes Weihc Engineers, Inc. ALLAN H. WEIHE, P.E., L.S. -PRESIDENT 10505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA 46280 (377) 846-661 1 (800) 452-6408 FAX: (317) 843-0546 " 1-,~: 1r~x:. ~'. Frmtk O "13aaaon Governor /.ori F. Kaplnrt Commissioner INI)IAN~C?I'AIZ'I'MI~N"i'OF LNV(IZONNI•!'l'AL.MANAGLMGN"C fVe make lndianu a cleutter, healthier plate to live VIA CBR"1'II~IGD MAIL JULY 18, 2003 100 North Senate Avenue P.O. Box 6015 Indianapolis, Indiana 46206-6015 (317) 232-8603 (8001 4 51-602 7 www.slule.in.us/idem 7002 0510 0004 0441 6093 i_ The Anderson Corporation 12900 North Meridian Street Suite 380 Carmel, Indiana 46032 Dear Applicant: ~ ~;'~~ Re: 327 IAC Article 3 Construction ~,~' RECFfUED -~ Permit Application Plans and Specifications for ~~- ~~~ ~~ 2~~3 ~' ~ DOCS Sanitary Scwcr '\ '` Ballantrae Subdivision ~ ~ Permit Approval No. 15993 ~' ~.~:%~ . _- ~-~ - Carmcl, [ndiana Hamilton County 'fhc application, plans and specifications, and supporting documents for the above-referenced project have been reviewed and processed in accordance with rules adopted render 327 IAC Article 3. Enclosed is the Constnrction Permit (Approval No. 15993), which applies to the construction of the above-referenced proposed sanitary sewer system to be located at 146i1' Street and Springmill Road. Please review the enclosed permit carefully and become familiar with its teens and conditions. In addition, it is imperative that the applicant, consulting architecdengineer (A/E), inspector, and contractor are aware of these terms, conditions, and reporting and testing requirements. It should be noted that any person affected or aggrieved by the agency's decision in authorizing the construction of the above-referenced facility may, within fifteen (15) days flour date of mailing, appeal by filing a reyuest with the Office of Environmental Adjudication for an adjudicatory hearing in accordance with 1C 4-21.5-3-7 and IC 13-15-6. The procedure for appeal is outlined in more detail in Part 111 of the attached construction permit. Plans and specifications were prepared by Weihe Engineers, Inc., certified by Mr. Allan H. Weihe, P. E., and submitted for review on May 21, 2003, with additional information submitted on June 2, 2003 and July l0, 2003. a.~,d.e r,y,r.® An liqual Opportunity Hmploycr rr.o.,. R.nm ~! ~J APPROVAL FORM FOR STREET NAMES AND SUBDIVISION NAMES WITHIN HAMILTON COUNTY ~r Subdivision Name: BALLANTRAE (Alrcady approved) Approved: ® Disapproved: ^ Street Names: Approved Disapproved BALLANTRAE CIRCLE ® ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ Submitted by: Approved by: Approved by: BILL AKERS Jill Jennings Date: 7-IS-U3 Date: Date: U7-15-U3 Transfer and.Mapping Dept. Ilam. Co. Auditor's Officc 33 North Ninlh St. Noblesville, IN 46060 Fax No.(317)776-9682 EAII Director llam. Co. Sheriff's Dept. 18100 Cumberland Rd. Noblesville, IN 46060 Fax No. (317) 776-9896 j mj ~n co.hamiltm~.in.us <_ Indiana Department of Environmental Management Notice of Intent (NOI) Storm Water Runoff Associated with Construction Activity NPDES General Permit Rule 327 IAC IS-5 (Rule 5) J, ta~2~(o3~ zl Submission of this Notice of Intent letter constitutes notice that the operator is npplying for cuvcrngc under the National Pollutant Discharge Elimination System (NPDES) General Permit Rule (or Storm 1Vnter Discharges Associated with Construction Activity (see 327 IAC 15-2-5 (c) for definition of operator). Permitted ope[ators are required to comply with all terms and conditions of the General Permit Rule J27 IAC IS-5 (Rule 5). Construction Project: Nanle: BAhI11NZRAE Location: 809 W. 146th Street, Carnlel IN. 46032 r's Name: t O ~• Jim Anderson phone: 317-848-5000 pera o Company Name: The Anderson Corporation lete Address: Com 12900 N. Meridian St. , Sui te 380, Cannel, Indiana 46032 p Contact Person (i engineer): Weihe project manager e Engineers Inc. Dave Barnes . , . lete Address Com (if different from above): 