Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Packet 10-21-03 ADLS
1 1 1 i 1 D 1 1 0 Application for Architectural Design, Lighting 8T Signage Carmel -Clay Plan Commission October 21, 2003 O^® WOOLLEN, MOLZAN AND PARTNERS, INC. ' ARCHITECTURE 4] Soufh Pennsylvania Street Suile 1000 Indianapolis. IN 46204 31].632.]484 31 ].68]20641fax www.woollenmolzaacom ARSEE ENGINEERS, INC. ' 9715 KINCAID DRIVE, SUITE 100 3171594-5152 FISHERS, INDIANA 46038-9459 FAX 3171594-9590 A New Facility for St. Christopher's Episcopal Church Carmel, Indiana R_E. Dimond and Associates, Inc. Consulting Engineers 732 North Capitol Avenue, Intlianapolis, Indiana 46204 Phone: (3t~)634-46]2 Fax: (3t0 638-8725 I~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ADLS Application 1 Date 1 DOCKET NO. APPLICATION for ARCHITECTURAL DESIGN, LIGHTING, and SIGNAGE FEE: $728.00 (Plus $36.50 per acre when NOT accompanied by a Development Plan) Name of Project: St. Christopher's Episcopal Church Address: 1402 W. Main Street Type of Project: New Church Applicant: St. Christopher's F icrnnal Church Phone No. 317-846-8716 Contact Person: Timothy Fleck Phone No. 317-632-7484 Fax No. 317-687-2064 Address: Woollen, F1olzan and Partners Inc. 47 S. Pennsylvania sr_ tnth Fl. Indianapolis, IN 46204 Legal Description: To be typewritten on a separate sheet Area (inaci•es) 10.11 acres Zoning OM/SU Owner of Real Estate: St. Christopher's Episcopal Church Carmel: yes Clay Township: Annexation: Y or N Other Approvals Needed: PARKING ' No. of Spaces Provided: 1 11 No. Spaces Required: 100 (1 per 4 seats in main assembly) DESIGN INFORMATION ' Type ofBuilding:Complex Center No. of Buildings: 1 l3 phases) ' Square Footage: 50 , 700 Height: 40' No. of Stories 1-2 Exterior Materials:Limestone/Stucco Colors: Natural Buff-Brown/Cream Maximum No. of Tenants: 1 Type of Uses: Institutional (p,lace of worship) ' Water by: City Water Sewer by: TBD (see site plan) ' z:\shared\forms\PC application\adls revised 12/31/02 1 1 1 LIGHTING Type of Fixture: King Lum i na re Height of Fixture: 15' / 19' No. of Fixtures: 36 Additional Lighting: * Plans to be submitted showing foot candle spread at property lines, per Ordinance. SIGNAGE ' No. of Signs: 2 ( institutional(~round) sign Type of Signs: i changeable copy sign Location(s): Institutionaii~: SE corner of property. Changeable: SW corner of property. ' see signage plan) Dimensions of each sign: Institutional: 9'-4'''w x 3'-4"'h/Changeable: 4'-0"' x 4'-0"' Square Footage of each sign: Institutional: 30sf./Changeable: 16sf. Total Height of each sign: Institutional: 5' ~0"/Changeable: 4'-0" see signag p an for elevations) LANDSCAPING ' * Plans to be submitted showingplant types, sizes, and locations I, the undersigned, to the best of my knowledge and belief, submit the above information as true and correct. / Architect Si a e of A plicant Title Timothy Fleck September 5, 2003 ' (Print) Date ************************************** State of Indiana, ' SS: County of ~7a~J Before me the undersigned, a Notary Public for iy~~'-~o~~, county, ' State of Indiana, personally appeared o~!4'~ir~.~e-t~~-, ay'~.ly~~jL and acknow]edged the execution of the foregoing instrument this .S day of , 20 D_3 My Co fission Expires: L~i~.e~ ~0 ~7 ' Notary Public ~ Z:\SHARED\FORMS\PC Application\ADLS ' z:\shared\forms\PC application\adls revised 12/31/02 2 Legal Description 1 ' LAND DESCRIPTION TRACT"A" ' Part of the Northeast Quarter of Section 26, Township 18 North Range 3 East, Hamilton County , Indiana and part of the real estate described in Instruments Numbered 2000-57571 and 2000-6246 in the Office of the Recorder of Hamilton County, more particularly described as follows: Commencing at the southwest corner of said Northeast Quarter, thence along the south line thereof North 90 degrees 00 minutes 00 seconds East (bearings based on above referenced deeds) 372.82 feet to ' the Point of Beginning; thence North 00 degrees 00 minutes 00 seconds East 471.00 feet; thence North 45 degrees 24 minutes 39 seconds East 240.12 feet; thence South 88 degrees 55 minutes 00 seconds East 512.00 feet to the east line