HomeMy WebLinkAbout09GAME_PDF 041309
09GAME_041309_A1.pdf C:\09\Gamestop Clay Terrace\09GAME_XR_PLAN.dwg A1.0 (1)
09GAME_041309_A2.pdf C:\09\Gamestop Clay Terrace\09GAME_XR_PLAN.dwg A2.0 (1)
09GAME_041309_A3.pdf C:\09\Gamestop Clay Terrace\09GAME_XR_PLAN.dwg A3.0 (1)
09GAME_041309_A4.pdf C:\09\Gamestop Clay Terrace\09GAME_XR_PLAN.dwg A4.0 (1)
09GAME_041309_D1.pdf C:\09\Gamestop Clay Terrace\09GAME_XR_PLAN.dwg D1.0 (1)
09GAME_041309_E1.pdf C:\09\Gamestop Clay Terrace\09GAME_XR_PLAN.dwg E1.0 (1)
09GAME_041309_E2.pdf C:\09\Gamestop Clay Terrace\09GAME_XR_PLAN.dwg E2.0 (1)
09GAME_041309_E3.pdf C:\09\Gamestop Clay Terrace\09GAME_E3.dwg Layout1 (1)
09GAME_041309_G1.pdf C:\09\Gamestop Clay Terrace\09GAME_G1.dwg G1.0 (1)
09GAME_041309_M1.pdf C:\09\Gamestop Clay Terrace\09GAME_XR_PLAN.dwg M1.0 (1)
09GAME_041309_P1.pdf C:\09\Gamestop Clay Terrace\09GAME_XR_PLAN.dwg P1.0 (1)
ASPR Clay Terrace.pdf
Page 1 FOR OFFICE USE ONLY PROJECT DATA (to be completed by submitter) Please answer all pertinent questions SBC project number Filing date DOCUMENTS REQUIRED FOR FILING
1. One Application for Construction Design Release, together with correct filing fees. (See Fee Schedule) 2. One complete filing (paper or e-mail). This filing will not be returned
to the applicant. A set of drawings identical to those released by the Office of the State Building Commissioner shall be maintained on the project site. Weight limit of each submitted
package is 30 pounds. A. Site plan showing dimensioned location of building to all property lines and to all existing buildings on the property, as well as width of any streets, access
roadways or easements bordering the property. B. Foundation and basement plans and details. C. Dimensioned floor plans for all floors. D. Fire and life safety plan showing graphically
or by legend the location and rating of building elements such as area separation walls, smoke barriers, fire-resistive corridor walls, stair enclosures, shaft enclosures and horizontal
exists. E. Wall elevations of all exterior walls including adjacent ground elevation. F. Sections and details of walls, floors and roof, showing dimensions, materials. G. Structural
plans and elevations showing size and location of all members, truss designs showing all connection details, and stress calculations. H. Room finish schedule showing finishes for walls,
ceilings and floors in all rooms, stairways, hallways and corridors. I. Door schedule showing material, size, thickness and fire-resistive rating for all doors. J. Electrical plans,
diagrams, details and grounding of service entrance and power or lighting information required for energy conservation. K. Plumbing plans showing location of fixtures, risers, drains,
and piping isometrics. L. Mechanical plans showing location and size of ductwork, equipment, fire dampers, smoke dampers and equipment schedules showing capacity. M. Fire protection
plans showing type of system, location of sprinkler heads, standpipes, hose connections, fire pumps, riser and hanger details. PROJECT DESCRIPTION (Must Be Complete) FLOOR AREAS
ESTIMATED COSTS Scope of work: New building Addition × Remodeling Total existing (if applicable)
2075 Sq. ft. Is this construction the result of fire or Natural disaster? Yes
× No Sewer : × Existing Proposed × Public Private None Addition (if applicable)
none Sq. ft. Addition (if applicable) $ Fire suppression system in building × Full Partial None Detailed
suppression system plans/specs Provided × To follow Remodeled (if applicable) 2075 Sq. ft. Remodeling (if applicable)
$150.00 Category H If partial, specify where* Located in flood plain (check county plan commission) Yes × No Total building area square feet Total project cost
$ Building construction type and occupancy classification Type IIB fully sprinklered, Occupancy M Building height (stories)* One Number of buildings this submittal (Describe if necessary)*
One Volume cubic feet (Fee category E only) Indiana rehabilitation standard (Rule 8) used? Evaluation documents provided? Yes × No
Yes × No Use of conversion rule (Rule 13) proposed? Yes
× No Does project include: (Check if yes) Elevator or lift Combustible fibers storage Fireworks
storage Explosives storage High-piled storage Boiler or pressure vessel
Hazardous or flammable materials storage Describe proposed use of facility IN DETAIL including types of flammable or combustible materials stored or handled Landlord’s
work to prepare existing retail space for incoming tenant GameStop. Tenant will follow separately for additional work required for occupancy Describe IN DETAIL previous or current
use of facility (if existing facility)* This was a retail space, previous tenant was Casual Corner. Number of persons employed (max/shift) N/A General comments* Number of persons (public)
N/A GENERAL INFORMATION Has work at this location ever been filed? X Yes No Unknown Does project include use of a master plan design release
or a factory built modular or mobile structure? Yes X No What year and month? Unknown Previous SBC Project
Number Unknown Name of Manufacturer Master Plan / Modular Number Has construction started? Yes × No If yes, has notice of
violation or investigation been issued? Yes No If no, probable construction starting date? May 01, 2009 *NOTE: USE SEPARATE SHEET IF
ADDITIONAL SPACE IS REQUIRED.