10505 N Colleg e Avenue p Indianapolis, Indiana 46280 phone: 317-846-6611 Affiliation with operator (i.e. consultanQ: ]~gineer Ownership Status : (check one) Federal ~ State_ Public (other than Federal or State) Private % Other (speci Location: Latitude Longitude Hamilton and Quarter N•E• Section 22 Township 18 Range 3E Name of Receiving Water. (and if applicable, name of mtmicipal operator of storm sewer): Charles Osborn Legal Drain (Williams Creek) Iamilton County Drainage_Board Please note thnt even ija retention pond is present on tl~e property, the name ojtGe nearest possible receiving water is required. Acreage: Total acreage: 4.87 Acreage to be Disturbed: 2.9+/- Timetable: 5/03 Start Date: Estimated End Date for all Land Disturbing Activity: 5/OS Please note: the operator is responsible (or all constmction activities within the boundaries of the project until all construction is complete. (C individual lots are to be sold within a subdivision or Commercial Park, llie operator should consider developing contractual agreements to bind lot buyers and builders to compliance with the Soil Erosion Control Plan established by the operator, and to indemnify the operator for any violations. An example of a contractual clause o(this nature may be obtained by contacting IDEM, Office of Water Management, Rule 5 Desk at (317) 233-1864 or (800) 451-6027 ext. 31864. Slate Form 47487 (R 5-02) (Continued on Reverse Sidc) NATURAL RESOURCES -~ PLAN REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9°i Street, Noblesville IN 46060 Ph- 317-773-1432 or Email at john-south(a~iaswcd.ore Project Name- Ballantrae Erosion Control Plan Location- Sec 22 "f-18N R-3E Acreage- Sac Owner/Developer- Jim Anderson Corporation Engineer- Mr. Dave Barnes Weihe Engineering 10505 N. College Avenue Indianapolis, IN 46280 Plan Review Date: 7-] 5-03 • The disturbed area for this project is less than 5 acres. An NOI and approved plans are not required from IDEM or the Soil and Water Conservation District. • 1 have no additional comments. Submitted By: ~ John t;. South P.E. Ccrliflcd Pmlhssional in Erosion and Sediment Control Cc: Jon Dobosiewicz, Cannel DOCS ,lenny Chapman, County Surveyor Steve Broermann, County Highway File HAMILTON COCiNTY H/GHW.9 Y DEPARTMEIYT~~ July 30, 2003 Mr. Dave Barnes Weihe Engineers, Inc. 10505 North College Avenue Indianapolis, Indiana 46260 RE: Ballantrae Subdivision Revised Construction Plans S of 146"' Street I W of Springmill Road Clay Township Dear Mr. Barnes: This letter serves to acknowledge receipt of a transmittal containing the revised plans for the above- mentioned subdivision. After reviewing the plans, the Highway Department has the following comments (I have maintained the numbering from my May, 8, 2003 letter): 1. A Public/Private Road Approach permit will be required for the construction of the entrance. Please contact Mr. Robb Chadwell, Highway Department Permit Inspector, for the necessary forms and information. The permit has not been obtained at this time. 2. Concrete ADA ramps are required at all street crossings for the sidewalk/asphalt path. Please include the appropriate detail for the ADA compliant path and show the locations on the site plan. have included copies of the new INDOT standards for curb ramps. The standards will need to be used for the ADA ramps. 3. OK 4. OK 5. OK 6. OK 7. OK 8. The C-210 annexation included the Ballantrae property; therefore, all review of interior street design will be performed by the City of Carmel. All Permits, including the entrance permit and any utility work performed within the right of way of 146'' Street, will need to be permitted through the Highway Department. S. The Highway Department requests a 2' non-access easement along the right ct way of i 4b''o- Street. 