of the real estate described as Parcel 4, Instrument Number 2000-57571 in said recorder's office; thence along said east line South 01 degrees 05 minutes 00 seconds West 630.00 feet to the south line of said quarter section; thence along said south line North 90 degrees 00 minutes 00 seconds West 671.00 feet to the Point of Beginning, containing 9.553 acres, more or less. LJ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ Site Development Drawings ... WOOLIEN. MOLiAN St. Christopher Episcopal Church Church Expansion Carmel, Indiana SECTION 26 /TOWNSHIP 18 N /RANGE 3 E ma AP I` ~5 ~ ~~ i~ ZONE % ROOD PUIN MAP nuE¢~ae~s ws~umm ~a ~o~.n °WAp ~N° w.. .~...s..-... A....e.,._.... ,.s. ~.... w eiwc axma AML~Exa~m0. Mt ~~~~ _~~ H~ L L Q1 ~ s ,~ Q-V 0 ~- N fQ ~L fl. ~s O A ~U ~ LL 3 ~ ~ y <{~ ~L7 Ns~Leema mm IC0.~11 n~ul W~1[4/VN ® R~~€~ 6{~6H~`e6! ~ ~~a~~~~g8~$g~ ~ e~ 9~ il~~~ ~4 . d r1 ; ~ 3 ~~ ~ ~ I ~ ANew Fac~'for ~ St. Christopher's idg@~'a?~~ }gp p; ~'~TjI A~3 a' ~ f~ 1 ~; ~ ;~ i$ ~~ 0 9 I ~ Episcopal Church ~~ 7~4~'{~; ~ ~ ~~~ ~ ! ; z~. Grtnel, IndWa - ~ ~ i ~ ~ I n~ _. 1 rte, 1P~.°% 9iid -.N ~y dm 9 5 Z ~~ fie; "~ •x ~~' i Fe i e pe eS g" e e i e e i w i; i", z~~i, ~~~~ iA . 6E~ ! y p" ~ ~~ ~5i ~ R. y~ '° ~Ai 1P30R f~~~ A~'sRA4 ~ ~§p3"6 ay ~i " "~d. Pi pp 9 x , i i ~C •kC ~' of 9 P~.~z s-g' gf B, &~ ]aa§ ~~B~~I ~~i i~ ~ 5 ~ 9j ~ ~ ! ~ ~i ~s~ 1g . ~~~~ S ~8" f ~ r daf iii 9 ~, r\ ~ S ~ ~ ~ r ~ ~ A New FadlhY for ~ Et. r~ ii 1 ,'o ~ ~ i,7 g 1 ~ f ~ ~ E o ' isco al Chu ch p p ~~~~ o + ~ !~ ~ Q~: ~ ~,~~~ o ~ ~! ~~ 1 i -.~ 1 1 1 1 i ~ e i ~ i ~ -~ ~ ~__ N w v i 9N 8 I ~ ~ j ~ ~ A New Facility for I ®® St Christopher's ~# ~ ~' m 7 ~~ ~ ~ j: g dY i # ~F ~ 1 ~I ~~ ~ i o T o ~~ ~ . ~ ®, Episcopal Church ' ~~~~ao f ~~ ~~ A° ~ I ~i ~~° N ~ Carmel, Indiana o. ! g ~ n 1 _ _ _ ~ ~ \~ 1 A 1 ~ f 1 i ~ I f ~ ~ -1 - ~ _A 1 my J N ~~' g, B ~ ~ ~ ~ ANew Facllhy for ~ I ®® St Christopher's ~s" as57~' °~~~ROi -p- ~~ : ? m i 39 p i f # ~ ` al sj ip { D ~° SN o ~ ~{ ~ . ~ ~, Episcopal Church ~ 5 as °J~ 1 X ~~~a~~ { f RE ~~ [X ! ~ " ii ~I: =~' i Carmel, Indiana a _ B n z `'~ / / , •R• WOOLLEN, MOLlAN AND PARTNERS. INC. ARSEE ENGMEERy INC. R.E.^Dimond _ ' ~ . Mxlsx[S. MC ~. EXISTING CHURCH TO BE OEMOIISHEO PHASE3 WORSHIP) BUILDING ~f- ~.- ~ SFATING • ~ E ~ ~ PH49E 7 ~ \ ~ClA55R ! r PI III 0 O - - _ _ _ _ _- t RE~PtrAN - . H = L L ~U o~ g` ~L ~. ~s o= n (,~ H € 3 . ' y Z ~ ~' Q (n ~U' ~, xs, xom ~__ PHASE 3 SITE PLAN C2.04 ~~ ~ ~ !! i• ~ 1~ 13331! ~ tr ~ ~ ~, rr II• ~ ~ i / / I WOOLLEN,MOIlAN ~~ ARSFE ENOMEER; IN<. R.E. Dimond ,~eN,oN~ ~.. j T01313I'sT13131iNCI's ONLY: NOT SiJ13~II'1"1'lil) TOIi AI'1'I30\'AL H ~ ~ ~ ~ L Q. ~ oU ~~ o`RL L.~ '~ n AU ~° ~_ v < ci ~ ~ - ~~n~ S -- ~ ~ -- - - -- - - C MASTER PIAN FOR REFERENCE ~____ - - - ~~o3..n ATE TEP ~ C2 05 ~ . cmr wrz sh/m &A a> _O 47 s z v c ti_ Cy K s z _~ ~/ ,~ pa ~ ~ g ~ ga1 ~ ~' _~all~ e~! ~gagi °E~I s~ °~ g~Ig H ~ a Q 8 A & ~ ~ @ ~g ~$gnfi a l ~e~ €° ~ B R ° ~ ~ 33~~~ !~R@ a~l~ 116 ~ ~ $n~ ~ ~~ ag°.~ ~ e gig; ~ w ~' I g' l ~ r I ~ A New Fatltlty for St Christopher's A A 9 P ~9 ~~~~o 1 ? P `,~ i; ~, °! - i f ~F 0 fi 0 [ ~ . Episcopal Church ~@~~~~ ~ ~~~ l; ~ ~{ . _~' Grmel°IrMlana p ~ p nz - nm o.~ siio~ eo a,y 0 z n 0 z ti A O r v s z~ 9i 1 ~ i ~ m z RR ~e ~~ c i4 ?~ P~ e# s o ~o I €z ~1 r ~ ~ ~ ANew FacUity for fit. r C ~~~ ~~'~_ ~~ g ~ + [1} iE9 ~ ! I~ 1 ~ ~ €1 ` ~o . ~ [ ~ ' co hurch al ~ ~ o ~ °~ t ' ~~ ~ .. '~ Camrel. lndlaiu c 1 ~ ` n no. ws' si~iw 4~ e V C t 5 z _~ z p o m v z a J ~~ ~ ~r ' I a ANew FacilhY for. , },I I ~d~~a "a m' iF~ ~9 ~ ~ ~~ E~ ' >o ~ o ~ ' Episcopal Church ;Is;i~~® ~~a~oi ~~g ~ o: .;. ~ Gmiel, Indiana - ~ - G ~ ~1 4 r ~ ~ ~ r ~ ~ ~ a~ .~ ~ r ~ ` ~ ~ ai „a R~ ~a ~~ ..~~ Ya°i - -m°upvP TYP. PRECAST CATCH BASINn _ _ .F, ZR^~°.$'ma TYP. PIPE BEDDING DETAILrI - ~. ,~ ,`'~ ~.,; .~. .-~ , TYP. H.AC. PAVEMENT DETAIL/;, _ `"" {, i ;, TYP CONCRETE PAVEMENT DETAIL/71 TYP. PAVEMENT TIE-IN TO EXISTING DETAIL/, HANDICAP PARNINC SIGN DETAILII ~,~-, Y ~ , J r w_ °~ ~7M1~ TYP. SIDEWALK PLAN DETAILr1 TYP. CONCRETE JOINT DETAILSrI STRAIGHT CONCRETE CURB DETAILn AwfE Exmrr~w,lxc. ~pa~tm~ ~4iM. _~, s ~ L s ~ a'= o~ ~.