HomeMy WebLinkAboutDept Report 11-06-03CARMEL/CLAY PLAN COMMISSION
SPECIAL STUDIES COMMITTEE
DEPARTMENT REPORT
November 6, 2003
1. Docket No. 138-03 DP/ADCs (#0309000
West Carmel Center, Block C -Bank One
The applicant seeks to construct a Bank One building. The site is located at northwest
Carwinion Way and Commetce Dr. The site is zoned part B-3 Business, and is within
the US 421 Overlay Zone.
Filed by Eric Matson of CSO Architects for 421 Realty.
The applicant is requesting approval of a Development Plan and ADLS for the construction of a
bank along US 421, just south of the Ritter's Frozen Custazd. Please see the informational
packet prepared by the applicant for an overview of the site and proposed building elevations.
As part of the request the petitioner is submitting a preliminary layout for the other two lots
within Block C of West Carmel Center. This is required based on the three-acre minirnum parcel
size for a Development Plan to insure a more comprehensive layout to the area along Us 421. It
is likely the Plan Commission will see amended Development Plans and ADLS (as required) for
the other two lots in the near fixture.
The following items aze those that require additional attention based on comments from the
Public Hearing:
1. .Please provide details of ATM at drive-thru for review by the Plan Commission. The
rendering submitted at the meeting is not acceptable. Please revise. Please refer to the
5/3 Bank south of this site for an example.
2. Wall pack lights shall be full cut-off fixtures, please provide more detail to the
committee.
3. Signage:
a. The parcel has a single frontage on US 421 and is thereby permitted one sign.
The proposed elevations along with the proposed ground sign display a total of
three signs with a logo above the drive-thru area (of less than three squaze feet in
azea) so it is not considered a sign but does require ADLS approval.
4. Direction to construct path along Commerce Drive at time first parcel develops. This will
be added as a condition of approval of the DP/ADCs.
The Department recommends that the Special Studies Committee forward this item to the
full Plan Commission with a favorable recommendation after all questions and concerns
have been addressed.
Committee Report 2003-1106