10. A three-foot stone shoulder is needed along the accel/decel lane. 11. Correct the note on Sheet 11 for the Traffic Maintenance Plan to say all pavement along octet/decel lane shall be saw cut. If you have any comments or questions regarding this letter or project, please feel free to contact me at any time. Thank you for your attention and cooperation. Sincerely, ~~%~ ~~- S even J. Broermann Staff Enyineer cc: Jon Dobosiewicz Jerry Liston Robb Chadwell Dick Hill GiUSERSISB\o3tac\07-30-03ballantrae.doc 1700 South 10"' Street Office (317) 773-7770 IVoblesvillc, ht, 46060 n~tvvv,coduunillon,in,us Fax (317) 77G-9814 pp a~~~ti¶¶y aoi ~ an•v~~h `~,Ulll°Il--~CII ~~QDII]IQ ~L ~~~)IDd1LII°I~RIlitQ~Illl~; P a~. ~i ra rpp ~f~~y ii ri^ rn '~.t1 i"3pOPll~~'~tl-{Ilite lOdt ~'IDI~ DA July 29, 2003 Dave Barnes Weihe Engineers, INC. 10505 N. college Avenue Indianapolis, IN 46280 RE: Ballantrae Subdivision (146th Street) Dear Mr. Barnes: I have received and reviewed the information for the above-mentioned project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respecffu Ti thy J. Green Ac ing Chief of Police TJG:vb cc: Dept. of Community Services Li177 :oTi-I,;nIPU G~~ N^flx 9;~r71 fe71-2bf `L .t.~ ..,i >,-,~; ~ ~ A Nationally Accredited:Law,~,Enforcement Agency ~ tip, ~~11~~~.1i; I-. tl r ~ fi I '~~''~~ ~IA~E~H~ ~NCiNE~1~9 IIVC~ `~ ~~~'~ ~~~~~~~~~ ,~ .- CIVIL ENGINEERS, LAND SURVEYORS, LANb PLANNERS, t.ANDSCAPE ARCHITECTS ~ ~ ; ~. i. r LETTER OF TRANSMITTAL . sY",, To: Cltv of Camlel TAC members Protect Ballanlrae Subdlvlson (148's Street) We are sending you ^ Attached ^ Under separate cover vin ^ Shop Drawings ^ Prints ^ Product Data ^ Specif cations ^ Samples ^ Change Order(s) n fl Skclches/Dl;~winns the following Items: ^ Copy of Letter ^ Meeting Minutes ^ h)spection Report ^ Annlicatiou(s) for Payment ^ Sets ^ Copies Document Dale Document Number Description l Dallaolrae Secondary PlaUconshtietion plans These are transndtted as indicated below: ^ Approved ^ Approved as Noted ^ Not Approved, Revise and Resubnut ^ Action Not Required ^ Action Indicated on Item'Crarxsmitted ^ For Signature. Return _ Copies to Us ^ I~~or Your Review or Use 6~'For Your Review & Comment ^ As IZeyuested ^ For YourlZecords ^ Por Your Approval Remarks: Enclosed are plans and Secondary Plat for the above project located on 1461 Street iti Catmel. This project is to appear for final construction plans on the August 201h Cannel TAC agenda. It has appeared on two previous 'CAC meetings as a Preliminary Plat. Please review these plans and address any comments to the undersigned. 'Chank you. Dave Barnes, cc: Engineers, lac. Par~'rlandle: t=ast~rrl I'ipeGne Ca, ir; no r..~rnpany t=acilities invo!vcrl in this lilclject ~ /J "s~nl,.. t~al~~ -- ALLAN H. WEIHE P.E. L.S. PRESIDENT 1050D NORTH COLLEGE AVENUE INDIANAPOLIS. INDIANA 48280 (317) 848-8811 (800) 452-6406 FA%: (317)843-0846 One Civic Square Cannel, IN 46032 (317) 571-2417 Fax: (317) 571-2426 Fvc To: {,Q.~-e. U0. i le S From: ~l2vvc.-- Fa;c gT 3 - ~~~ Pages: Z Phone: Dale: Re: CC; ^ Urgent ^ Far Review ^ Please Comment ^ Please Repiy ^ Please Recycle VIA FAX: 843-0546 Original by mail August 6, 2003 Dave Barnes Weihe Engineers, Inc. 10505 N College Ave Indianapolis, IN 46280 RE: Ballantrae Subdivision, Secondary Plat Application Dear Mr. Bames: This letter is in response to your Secondary Plat application for Ballantrae Subdivision. The following items listed are a starting point, and more comments will be made at the TAC Meefing. The following issues must be resolved prior to signature of the plat by the director: Plat• 1. Please place date of submission and/or latest revision on plat 2. Please Place surveyor's signature and date on plat. 3. Please label Streefright-of--way as being dedicated, 75-ft half, per the Thoroughfaze Plan. 4. Please provide two (2) copies or covenants/and or restrictions. 5. Place plat Instrument No. 6. Place a floodplain note on plat. 7. Place S-1 zoning classification on plat. 8. Place docket numbers, 28-03 PP and 117-03 SP on plat. 9. Show street 1Z/W of Interior Street at various points. S~inno T)ata~ 10. Label existing adjacent uses and zoning. 