~ o ~U Hg .__ c i uai ~ '~ IC6.01 TYP. CONCRETE STOOP DETAIL v . MONOLITHIC CURB 8 WALK DETAIL!;, HANDICAP RAMP DETAIL ~ ~ ~s ~ ~ ~ r .i ~ ~ ~ ~^ ~, tia r ~ ~ ~ s NOOLLFN, MOWN 1ND lA0.1NExx. INC 1 ~~.a .~ ~~ mm ~-3 , 31' SILT .FENCE DETAIL ..I'~f:::'FI: PlAtl_Y1EY! BALLLE INLET FILTER ~aa,.~ §~.o.~ M RAN BALE DITCH FILTER MONITORING 8 MAINTENANCE OF EROSION CONTROL MEASURES ~~.:m a._.~.~.4.~ TEMPORARY k PERMANENT SEEDING RULE 5 CHECKLIST AxnFExoNEOm,lxc. ~~tiW~ ~`mm. .~. ...r-.~ ' ~, s ~ L .L Qs oU ~- ~~ ,~ •~ a LLU o A v_ . =^~..L~a < can W L~ ~~ ~a ~s IC6.021 -~ r . s . ~ ~ ~ r .. r ~ .. r 0 n ~ 3 s...~... ~ Z51Id.B PLANfiNB xi~.~~~om U p"...• ~:~~=.~, ea ~5 ~a /1 TRff PIT OftY l8L a~....®...~r~~ ~e ~i r~.~., w~. aex d «.e rme ~. e.o ~» w.~. e<nm..~ ~~ w.a mr..Ww.. ~1m~w~e -0 J me oy,®, ~ as e... M,.apym a~ oc. .~np...n an... s.a usn~ «....~.~w w.a'wemw e.uy mee roomy ro.. two ~p~ra so..b.e ~.m .iw. ..o, wa,. W6M 6ayme 4n~me ] IH' Grt ~ /1• ~ ~ ~ ~ r Mv¢Exonmu.6w ~wwwar~ R !mm~ ~~ i N ( . ~ VL _ ~ Q= ~ ov H~ =oqi nV c.r9 N`i c'n uai ~ ^ .~.~,,,~ I ..n I I C6. r~~ 91. aryristsphrr's BplsEnpa( ary~T~ry Ho BLE COPY SIGN ~~i. C(iirisfoplier's a" "~ (~piscopoi ai?urrii i .~ ~ ._~~ N TI AL (GftOUND)SIGN cmo , +> PHASE3 (WORSHIP) BUILDING SEATING ~ L. ~•_ F0~ ~~ pRASEi ~QASSRO01 f ~ ~'-'gip BUILDING AR9EE EN4MEERS, INC. ~~...._ H V L y„ "~' QU Q ~ L~ AU ~9 {A = ~•Q.E Q~t~t~ 1rm- ~~ , n N J S __ SIGNAGE PLAN AND ELEVATION C900 ~ r ~ ~ ~ r ~ r ~ ~ ~ ~ ~ r ! ~ ~ ~ ~ _ _, ... / WOOIIEN_MOl1AN .e0 . 4 ^® V o ,< ~OII, ` ~_~~ ~ o ~x~A~~~aN L® ING °~°`.. s ,~ .... / ~ ~ ~ .... ~ .. .. . PH SE My tlKIt3G'Dti• u u L-~ . . .. ... u ~~Cx~fi~4tx~G :: cs- .. „a. .e„ ~. MAM STREET (1315 i1 £a° a~ ^VERALL SITE PLAN - LIGHT ~N~G 1~1~E E'XGIIE311f~IMG ~N•M~W ~~ r~ finsa+ ,~c ~^ W '~ U 0 .ti '~. N ~ c ^~ rU- z ~~~" e~ W~~ es.ro.x~ooo ~_ ~ ~WW E001 i Building Elevations AassE Exaxssas,ixc. r~+r•-om~*s N ~ ~ L ~ ~ Q. ~ oU ~~ .~ o ~U ~ a ~= z +-~ .Q a N LLl ~ Segemeer ~a, mn A6.Oa ~ V ,_~..,, .~..,,_~.._.,..v~, v.......,< ^-lJU1F1IXiERIOR ELEVAl4N ~ ti'ES aIXTERIOR EItVATY>N E45T FXTERIOF ELEVATON 0... n.v Axss[ Exuxssxs,lxc. 2.E. Dimond H ~ ~ L /~/~ ~ ii~~ O jJ ~ H o ~L ~. AU o~q ~_ d Z +-t 's~. cn u] I s.~.~ro.io.xw I A6.Ob Q w~TH E~woR E~vAnoN 0 Eoqq 6y 0 u m 0 r~ SN 6 mph p O m m D ~ i i r ( ~ ANew Facility for ' ®^ ~~~g~==m~ e~ i ~~9 p~ $ ~ ~ m ii { c0 3 i St. Christopher s ~~~ o ;;~ J ~,y ~ F a= ( ~ ~~~ ®, Episcopal Church ~~~'R~;' ~~~ ~~ ~ ~i ; =s' Carmel, Indiana a I n z _`l u• W OOILEN, MO W N O ~am..es ENXtl~ Enm:an ARSEE EX4gEFXS. IHG R.E. Dimond h ~ L L ~ ~ ~ s QV o_ ~~ `o ~L ~. AU ~_ a Z ~.s 'fl. <cn w ,.~, PHhSE ] E%TERIOfl ELEVhiION] A6.Oc o~ro~E~,.a~E~~~~ ~ L'9`d SNg1tlA39 tl01tl31 urc 1N~~ r Cr7 Cn ~'a ~ i a~ ~ o ~~ .~ = o v~ _~ n° ~~ _~ ~~ ~~ ~~ puowid .3.2. 7nl'sx~ruox3 ~aay ~0.~3.o,.a..3.~03 ~~ o uoucal3 ~oya~x3+aaM 4=^Y OO u• e ~~ _i. ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Drainage Calculations 1 CLIENT N) aDLI~~\ M.t~ ~~_~'}~~ 14RSEE ENGINEERS, INC. PROJECT ~t~ C-~F~LS'C ~ CLIENT ORIENTED-BY DESIGN EY UI~ DATE ~ D PROJ. N0. (73G~u-(~ ' CHK'D BY DATE PAGE N0. ~~D ~y~~r~p ~ ~t~~~ ~ ti~..~-c~v~. 1 -~~~ ~~o~~~ ~,~~ 1 IM~:C> .~~ ~J1°CC-Ft ~~.t~ till 1 ~1~~ ST~'l~'T•, ~~~SIT~ `®21~11~1~C,t'~ ~~L~C~IZ-~ ~L'C'~ T~-2.ol~l "~FC~ (~L~z~~W~SC ~l,fJrJ.G~ -CI-f~ 'f~-'fi't-"C~-C I~~~~ U LLE~ ~T! A! ~t ' ____ _- f.~Y'_Ia::G~~_~__~L~!"t` CJ~`F r•!:~',~'__ _Y~~2~-th.l<.~FC~~c- _ ~ ~G?P'( _ __ 1 1 1 1 1 1 9715 KINCAID DRIVE • SUITE400 • FISHERS,.INDIANA 46038-9459 • PHONE 317/594-51.52 • FAX317/594-9590 • www.arsee-engineers.com ,! i f 1 PEL~MIN~RY NOT TO BE USED FOR e~arr~s~~ucT-tam ~~~~ ~s«~ ~~ ~~c~c~~ wooer ~ i ~,~1 (~Z~~ ~-~~ a 1 `` =-1 ~' 2 ~,.~ ,' CLIENT ~obLL"~ ~ t,~E--"C.~j'~.I.. ' ARSEE ENGINEERS, INC. PROJECT 1fL,~s`Ca E~(2-F~ CLIENT ORIENTED - BY DESIGN BY~ DATE Z ~~PROJ. N0. ~ CHK'D BY DATE PAGE N0. •3 ~ ~ (~ 4~4~~~1~~:t-y~t0 S t ~~ - o ~I,S 1~r~ t~C~+ t ~1 '. ~ ~'` ~M.POSI'~'~ '12U a~Ot='F (~ d ~-~.~,`~T T~ ~E us~D~uR~ Sys I „~ F;UC'CP~1[d Gjl.ll2~hC~ C ~ ~ C~ ~V~tG~T D.~S 3-~t ~l4 ~a~3"1 (~,~c~ ~rcr~l ' Ro®~~ ~,~~ ~ ~ Qo ~s~s ` Gc~~ ~j,l~ 361 1 CD 5?7`~~ v~~o~ ~ a, 1-~~.~~ 34~8~ _.. - _ -- s~~~qo ~zolos~ ~ - C~ ~ _Izoost~ a~~` ' = U.Z4 _, ~ ~ t ~ &v~~~:, clszStzy ~~ ~ -Irs~~~ ~ ~~~ ©;Sg h.r = 3g m.in ~`.~~ h7°~C.Ft~-'~J ~fLS~{~~ Q. ~~ '~ G- - - - c t ~t~ L~~ r r~7~ ~ '~ z r,-ahL-~ Zo4-1' p , ~ ,~;~ 9715 KINCAID DRIVE • SUITE 100 • FISHERS,- INDIANA46038-9459,• PHONE 377/594-5152 • FAX 317/594-9590 •-www:arsee=engineers.com ,' Cdr ~~~~~~~~. -: J i.`)NSi3tNf'^~?11~I Ph1~1P1)~a~Ri RUNOFF Cr1FFFIr~IFNT Bare earth Steep grassed areas (slope 2:1) Turf meadows Forested areas Cultivated fields _ llrhan Arwac All watertight roof surfaces Pavement Gravel 0.85 0.55 0.60 0.25 0.20 0.30 0.90 0.85 Impervious soils (heavy) 0.55 Impervious soils (with turf) 0.45 Slightly pervious soil 0.25 ' Slightly pervious soil (with turf) - 0.20 Moderately pervious soil 0.15 Moderately pervious soil (with turf) 0.10 Business, Commercial & Industrial 0.85 _____. -_-_.__.--_ _ _____- __- _Apartments.&.Townhouses -_- --- - 0.70---------„---_ -- Schools & Churches 0.55 Single Family Lots < 10,000 SF 0.45 Lots < 12,000 SF 0.45 Lots < 17,000 SF 0.40 Lots > 34 acre 0.35 Park, Cemetery or Unimproved Area 0.30 t I_ TABLE 204-1: Runoff Coefficients ®for Use in the Rational Method City-ofJndianapolis --- APPendix page A2-10 Stormwater Specifications Manual May 10, 1995 _~.. ~r i Project ~l-~ l.iM i~.-1J \.~i1,~~~C„I~ By Date ~ G~ d .~,~ Location - (~) ~(~,, Checked Date Circle one: resent Developed Circle one: Tc Tt through subarea NOTES: Space for as many as two segments per flow type can be used for* each ~ y worksheet. `~A~Yl Include a map, schematic, or description of flo~s 8 ED FOR PU POS6S Sheet flow (Applicable to Tc only) Segment ID N ~'~~' T1O N 1. Surface description .......... .. ~~ 2. Manning's roughness coeff., n .. ~, (i 3. Flow length, L (total L < 300 ft) ........ .. ft ~~ 4. Two-yr 24-hr rainfall, P2 ................. . in ~7 ` l~O~o S.. Land slope., s -.......-..-.~~-......-.. ..... .......... . ft/ft ~~ Q ~ a 6. Tt . 0.00075(nL0)~.8 Compute Tt ..... . hr QQ Q~SU + P2 s' Shallow noncentrated flow Segment -ID 7. Surface desccipiian .(paved or unpaved)-..... 8. Flow length, L .. ..... ft - ----- -------9.--watercourse-sloped s~.-:~ .-...... ..... 10. Average velocity, V ~ ........... ft/s 11. Tt 3600 V Compute TC ...... hr ' Chan nel flow Segment ID 12. Cross sectional flow area, a ..... ... ....... ft2 13 wetted erimeter _ p , pw ...... ....... ... ....... ft 14. Hgdraulic radius, r = P Compute r ....... ft w 15. Channelslope,-s .......... ....... ... ....... ft/ft ' 16. lianning's roughness coeff.., 2/3 l/2 n .... ... ....... i7. s 1.49 r V Compute V ....... ft/s n 18. Flow length, I : ............ .......... ....... ft 19: Tt = 3600 V Compute Tt hr 20. Watershed or subarea Tc or Tt (add Tt in steps 6, 1 _ V~~~. -~ 1, and 19) ....... hr FlGURE 203-1: Time of concentration « TravN rme worksheet 1 (SOURCE: 210-VI TR-55, Secord Ed., ,ku~e 1886) City of Mdianapo6s Appends page A2-6 __ 5t«mwater Specifications Manual A41ay 70, 1995 i r i ,~ ~l pL~ I~~R ., ,, r m n R G li S'Rl) ~~~ ~p~g~~yCT[ON Return Perio m a ntensit (in/hr) Hours Minutes 2 5 10 25 50 100 0.08 5 4.75 6.14 6.99 8.08 8.83 9.69 0.17 10 3.63 4.75 5.48 6.40 7.07 7.77 0.25 15 2.97 3.92 4.55 5.34 5.94 6.53 0.5 30 1.98 2.64 3.09 3.65 4.10 4.50 1 60 1.25 1.67 1.96 2.31 2.62 2.88 2 120 0.76 1.02 1.20 1.40 1.59 1.75 3 180 0.56 0.75 0.88 1.03 1.17 1.29 6 360 0.33 0.44 0.52 0.60 0.68 0.75 12 720 0.20 0.26 0.30 0.35 0.39 0.43 24 1440 0.11 0.15 0.17 0.20 0.22 0.25 Return Period -Rainfall De th (in) Hours Minutes 2 5 10 25 50 100 0.08 5 0.40 0.51 0.58 0.67 0.74 0.81 0.17 10 0.61 0.79 0.91 1.07 1.18 1.30 0.25 15 0.74 0.98 1.14 1.34 1.49 1.63 0.5 30 0.99 1.32 1.55 1.83 2.05 2.25 1 60 1.25 1.67 1.96 2.31 2.62 2.88 2 120 1.52 2.04 2.40 2.80 3.18 3.50 3 180 7.68 2.25 2.64 3.09 3.51 3.87 6 360 1.98 2.64 3.12 3.60 4.08 4.50 12 720 2.40 3.12 3.60 4.20 4.68 5.16 24 1440 2.64 __._.3.60.... 4.08 4.80 5.28 6.00 TABLE 202-2: IDF and IDD Tables for Indianapolis, IN City of Indianapolis - - --- Appendix page A2-2 Stormwater Specifications Manual May 10, 1995 t ~' IrIII `J CLIENT W~~ L~C''~L ~-~ CJ~.