11. Provide service reports/statements from: utilities, police, fire, soil & water conservation, etc. 12. Provide signage plan. 13. Forward a copy of approval letters from Urban Forester and City Engineer. 14. Please provide a lighting plan. 15. Two copies, total, of construction plans are required. 16. Please provide a soils map on construction plans. Please submit a revised Secondary Plat with above-mentioned changes. Sincerely, ~~~ ~~ Angelina Butler Planning Administrator Ballantrae SD-SPl Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 Dobosiewicz, Jon C From: Babbitt, Pamela A Sent: Friday, July 18, 2003 12:48 PM To: Brewer, Scott I; Butler, Angelina V; Dobosiewicz, Jon C; Hollibaugh, Mike P; Lillig, Laurence M; Pattyn, Dawn E Subject: new Ballantrae,~SP Jim "Anderson 848':'r~000~ f}~ ~'~S v ~ "Il'~'c_ r~ to ~s -1•x.4--~ ~~ ~1~f3 ~~~~ l7 a9 Lz ®a o 0 of ~ Oo/ ¢ ~~ ~~~~ CIVIL ENGINEERS, LAND 'SURVEYORS, LAND PLANNERS, LANDSCAPE ARGHITECTSr ~l Rr;,r 11; ~ LETTER OF TRANSMITTAL ~~ ;i 1 ~~ n~~ To: Carmel Community Services Project: Ballantrae v'~J One Civic Square Job #: Carmel, Indiana 46032 Date: July 17, 2003 Phone: 571-2417 Attn: Jon Dobosiewicz Fax: We are sending you ^ Attached ^ Under separate cover via ^ Shop Drawings ^ Prints ^ Product Data ^ Specifications ^ Samples ^ Change Order(s) G ^ Sketches/DrawinQs ^ Copy of Letter ^ Meeting Minutes ^ Inspection Report ^ Application(s) for Payment ^ Sets ^ Copies Document Date Document Number Description 1 Construction Set/Secondary Plat -Ballantrae These are transmitted as indicated below: ^ Approved ^ Approved as Noted ^ Not Approved, Revise and Resubmit ^ Action Not Required ^ Action Indicated on Item Transmitted ^ For Signature. Retum Copies to Us ^ For Your Review or Use ^ For Your Review & Comment ^ As Requested ^ For Your Records ^ For Your Approval Remarks: Jon: Enclosed are plans for the above subdivision to be placed on the next TAC agenda. Copies of the construction set will be delivered to all TAC members this date. Thank you. By: `~ cc: Dave Barnes ALLAN H. WEIHE, P.E., L.S. -PRESIDENT 10805 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA 462$0 (317) 846-661 1 ($OO) 452-640$ FAX: (317)$43-0546 the following items: MERRIMAC SUBDIVISON J, ~1 .ll zCe~ ~~~/V" March 4, 2003 Ramona Hancock Secretary of Planning Commission Department of Community Services One Civic Square Carmel, IN 46032 Dear Ms. Hancock: I am a resident of Merrimac Subdivision at 146` and Spring Mill Road. I have been increasingly alarmed at the rate of development in my area. When my family chose to purchase a home here, a large reason was the rural feel to the town and the incredible view of the woods and wildlife from our backyard.. In an area where woods and cornfields are being destroyed at an alarming rate in the name of progress, I guess I am trying to be the voice of reason. Is there truly a need for more homes here or are we, once again, at the mercy of greedy developers with a desire for more profits. And why do they have to be built all in the same place? Just a mile west is absolutely nothing! Why not be smarter about this and spread the homes out so that they aren't all jammed in together? Will the Carmel/Westfield area become just another town full of subdivisions and strip malls or can we retain some of our natural, God-given beauty? I guess I am trying to speak for the trees. If the developers are given free reign over the natural beauty of the landscape, when will it end? When will humanity finally say, "enough!" When the last tree is toppled? I implore you to reconsider this proposal. If this must move forward, I would humbly ask that as many trees are retained as possible. Please keep the dense woods viewable from the road and carefully consider which trees truly must be destroyed. Corlette Waller Merrimac resident [STREET ADDRESS] [CITY/STATE] [ZIP/POSTAL CODE] PHONE: [PHONE NUMBER] FAX: [FAX NUMBER]