-`L !°4RSEE ENGINEERS INC. PROJECT ~ ~-+-~.~?.--~ ~~~ w1,1e~- CLIENT ORIENTED - BY DESIGN BY U ~ DATE ~ O~j PROD. N0. ~n~~~ CHK'D BY DATE PAGE N0. 1 ~~ ' i `~-~ 1~fa-O~~p SI c ~ P~M~ IZu ~ oFF PR~'~.~ WARY NOT TO BE USED FOR CONSTRUCTION PURPOSES Q=CAS ~s coo ~= o,z4 ~it1~~~- = 281 ~ .= t l . ~ acres ~iy5r~= 2,~1 (2,Z~~ =';1p~3~ ,~~-~~~11.oT,..,-- - _ __ ~~oy~n-' 211: 2~a~ - ~;~~7, ~- ~~G~.o,~.r= ~~J ~ I~ ift., ~ ~ AtiK / ~""`5~~~ ...~ ~Bl.~(~ ' 9715 KINCAID.DRIVE-•-SUITE 100 • FISHERS, INDIANA 46038-9459 • PHONE 317/594-5752.•FAX 377/594 9590 • www.arsee-engineers.com 1 i ~, i _~ i i i / ~ C ~ - --\ M ~- TO BE USED 4 40SRS i~TgRUCTION 4UF~ \\ .~ } _ r ~. ~ A4~S~- ___. ~--. _ _ ._ ~~%~'~~1.-Dt''~'~3 ~~"~~:1"~' ~~~~ ti.~ Ft G. '.J CLIENT ~/~)OOt-ls~:~ ~L.'~3~~ ' ARSEE ENGINEERS, INC. PROJECT ~~• C'I"~~5'C~E~~I~,f-~~"~~-~lS CLIENT ORIENTED-BY DESIGN BY \~~~ DATE lol i~h IVY PROJ. N0. ~~{~ CHK'D BY DATE ~~ ~ PAGE N0. ' ` N 'T B U FOR ~~ y Fop 5 t"CG - ~~ ~ ~ l' ~ .r~a8~ot~S 1 S(,l(~~lC~ C~ ~ C~, w~nvS O,~o dodo Z~nU ' 2`f3~130 ~~jjZ30 Wei-~~~~~ C ~ ~c-P~; 5_ .~ b.2 ~yVIV'~4~V ~~ I.'G~I+-~:J~, 1~4~ ~ii~' ~`..s;J-<~i'~...t=-~`I~~-.~~... ~~- 0~5~, h~ = 35 ~n CSC ~T~c~-~~ ~r~k~K~,P.Ii~ ~2~l~t Z"rl,~L~ 2.02..-2y (7, (~ ~, ^ ~D'I~ Z `ESA-~Z.- ~.~.~:~~.,t.(~_~til,~ :~.. ~- Z ~ 2 ~o i~/hr ^ ... ~'~n._ iC~ ~(~,~y~. Y~ ~~.t L.!.i?.~~1_~ 1. = G~`~~a ir•. ~1r I ~` ~~ L~ 20~-~~ , p, ~ 9715 KINCAID DRIVE • SUITE 100 • PISHERS,~INDIANA 46038-9459 • PHONE 317/594-5152 • FAX 317/594-9590 •www.arsee-engirieers.com CLIENT w ~~ L~-.~ I°l~ ~--~A'~.~ Q-RSEE ENGINEERS INC. PROJECT n~ C~-~V2.~e..rC~~i~E~"~-~~ BY ~J YC V DATE Jb, ~~ PROJ.NO.~ CLIENT ORIENTED - BY DESIGN CHK'D BY DATE PAGE NO. =- c /k Z C=ca,~ ~~~1~ARY s~ USEOeUR40Sg3 TO CTION CONSTRU -F ~~:~~ ~, ~ ~s ~z~~~lz.-~- 1.~~ {2,2.~~ ~ 3, ~ cis _- - ---___ r ~ _ __ r 9715 KINCAID-DRIVE •SUITE 100.E FISHERS, INDIANA 46038-9459 • PHONE.317/594-5152- FAX 317/594-9590 • www.arsee-engineers.com _. Project _ S~~ l..rl.ly. ~ 1,~~:'6°-~~ 6J By Date ('J ~T ~3 Location C.~Y~~M~ ( ~, Checked Date , J Circle one: resen Developed ' Circle one: Tc Tt through subarea NOTES: Space for as many as two s egments per flow ty than a kSf'~~~e~R worksheet. NUT TO U YURPOSgS I Include a map, schematic, or description of p~~ f1Qc0 ~th~hL~Tt~N = 1 Sheet flow (Applicable to Tc only) Segment ID 1. Surface description ,,,,,,,,,,,, ' 2. Manning's roughness coeff., n .. 3. Flow length, L (total L < 300 ft) .......... f[ ' 4. Two-yr 24-hr rainfall, P2 .................. in 5. Land-slope, s .............................. ft/ft ' 6. 0.007 (nL)0'8 Com ute T T = t ,,,,, 0.4 P t 0.5 hr s P 2 ' Shallow concentrated flow Segment ID 7. Surface description (paved or unpaved) ..... 8. Flow length, L .:... .... .... ft 9. Watercourse slope, s ... .... .... ft/ft 10. Average velocity, V ~ -. ,,,,,,,,,,, ft/s 11. Tt = 3600 V Compute Tt ...... hr Ch l fl anne ow Segment ID 12. Cross sectional flow area, a ............... ft2 ' 13. We[[ed perimeter, pw ..... .................. ft 14. Hydraulic radius, r = a Compute r ....... ft ' Pw 15. Channel slope, s ......... .................. ft/ft ' 16. Manning's roughness coeff., n .............. 1.49 r2/3 sl/2 17. V = Compute V ....... ft/s n 18. Flow length, L ............................. ft L 19. Tt = 3600 V Compute Tt ,,,,,, hr ' -20. Watershed or subarea Tc or Tt (add Tt in steps 6, 1 Vt~1~.~sl~~~ CtCU~~ Qa4' ~~~ 2~(0~ ~:a~-~ O,~S - ~:~~ ~~ -- - + _ and 19) ....... hr V,~~ ' FIGURE 203-1: Time of Concentration or Travel Time Worksheet 1$OURCE: 210-VI-TR-55, Second Ed., June 1986) '. _ City of Indianapolis - --- APPendix page A2$ - -- Stormwater Specifications Manual May 10, 1995 u CLIENT W~~w>r~, ~di.,~~f~, ARSEE ENGINEERS, INC. PROJECT ~~, ~~~~'--t.~C~ t-[~Y~.'S~ CLIENT ORIENTED-BY DESIGN BY W~ DATE YT " ~; PROD. N0. ~~~ ' CHK'D BY DATE PAGE N0. ~ p ~. co~,s ~ucTio~ ~~~~®~T~~ ~A121?.~~CI~.~ ' T~ ~ ~T ~~di~Jti'l--F~ PCB S IT ~ C..t7 f\1S (S"CS G~ /~ Y"(?.~ ~~~j-1 ' i~s~zG~{ ~C~2~Lzu2~~ -~'drw'~._t~..lrt~~ t_.cx5~ ~°~`Ctor~ ~~~~~ ~`f1.(~ 1~.~~ ~~9'~-.F~~ TE-E~ b0.i.S(T~ .D(L4-LI.lfFrcE (Jjtl_l_ ~N`t~-C ~LDLtJ "CD G4'~C.~i (/~Sl~..(S~ {~2(!/LL-~Z~ ~v UJ~L~S~ ~~ 'CI-4~ ~~C~f.(.'•f_ i o~,l, pot.>.D • TI-e~ p{-~-~1'CE - ~I~v~ 1~~-~• ~u=-- o~~~i~~ ~~J--l~~St-~~ -Dig ~.~G~ -wtL~. °~ I t`t~-b i N °`I'N~ ~~r~~: ~ I ~d 2 'CHI I ~ `f _-- 9715 KINCAID DRIVE • SUITE~100 •~FISHERS, INDIANA46038-9459 • PHONE 317/594-5152 • FAX 317/594=9590-•www.arsee-engineers.com 1 1 1 1 1 1 1-' _. 1 1 1 1 __._-- 1 I' ~' ~' °k~ ~~% , ,~ . _ r-~~~ ~~~~ ~ , . xE- ~ ~J ~ ~ ~ ~ ~1 Pik 2: S:! 2/~~ ~~ ~ h ~ ~ ~ ~~1~~/~R ~r.~~~~/~R~ ~ ~ L~ ~ el sy t ~V1 l3 II II II II 1 1 1 1 1 1 CLIENT ~JUn~LL-{~~~ M~,jO(<.~;~~ /eiR3EE ENGINEERS INC. PROJECT ~ ~{~~-{.r~'Ct~ll' f"! ~i- CLIENT ORIENTED - BY DESIGN BY ~J DATE `~ v? f PROD. N0. X31 CHK'D BY DATE PAGE N0. 1~ Copt P~s~T~ ~~~.~= co~~=~c.~-~T~sucTi~ti ~~~~®~~~ 5u~t=~~ C~ f~ C~ wodDS p,3t1 ~ro~ it~~n ~~v~t~~" o,~s tib~iq {~ i4~"1Z~i 12p~E~ D,a~ ~S (~~ 3~3~~ Gc~itSS ~, t~, 2~a;~ iii: 3 Sag~~o 2~~~!~ ~; ~ ~ ~~~ ~tM~ ~. Ib Y(E. ~~~Z i~(n,ews~~ VFIP~E Z02~z~ gyp, (o lcb `llz. `~~ t Z i~..~ dwu,r 9775KINCAID DRIVE • SUITE 100 • FISHERS, INDIANA46038-9459 • PHONE317/594-5152 • FAX377/594-9590 • www.ar§ee-engineers.com CLIENT W©~{..L,~~.~ MaL"-~~A~hJ, 1 /1RSEE ENGINEERS, INC. PROJECT ~L ~~-E.~2(~P~'~~~~~ CLIENT ORIENTED - BY DESIGN BY ~ I ~ t% DATE ~' l PROD. N0. Y~~-~o CHK'D BY DATE PAGE N0. IS `mss-c~~v~~~ si-t~ 1 c~~~~ ~ 1 ~-~ ~~ 1 c=d, 1 ~ - < <.-~ 0.G,~S ~~LiNiIN ARY NOT TO BE USED FOR CONSTRUCTION PURPOSES 1 ~lo ~l~ar+-= ~,3~ ~~,12,1 = 33 ~Fs 1 ~~~ ~~~n ' ~r~`~-_C~~, ~ ~~ _ ~~q~~ ~~s 1 i ~ ___ 1 1 9715 KINCAID DRIVE-SUITE"100-~ FISHERS, INDIANA 46038-9459 • PHONE 377/594-5152 •,FAX317/594=9590 • www.arsee-engineers.com CLIENT ~1Dd(..~.~ r'IOL..~I~:'~4- ARSEE ENGINEERS, INC. PROJECT S~~ GN.tZtS~CoPN -~-~~ CLIENT ORIENTED- BY DESIGN BY y ~> DATE CD F3 D3 PROD. N0: a 0 ~- CHK'D BY _ DATE _ PAGE NII.. ~ !~ 1 1 1 ~uN GO~I~I~~"L-C .O~S17-~ D('~l.f~~G~ I~ i(~--6wt~.~E`~.. ~!CW+`C ' ~ ~ GF TN.~ ~ ~ P~~,P f~t2~,~- 1.,~ l l~i_. I~'(~ t t~ I f~C°~a Go k-l Pos ~T~ ~ZV~ I.~.~~F' ~~F't.Gl~rt' ~~ t~r8~ l~~~~~, 14~~0 3~~01~ ~ ,14b C _ 1~ ~ ~ `~~° y ~ ~ S~' 3~ec~ f~v~-~~~ ~ ~r~ s -~~_ ~ M 1 rel. ~P. ~~> ~~-caM, -~`A ~~ ~..~w Z~ Z- 2, P . ~O z~ •~ --~=9715~KINCAID DRIVE •BUITE 100 • FISHERS, INDIANA 46038-9459• PHONE 31 715 94-5 7 5 2 • FAX317/594-9590 • www.arsee-engineers.com _. - _ 1 i ..-__ Project ~~. ~~4-~..~~~~a~~"I,iG G--~~ Sy ~`~' Location C-~~`~.-~?~ ~ (~'.. Checked Circle one: Present Developed Circle one: T~ Tt through subarea NOTES: Space for as many as two segments per flow tape can b worksheet. ~+~'~1 Include a map, schematic, or description Of f~ Sheet flow (Applicable to Tc only) Segment IDC ~ 1. Surface description ,,,,,,,,,,,, 2. Nanning's roughness coeff., n 3. Flow length, L (total L < 300 ft) .......... -4. Tvo yr 26-hr-raiafall, P2 .................. 5. Land slope., s ............-...-............. ............. 6. T = 0.007 (nL)0'8• Compute T t P 0.5 50.4 t ...... 2 Sh 11 USED FOR - rrma-rttRi>e SES 1~ !`~IV- ~eC,J,j ft ~`Z. ~ 3 ft/ft ~e~ ~e~~ hr Dr~~_ + ~1~~ _ ~i~1lJ. a-ow concen[cated~flow -Segment iD 7. Surface description (paved_or .unpaved)........ 8. Flow length, L ......- . ...................... ft ..9......Watercourse-slope,-s-..-..-...~~_.-~:z- :-~--..-.rc ft/ft - 10. Average Velocity, V - ~ .........., ft/s 11. Tt bjr--L~ V Compute Tt ...... hr Channel flow Segment ID 12. Cross sectional flow area, a ............... ft2 ~ 4 13. Wetted perimeter, p '~ ` w ....................... ftpp4`dft~-- 14. Hydraulic radius, r e Compute r ....... ft ~.e~l ~l pw 15. Channel slope, s-.... ........................ ft/ft ©i~.~ 16. Manning's roughness eoeff., n 1.49 r2/3 sl/2 17. V Compute V ......, ft/s 4~~~~ n 18. Flow length, L ............................. ft ~ n~~ L 19. Tt - 3600 V Compute -Tt -: ~ .... hr ~~ ~ J + _ ~ [7~ap~ 20. Wacershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19) ....... hr ~ ~G--t ~CGURE 2031: Tuno of Concemration or Traval Time Worksheet - -- - ' ' ISOURCE: -21U-VMTR-55, Second Ed., June 198fi) ' Gty of hsdare~poGs x paw A2 Stomiuvater Specifications fllanual _ fay 10. 1995 DatelO ~~ 7~~ Date CLIENT ~oE~fD~~I~~~. ~ DL~hi~k ' ARSEE ENGINEERS, INC. PROJECT ~ ~ ~'`'~~--~`-~~~ F"''A ~`5 ' CLIENT ORIENTED - BY DESIGN BY DA7E D PROJ. N0. ~'O4'~ CHK'D BY DATE PAGE N0. 1-" 1 ~~- ~u~~ ~~~ ~} = 3~ ~ l Q, ~+~ ~~35~0 0 ~'l3 acAc =fl, s4 ~0, ~13) L ' D, 3a ~ F~'~~~~~1NARY NOT TO BE USED FOR CONSTRUCTION FURYOSES ---._. ___- ---- ' - - 9715 KINCAID DRIVE• SUITE-100 • FISHERSr1NDIANA 46038-9459 • PHONE 317/594-5152> FAX317/594-9590 • www:arsee-engineers.com 1 CLIENT ~~~ (~~.fr~»F P~,n 1.~.~ ~e1' ARSEE ENGINEERS, INC. PROeECT _ ~ C 2(S'CO 12-='S ,,~,,~1 CLIENT ORIENTED - BY DESIGN BY ~~ Ali DATE 0 PROD. No. ~~q~ ~,~ CHK'D BY DATE PAGE ND. .F I ~~~ ~~ ~~~ pos-r~v~oP~D py~ELiMINAR, NOT TO BB USLB coNSTeucrto~ t~~P®9~~ to y~k~ Pos-c 4 Z Y~~ P2E O~SIT~ 33 cis ~ ~r4 c~'-s ~~Sl T~ C, ~ GAS < 3 ~ I ~~s _TF'f1t'~~-_ ~YLC..'•4~.'r"°?J~-~.-~Y~~~~., ~1:~_.~"i``~?i~'ir:~t<.f ~~ _~ ~~ ' j7 i~-•,t`~, n € ~ti~, A~' ~ ~ i ~~.~'U, ~r.45t~C~ i~kh rr~t A:C`~. ~~ `~-(`" ~~ ' ~b O ~ ~~ ~'C~'C" D'~'V~CtC~P~1 "C Ito YtrM2_ P®5-r C~~.~~1T ~- ~~ c~S ~lo y~R~ 'it ~ ~,4 ~~ G 4r i ~-s C~~ZAi r~.~ P, C~~~ ~ C. ~ ~;~ . ~F t``~,,1` %,< !; (-~ ~.,!; P ~~'F~: ~~~~ I.J. t`~~-~=~i, Do~SI'[~ '"-'- -- 9715KINCAID DRIVEiSUITE 100 • FISHERS, INDIANA 46038-9459-• PHONE-317/594-5152 •fAX 317/594-9590 • www.arsee-engineers.com -- --- U ~ ~-~~i~~. ~r~a ~sE~.~ '. ~+~ ~ T~ F CaN~ gT~ve'N ~~o, ~~ ~~ \~ ~~ 20 Pond Volume (half of pond) Level Area average area height total height volume total volume 868 8 477. 0.5 238.5 868.5 946 0.5 238.5 2507.5 0.5 1253.75 869 4069 1 1492.25 4584.5 0.5 2292.25 869.5 5100 1.5 3784.5 5440 0.5 2720 870 5780 2 6504.5 5969 0.5 2984.5 870.5 6158 2.5 9489 6359 0.5 3179.5 871 6560 3 12668.5 6940 0.5 3470 871.5 7320 3.5 16138.5 7566 0.5 3783 872 7812 4 19921.5 '~~ ~ (~ ~~, USED FD tdt)'C ~~~~C'f10~1 ?u~R®~~~ .. __ ~. 1 CLIENT VvO~~-'L•C~' ~ D~~Ro-~.~~ ARSEE ENGINEERS, INC. PROJEC`T' ~~ ~V~~C~'~~~VZ- S CLIENT ORIENTED-BY DESIGN BY V~ DATE Ory7 PROJ.NO.~Jd~ CHK'D BY DATE PAGE N0. 1 1 1 -~ 1 C 1 L_1 1 ~~~~A~~ ,-~-~ ~~~ ~,-, $'~.D ~~ ~~~ 0 C7 Ll~. ~ U S. 4~C~,b ~--~ ~,~~ ~~ ~E, m ~P~l~ Dt= ~n n..~ `9715 KINCAID DRIVE • SUITE 100 • FISHERS, INDIANA 46038-9459 •PHONE 377/594-5152 • FAX 317/594-9590 • www.arsee-engineers.com- - -- t ScvX7 00000 15G2~p Z~Gp~ 1 1 1 1 1 CLIENT ~JO~~-~~ P~OCr~~~~-4' ARSEE ENGINEERS, INC. PROJECTT s~~ C~-'r(Z_ ~°r =-,~!f, CLIENT ORIENTED - BY DESIGN BY V ~ DATE -7 i ~72~ PROJ. N0. ~3 CHK'D BY DATE PAGE N0. ZZ ~L~i l Z ` (~12-11=~LE ~~ Cpl 2 +,-~ ~~ ~~ ~~ FOR gE USED F,~ ~pT TD UCI~Q~ RL1~Y0_~- ~,ONSTR _ :p•~ C~C'~~l«l~~ 2~3z,z~~ ~ ~,~tg.l N ' 9715 KINCAIDDRIVE • SUITE 100-'FISHERS,-'INDIANA 46038-9459 • PHONE 317/594-5152 • FAX 317/594-9590'-www.-arsee-engineers.com 1 CLIENT ~iOOG~~ a`lo(r~TC~ A-RSEE ENGINEERS INC. PROJECT =%( ~~.--N ~( STC~f~f-f ~"1t":(~ f CLIENT ORIENTED -BY DESIGN BY U~ DATE ~- ~~j PROJ. N0. ~~' CHK'D BY DATE PAGE N0. 2 ' ~~~~ ~®~ ~~ T~ BCT!®~ ~~~~®~_~ lJ r 1 1 ~L-- ~JD yVtirl ~_ Z~CD4oa v~SlY~t i"1 ISO ~F6=Sl"C~= Z53~~oa ~{z ~1~F~~ UAL ©4l'[~Lt~~ ~'~Gwi. p~cGU at ul.h~~ u ~G y ~ S ~J l lA~ ~~' µ CZ~ L~ ~ (2s~ ~ ~~ `S~i ~•1'~° 3,~ J+~3~'~~ -~oY~~' Du~C~~o~J = Ou~C~~ow ~ 3o M,~a, °-~ ('f~~ouS b~`~4 c~~s C3E~ -1 ~> ~ ~A ~~~~ + 3709 = GI: °tS5 ~~ N~°C Vn~u 1~1~ = rto~L U nt~ut~l~-- ~~~ , cu~C~~o~,U Po~,v ~T ~~ti A-~ 3 ~~' ~~~ ~ P~ P z~~ oil,Z~oua P~C~= 3.~g~ = 3r~~~ = 1,41 e-F5 9715 KINCAID DRIVE ~ SUITE 100 i. FISHERS, INDIANA 46038-9459 • PHONE 3 7 71594-51 5 2 •-FAX 317/594-9590 • www.arsee-engineers.com Detention Analysis, - 100 Year Onsite drainage only Total Rainfall Total Rainfall Outflow from Accum'. Net half Tc AC Depth Volume Previous Inc. Outflow Volume volume 5 253600 0.81 17118 0 0 17118 8559 10 253600 1.3 27473 1738.39 1738.39 25735 12867 15 253600 1.63 34447 1970.68 3709.07 30738 15369 30 253600 2.25 47550 8245.24 9954.31 37598 18798 60 253600 2.88 60864 13333.06 23287.38 37577 18788 Detention Analysis - 10 Year Onsite drainage only Total Rainfall Total Rainfall Outflow from Accum'. Net half Tc AC Depth Volume Previous Inc. Outflow Volume volume 5 253600 0.58 12257 0 '0 12257 6129 10 253600 0.91 19231 1567.60 1587.60 17644 8822 15 253600 1.14 24092 1756.79 3344.39 20748 10374 30 253600 1.55 32757 5517.12 8861.50 23885 11948 60 253600 1.96 41421 11466.30 20327.81 21094 10547 Depth of Outflow Pond Rate 2.35 5.79 3.02 6.57 3.37 6.94 3.84 7.41 3.83 7.40 Depth of Outflow Pond Rate 1.96 5.29 2.40 5.86 2.83 6.13 2.84 8.37 2.87 .1 6 8 ,, ~~ qq Az ~~O y, a OO v' ~ `~ ~ ~ n~ ~ ~ ~A~ o w~ Site Lighting Fixtures The K56 Octagonal Luminaire An ll/ustrinus Past Probably the most versatile of all orna- mental luminaires available in the first three or tour decades of the 20th Century, the K56 was originally used as a post ' top, a pendant and on occasion even a floodlight. It first appeared during the First World War achieving instant approv- al as an acceptable alternate to the ever popular Acorns. It figured largely in the first integrated street lighting system of Cleveland, Ohio ' and went on over the next 30 or so years to be produced and sold coast to coast by at least three major manufacturers. ' Variously known as the Tallmadge Lantern, Tudor, Edgewater, Octagonal and Cleveland it graced the streets and parks of literally thousands of communi- ' ties right across the continent. An Illuminating Future ' King Luminaire has elected to revive the original GE Nomenclature of the "Octagonal novalux form 56". The Octagonal today is available in the ' Cleveland version (without spurs) and as the Tudor (with spurs). While the physical appearance of the K56 is ' completely authentic, King Luminaire has totally redesigned the optical system, offering excellent photometric ' performance in IES Type III & V patterns with a wide variety of HID light sources. The rugged cast aluminum construction and modular ballast assembly of the K56 ensure low cost and easy mainte- ' nance, while for the first time a twistlock receptacle for a photocell is offered as ' an option. 1 1 ~~~~ ~~J~~~~~~ L l I K56 Features at a Glance: • Authentic reproduction of original luminaire • Sturdy cast aluminum frame • Versatility of post top or pendant mounting • Available with spurs (Tudor) or without (Cleveland) • Durability of polycarbonate or acrylic prismatic panels • Available with various HID light sources up to 250 W • IES Type III or V • CSA approved Available IETL Options • Wide base 7" ring adapter (3-1/2" OD slipfitter is standard for post top application) • Twist lock receptacle for photocell • Historic K5 Amherst capital (with wide base unit) • Plumbizer (pendant only) • Available in most colors (black is standard) • A variety of finials is available on request (traditional spike is standard) Retrofit Capabilities As the leader in the field of retrofitting ornamental luminaires, King has achieved the capability to rejuvenate all versions of the historic K56. Ask us about our facilities to reVOfit to H ID light sources, or completely upgrade old units to modern performance standards. We welcome your challenge. Newyork City Parry Sound, Ontario Ontario Parks Commission) Niagara Falls (Courtesy of Niagara Consider the Per/ormance! The K56 - A historical Luminalre with modern performance. The octagonal luminaire, with King's innovative updating far outperforms the original and has now become the standard by which others are judged. Report Number LSC #1635 Date: January 26, 1988 Catalog : #K56 Luminaires Heavy duty aluminum castings, modular ballast assembly, highly engineered prismatic panels in either polycarbonate or acrylic. Co-efficient of Utilization Downward: Streetside 29.1 Houseside 22.6% Total 51.7% Upward: Streetside 2.6% Houseside 2.1 Total 4.7 Total Efficiency 56.4% An IES Type V employing the same uniquely efficient optical system is available for parks, intersections and general lighting. Approximate Mounting Correction Factors Multiplier for Other lamps Lamp Multiplier Height(ft.) 70HP5 .394 7.5 4.00 100HPS 594 10.0 2.25 250HPS 1.72 125 1.44 175MH 875 15.0 1.00 250MH 1.28 20.0 0.56 100MV .238 25.0 0.36 175MV 497 30.0 0.25 We are happy to oRer preliminary and final computer designed layouts for any project. 0 x CURB LINE tL w ~~ i, SI o~ 0 7 Rq~p_ OISTAIJCE ACROSS CCemCIENi OF UiILIIAiIgJ MOUMING HEIGM pAEHEa CLwvFS) Octagonal Pendants The Cleveland The Tudor